Notice <strong>of</strong> Letting<br />

Letting Date:<br />

FEDERAL<br />

FRAUD<br />

HOTLINE<br />

<strong>Transportation</strong> Bulletin<br />

<strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />

2300 South Dirksen Parkway, Springfield, <strong>Illinois</strong> 62764<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


IMPORTANT NOTICE:<br />

TRANSPORTATION BULLETIN REVISIONS<br />

Letting Date: March 5, 2010<br />

The following revisions have been made to this <strong>Transportation</strong> Bulletin. If you downloaded the<br />

bulletin prior to the noted revision date, you should incorporate the revisions or download and use<br />

a new copy <strong>of</strong> the bulletin.<br />

REVISION DATE: There are no revisions as <strong>of</strong> January 29 2010.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


STATE OF ILLINOIS<br />

<strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />

2300 South Dirksen Parkway<br />

Springfield, <strong>Illinois</strong> 62764<br />

The <strong>Transportation</strong> Bulletin is the <strong>of</strong>ficial <strong>Illinois</strong> Procurement Bulletin for the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong><br />

<strong>Transportation</strong> as authorized by Section 15-1 <strong>of</strong> the <strong>Illinois</strong> Procurement Code, 30 ILCS 500/15-1. It is<br />

available on the IDOT Web Site at http://www.dot.il.gov and through the IDOT Subscription Service.<br />

Three versions <strong>of</strong> the <strong>Transportation</strong> Bulletin are currently published.<br />

<strong>Transportation</strong> Procurement Bulletin<br />

Invitation for Bids<br />

Pr<strong>of</strong>essional <strong>Transportation</strong> Bulletin<br />

Questions concerning file downloads and/or subscription service information should be directed<br />

to Tim Garman at 217-524-1642 or email Timothy.Garman@illinois.gov.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


<strong>Transportation</strong> Procurement Bulletin<br />

Formerly published as the <strong>Transportation</strong> Bulletin – Weekly Procurement, this bulletin is now<br />

located at http://www.dot.il.gov/desenv/transprocbulletin.html. It features procurement<br />

information for the construction and consulting industry, and the general public. Postings<br />

include Invitations to Bid and Request for Proposals from a variety <strong>of</strong> Bureaus within the<br />

<strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>. The site also features important procurement information and<br />

links to contract award <strong>notice</strong>s for construction and engineering, sole source procurements,<br />

emergency purchases, change orders which exceed $30,000, and renewal <strong>notice</strong>s.<br />

Questions concerning this Bulletin should be directed to:<br />

Tim Garman or E-mail Timothy.Garman@illinois.gov<br />

2300 South Dirksen Parkway<br />

Room 330<br />

Springfield, IL 62764<br />

217-524-1642<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


Invitation For Bids<br />

Contains information pertaining to the advertisement for bidding <strong>of</strong> Highways,<br />

Aeronautics and <strong>Department</strong> <strong>of</strong> Natural Resources.<br />

Questions concerning this Bulletin should be directed to:<br />

Ryan Sheley Rm 326 (217) 782-7806 Ryan.Sheley@illinois.gov<br />

Ted Walschleger Rm 330 (217) 782-4894 Ted.Walschleger@illinois.gov<br />

2300 South Dirksen Parkway<br />

Springfield, IL 62764<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


Pr<strong>of</strong>essional <strong>Transportation</strong> Bulletin<br />

Contains information pertaining to the advertisement for <strong>of</strong>fers <strong>of</strong> interest for<br />

pr<strong>of</strong>essional services for <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> projects.<br />

Questions concerning this Bulletin should be directed to:<br />

Carrie Kowalski or E-mail Carrie.Kowalski@illinois.gov<br />

2300 South Dirksen Parkway<br />

Room 330<br />

Springfield, IL 62764<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


“LETTING YOU KNOW”<br />

The <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> is interested in maintaining close communications<br />

with industry. This newsletter highlights subjects which we believe will be <strong>of</strong> interest to you.<br />

No. 117 January 2010<br />

“FOR BID LIST OF<br />

BIDDERS”<br />

DISCLAIMER:<br />

PROFILE EQUIPMENT<br />

VERIFICATION (PEV)<br />

PROGRAM<br />

“This list is an aid and is not intended to be an all inclusive list <strong>of</strong><br />

potential bidders. It is the responsibility <strong>of</strong> the bidder, subcontractor<br />

or vendor to determine who is bidding on an (item) project.”<br />

Beginning with the January 29, 2010 “Notice <strong>of</strong> Letting” for the March 5,<br />

2010 letting the above disclaimer will be added to the “For Bid List <strong>of</strong><br />

Bidders” and “Final - For Bid List <strong>of</strong> Bidders” issued before every letting.<br />

The bidders’ list is maintained for subcontractors and materials suppliers<br />

so that they can network and provide quotes for specific work to<br />

authorized prime contractors. However, the bidders’ list is subject to<br />

change due to unforeseen issues that may arise until the beginning <strong>of</strong><br />

the specific letting day.<br />

Questions or comments should be directed to the Proposals and<br />

Contracts Unit at (217) 782-7806.<br />

The 2010 Pr<strong>of</strong>ile Equipment Verification (PEV) program will be conducted<br />

by Applied Pavement Technology, Inc. this spring on behalf <strong>of</strong> the Bureau<br />

<strong>of</strong> Materials and Physical Research. The PEV program was established<br />

to address changes to the Special Provision for Surface Testing <strong>of</strong><br />

Pavements that were made effective as <strong>of</strong> the August 5, 2005 letting.<br />

These changes require any contractor on a project using this Special<br />

Provision (0.00-inch Blanking Band) to verify their pr<strong>of</strong>ile equipment<br />

through the PEV program. This also applies to equipment used by a<br />

subcontractor on the project.<br />

The 2010 PEV program is tentatively scheduled for the weeks <strong>of</strong> April 19<br />

and April 26, 2010 at the Rantoul Airport. Participants in last year's<br />

program will need to have their pr<strong>of</strong>ile equipment re-verified (this is an<br />

annual program). If you or a subcontractor have pr<strong>of</strong>ile equipment to be<br />

verified, please contact either <strong>of</strong> the following individuals for scheduling:<br />

NOTE: No walk-ins will be allowed.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


PEV (CONTINUED)<br />

INSURANCE<br />

REQUIREMENTS ON<br />

LOCAL ROADS AND<br />

STREETS’ PROJECTS<br />

JOINT IDOT<br />

INSPECTORS/<br />

PAINTING<br />

CONTRACTORS<br />

ANNUAL MEETING<br />

CERTIFICATION OF<br />

METAL<br />

FABRICATORS<br />

STAY INFORMED!<br />

-2-<br />

James Krstulovich<br />

Applied Pavement Technology, Inc.<br />

(217) 398-3977<br />

jkrstulovich@appliedpavement.com<br />

Angela Wolters<br />

Applied Pavement Technology, Inc.<br />

(217) 398-3977<br />

awolters@appliedpavement.com<br />

If you have any questions regarding the PEV Program, please contact<br />

the following individual at the Bureau <strong>of</strong> Materials and Physical Research:<br />

LaDonna Rowden<br />

<strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />

Bureau <strong>of</strong> Materials and Physical Research<br />

(217) 782-8582<br />

LaDonna.Rowden@illinois.gov<br />

All Local Roads and Streets’ contracts contain a Special Provision<br />

(LR-107-4) requiring the contractor to name listed entities as an<br />

additional insured under the contractor’s general liability insurance<br />

policy in accordance with Article 107.27 <strong>of</strong> the Standard Specifications<br />

for Road and Bridge Construction. Contractors with “blanket” certificates<br />

<strong>of</strong> insurance will need to have any necessary endorsements in place<br />

and submitted to the Contracts Office before the contract can be<br />

executed. Local Roads and Streets’ contracts can be identified by the<br />

second digit <strong>of</strong> the contract being an odd number. Some contractors<br />

have not been submitting the required insurance, which causes delays<br />

in execution <strong>of</strong> the contract. Please contact Nancy Knapp or Ryan Sheley<br />

at (217) 782-7806 if you have any questions.<br />

The Joint IDOT Inspectors/Painting Contractors annual meeting is<br />

scheduled for March 3, 2010 at the Pere Marquette Hotel in Peoria,<br />

<strong>Illinois</strong>. More details have been sent by mail to all prequalified painting<br />

contractors.<br />

Beginning with the July 2010 letting, all fabricators <strong>of</strong> steel or other non-<br />

ferrous metal components <strong>of</strong> structures not certified under the AISC<br />

Quality Certification Program for Category MBr (Major Steel Bridges) or<br />

Category SBr (Simply Steel Bridges) shall be certified under the AISC<br />

Program for Bridge and Highway Metal Component Manufacturers.<br />

Please contact Chris Mehuys at (217) 524-3320 with any questions.<br />

Keep in touch with your representative on the IDOT/Industry Policy<br />

Committee and IDOT/Industry Joint Co-op Committee.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


Bureau <strong>of</strong> Design and Environment<br />

Contractor Publications<br />

Electronic Subscription Service<br />

To receive construction contractor related publications and reports through the free subscription<br />

service, please follow the instructions to subscribe. The information will be automatically<br />

emailed to the subscriber on the publish date. The following publications and reports are<br />

currently available for subscription:<br />

IDOT Contractor’s Packet<br />

Subscription listname: IDOTContractorsPacket<br />

The IDOT Contractor’s Packet automatically subscribes the requestor to all <strong>of</strong> the<br />

following publications and reports. Those not wishing to receive all <strong>of</strong> the following lists<br />

can subscribe to the desired lists individually.<br />

IDOT Addendum Checklist<br />

The IDOT Addendum Checklist identifies all letting items that have been revised by<br />

addendum. The contractors should use this checklist to ensure they have incorporated into<br />

their plans and proposals all addenda that have been issued for each particular letting item.<br />

The checklist also identifies withdrawn and deleted items. The checklist is published<br />

regularly whenever addenda are processed.<br />

IDOT Aeronautics Unit Price Tabulation <strong>of</strong> Bids<br />

The Aeronautics Unit Price Tabulation <strong>of</strong> Bids is a listing <strong>of</strong> all unit price bids on awarded<br />

jobs for the letting, sorted by letting item. The listing identifies the actual bidders, the asread<br />

bid amounts, the corrected bid amounts (if applicable) and the low bidders. The listing<br />

is not published until jobs are awarded. Typically, Unit Price Tabulation <strong>of</strong> Bids listings begin<br />

to be published four to eight weeks after the letting, excluding the federal discretionary<br />

seeking projects placed on the March and August lettings. These may take several months<br />

before funds are secured and the projects awarded.<br />

IDOT As Read Tabulation <strong>of</strong> Bids<br />

The IDOT As Read Tabulation <strong>of</strong> Bids is a listing <strong>of</strong> bids as they were read at the bid<br />

opening. The bid amounts are not checked at the time this listing is produced. This listing<br />

also includes a page which identifies all letting items for which the as read low bid was, prior<br />

to a post letting review, within a reasonable approximation <strong>of</strong> the Engineer’s estimate. The<br />

listing is usually published by 4:30 p.m. <strong>of</strong> the day <strong>of</strong> the letting.<br />

