7.3<br />

7000<br />

6000<br />

5000<br />

4000<br />

3000<br />

2000<br />

1000<br />

DM/m<br />

0<br />

Berlin 1997<br />

0 1,75 3,00 4,00 5,00 6,00<br />

Open construction<br />

Micro-tunnelling<br />

Sewer-construction costs compared above the water table<br />

open construction / micro-tunnelling using vitrified-clay pipes<br />

Surface concrete paving<br />

2,45 m - DN 300<br />

3,40 m - DN 800<br />

4,00 m - DN 500<br />

DN 600<br />

4,30 m - DN 400<br />

Micro-tunnelling Page 27<br />

Depth in meters<br />

DN-200 DN-250 DN-300 DN-400 DN-500 DN-600 DN-800<br />

Sewer-construction costs compared:<br />

surface concrete paving<br />

For concrete-paved surfaces jacking for DN 200<br />

and DN 250 is more cost-effective at all depths<br />

considered and for<br />

DN 300 at depths > approx. 2,45 metres<br />

DN 400 > approx. 4,30 metres<br />

DN 500 and DN 600 > approx. 4,00 metres<br />

DN 800 > approx. 3,40 metres.<br />

Fig. 30