FIGURE 1: SPECIFICATIONS FOR THE CONSTRUCTION OF A BADGER UNDERPASS<br />

14<br />

NOTES:<br />

GUIDELINES FOR THE TREATMENT OF BADGERS<br />

PRIOR TO THE CONSTRUCTION OF NATIONAL ROAD SCHEMES<br />

1. ASSUME 600Ø PIPE CROSSES THROUGH THE ROAD EMBANKMENT.<br />

600Ø<br />

2. SEE FIGURE 2 FOR DETAILED REQUIREMENTS OF FENCING.<br />

3.THIS DRAWING IS AN INDICATIVE (TYPICAL) DETAIL<br />

DESIGN/DETAILING OF DRAINAGE, SERVICES AND THE HEADWALL<br />

ARE TO BE UNDERTAKEN ON A SCHEME SPECIFIC BASIS.<br />

ROAD EMBANKMENT<br />

4. CONCRETE TO HEADWALL TO BE 30N/mm2 . REINFORCEMENT TO BE<br />

A393 MESH (WITH 40 COVER) BENT TO “L” SHAPE AS SHOWN.<br />

1:4<br />

1:4<br />

3m MAINTENANCE<br />

TRACK<br />

A<br />

3000<br />

Approx<br />

1:2<br />

Approx<br />

1:2<br />

1400<br />

A<br />

ACCESS<br />

TRACK<br />

750<br />

PERMANENT<br />

BOUNDARY<br />

750<br />

200<br />

HEADWALL DETAIL PLAN<br />

BADGER RESISTANT<br />

FENCING. SEE NOTE 2.<br />

(SEE NOTE 4)<br />

2400 2400<br />

850<br />

HEADWALL<br />

1150<br />

100mm<br />

COVER<br />

1300<br />

100<br />

200<br />

40<br />

ELEVATION<br />

CROSS SECTION A-A<br />

1:20 @A3<br />

FIGURE 2: SPECIFICATIONS FOR THE DEVELOPMENT OF BADGER-RESISTANT FENCING<br />

WEATHER DETAIL<br />

75<br />

NAILING OF RAIL TO POST IN<br />

ACCORDANCE WITH CLAUSE<br />

2.5.3 OF I.S. 435<br />

PLASTIC COATED CHAINLINK IN<br />

1.8M WIDTH - 50MM X 50MM MESH<br />

2.43/3.15 GAUGE TO ISEN 10223<br />

MESH TO BE BURIED TO A DEPTH OF 200mm<br />

BENT AT 90<br />

2400<br />

2400<br />

O TO RUN 300mm AWAY FROM<br />

FENCELINE (SEE SECTION)<br />

100<br />

30<br />

250<br />

250<br />

100 x 50<br />

2100<br />

200<br />

GUIDELINES FOR THE TREATMENT OF BADGERS<br />

PRIOR TO THE CONSTRUCTION OF NATIONAL ROAD SCHEMES<br />

100 x 50<br />

1300 MESH HEIGHT<br />

250<br />

200<br />

700<br />

100 x 50<br />

LINE WIRE TO I.S.<br />

435 PART 1,<br />

CLAUSE 4.4.4<br />

200<br />

200<br />

POST 2100 x 150 x 75<br />

300<br />

ELEVATION FIELD SIDE<br />

1:50 AT A3<br />

600<br />

POSTS TO BE SET IN<br />

475 x 200 Mix ST2<br />

CONCRETE STATED<br />

IN APPENDIX 1/3 (SEE<br />

NOTE 5) THIS CONCRETE<br />

WILL EXTEND 75mm<br />

BELOW THE BASE OF THE<br />

POST AND TERMINATE<br />

300mm FROM THE SURFACE<br />

POINTING<br />

DETAIL AS PER<br />

CLAUSE 2.5.2<br />

ELEVATION FIELD SIDE<br />

1:25 AT A3<br />

150<br />

100<br />

75<br />

PLAN<br />

SECTION<br />

1:25 AT A3<br />

RAIL 4800 x 100 x 50<br />

NOTES:<br />

1. FENCES SHALL BE CONSTRUCTED IN ACCORDANCE WITH IS 435 AND ERECTED IN ACCORDANCE WITH<br />

CLAUSE 2.5 OF IS 435 EXCEPT WHERE OTHERWISE SHOWN.<br />

2. ANY LENGTH OF FENCING (INCLUDING BRANCHES AND SPURS) SHALL START WITH A POST AND END<br />

WITH A POST. AN ADDITIONAL POST SHALL BE PROVIDED AT FENCE JUNCTIONS AND AT FENCE<br />

CORNERS.<br />

3. POST HOLES FALLING IN ROCK SHALL BE EXCAVATED TO THE DEPTH SHOWN ON THIS DRAWING OR,<br />

WITH THE ENGINEER’S APPROVAL, TO A DEPTH OF 500mm AND SHALL BE BACK FILLED WITH MIX ST2<br />

CONCRETE. WHERE A REDUCED DEPTH OF HOLE IS ACCEPTED BY THE ENGINEER,THE TOP OF THE POST<br />

SHALL BE SUITABLY CUT AND TREATED IN ACCORDANCE WITH THE RELEVANT CCA OR<br />

MANUFACTURER’S RECOMMENDATIONS.<br />

ELEVATION ROAD SIDE<br />

1:50 AT A3<br />

4. FENCE TYPES SHALL BE AS FOLLOWS DEPENDING ON THE REQUIRED PRESERVATION TREATMENT:<br />

TYPE A COPPER-CHROME-ARSENIC IN ACCORDANCE WITH IS 435 AND IS/EN 599, PARTS 1 AND 2.<br />

FIXING<br />

1. FIX 1 LINE WIRE TO THE FIELD SIDE OF POSTS AS CLOSE TO GROUND LEVEL AS<br />

POSSIBLE.<br />

15<br />

TYPE B CREOSOTE IN ACCORDANCE WITH IS 435.<br />

5. CONCRETE FOUNDATIONS TO POST SHALL BE PROVIDED WHERE STATED IN APPENDIX 1/3 OR DIRECTED<br />

BY THE ENGINEER.<br />

2. SECURE CHAINLINK MESH TO THE FIELD SIDE OF RAILS WITH 4 STAPLES PER LIN.<br />

METRE ON THE TOP RAIL AND 1 STAPLE PER LIN. METRE ON THE OTHER RAILS. SECURE<br />

TO LINE WIRE WITH 2mm TYING WIRE OR WITH APPROVED GALVANISED HOG-RINGS<br />

AT 4 TIES/HOG-RING PER METER 2mm GALV. M.S.TYING WIRE TO COMPLY WITH BS<br />

1722 WIRE. STAPLES SHALL BE GALV. 30mm x 3.75mm ROUND.