IDOT Price Indices<br />

The IDOT Price Indices are monthly listings <strong>of</strong> the average price <strong>of</strong> Bituminous, Steel and<br />

Fuel; used in determining cost adjustments on contracts containing the <strong>special</strong> provision.<br />

IDOT CBid Files<br />

The CBID files contain the pay items and quantities for a contract, as well as macros to<br />

prepare and print a bid. These files are in Micros<strong>of</strong>t Excel format (xls). CBID files are put on<br />

the Website as they become available. It is your responsibility to determine which, if any,<br />

addenda pertains to any project you may be bidding. Failure to incorporate all relevant<br />

addenda may cause your bid to be declared unacceptable. Note that the CBID filename<br />

is the same as the IDOT Contract Number. Please refer to the <strong>Transportation</strong> Bulletin –<br />

Notice <strong>of</strong> Letting for the correct contract number.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


IDOT Construction Contractor’s <strong>Transportation</strong> Bulletin – Notice <strong>of</strong> Letting<br />

The IDOT Construction Contractor’s <strong>Transportation</strong> Bulletin – Notice <strong>of</strong> Letting is the <strong>of</strong>ficial<br />

publication and invitation for construction bids by the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>’s<br />

Division <strong>of</strong> Highways, IDOT Division <strong>of</strong> Aeronautics and the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> Natural<br />

Resources. The bulletin also contains information pertaining to pre-bid meetings, the DBE<br />

program and other current information. The bulletin will be published on the advertised<br />

publish date for each regularly scheduled letting. Special lettings will have applicable<br />

bulletins published at least 14 days prior to the letting on an as needed basis.<br />

IDOT Corrected Tabulation <strong>of</strong> Bids<br />

The IDOT Corrected Tabulation <strong>of</strong> Bids is a listing <strong>of</strong> all bids for the letting, sorted by letting<br />

item. All bids have been recalculated and checked before this listing is produced. The<br />

listing identifies the eligible bidders, the actual bidders, the as-read bid amounts, the<br />

corrected bid amounts (if applicable) and the low bidders for the letting. The listing is<br />

usually published within 14 days after the letting.<br />

IDOT Federal Wage Rates Listing<br />

The IDOT Federal Wage Rates listing identifies the current federal wage rates to be used by<br />

contractors for preparing bids whenever the construction activities are federally participating.<br />

The federal wage rates will be published 10 days prior to the letting date.<br />

IDOT For Bid List <strong>of</strong> Bidders<br />

The IDOT For Bid List <strong>of</strong> Bidders is a compilation <strong>of</strong> all potential bidders who have been<br />

authorized to bid on each letting item for each letting. A separate list is compiled for each<br />

letting and the list is sorted by letting item. The list will be published several times with the<br />

last time being one day prior to the letting.<br />

IDOT Letting Plans and Proposals<br />

IDOT Letting plans and proposals are available for download on the IDOT Web Site. Go to<br />

the Letting and Bidding Information Page and select the current Letting date.<br />

Plans and proposals are posted as they become available.<br />

IDOT Local Roads Contractors Bulletin<br />

The Contractors Bulletin is a weekly publication advertising locally let and "material only,<br />

bids" for local agencies, counties, cities/villages, and road districts throughout the state. The<br />

bulletin is in three parts: (1) previous advertisements for two weeks, (2) new advertisements<br />

with a description <strong>of</strong> the job, the date and time <strong>of</strong> letting, description <strong>of</strong> the material needed<br />

for bidding and any other information, and (3) awarded projects identifying the successful<br />

bidder and the dollar amount.<br />

IDOT News Flash from BDE<br />

The IDOT News Flash is important information released by the IDOT Bureau <strong>of</strong> Design and<br />

Environment which all contractors should read. This is information that becomes available<br />

after publication <strong>of</strong> the Notice <strong>of</strong> Letting Bulletin.<br />

IDOT Not For Bid List <strong>of</strong> Bidders<br />

The IDOT Not For Bid List <strong>of</strong> Bidders is a compilation <strong>of</strong> all parties who have requested<br />

plans and/or proposals. A separate list is compiled for each letting and the list is sorted by<br />

letting item. The list will be published several times.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


IDOT Pay Item Report<br />

The Pay Item Report is a listing <strong>of</strong> all pay items on a letting. For each pay item, the listing<br />

identifies the quantity, letting item number, contract number, county, IDOT district <strong>of</strong>fice and<br />

the unit <strong>of</strong> measure.<br />

IDOT Pay Item Report with Awarded Prices<br />

The Pay Item Report with Awarded Prices is a listing <strong>of</strong> all pay items on a letting. For each<br />

pay item, the listing identifies the quantity, letting item number, contract number, county,<br />

IDOT district <strong>of</strong>fice and the unit <strong>of</strong> measure. This report has an added column which is the<br />

awarded unit price <strong>of</strong> each item. The Pay Item Report with Awarded Prices will be published<br />

after the last item on the letting is awarded.<br />

IDOT Unit Price Tabulation <strong>of</strong> Bids<br />

The IDOT Unit Price Tabulation <strong>of</strong> Bids is a listing <strong>of</strong> all unit price bids on awarded jobs for<br />

the letting, sorted by letting item. Whereas the As Read Tabulation <strong>of</strong> Bids and the<br />

Corrected Tabulation <strong>of</strong> Bids provide the sum total amount bid for each letting item, the Unit<br />

Price Tabulation <strong>of</strong> Bids provides the break down <strong>of</strong> all bids per line item unit price, and it is<br />

only provided for awarded jobs. The listing identifies the actual bidders, the as-read bid<br />

amounts, the corrected bid amounts (if applicable) and the low bidders. The listing is not<br />

published until jobs are awarded. Typically, Unit Price Tabulation <strong>of</strong> Bids listings begin to be<br />

published within three weeks after the letting and may continue for up to 60 days. Jobs<br />

through the Division <strong>of</strong> Aeronautics and the <strong>Department</strong> <strong>of</strong> Natural Resources are not<br />

included.<br />

IDOT <strong>Transportation</strong> Procurement Bulletin<br />

The <strong>Transportation</strong> Procurement Bulletin Web Page features procurement information for<br />

the construction and consulting industry, and the general public. Postings include Invitations<br />

to Bid and Request for Proposals from a variety <strong>of</strong> Bureaus within the <strong>Department</strong> <strong>of</strong><br />

<strong>Transportation</strong>. The site also features important procurement information and links to<br />

contract award <strong>notice</strong>s including sole source procurements, emergency purchases, change<br />

orders which exceed $30,000, and renewal <strong>notice</strong>s. Subscribers will receive notification<br />

when new procurement opportunities are posted to the Web page.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


INSTRUCTIONS FOR SUBSCRIBING<br />

Prepare an e-mail to the IDOT Subscription Server by using the following e-mail address<br />

and with the information as noted below:<br />

1. Address the e-mail message to: listserv@lists.dot.il.gov<br />

2. Type the letters ‘sub’, a space and then the subscription listname in the body <strong>of</strong> the<br />

message. Please Note: There are no spaces in the listname.<br />

For example: sub IDOTContractorsPacket (Do Not Include Any Other Text)<br />

3. Send the message.<br />

4. A confirmation e-mail will be sent to you.<br />

5. Click on the reply button and type OK in the body <strong>of</strong> the message and send the message<br />

back to IDOT.<br />

6. Once the <strong>Department</strong> receives the OK, you will be added to the subscription list.<br />

7. You will then receive a confirmation e-mail stating that you have been added to the list<br />

and automatically receive the publications and reports for which you have subscribed<br />

when they are published.<br />

If you have questions, contact Tim Garman at (217)524-1642 or Timothy.Garman@illinois.gov<br />

To subscribe to each item individually:<br />

Follow the above subscription instructions. Substitute the appropriate listname for each item<br />

to which you want to subscribe. Please Note: There are no spaces in the listname and<br />

you must follow these steps for each list that you to want to receive.<br />

• IDOT Contractor's Packet (Automatic Subscription to all <strong>of</strong> the following lists)<br />

Subscription listname: IDOTContractorsPacket<br />

• IDOT Addendum Checklist<br />

Subscription listname: IDOTAddendumChecklist<br />

• IDOT Aeronautics Unit Price Tabulation <strong>of</strong> Bids<br />

Subscription listname: IDOTAeroUnitPriceTabulation<strong>of</strong>Bid<br />

• IDOT As Read Tabulation <strong>of</strong> Bids<br />

Subscription listname: IDOTAsReadTabulationOfBids<br />

IDOT Price Indices<br />

• Subscription listname: IDOTBituminousPriceIndex<br />

•<br />

• IDOT CBid Files<br />

Subscription listname: IDOTCBid<br />

• IDOT Construction Contractor’s <strong>Transportation</strong> Bulletin – Notice <strong>of</strong> Letting<br />

Subscription listname: IDOTBulletinNoticeOfLetting<br />

• IDOT Corrected Tabulation <strong>of</strong> Bids<br />

Subscription listname: IDOTCorrectedTabulationOfBids<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


• IDOT Federal Wage Rates Listing<br />

Subscription listname: IDOTFederalWageRatesListing<br />

• IDOT For Bid List <strong>of</strong> Bidders<br />

Subscription listname: IDOTForBidListOfBidders<br />

• IDOT Letting Plans and Proposals (Specifications)<br />

Subscription listname: IDOTLettingProposals<br />

• IDOT Local Roads Contractor Bulletin<br />

Subscription listname: IDOTLocalRoadsContractorBulletin<br />

• IDOT News Flash from BDE<br />

Subscription listname: IDOTNewsFlashFromBDE<br />

• IDOT Not For Bid List <strong>of</strong> Bidders<br />

Subscription listname: IDOTNotForBidListOfBidders<br />

• IDOT Pay Item Report<br />

Subscription listname: IDOTPayItemReport<br />

• IDOT Pay Item Report with Awarded Prices<br />

Subscription listname: IDOTPayItemAwarded<br />

• IDOT Unit Price Tabulation <strong>of</strong> Bids<br />

Subscription listname: IDOTUnitPriceTabulationOfBids<br />

• IDOT <strong>Transportation</strong> Procurement Bulletin<br />

Subscription listname: IDOTBulletinWeeklyProcurement<br />

INSTRUCTIONS FOR UNSUBSCRIBING<br />

Prepare an e-mail to the IDOT Subscription Server by using the following e-mail address and<br />

with the information as noted below:<br />

1. Address the e-mail message to: listserv@lists.dot.il.gov<br />

2. Type the letters ‘sign<strong>of</strong>f’, a space and then the subscription listname in the body <strong>of</strong> the<br />

message. Please Note: There are no spaces in the listname.<br />

For example: sign<strong>of</strong>f IDOTContractorsPacket (Do Not Include Any OtherText)<br />

