Atlas Copco rd20 in the permian Basin
Atlas Copco rd20 in the permian Basin
Atlas Copco rd20 in the permian Basin
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
looK<strong>in</strong>G <strong>in</strong>To<br />
The FuTure<br />
driller talks about his experience as one of <strong>the</strong> first to operate <strong>the</strong> predator<br />
o’Ryan Drill<strong>in</strong>g of Odessa, Texas,<br />
is do<strong>in</strong>g <strong>Atlas</strong> <strong>Copco</strong> and future<br />
owners of <strong>the</strong> Predator Drill<strong>in</strong>g<br />
System a favor. It is putt<strong>in</strong>g <strong>the</strong> new<br />
drill<strong>in</strong>g system through <strong>the</strong> paces, logg<strong>in</strong>g<br />
time on <strong>the</strong> rig and go<strong>in</strong>g through<br />
<strong>the</strong> rig-up and rig-down process, look<strong>in</strong>g<br />
for any necessary design improvements.<br />
The O’Ryan people are <strong>in</strong>tentionally<br />
look<strong>in</strong>g for flaws, also mak<strong>in</strong>g<br />
sure <strong>the</strong> Predator Drill<strong>in</strong>g System does<br />
what <strong>the</strong> eng<strong>in</strong>eers have promised.<br />
Th<strong>in</strong>gs are mov<strong>in</strong>g along well and <strong>the</strong><br />
company is see<strong>in</strong>g success us<strong>in</strong>g <strong>the</strong><br />
drill<strong>in</strong>g system.<br />
The company has drilled 12 holes to<br />
date. These are not <strong>the</strong> 6,000- to 8,000foot<br />
(1,800 to 2,450 meters) holes <strong>the</strong> rig<br />
was designed for, but surface “presets”<br />
onto which a conventional rig will move<br />
to complete <strong>the</strong> well.<br />
This area, called <strong>the</strong> Dora Roberts <strong>in</strong> <strong>the</strong><br />
Permian Bas<strong>in</strong> of West Texas, is leased to<br />
Occidental Petroleum Company (OXY).<br />
OXY’s company policy requires a 1,400foot<br />
(427 meters) surface hole <strong>in</strong>stead<br />
of <strong>the</strong> 400- to 600-foot (120-180 meters)<br />
surface cas<strong>in</strong>g on neighbor<strong>in</strong>g leases.<br />
This gives <strong>the</strong> crew sufficient hole depth<br />
to make a number of connections and set<br />
deep hole driller – 2 / 2010 7