STORED ENERGY RESOURCE TREATMENT IN THE <strong>MISO</strong> TARIFF<br />
4-4<br />
• Hourly Full Charge <strong>Energy</strong> Withdrawal Rate: the rate in MWh/min at which a stored<br />
energy resource can continue to absorb energy while the storage level is at the resource’s<br />
maximum energy storage level.<br />
Table 4-1 : Stored <strong>Energy</strong> Resource Operating Parameter Data Summary (Source <strong>MISO</strong> BPM-<br />
002)<br />
The defaults for these parameters are set through the tariff when the storage asset is registered. If<br />
the parameter is updated in the resource offer, the updated value overrides the defaults.<br />
Real Time (5 minute) Security Constrained Economic Dispatch (SCED) <strong>Energy</strong><br />
Dispatch<br />
As stated above, SER’s can only be bid as regulation and the resource offer includes parameter<br />
values describing the resource storage level and ramp rate etc. SER is then dispatched as energy<br />
by the real time SCED dispatch model as follows:<br />
• Dispatched MW is limited to a value that is the mean of MaxLimit and MinLimit based<br />
on the latest telemeter data from the SER.<br />
• The dispatch MW value indicates whether SER requires charging (negative MW) or has<br />
available stored energy to dispatch (positive MW)