3. Send the message.<br />

4. A confirmation e-mail will be sent to you removing you from the subscription list.<br />

Note: You must follow these steps for each list that you no longer want to receive.<br />

If you have questions, contact Tim Garman at (217)524-1642 or Timothy.Garman@illinois.gov.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


Electronic Subscription Service<br />

Bureau <strong>of</strong> Design and Environment Manual<br />

and Procedure Memorandum Updates<br />

To receive updates related to the BDE Manual and BDE Procedure Memorandums through the<br />

free subscription service, please follow the instructions for subscribing. The information for both<br />

the items will be automatically e-mailed to the subscriber upon release for publication.<br />

Bureau <strong>of</strong> Design and Environment Manual<br />

The Bureau <strong>of</strong> Design and Environment Manual (BDE Manual) has been prepared to provide<br />

uniform policies and procedures for the <strong>Department</strong> and consultant personnel preparing Phase I<br />

studies and reports and contract plans for <strong>Department</strong>. The BDE Manual presents most <strong>of</strong> the<br />

information normally required for location, design and environmental evaluation <strong>of</strong> highway<br />

construction projects on the state highway system. The BDE Manual is available on CD-ROM<br />

and IDOT’s Doing Business/Manuals-Memorandums/Bureau <strong>of</strong> Design and Environment<br />

Manual & Memorandums page at: http://www.dot.il.gov/desenv/bdemanual.html<br />

BDE Procedure Memorandums<br />

The BDE Procedure Memorandums are used as a means to implement changes in procedures,<br />

policies, directives, and/or criteria in the interim between issuance <strong>of</strong> updates to the BDE<br />

Manual. The designer should refer to these when using the BDE Manual until such time as they<br />

are superseded or incorporated into an updated edition <strong>of</strong> the BDE Manual. BDE Procedure<br />

Memorandums are available on IDOT’s Doing Business/Manuals-Memorandums/Bureau <strong>of</strong><br />

Design and Environment Manual & Memorandums page at:<br />

http://www.dot.il.gov/desenv/bdemems.html<br />

INSTRUCTIONS FOR SUBSCRIBING<br />

Please Note:<br />

By subscribing to the IDOTBDEManualUpdates list, you will receive both the Bureau <strong>of</strong> Design<br />

and Environment Manual and Procedure Memorandum Updates<br />

Prepare an e-mail to the IDOT Subscription Server by using the following e-mail address and<br />

with the information as noted below:<br />

1. Address the e-mail message to: listserv@lists.dot.il.gov<br />

2. Type the letters ‘sub’, a space and then the subscription listname in the body <strong>of</strong> the<br />

message. Please Note: There are no spaces in the listname.<br />

Example: sub IDOTBDEManualUpdates<br />

(Do Not Include Any Other Text)<br />

3. Send the message.<br />

4. A confirmation e-mail will be sent to you.<br />

5. Click on the reply button and type OK in the body <strong>of</strong> the message and send the<br />

message back to IDOT.<br />

6. Once the <strong>Department</strong> receives the OK, you will be added to the subscription list.<br />

7. You will then receive a confirmation e-mail stating that you have been added to the list<br />

and automatically receive the publications and reports for which you have subscribed<br />

when they are published.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


INSTRUCTIONS FOR UNSUBSCRIBING<br />

Prepare an e-mail to the IDOT Subscription Server by using the following e-mail address and<br />

with the information as noted below:<br />

1. Address the e-mail message to: listserv@lists.dot.il.gov<br />

2. Type the letters ‘sign<strong>of</strong>f’, a space and then the subscription listname in the body <strong>of</strong> the<br />

message. Please Note: There are no spaces in the listname.<br />

Example: sign<strong>of</strong>f IDOTBDEManualUpdates<br />

(Do Not Include Any Other Text)<br />

3. Send the message.<br />

4. A confirmation e-mail will be sent to you removing you from the subscription list.<br />

If you have questions, contact Tim Garman at (217)524-1642 or Timothy.Garman@illinois.gov<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


Electronic Subscription Service<br />

Highway Standards<br />

To receive updates related to the Highway Standards through the free subscription service, please follow the<br />

instructions for subscribing. Subscribers will be automatically emailed upon release <strong>of</strong> revisions to the<br />

Highway Standards.<br />

Highway Standards<br />

These drawings show the details <strong>of</strong> various construction items and are considered part <strong>of</strong> the plans. The<br />

Highway Standards applicable to a particular contract are referenced on the cover sheet <strong>of</strong> the plans.<br />

The Highway Standards are only available electronically. To access them, please visit the <strong>Department</strong>’s<br />

website at http://www.dot.il.gov/desenv/hwystds/stnds.html<br />

INSTRUCTIONS FOR SUBSCRIBING<br />

Prepare an e-mail to the IDOT Subscription Server by using the following e-mail address and with the<br />

information as noted below:<br />

1. Address the e-mail message to: listserv@lists.dot.il.gov<br />

2. Type the letters ‘sub’, a space and then the subscription listname in the body <strong>of</strong> the message.<br />

Please Note: There are no spaces in the listname.<br />

Example: sub IDOTHighwayStandards<br />

(Do Not Include Any Other Text)<br />

3. Send the message.<br />

4. A confirmation e-mail will be sent to you.<br />

5. Click on the reply button and type OK in the body <strong>of</strong> the message and send the message back to IDOT.<br />

6. Once the <strong>Department</strong> receives the OK, you will be added to the subscription list.<br />

7. You will then receive a confirmation e-mail stating that you have been added to the list and<br />

automatically receive the publications and reports for which you have subscribed when they are<br />

published.<br />

If you have questions, contact Tim Garman at (217)524-1642 or at Timothy.Garman@illinois.gov<br />

INSTRUCTIONS FOR UNSUBSCRIBING<br />

Prepare an e-mail to the IDOT Subscription Server by using the following e-mail address and with the<br />

information as noted below:<br />

1. Address the e-mail message to: listserv@lists.dot.il.gov<br />

2. Type the letters ‘sign<strong>of</strong>f’, a space and then the subscription listname in the body <strong>of</strong> the message.<br />

Please Note: There are no spaces in the listname.<br />

Example: sign<strong>of</strong>f IDOTHighwayStandards<br />

(Do Not Include Any Other Text)<br />

3. Send the message.<br />

4. A confirmation e-mail will be sent to you removing you from the subscription list.<br />

If you have questions, contact Tim Garman at (217)524-1642 or at Timothy.Garman@illinois.gov<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


NOTICE TO ALL BIDDERS<br />

TO REPORT BID RIGGING, BIDDER COLLUSION OR OTHER FRAUDULENT ACTIVITIES<br />

The U.S. <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> (USDOT) maintains a Hotline Complaint Center<br />

and operates a toll-free “hotline” Monday through Friday, 8:00 a.m. to 5:00 p.m., eastern<br />

time. Anyone with knowledge <strong>of</strong> possible bid rigging, bidder collusion, DBE fraud or<br />

other fraudulent activities should use the following hotline number or address to report<br />

such activities:<br />

Hotline Number:<br />

(202) 755-1855 or 800-424-9071<br />

Hotline Address:<br />

Office <strong>of</strong> Inspector General<br />

P. O. Box 23178<br />

L’Enfant Plaza Station<br />

Washington, D.C. 20024-0178<br />

The hotline is part <strong>of</strong> USDOT’s continuing effort to identify and investigate highway<br />

construction contract fraud and abuse and is operated under the direction <strong>of</strong> USDOT’s<br />

Inspector General. All information will be treated confidentially and caller anonymity will<br />

be respected.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


<strong>Transportation</strong><br />

Bulletin<br />

Pre‐Qualification<br />

"Cut Off"<br />

IDOT LETTING SCHEDULE<br />

Joint Venture "Cut<br />

Off"<br />

2009 - 2012<br />

Bid Authorization<br />

"Cut Off"<br />

Letting Day<br />

DBE Utilization Plan<br />

(SBE 2025 and SBE 2026)<br />

1/29/2010 2/16/2010 2/26/2010 3/2/2010 3/5/2010 Submit With Bid<br />

3/19/2010 4/2/2010 4/16/2010 4/20/2010 4/23/2010 Submit With Bid<br />

5/7/2010 5/21/2010 6/4/2010 6/8/2010 6/11/2010 Submit With Bid<br />

6/25/2010 7/9/2010 7/23/2010 7/27/2010 7/30/2010 Submit With Bid<br />

8/13/2010 8/27/2010 9/10/2010 9/14/2010 9/17/2010 Submit With Bid<br />

10/1/2010 10/15/2010 10/29/2010 11/3/2010 11/5/2010 Submit With Bid<br />

12/10/2010 1/3/2011 1/14/2011 1/18/2011 1/21/2011 Submit With Bid<br />

2/4/2011 2/18/2011 3/4/2011 3/8/2011 3/11/2011 Submit With Bid<br />

3/25/2011 4/8/2011 4/22/2011 4/26/2011 4/29/2011 Submit With Bid<br />

5/13/2011 5/27/2011 6/10/2011 6/14/2011 6/17/2011 Submit With Bid<br />

7/1/2011 7/15/2011 7/29/2011 8/2/2011 8/5/2011 Submit With Bid<br />

8/19/2011 9/2/2011 9/16/2011 9/20/2011 9/23/2011 Submit With Bid<br />

10/14/2011 10/28/2011 11/14/2011 11/15/2011 11/18/2011 Submit With Bid<br />

12/9/2011 12/30/2011 1/13/2012 1/17/2012 1/20/2012 Submit With Bid<br />

2/3/2012 2/17/2012 3/2/2012 3/6/2012 3/9/2012 Submit With Bid<br />

3/23/2012 4/6/2012 4/20/2012 4/24/2012 4/27/2012 Submit With Bid<br />

5/11/2012 5/25/2012 6/8/2012 6/12/2012 6/15/2012 Submit With Bid<br />

6/29/2012 7/13/2012 7/27/2012 7/31/2012 8/3/2012 Submit With Bid<br />

8/17/2012 8/31/2012 9/14/2012 9/18/2012 9/21/2012 Submit With Bid<br />

10/5/2012 10/19/2012 11/2/2012 11/6/2012 11/9/2012 Submit With Bid<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


SPECIAL NOTICE<br />

TO ALL CONTRACTORS SUBMITTING BIDS<br />

Please remember to staple your bids together so that it will be less likely that anything will get<br />

misplaced or lost.<br />

Please turn in your proposal printed one sided. Double sided copies cause a problem with the<br />

print shop and processing.<br />

Thank you for your cooperation<br />

If you have any questions about these issues please call Ryan Sheley at (217) 782‐7806 or send<br />

an e‐mail to ryan.sheley@illinois.gov<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- SPECIAL NOTICE REGARDING DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION -<br />

