02.01.2013 Views

Travis AFB NIKE Battery 86 Inventory Project Report - Corpsfuds.org

Travis AFB NIKE Battery 86 Inventory Project Report - Corpsfuds.org

Travis AFB NIKE Battery 86 Inventory Project Report - Corpsfuds.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The 4,200 gallon UST which was installed by DOD in the Launcher Area but used by the current owner was<br />

removed and groundwater contamination from the tank is currently being remediated. Remediation is overseen by<br />

the current owner due to beneficial use and is thus not covered by the FUDS policy.<br />

AVAILABLE STUDIES AND REPORTS:<br />

1. ... Fairfield-Suisun Unified School District. Status of Hazardous Materials at Nike Site.<br />

Memorandum. August 17, 1990.<br />

PA POC: Sharon Bruno, CESPK-ED-M, Sacramento District,<br />

(916) 551-1049.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!