STORED ENERGY RESOURCE TREATMENT IN THE <strong>MISO</strong> TARIFF<br />

4-4<br />

• Hourly Full Charge <strong>Energy</strong> Withdrawal Rate: the rate in MWh/min at which a stored<br />

energy resource can continue to absorb energy while the storage level is at the resource’s<br />

maximum energy storage level.<br />

Table 4-1 : Stored <strong>Energy</strong> Resource Operating Parameter Data Summary (Source <strong>MISO</strong> BPM-<br />

002)<br />

The defaults for these parameters are set through the tariff when the storage asset is registered. If<br />

the parameter is updated in the resource offer, the updated value overrides the defaults.<br />

Real Time (5 minute) Security Constrained Economic Dispatch (SCED) <strong>Energy</strong><br />

Dispatch<br />

As stated above, SER’s can only be bid as regulation and the resource offer includes parameter<br />

values describing the resource storage level and ramp rate etc. SER is then dispatched as energy<br />

by the real time SCED dispatch model as follows:<br />

• Dispatched MW is limited to a value that is the mean of MaxLimit and MinLimit based<br />

on the latest telemeter data from the SER.<br />

• The dispatch MW value indicates whether SER requires charging (negative MW) or has<br />

available stored energy to dispatch (positive MW)