1. Disadvantaged Business Enterprise (DBE) Utilization Plan<br />

For proposals that contain a Special Provision for Disadvantaged Business Enterprise Participation it is the responsibility <strong>of</strong> each bidder<br />

to submit a DBE Utilization Plan (Plan) (Form SBE 2026 and Form SBE 2025) as required by the Special Provision. Forms for the<br />

submittal <strong>of</strong> the Plan are available on the IDOT Web Site, in each district’s Bureau <strong>of</strong> Construction <strong>of</strong>fice or by calling IDOT’s Bureau <strong>of</strong> Small<br />

Business Enterprises at (217) 782-5490.<br />

DBE Plan submittal - As detailed in the Special Provision entitled “DISADVANTAGED BUSINESS ENTERPRISE<br />

PARTICIPATION (BDE)”; all bidders must submit Form SBE 2026 and Form SBE 2025 with their bid at the Letting.<br />

Failure to submit both forms with the bid shall cause the bid to be rejected as not responsive.<br />

SEE THE SPECIAL PROVISIONS WITHIN THE PROPOSALS FOR SPECIFIC DBE GOAL PERCENTAGES<br />

2. <strong>Illinois</strong> Unified Certification Program DBE Directory<br />

Pursuant to the requirements <strong>of</strong> the federal regulations, all state transportation agencies that receive federal-aid funds are required to<br />

implement a “one-stop” certification process for DBEs. As a result <strong>of</strong> this requirement, IDOT, together with the City <strong>of</strong> Chicago, CTA, Metra<br />

and Pace, has established the <strong>Illinois</strong> Unified Certification Program (IL UCP).<br />

The IL UCP maintains a DBE Directory to provide a reference source to assist bidders/proposers in meeting DBE contract goals. The DBE<br />

Directory lists the DBE-certified firms in alphabetical order with their address, contact information and <strong>special</strong>ty <strong>of</strong> work. It is the responsibility<br />

<strong>of</strong> the prime contractor/consultant to make his/her own determination regarding the capability <strong>of</strong> a DBE firm. Only those firms certified as <strong>of</strong><br />

the letting date/bid opening may be utilized in meeting a DBE contract goal.<br />

3. Supportive Services Consultants<br />

The Bureau <strong>of</strong> Small Business Enterprises administers the federal DBE program and ensures that external Equal Employment Opportunity,<br />

On-the-Job Training and Labor contract requirements are met. The goal <strong>of</strong> IDOT’s Supportive Services program is to provide assistance that<br />

fosters opportunities for IDOT’s DBE firms and minority and female individuals to participate in IDOT’s transportation-related contracts.<br />

The following consultants have contracts to provide supportive services assistance. These services are provided at no charge to IDOT’s<br />

DBE firms, to those firms seeking IDOT DBE program certification, to IL UCP DBE-certified firms who have an IDOT contract(s), and to prime<br />

contractors doing business with IDOT.<br />

If you have any questions or concerns regarding the supportive services assistance that IDOT <strong>of</strong>fers, please contact the Bureau <strong>of</strong> Small<br />

Business Enterprises at (217) 785-5947.<br />

Management Assistance - Assistance with cash flow, bonding and financing, payments, obtaining work and equipment / other resources,<br />

preparation <strong>of</strong> business plans, computer technology, certification / prequalification application assistance, assessment <strong>of</strong> management,<br />

accounting and computer systems, assistance with loan package preparation, development <strong>of</strong> web site / marketing materials / safety plans,<br />

and IDOT DBE workshops.<br />

Districts 1 - 3 (contract period 10/08/08 – 10/07/10)<br />

Mr. Theo Joyner, Project Director<br />

Ralph G. Moore & Associates<br />

211 West Wacker Drive, Suite 1050<br />

Chicago, IL 60606<br />

Phone: 312/419-7260<br />

Fax: 312/419-1918<br />

Email: theojoyner@rgma.com<br />

Districts 4, 5, 6, 7,8, 9 (contract period 10/9/09 – 10/8/10)<br />

Mr. Mark Vaughn, Project Director<br />

Hutson & Associates, Inc.<br />

3555 College Avenue<br />

Alton, IL 62002<br />

Phone: 618/433-9229<br />

Fax: 618/433-9239<br />

Email: mvaughn@hutsonassociates.com<br />

Hutson & Associates, Inc. staff bios<br />

Technical Assistance – Training and assistance in estimating, bidding, negotiations, technical tasks, reading specifications and plans,<br />

developing production schedules, preparing required reporting forms and documentation, reviewing IDOT contract-related documents /<br />

reports, assistance with IDOT project site inspections / meetings and contract troubleshooting, and IDOT DBE workshops<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010<br />

1


Districts 1, 2, 3 (contract period 10/9/09 – 10/8/10)<br />

Mr. Peter Stresino, Project Director<br />

Pavia-Marting & Co.<br />

910 W. Lake Street<br />

Roselle, IL 60172<br />

Phone: 630/529-8000<br />

Fax: 630/894-4910<br />

E-mail: peter.stresino@pavia-marting.com<br />

Pavia-Marting & Co. staff and subcontractor bios<br />

Districts 6, 8 (contract period 10/9/09-10/8/10)<br />

Mr. Jim Sullivan, Project Director<br />

ESI Consultants, Ltd.<br />

753 Windsor Road<br />

Charleston, IL 61920<br />

Phone: 217/348-1900<br />

Fax: 217/348-1903<br />

E-mail: jsullivan@esiconsultantsltd.com<br />

ESI Consultants, Ltd. staff and subcontractor bios<br />

Districts 4, 5, 7, 9 (contract period 10/9/09-10/8/10)<br />

Mr. Richard Nowack, Project Director<br />

Quigg Engineering Inc.<br />

495 North Westgate Avenue<br />

Jacksonville, <strong>Illinois</strong> 62650<br />

Phone: 217/245-5375<br />

Fax: 217/245-5398<br />

E-mail: rnowack@quiggengineering.com<br />

Quigg Engineering Inc. staff and subcontractors bios<br />

4. Minority-Owned Financial Institutions<br />

It is IDOT’s policy to investigate the full extent <strong>of</strong> services <strong>of</strong>fered by financial institutions owned and controlled by socially and economically<br />

disadvantaged individuals in the community, to make reasonable efforts to use these institutions, and to encourage prime contractors on<br />

federally funded contracts to make use <strong>of</strong> these institutions.<br />

As <strong>of</strong> October 14, 2009, the list <strong>of</strong> Minority Depository Institutions in <strong>Illinois</strong> are as follows:<br />

1. All American Bank -------------------------------------------------------------- Des Plaines<br />

2. American Metro Bank --------------------------------------------------------- Chicago<br />

3. Citizens Bank & Trust Company <strong>of</strong> Chicago ----------------------------- Chicago<br />

4. Convenant Bank ---------------------------------------------------------------- Chicago<br />

5. The Foster Bank ---------------------------------------------------------------- Chicago<br />

6. Highland Community Bank --------------------------------------------------- Chicago<br />

7. <strong>Illinois</strong> Service Federal Savings and Loan Association. -------------- Chicago<br />

8. International Bank <strong>of</strong> Chicago ----------------------------------------------- Chicago<br />

9. National Republic Bank <strong>of</strong> Chicago ---------------------------------------- Chicago<br />

10. Pacific Global Bank ------------------------------------------------------------ Chicago<br />

11. Seaway National Bank <strong>of</strong> Chicago ----------------------------------------- Chicago<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010<br />

2


Special Notice Regarding<br />

IDOT Proposals, Authorization To Bid, and<br />

Requests For Plans & Proposals<br />

ABOUT IDOT PROPOSALS<br />

All Proposals issued by IDOT are potential bidding proposals. Each proposal contains all Certifications<br />

and Affidavits, a proposal signature sheet and a Proposal Bid Bond required for Prime Contractors<br />

submit a bid after written AUTHORIZATION TO BID has been issued by IDOT. A Proposal Bid Bond<br />

and Authorization To Bid are not required on items designated as Small Business Set-Aside.<br />

ABOUT AUTHORIZATION TO BID<br />

(Not required for Small Business Set-Asides)<br />

WHO CAN BID? Bids will be accepted from only those companies that request and receive written<br />

Authorization to Bid from IDOT. To request authorization, a potential bidder must complete and<br />

submit Part A <strong>of</strong> the Request for Authorization to Bid/or Not For Bid Status for (BDE 124INT).<br />

WHAT CONSTITUTES AUTHORIZATION TO BID? When a prospective prime bidder submits a BDE<br />

124INT he/she must indicate at that time which items are being requested for bidding purposes. Only<br />

those items requested For Bidding will be analyzed. After the request has been analyzed, the bidder<br />

will be issued a Authorization To Bid or Not For Bid Report that indicates which items have been<br />

approved for Bidding. If Authorization to Bid cannot be approved, the Authorization To Bid or Not<br />

For Bid Report will indicate the reason for denial.<br />

FIRMS UNSURE AS TO AUTHORIZATION STATUS? Firms that have not received an authorization<br />

form within a reasonable time <strong>of</strong> complete and correct original document submittal should contact the<br />

department as to status. This is critical in the week before the letting. These documents must be<br />

received by three days before the letting date. Firms unsure as to authorization status should call the<br />

Prequalification Section <strong>of</strong> the Bureau <strong>of</strong> Construction at 217/782-3413.<br />

NOTICE<br />

NO AUTHORIZATION TO BID WILL BE ISSUED UNTIL A COMPLETED PART A OF FORM BDE 124INT AND<br />

THE ORIGINAL AFFIDAVIT OF AVAILABILITY HAS BEEN FILED WITH THE CENTRAL BUREAU OF<br />

CONSTRUCTION.<br />

FOR SMALL BUSINESS SET-ASIDES, THE AFFIDAVIT OF AVAILABILITY IS NOT REQUIRED.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


SPECIAL NOTICE<br />

ATTENTION IDOT FORM USERS!<br />

On Wednesday April 15, 2009 the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> began posting all<br />

business forms developed using Micros<strong>of</strong>t Word and/or Micros<strong>of</strong>t Excel in the 2007<br />

format.<br />

To open Micros<strong>of</strong>t Office Word 2007 .docx or .docm files with Micros<strong>of</strong>t Office Word<br />

2003, Word 2002, or Word 2000, you need to install the Micros<strong>of</strong>t Office Compatibility<br />

Pack for 2007 Office Word, Excel and PowerPoint File Formats and any necessary<br />

Office updates. By using the Compatibility Pack for the 2007 Office system, you can<br />

open, edit some items, and save Office Word 2007 documents in previous versions <strong>of</strong><br />

Word.<br />

If you have questions regarding this conversion, please e-mail<br />

Dorothy.Negangard@illinois.gov<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


