Project Management Consultancy Services for <strong>Sewerage</strong>, Storm, Surface Water Drains and Lake<br />

Protection Works For <strong>Raipur</strong> City<br />

Detailed Design Report - <strong>Sewerage</strong><br />

Executive Summary<br />

are adopted. Based on the detailed designs done for gravity sewers of 1032 kms, the cost is<br />

worked out as under;<br />

Particular Description Cost<br />

Sewer Network Zone-I+II+III (142 km 2 ) Rs. 57326.72 Lakhs<br />

Pumping Stations 13 Nos. Rs. 2198.35 Lakhs<br />

Treatment Plant 209 MLD Rs 20482.00 Lakhs (w/o O&M)<br />

Land Acquisition 29.40 + 0.71 ha Rs. 32.41 Lakhs<br />

Sr.<br />

No.<br />

1<br />

2<br />

Summary of Costs<br />

Item Cost (Rs.)<br />

Crores<br />

<strong>Sewerage</strong> system complete with laterals,<br />

collectors, interceptor sewers + 13 Nos of Sewage<br />

Pumping Stations with DI rising main and all<br />

accessories complete<br />

3 Sewage Treatment Plants on SBR technology<br />

complete in all aspects (zone-I : 65 Mld, zone –II:<br />

67 Mld and zone-III: 77 Mld)<br />

595.250<br />

204.82<br />

3 O & M Cost for SPS and STP 22.411<br />

4<br />

Land Acquisition Cost for 30.11 hac (for all 3 STPs<br />

& 11 SPS)<br />

5 Environmental Mitigation and Monitoring Cost 0.25<br />

6 Relocation of Utilities 1.00<br />

7<br />

House Connections for 82200 as per CDP of <strong>Raipur</strong><br />

Remarks<br />

1032 km of<br />

gravity sewers<br />

150 – 2200 mm<br />

diameter<br />

Only construction<br />

cost<br />

cost of O&M of 3<br />

years<br />

0.3241 @ Rs.1 per sq.ft.<br />

51.349<br />

TOTAL 875.3118<br />

Adding 6%* for Contingencies and Departmental<br />

Charges of Total Cost<br />

52.923<br />

Total Cost (Rs. in Crores)<br />

* percentage approved under Bilaspur <strong>Sewerage</strong> Project<br />

927.830<br />

During<br />

construction stage<br />

Provisional LS<br />

item<br />

75000 domestic,<br />

5000 commercial,<br />

2200 industrial<br />

The major capital cost in this project is for laying of 1032 kms of gravity sewers ranging from 150<br />

mm to 2200 mm diameter. Though the sewer laying is for the betterment of population of<br />

<strong>Raipur</strong>, but at the same it is the responsibility of RMC to recover the cost of project from the<br />

population benefited by the project. Unlike water supply schemes, where water is charges to the<br />

consumers who are connected to piped water supply, sewerage connections perform poor in<br />

terms of realization of user charges. The CDP targets for providing 75000 domestic sewer<br />

connections, 5000 commercial and 2200 industrial connections by year 2012-2013.<br />

Meinhardt Singapore Pte Ltd, (India Branch) Page 10 of 120