Services GDV<br />

»The Data »Compared Center OPTIMIZATION to the previous Services solution are no we longer have limited been able to energy to cut operating efficiency costs solutions. by 75 Our consulting<br />

concept percent. goes even And, further, at the same as it is time, a vital the concern <strong>Fujitsu</strong> Media to identify Portal as has many become security faster vulnerabilities and more in a data<br />

center as possible efficient. – As and you to see, eliminate the transition them.« to IaaS has been more than profitable for us.«<br />

Patrick Böning, Head of Fund Management, <strong>Fujitsu</strong> Technology Solutions<br />

Frank Jensen, OPTIMIZATION Services, <strong>Fujitsu</strong><br />

Hence, it became clear that a straightforward implementation of the<br />

security retrofits would not be feasible at the existing location of the<br />

data center. “In close coordination with <strong>Fujitsu</strong>, the GDV decided to relocate<br />

the entire data center,” explains Frank Jensen, member of the<br />

OPTIMIZATION Services team at <strong>Fujitsu</strong>. “And so it happened that the<br />

data center with its existing hardware was moved into a new office<br />

building. “When it came to setting up the servers <strong>Fujitsu</strong> deployed an<br />

important element of the “Facility Readiness Assessment” package,<br />

namely powerful simulation software for 3D Computational Fluid Dynamics.<br />

“With this tool we are able to simulate the operational reliability<br />

of a planned data center in terms of airflow and to reveal potential<br />

hotspots early in the pre-planning stage,” says Jensen. “Otherwise there<br />

is a risk that certain areas of the data center will overheat.” With this<br />

software it is possible to create a fully detailed virtual 3D model of the<br />

planned data center including the individual airflow of all servers.<br />

84<br />

“In terms of lost heat, we are able to produce, so to speak, true-to-life<br />

simulations of every single server model,” says Frank Jensen.<br />

Consolidated expert knowledge<br />

Companies can call upon <strong>Fujitsu</strong>’s consulting services, irrespective of<br />

their individual hardware equipment. “Typically, many companies are<br />

predominantly concerned with energy savings,” says Jensen. “However,<br />

our Data Center OPTIMIZATION Services are no longer limited to energy<br />

efficiency solutions. Our consulting concept goes even further, as it is a<br />

vital concern to identify as many security vulnerabilities in a data center<br />

as possible – and to eliminate them.” The GDV has truly benefitted<br />

from the consolidated expert knowledge of the Global <strong>Fujitsu</strong> Group. “It<br />

is important to create sufficient redundancies,” explains Frank Jensen.<br />

“In fact, it is not uncommon for companies to put a device, which is<br />

officially declared as a redundant air conditioning unit, into permanent<br />

<strong>Fujitsu</strong> <strong>Best</strong> <strong>Practice</strong> <strong>Compendium</strong>