SPECIAL NOTICE:<br />

RULE FOR SUBMITTAL OF DBE UTILIZATION PLANS<br />

All Prime contractors please take note that DBE utilization<br />

plans, both forms SBE 2025 and SBE 2026, are now being<br />

required to be submitted with the bid on all construction<br />

contracts that contain a specified goal in the <strong>special</strong> provision<br />

for Disadvantaged Business Enterprise Participation.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


SPECIAL NOTICE<br />

SUBSTANCE ABUSE PREVENTION PROGRAM<br />

CERTIFICATION<br />

PA 95-0635 SUBSTANCE ABUSE PREVENTION PROGRAM (SAPP)<br />

Effective January 1, 2008<br />

This Public Act requires that all contractors and subcontractors have a SAPP, meeting<br />

certain requirements, in place before starting work.<br />

The contractor should submit their correctly completed SAPP Certification (Form BC 261 )<br />

to the District at the preconstruction conference.<br />

The requirements <strong>of</strong> this Public Act are a material part <strong>of</strong> the contract, and the contractor<br />

shall require this provision to be included in all approved subcontracts. The contractor shall<br />

submit the correctly completed SAPP Certification (Form BC 261) for each subcontractor<br />

with the Request for Approval <strong>of</strong> Subcontractor (Form BC 260-A).<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


SPECIAL NOTICE<br />

SMALL BUSINESS SET-ASIDES<br />

Several items on this Letting are designated as small business set-asides. In<br />

accordance with Section 45-45 <strong>of</strong> the <strong>Illinois</strong> Procurement Code and the rules <strong>of</strong> the<br />

<strong>Department</strong>, only bids from qualified small businesses will be considered for award. No<br />

construction business is a small business if its annual sales and receipts exceed<br />

$10,000,000.<br />

To encourage maximum competition, these small business set-asides are open bidding<br />

items. In accordance with the rules <strong>of</strong> the <strong>Department</strong>, prequalification is waived for<br />

these items. All bidders, including those correctly prequalified by the <strong>Department</strong>, are<br />

required to submit with the bids a Qualification and Equipment Inventory Certification<br />

Form. The form is included with the proposal and bidding documents.<br />

Please see the list <strong>of</strong> items elsewhere in the Bulletin. There will be Small Business Setasides<br />

on future Lettings as well.<br />

Authorization to bid is not required; however, firms wishing to be listed on the For Bid list<br />

should so indicate by sending a Request For Authorization To Bid/or Not For Bid Status<br />

(form BDE 124INT).<br />

If you have any questions please contact Ryan Sheley at 217-782-7806.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


SMALL PROJECTS LISTING<br />

March 5, 2010<br />

Small Business Set-Aside<br />

The following items on this letting are designated as small business setasides.<br />

In accordance with Section 45-45 <strong>of</strong> the <strong>Illinois</strong> Procurement Code<br />

and the rules <strong>of</strong> the <strong>Department</strong>, only bids from qualified small businesses<br />

will be considered for award. No construction business is a small business<br />

if its annual sales and receipts exceed $10,000,000.<br />

To encourage maximum competition, these small business set-asides are<br />

open bidding items. All bidders are required to submit with the bids a<br />

Qualification and Equipment Inventory Certification Form. The form is<br />

included with the proposal and bidding documents.<br />

65 82 164 200 208 236 237<br />

Hot-Mix Asphalt Projects (less than 3000 Ton)<br />

The following items on this letting are small business projects designated to<br />

encourage the participation <strong>of</strong> prequalified small businesses and or<br />

prequalified Disadvantaged Business Enterprises. These items have up<br />

to 3,000 tons <strong>of</strong> bituminous products; however, the ownership <strong>of</strong> a<br />

bituminous plant is not required in accordance with 44 <strong>Illinois</strong><br />

Administrative Code 650.70. These designated projects are open for<br />

bidding by any pre-qualified contractor with a Hot-Mix Asphalt (HMA)<br />

Paving work rating or a Hot-Mix Asphalt (HMA) Plant Mix work rating. All<br />

other prequalification requirements are unchanged.<br />

4 7 8 10 11 14 20<br />

56 89 91 97 100 101 102<br />

111 127 153 155 179 183 206<br />

265 283<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


Subcontractor Registration<br />

Subcontractors interested in participating on contracts are required<br />

to register with the <strong>Department</strong>. Prequalified contractors,<br />

consultants, material suppliers and trucking companies are NOT<br />

required to register. Subcontractors can register electronically at the<br />

<strong>Department</strong>’s web site, http://www.dot.il.gov/. At the home page click<br />

on “Doing Business”. The subcontractor registration form is listed<br />

under Contractor Services. The registration form requires minimal<br />

information and can be completed in minutes. Confirmation, along<br />

with a registration number, will be received by e-mail in 1-2 days.<br />

Registration is valid for one year and will then require renewal.<br />

Questions may be addressed to the Prequalification Section, Bureau<br />

<strong>of</strong> Construction.<br />

Phone: (217) 782-3413<br />

E-mail: Michael.Copp@illinois.gov<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


<strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />

INVITATION FOR BIDS<br />

Volume 13 Springfield, <strong>Illinois</strong>, January 29, 2010 No. 5<br />

This invitation is the <strong>of</strong>ficial advertisement and solicitation for bids issued by the <strong>Illinois</strong><br />

<strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> to secure the performance <strong>of</strong> highway work by contract, airport<br />

work by contract and contract work solicited by the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> Natural Resources.<br />

The Invitation for Bids is published in the <strong>Transportation</strong> Bulletin and is available on the<br />

<strong>Department</strong>’s Internet website at http://www.dot.il.gov and through electronic subscription.<br />

Questions concerning this invitation should be directed to:<br />

Mr. Ryan Sheley<br />

Harry R. Hanley Building<br />

Room 326<br />

2300 South Dirksen Parkway<br />

Springfield, IL 62764<br />

(217)782-7806<br />

Fax: (217)785-1141<br />

TDD: (217)524-4875<br />

Ryan.Sheley@illinois.gov<br />

NOTICE OF LETTING – March 5, 2010<br />

1. LETTING DUE DATE AND TIME FOR SUBMISSION AND OPENING OF BIDS. The<br />

<strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> is requesting <strong>of</strong>fers in the form <strong>of</strong> sealed bids from<br />

responsible contractors to fill the State’s needs as described in this invitation. Sealed bids<br />

for the contract items described herein will be accepted at the above address <strong>of</strong> the Chief<br />

Contract Official and at the auditorium in the Harry R. Hanley Building by U.S. Mail, delivery<br />

service or hand deposit until 10:00 a.m. prevailing local time March 5, 2010, at which time<br />

the bids will be publicly opened and read. The <strong>Department</strong> will not open or read bids<br />

received after the stated opening date and time.<br />

2. RULES GOVERNING LETTING. This letting is subject to and governed by the rules <strong>of</strong> the<br />

<strong>Department</strong> adopted at 44 <strong>Illinois</strong> Administrative Code 650 and 44 <strong>Illinois</strong> Administrative<br />

Code 660, and by the provisions <strong>of</strong> this invitation. Copies <strong>of</strong> the rules are available by<br />

contacting the above address <strong>of</strong> the Chief Contract Official.<br />

3. INSTRUCTIONS TO BIDDERS. Read the following instructions carefully before submitting<br />

any bid. Failure to follow these instructions and the rules may result in the rejection <strong>of</strong> your<br />

bid. The <strong>Department</strong> reserves the right to reject any and all bids, to waive minor or<br />

immaterial irregularities, informalities or technicalities, to advertise for new bids, or to<br />

request confirmation or clarification from any bidder regarding a bid.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


(a) CONTRACT ITEM DESCRIPTIONS. A summary description <strong>of</strong> each contract item<br />

advertised in this invitation is given following these instructions by Item numbers.<br />

Bids shall be submitted by Item number. A contract number appears after the Item<br />

number. The contract number will also be shown on the contract documents for the<br />

contract that the Item number represents. The summary description provided for the<br />

proposed work, quantities and time for completion for each Item are for information<br />

only and are subject to the terms published in the contract documents for bidding.<br />

(b) CONTRACT DOCUMENTS FOR BIDDING. Contract documents for bidding include<br />

a Notice to Bidders, Specifications, Proposal, Contract and Contract Bond document<br />

and a set <strong>of</strong> Plan documents. These documents may be separate or combined into<br />

one document. Contract documents for bidding applicable to each Item number<br />

advertised in this invitation may be examined at the above address <strong>of</strong> the Chief<br />

Contract Official. In addition, contract documents for bidding highway work may be<br />

examined at the respective District Offices in which the prospective work is located.<br />

The names and addresses <strong>of</strong> the District Engineers are as follows:<br />

REGION DISTRICT ENGINEER ADDRESS Phone<br />

1 1 D. M. O'Keefe 201 West Center Court, Schaumburg, IL 60196-1096 (847) 705-4000<br />

2 2 G. F. Ryan 819 Depot Avenue, Dixon, IL 61021-3546 (815) 284-2271<br />

2 3 G. F. Ryan 700 East Norris Drive, PO Box 697, Ottawa, IL 61350-0697 (815) 434-6131<br />

3 4 J. E. Crowe 401 Main Street, Peoria, IL 61602-1111 (309) 671-3333<br />

3 5 J. E. Crowe 13473 IL Hwy 133, PO Box 610, Paris, IL 61944-0610 (217) 465-4181<br />

4 6 R. L. Driskell 126 East Ash Street, Springfield, IL 62704-4792 (217) 782-7301<br />

4 7 R. L. Driskell 400 West Wabash, Effingham, IL 62401-2699 (217) 342-3951<br />

5 8 M. C. Lamie 1102 Eastport Plaza Dr., Collinsville, IL 62234-6198 (618) 346-3100<br />

5 9 M. C. Lamie State <strong>Transportation</strong> Bldg., PO Box 100, Carbondale, IL 62901-0100 (618) 549-2171<br />

Contract documents for bidding will not be loaned to prospective bidders. Electronic<br />

plans and proposals may be downloaded from the <strong>Department</strong>’s web site<br />

http://www.dot.il.gov/desenv/delett.html.<br />

(c) PREQUALIFICATION. Any contractor desiring to bid shall be prequalified in<br />

accordance with the rules <strong>of</strong> the <strong>Department</strong>, adopted at 44 <strong>Illinois</strong> Administrative<br />

Code 650, prior to being granted Authorization to Bid. Prequalification may be waived<br />

for particular contract items. In such cases, the manner <strong>of</strong> determining bidder<br />

responsibility will be stated in the contract documents for bidding. Contractors who<br />

desire to become prequalified or to renew their prequalification for this letting must file<br />

with the <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>, Bureau <strong>of</strong> Construction, Room 322, 2300<br />

South Dirksen Parkway, Springfield, <strong>Illinois</strong> 62764, a Contractor’s Statement <strong>of</strong><br />

Experience and Financial Condition no later than 4:30 p.m. prevailing local time,<br />

February 16, 2010. A Contractor will not be prequalified for this letting unless the<br />

statement is received before the time and day established.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


(d) AUTHORIZATION TO BID. Contractors planning to bid MUST request Authorization<br />

to Bid prior to 4:30 p.m. prevailing time March 2, 2010. No Authorization to Bid will be<br />

issued after that time. Requests for Authorization to Bid submitted by U.S. Mail or<br />

courier delivery will not be honored unless received prior to 4:30 p.m. prevailing local<br />

time March 2, 2010, at the <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>, Bureau <strong>of</strong> Construction,<br />

Room 322, 2300 South Dirksen Parkway, Springfield, <strong>Illinois</strong> 62764. A form to<br />

request authorization to bid is included in the <strong>Transportation</strong> Bulletin, and is entitled<br />

“Request for Authorization to Bid/or Not For Bid Status” (BDE 124 INT).<br />

(e) AFFIDAVIT OF AVAILABILITY. In addition to the Authorization to Bid, prospective<br />

bidders shall submit an Affidavit <strong>of</strong> Availability prior to 4:30 p.m. prevailing time March<br />

2, 2010. The Affidavit must include all uncompleted contracts awarded to them and<br />

all low bids pending award for all public and private work using the prescribed format.<br />

The sworn statement relative to contracts and pending awards must be in complete<br />

detail, be properly signed and notarized. Facsimiles <strong>of</strong> the sworn statement will be<br />

accepted for analysis, but Authorization to Bid will be issued only upon receipt <strong>of</strong> a<br />

signed and properly completed original Affidavit <strong>of</strong> Availability. Any omission or<br />

misstatement <strong>of</strong> fact in the sworn statement will be considered as sufficient grounds<br />

for the disqualification <strong>of</strong> the bidder and the rejection <strong>of</strong> bids. Prospective bidders<br />

shall notify the <strong>Department</strong> within two working days <strong>of</strong> any low bids pending award or<br />

contracts awarded which might occur between the date <strong>of</strong> submission <strong>of</strong> the sworn<br />

statement and the date <strong>of</strong> letting. For your convenience, a form to report this<br />

information is included in the <strong>Transportation</strong> Bulletin, and is entitled “Affidavit <strong>of</strong><br />

Availability” (BC 57). The form can also be downloaded from the department’s Web<br />

Site at www.dot.il.gov/const/conforms.html.<br />

(f) JOINT VENTURES. Prequalified contractors desiring to bid as a joint venture must<br />

submit the properly completed documentation no later than 4:30 p.m. prevailing local<br />

time February 26, 2010. The required forms for the joint venture are:<br />

• “Affidavit <strong>of</strong> Availability” (BC 57) from each <strong>of</strong> the joint venture entities,<br />

• “Certificate <strong>of</strong> Joint Venture” (BC 2267),<br />

• “Request for Authorization to Bid/or Not for Bid Status” (BDE 124INT).<br />

The Certificate <strong>of</strong> Joint Venture and the Request for Authorization to Bid/or Not for Bid<br />

Status forms must be in the name <strong>of</strong> the Joint Venture. The original, signed and<br />

notarized Certificate <strong>of</strong> Joint Venture and Affidavits <strong>of</strong> Availability must be received<br />

before consideration will be given for the Joint Venture request.<br />

(g) EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF THE WORK. The<br />

bidder shall, before submitting a bid on any contract item, carefully examine the<br />

provisions <strong>of</strong> the contract documents for bidding and all contract documents<br />

referenced therein that comprise the contract as defined in Article 101.09 <strong>of</strong> the<br />

Standard Specifications for Road and Bridge Construction. The bidder shall inspect<br />

in detail the site <strong>of</strong> the proposed work, investigate and become familiar with all the<br />

local conditions affecting the contract and the detailed requirements <strong>of</strong> construction.<br />

If the <strong>Department</strong> has made a sub-surface examination <strong>of</strong> the site <strong>of</strong> the work, the<br />

borings, test pits, or other information pertaining thereto are available for examination<br />

by all bidders by written request to the <strong>of</strong>fice <strong>of</strong> the District Engineer <strong>of</strong> the district in<br />

which the work is to be performed. The availability <strong>of</strong> subsurface information from the<br />

<strong>Department</strong> is solely for the convenience and information <strong>of</strong> the bidder and shall not<br />

relieve the bidder <strong>of</strong> the duty to make, and the risk <strong>of</strong> making, examinations and<br />

investigations as required to assess conditions affecting the work. Any data furnished<br />

in the contract plans is for information only and does not constitute a part <strong>of</strong> the<br />

contract. The <strong>Department</strong> makes no representation or warranty, express or implied,<br />

as to the information conveyed or as to any interpretations made from the data.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


Submission <strong>of</strong> a bid shall be a conclusive assurance and warranty the bidder has<br />

made these examinations and the bidder understands all requirements for the<br />

performance <strong>of</strong> the work. If the bid is accepted, the bidder will be responsible for all<br />

errors in the proposal resulting from a failure or neglect to comply with these<br />

instructions. The <strong>Department</strong> will not be responsible for any costs, expenses, losses,<br />

or change in anticipated pr<strong>of</strong>its resulting from such failure or neglect <strong>of</strong> the bidder to<br />

make these examinations.<br />

The bidder shall take no advantage <strong>of</strong> any error or omission in the proposal and<br />

advertised contract. Any prospective bidder who desires an explanation or<br />

interpretation <strong>of</strong> the plans, specifications, or any <strong>of</strong> the contract documents, shall<br />

request such in writing from the Central Bureau <strong>of</strong> Design and Environment at the<br />

above address <strong>of</strong> the Chief Contract Official. The request should be made in<br />

sufficient time to allow a written reply by the <strong>Department</strong> that can reach all<br />

prospective bidders before submission <strong>of</strong> their bids. Any reply given a prospective<br />

bidder concerning any <strong>of</strong> the contract documents, plans, and specifications will be<br />

furnished to all prospective bidders in the form determined by the <strong>Department</strong><br />

including, but not limited to, an addendum, if the information is deemed by the<br />

<strong>Department</strong> to be necessary in submitting bids or if the <strong>Department</strong> concludes the<br />

information would aid competition. Oral explanations, interpretations, or instructions<br />

given before the submission <strong>of</strong> bids unless at a prebid conference will not be binding<br />

on the <strong>Department</strong>.<br />

(h) ADDITIONAL INSTRUCTIONS. The Notice to Bidders, Specifications, Proposal,<br />

Contract and Contract Bond document for each contract item includes specific and<br />

additional information and instructions pertaining to submission <strong>of</strong> bids. That<br />

information should be carefully read and the instructions followed by the bidder.<br />

4. IMPORTANT DATES FOR BIDDERS. All due dates published in this invitation are<br />

summarized for convenient reference by potential bidders on the page entitled “Important<br />

Dates for Bidders”. Bidders are cautioned that all due dates are strictly enforced.<br />

5. PART OF THE CONTRACT. This invitation is made part <strong>of</strong> the contract by operation <strong>of</strong><br />

Article 101.09 <strong>of</strong> the Standard Specifications for Road and Bridge Construction.<br />

This invitation issued under the authority <strong>of</strong> the <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>, State <strong>of</strong> <strong>Illinois</strong>.<br />

Gary Hannig,<br />

Secretary <strong>of</strong> <strong>Transportation</strong><br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


IMPORTANT DATES FOR BIDDERS<br />

March 5, 2010 Bid Opening<br />

PREQUALIFICATION<br />

Any contractor who desires to become prequalified to bid on work advertised by IDOT must<br />

submit the properly completed prequalification forms to the Bureau <strong>of</strong> Construction no later than<br />

4:30 p.m. prevailing time twenty-one days prior to the letting <strong>of</strong> interest. This prequalification<br />

requirement applies to first time contractors, contractors renewing expired ratings, contractors<br />

maintaining continuous prequalification or contractors requesting revised ratings<br />

The prequalification cut-<strong>of</strong>f date is 4:30 p.m. prevailing time February 16, 2010 .<br />

Also, to be eligible to bid, existing prequalification ratings must be effective through the date <strong>of</strong> letting.<br />

JOINT VENTURES<br />

Prequalified contractors wishing to combine bidding capacity and bid items as joint ventures must<br />

submit the appropriate properly completed forms no later than 4:30 p.m. prevailing time, seven<br />

(7) days prior to the letting date. The required joint venture forms are the “Request for<br />

Authorization to Bid/or Not for Bid Status” (BDE 124INT), the ORIGINAL “Affidavit <strong>of</strong> Availability”<br />

(BC 57) and the ORIGINAL “Certificate <strong>of</strong> Joint Venture” (BC 2267).<br />

The Joint venture cut-<strong>of</strong>f date is 4:30 p.m. prevailing time February 26, 2010 .<br />

REQUESTS FOR AUTHORIZATION TO BID<br />

Contractors wanting to bid on items included in a particular letting must submit the properly<br />

completed “Request for Authorization to Bid/or Not for Bid Status” (BDE 124INT) and the properly<br />

completed ORIGINAL “Affidavit <strong>of</strong> Availability” (BC 57) to the proper <strong>of</strong>fice no later than 4:30 p.m.<br />

prevailing time, three (3) days prior to the letting date.<br />

The Authorization to Bid request cut-<strong>of</strong>f date is 4:30 p.m. prevailing time March 2, 2010 .<br />

SUBMITTAL OF BIDS<br />

The time and place <strong>of</strong> letting is always listed in the <strong>Transportation</strong> Bulletin. Most lettings are held<br />

at 10:00 a.m. prevailing time in the Auditorium <strong>of</strong> the IDOT Harry R. Hanley Building located at<br />

2300 South Dirksen Parkway, Springfield, <strong>Illinois</strong>.<br />

No bid will be accepted unless delivered prior to the time specified in the <strong>Transportation</strong> Bulletin.<br />

Bidders submitting bids by U.S. Mail or courier are cautioned to allow sufficient time for delivery.<br />

DBE UTILIZATION PLANS<br />

Projects with DBE participation require all bidders to submit a DBE Utilization Plan with their bid.<br />

ADDITIONAL AWARD CRITERIA<br />

Projects requiring Additional Award Criteria require the AS-READ-LOW-BIDDER to submit the<br />

required criteria to the Contracts Office within seven (7) working days after the letting.<br />

The cut-<strong>of</strong>f date for the submittal <strong>of</strong> the required criteria is March 16, 2010 .<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


PAVEMENT<br />

March 5, 2010 Letting<br />

Index Listing<br />

156. Cass-Sangamon 105(RS-6); 106(RS-4) FAP 67 IL 125<br />

69. Champaign (10-30)RA-I-2 FAI 57 I-57<br />

123. Champaign (28Z)RS-5 FAP 808 US 150/US 45<br />

260. Champaign-Douglas (21-28,21-10-29,10-30)RS-1 FAI 57 I-57<br />

58. Champaign 10-37RS-2 & (10,27-38)RS-1 FAI 57 I-57<br />

2. Christian 05-00071-05-RS FAS 645 CH 1<br />

1. Christian 09-00060-00-RS FAU 7877 SPRESSER STREET<br />

198. Clark-Coles D7 PAVT PATCHING 2010-5 FAS 691/689 & FAS 677 CLEONE RD & OAKLAND RD<br />

196. Clay (106,107)RS-2 FAP 828 N/A<br />

225. Clay 09-00053-00-PV FAU 8526 WORTHEY STREET<br />

179. Coles 09-00092-00-RS VARIOUS<br />

178. Coles 09-00182-00-RS VARIOUS<br />

19. Coles 4RS-1,114RS-2 FAP 832 IL 49<br />

141. Cook (145&146)RS-7 FAU 2857 ASHLAND AVE/WOOD ST<br />

240. Cook (1616&1718)RS-3 FAP 39 PERSHING RD<br />

241. Cook (2021-Y-1&3128)RS-3 FAP 348 IL 43<br />

165. Cook 01-P4019-05-BT MARQUETTE DRIVE<br />

285. Cook 0103 RS-2 FAP 370 WESTERN AVE<br />

100. Cook 0307 RS-5 FAU 3596 DOLTON AVE<br />

217. Cook 05-00161-00-CH FAU 2743 GREENWOOD ROAD<br />

168. Cook 08-00169-00-PK LEHIGH AVE. & COMPASS RD.<br />

88. Cook 0811 RS FAU 1477 PERSHING RD<br />

90. Cook 09-00020-00-RS FAU 3598 VINCENNES ROAD<br />

10. Cook 09-00022-00-RS FAU 1610 167TH STREET<br />

7. Cook 09-00030-00-RS FAU 1596 135TH STREET<br />

13. Cook 09-00031-00-RS FAU 1349 DEVON AVENUE<br />

190. Cook 09-00046-00-RS VARIOUS<br />

14. Cook 09-00051-00-RS FAU 1366 MONTROSE AVENUE<br />

15. Cook 09-00067-00-BT FAU 2696 104TH AVENUE<br />

172. Cook 09-00129-00-PV FAU 1397 ST. CHARLES ROAD<br />

248. Cook 09-00173-00-BT STONY CREEK TRAIL<br />

112. Cook 09-00247-00-RS FAU 2783 RIDGELAND AVENUE<br />

77. Cook 1315 RS-3 FAP 358 TORRENCE AVE<br />

93. Cook 1316 RS-2 FAU 2743 GREENWOOD AVE<br />

144. Cook 1316 RS-4 FAU 3778 CRAWFORD AVE<br />

137. Cook 2009-066 I FAU 3565 IL 171/ARCHER AVE<br />

62. Cook 2009-076RS FAP 305 IL 53 FRONTAGE RD<br />

143. Cook 2009-077 RS FAP 307 IL 64<br />

242. Cook 2009-131 RS FAU 3562 & FAU 1504 JOLIET RD & 55TH ST<br />

142. Cook 3248 RS-1 FAU 2843 DIXIE HWY<br />

239. Cook 3271(A&B)RS-4 FAP 348 IL 43<br />

138. Cook 3293 RS-2 FAP 305 IL 50/CICERO AVE<br />

6. Cook 3309B-RS-1 FAU 1349 DEVON AVE<br />

5. Cook 42-Z(2&3)RS-3 FAP 341 STONY ISLAND AVE<br />

139. Cook 44RS-6 FAU 2820 GOVERNORS HWY<br />

149. Cook 524-1-N FAP 344 IL 83<br />

150. Cook 8 Y-RS-5 FAP 311 US 34<br />

3. Cook C-RS-7 FAU 3587 MAIN ST/CHICAGO-JOLIET RD<br />

197. Cumberland-Clark D7 PAVT PATCHING 2010-4 FAI 70 I-70<br />

205. Cumberland 09-00061-01-RS FAS 662<br />

63. DeWitt-Piatt 124RS-6 & 125RS-3 FAP 760 IL 48<br />

61. DeWitt 124RS-6 FAP 760 IL 48<br />

67. DeWitt 2010PPP FAP 322 US 51<br />

71. Douglas-Edgar (145,146)RS-3 & 147RS-5 FAP 323 US 36<br />

275. Douglas-Moultrie 120RS-3 FAP 749 IL 133<br />

11. DuPage 09-00019-00-RS FAU 2663 CLARENDON HILLS RD.<br />

96. DuPage 09-00074-00-RS FAU 2534 JOLIET STREET<br />

89. DuPage 09-00075-00-RS FAU 2530 POWIS ROAD<br />

171. DuPage 09-00098-00-RS FAU 3884 & FAU 2625 ARMY TRAIL BLVD & MILL RD<br />

9. DuPage 09-00172-00-PK FAU 1392 FIRST STREET<br />

233. DuPage 55WRS FAU 1453 22ND STREET<br />

18. Effingham (12,13)RS-3 FAS 1652 US 45<br />

261. Effingham (12R)RS-1 FAP 328/FAU8379 US 45<br />

70. Fayette D7 HMA SAFETY SHLD 2010-1 FAP 777 IL 185<br />

26. Franklin 08-00059-00-RP FAU 9452 NORTH DUQUOIN ST.<br />

84. Fulton 18RS-4 FAP 315/317 US 136/US 24<br />

255. Fulton 21RS-4,22RS-6 FAP 630 IL 100<br />

184. Gallatin-Saline 05-00002-00-BT PEDESTRAIN TRAIL<br />

102. Greene (102,103)RS FAP 761 IL 108<br />

274. Henderson (114,116)RS-3 FAP 657 IL 164<br />

87. Henry (125,126)RS-3 FAP 22 IL 78<br />

254. Henry-Knox 132RS-4;110RS-5 FAS 1195 IL 17/IL 180<br />

- 1 -<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


86. Henry-Whiteside 115 RS-4 FAP 22 IL 78<br />

170. Jackson 05-00118-00-RP REED STATION PARKWAY<br />

134. Jefferson 09-00130-00-RP FAU 8749 NORTH DAVIDSON AVENUE<br />

32. Jo Daviess 31T FAP 301 US 20<br />

25. Johnson 09-00062-00-RS FAS 924 LICK CREEK ROAD<br />

169. Kane 08-00370-00-SP FAP 363 FABYAN PARKWAY<br />

238. Kane 126 RS-5 FAP 307 IL 64<br />

259. Knox (13,16,15)RS-4 FAP 574 IL 41<br />

252. Knox-Henry 2RS-5,3RS-3,4RS-4 FAP 37 US 34<br />

253. Knox-Stark (132,133,133EXT)RS-3 FAS 392 IL 17<br />

66. Knox 106RS-2;107RS-4;108RS-3 FAS 2400 US 150<br />

148. Lake (106-2 & 117) RS-1 FAP 334 US 12/IL 59<br />

269. Lake (46-1S&47)WRS-2 FAP 344 US 45<br />

4. Lake 44 X-RS-1 FAP 335 IL 83<br />

271. LaSalle (5)N FAP 311 IL 71<br />

192. Lee (103-1,103-2)SHLD FAI 39 I-39<br />

152. Lee 115RS-4 FAP 573 US 30<br />

97. Lee 75RS-3 FAP 694 US 52<br />

115. Livingston 114RS-2 FAP 681 IL 116<br />

159. Macoupin (1)I-2 FAS 731 SCOTTVILLE ROAD<br />

278. Macoupin 06-00086-00-PV FAS 2729 CH 3<br />

161. Madison (101,102)RS-3 FAP 604 IL 159<br />

130. Madison-St Clair 60-(30,31,128)-1 FAP 600 IL 159<br />

28. Madison 07-00089-03-RS FAS 778 ST. ROSE ROAD<br />

265. Madison 09-00048-00-RS FAU 9097 BROADWAY AVENUE<br />

91. Madison 09-00080-04-RS FAU 9010 NINTH STREET<br />

212. Madison 261-RS-1 FAP 789 IL 111<br />

268. Madison 30-ZRS-1 FAU 9122 BELTLINE RD<br />

213. Madison 31-15RS-3 FAU 9110 VADALABENE DRIVE<br />

211. Madison 42RS-2 FAS 776 POSSUM HILL RD<br />

129. Madison 60-15, 60-15B FAP 310 IL 255<br />

283. Marion 09-00096-00-RS FAU 8623 & FAU 8609 W BROADWAY & BROOKSIDE<br />

AVE<br />

52. Marion 10-00070-01-RS FAU 8566 SOUTH MARION ST.<br />

214. Marion 101RS FAP 805 IL 161<br />

267. Massac 09-00038-00-BT GEORGE ROGERS CLARK DISCOVERY TRAIL<br />

215. McHenry 00-00246-01-FP FAU 85 WALKUP ROAD<br />

12. McHenry 08-00054-00-CH FAP 305 US 14<br />

111. McHenry 09-00003-00-SP FAU 3702 RAWSON BRIDGE ROAD<br />

247. McHenry 09-00366-00-RS FAU 167 CHAPEL HILL ROAD<br />

74. McLean (101,102X)R,RS-2&55RS-PRK LN FAP 315/709 US 136<br />

68. McLean (9,10,11)RS-3 FAS 2466 US 150<br />

21. McLean 01-00001-01-BT ROUTE 66 BIKEWAY<br />

277. Mercer 06-00094-05-DR FAS 206 CH 4<br />

158. Montgomery (112)SEAL COAT FAS 1769 FRI-55 WEST<br />

23. Morgan 09-00123-00-RS FAU 8169 LAFAYETTE AVENUE<br />

101. Moultrie (101,102,105)RS-1 SBI 132 OLD IL 121<br />

57. Moultrie 3RS-5, (4,5)RS-2 FAP 758 IL 32<br />

202. Ogle 06-00242-00-RS FAS 90 RIVER ROAD<br />

250. Ogle 9RS-8 FAP 567 IL 38<br />

191. Ogle D2 PATCHING 2010-3 FAP 742 IL 2<br />

203. Peoria 09-00318-00-RS FAU 6593 UNIVERSITY STREET<br />

120. Peoria 12RS-3; 13RS-4 FAP 317 US 150<br />

118. Peoria Z[9D-15D)RS-6;(15D)RS-3],GRS-2 FAS 1388 IL 8<br />

27. Pope 06-00038-00-RS FAS 1930 BAY CITY ROAD<br />

256. Putnam-Marshall 123RS-4;(122,124)RS-5;2RS-3ETC FAP 649 & 698 IL 89 & IL 17<br />

20. Putnam 07-00020-00-RS FAS 1254 CH 16<br />

226. Richland 09-00080-00-PV FAU 8484 BUTLER STREET<br />

206. Richland 09-00117-00-RS FAS 801 EAST DUNDAS LANE<br />

153. Rock Island D2 MRS 2010-5 FAS 1205 IL 192<br />

22. Sangamon 09-00015-00-PV FAU 8081 VILLAGE CENTER DRIVE<br />

24. Sangamon 09-00447-03-PV FAU 7982 CAPITOL AVENUE<br />

180. St. Clair 05-00016-01-PV FAU 9247 ST. LOUIS ST.<br />

104. St. Clair 06-00092-02-PV FAU 9294 CONCORDIA CHURCH RD.<br />

183. St. Clair 09-00044-00-RS FAU 9199 DORIS AVENUE<br />

181. St. Clair 09-00049-01-SW OHIO AVENUE<br />

227. St. Clair 09-00219-00-RS FAU 9223 17TH STREET<br />

119. Stark (11,12)RS-2;(6W)RS-3;101RS-4 FAP 643 IL 17/IL 91<br />

272. Tazewell-Woodford 17RS-6;18RS-1;35RS-8 FAP 317 US 24<br />

55. Union 09-00098-00-RS FAS 926 ST. JOHNS ROAD<br />

17. Vermillion (36X,36X-1,34Z-3)RS-1 FAP 729 & FAU 7052 US 150<br />

257. Warren-Henderson 105RS-2 FAS 1412 IL 94<br />

92. Warren 103RS;(1,3)RS-3 FAS 411 IL 164<br />

121. Warren 4RS SBI 8A OLD US 34<br />

162. Washington 2RS-3 FAP 42 IL 127<br />

127. Washington 95-AC & 32B-I OR 322/SBI 2 OLD US 51/DELAWARE RD<br />

16. Whiteside (20-1)M FAP 309 US 30<br />

286. Whiteside (32-4)RS-2 FAP 561 IL 2<br />

- 2 -<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


229. Whiteside 110RS-4 FAP 309, FAS 1197 US 30<br />

136. Will (535B-6R&536)RS-4 FAP 351 IL 7<br />

232. Will (99-1&2)AC-3 FAI 55 I-55<br />

145. Will (H & 10)RS-7 FAP 876 IL 1<br />

186. Will-Cook 144RS-5 FAU 3778 GOVERNORS HWY<br />

110. Will 09-00018-00-RS FAU 2967 UNIVERSITY PARKWAY<br />

8. Will 09-00027-00-RS FAU 375 RAVEN ROAD<br />

105. Will 09-00039-00-RS VARIOUS<br />

95. Will 09-00418-00-RS VARIOUS<br />

140. Will 121 RS-1 FAU 323 IL 126<br />

147. Will 2009-091 GRR VARIOUS VARIOUS<br />

243. Will 99 (1&2) RS-11 FAI 55 I-55<br />

56. Williamson 08-00058-00-RS FAU 9588 EAST HERRIN ST.<br />

99. Williamson 09-00109-00-RS VARIOUS<br />

155. Winnebago 41RS-1 FAP 303 US 20 BUS<br />

223. Woodford 86-00075-01-AS FAS 358 CH 1<br />

BRIDGES<br />

132. Alexander D9 DECK SEAL 2010-1 FAI 57 I-57<br />

38. Brown 05-00065-00-BR FAS 1583 CH 3A<br />

39. Cass 00-00063-00-BR FAS 575 CH 12<br />

37. Cass 09-00074-00-BR FAS 575 CH 12<br />

94. Champaign (10-6HB-5)BR FAI 74 I-74<br />

124. Champaign (105BR)BR FAP 709 US 136<br />

60. Champaign 12BR FAS 1517 US 150<br />

289. Cumberland 07 Bridge Painting 2010-1 FAI 57 I-57<br />

280. Clark 09-00268-00-DR FAS 1660 CH 12<br />

264. Clay 09-00082-00-BR FAS 801 CH 16<br />

287. Clinton 14-12BR-1 FAP 327 US 50<br />

245. Cook 0203-100 1HB-I FAI 57 I-57<br />

220. Cook 09-00071-00-BR WHITEHALL AVE.&PRATER AVE.<br />

234. Cook 2009-069BR VARIOUS VARIOUS<br />

235. Cook 2009-070 BR FAP 348 IL 43 (HARLEM AVE)<br />

221. Crawford (21,BY)B-1 FAU 8324 TRIMBLE ROAD<br />

46. DeKalb (116,128)T FAP 573 & 557 US 30 & IL 72<br />

76. Douglas (143BR)BR FAP 323 US 36<br />

133. Douglas (15,21-25HB-2)BR FAI 57 I-57<br />

135. DuPage 10HB-R FAP 311 US 34<br />

222. Effingham D7 BRIDGE REPAIRS 2010-1 FAP 328 US 45<br />

193. Fayette 114B-1(1) & 114B-1(2) FAP 750 & FAS 719 IL 185<br />

33. Ford 104 I & 105 BR-1 FAP 796 IL 115<br />

64. Fulton (142-BR)I FAP 665 IL 116<br />

65. Grundy (111)I-6 FAP 326 IL 47<br />

117. Hancock (6G-WPSO)BR FAP 522 IL 96<br />

177. Iroquois 07-00222-01-BR FAS 1322 CH 37<br />

282. Jasper 05-10127-00-BR TR 186A<br />

31. Jo Daviess 43T & M FAP 301 US 20<br />

116. Kankakee (102)I FAS 1323 IL 115<br />

258. Knox (42B)I-1 FAP 626 IL 97<br />

29. Lake 04-00038-03-BT FAU 1257 DEERFIELD ROAD<br />

34. LaSalle (H)I-1 FAP 623 US 6<br />

80. Logan 09-00074-01-BR FAS 559 CH 2<br />

279. Macon 03-00184-00-BR FAU 7352 CH 20<br />

35. Madison 60-15HB-3 FAP 310 IL 255<br />

288. Madison 60-3HB-1-HDF FAI 270 I-270<br />

164. Madison D-8 BRIDGE CLEANING 2010-1 FAI 270 & FAP 2 I-270 & IL 3<br />

73. Marion 15B-1 FAP 327 US 50<br />

218. McHenry 06-00005-00-BR FAU 4081 THOMPSON ROAD<br />

224. Menard 08-10110-00-BR TR 166<br />

131. Monroe 67-1HBR FAP 809 IL 158<br />

276. Pope 3(I-1) SBI 34 IL 34<br />

79. Pulaski (120)I-1 FAP 726 IL 37<br />

36. Pulaski D9 BSMART FY10-2 FAI 57 I-57<br />

154. Rock Island 17(D)BR-M FAP 599 US 67<br />

40. Sangamon 09-00028-01-DR FAU 8153 GORDON DRIVE<br />

41. Scott 09-00006-02-BR FAS 605 CH 3<br />

210. St Clair 82-1-1HB FAI 70 I-70/I-55<br />

173. Stephenson 04-00164-00-BR FAS 62 GOLDMINE ROAD<br />

281. Wayne 06-00047-00-BR EAST 4TH STREET<br />

266. White 08-07120-00-BR FAS 890<br />

175. Whiteside 06-00183-00-BR FAS 76 LYNDON ROAD<br />

284. Will 112T-1 FAU 327 WEST RIVER ROAD<br />

30. Winnebago (W-1-15D)BR-1 FAS 55 IL 70<br />

151. Winnebago 1-HBR-2 FAP 301 US 20<br />

98. Woodford (114 BR-1)I FAP 702 IL 117<br />

- 3 -<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ELECTRICAL<br />

43. Cook 09-00033-00-LT FAU 2943 BURNHAM AVENUE<br />

44. DuPage 09-00020-00-LT FAP 344 IL 83<br />

185. Kane 08-00270-00-TL FAU 1521 GALENA BOULEVARD<br />

244. Kane 2009-105 TS VARIOUS VARIOUS<br />

122. Peoria 12-I-5;11-I-2 FAP 64 & FAU 6659 IL 29 & UNMARKED<br />

204. Stark 09-00001-00-LT FAP 643 WILLIAMS ST.<br />

273. Tazewell (6)TS,J FAS 2466 US 150<br />

45. Will 09-00012-00-LT FAS 2320 IL 113<br />

251. Winnebago 3TS-3 FAP 303 IL 251<br />

MISCELLANEOUS<br />

187. Bureau-LaSalle D-3 OVD SIN STR REPL 2010-37 FAI 80 I-80<br />

249. Cook 06-00162-03-SW FAU 1008 CLAIRE BOULEVARD<br />

167. Cook 08-00202-00-SW DES PLAINES RIVER TRAIL<br />

49. Cook 09-00041-00-SW FAU 2831 KEDZIE AVENUE<br />

81. Cook 09-00044-00-SW VARIOUS<br />

114. Cook 09-00049-00-SW VARIOUS<br />

51. Cook 09-00050-00-LS VARIOUS<br />

216. Cook 09-00056-00-LS FAP 29 95TH STREET<br />

219. Cook 09-00108-00-LS FAP 348 HARLEM AVENUE<br />

50. Cook 09-00283-00-LS FAP 350 US 41<br />

59. Cook D 1 N COOK CNTY RR 10-42 VARIOUS VARIOUS<br />

72. Cook D-1 S COOK CNTY RR 10-43 VARIOUS VARIOUS<br />

166. DuPage 08-00086-00-SW FAU 1376 GRAND AVENUE<br />

208. Franklin D9 MITIGATE WETLAND SUGAR CAMP FAP 853 IL 14<br />

182. Jersey 09-00034-02-SW FAU 8801 & FAU 8818 FAIRGROUNDS AVE.& JUNE<br />

ST.<br />

201. JoDaviess 08-00043-00-SW RIDGE STREET<br />

47. Kane-Cook 2009-088 I FAP 339 IL 62<br />

113. Kane 09-00056-00-LS FAP 341 IL 72<br />

236. Lake 2009-072 I VARIOUS VARIOUS<br />

176. LaSalle 09-00161-00-SW VARIOUS<br />

262. Lee 09-P4000-01-BT LOWELL TRAIL<br />

290. Macon 07 Safety Tree RM 2010-1 FAP 714 IL 48<br />

189. Madison-St Clair D 8 OVD SIN STR REPL 2010-45 VARIOUS VARIOUS<br />

207. Madison 09-00075-01-LS FAU 8902 GOVERNORS PARKWAY<br />

54. Madison 09-00176-01-LS FAP 2 IL 3<br />

195. Madison 60-(30,31,128)DM FAP 600 IL 159<br />

53. Mason 09-00065-00-ST VARIOUS<br />

263. Peoria 09-00066-01-SW FAU 6679 PFEIFFER ROAD<br />

75. Peoria 72-[(7)RS-2;(1,7-1)I] FAP 318 IL 6<br />

126. Richland-Edwards D7 GUARDRAIL 2010-1 FAP 116 IL 130<br />

109. Rock Island BLACK HAWK STATE HISTORIC SITE PARK ROADS PARK ROADS<br />

228. Saline 06-00082-00-BT PEDESTRIAN PATH<br />

157. Sangamon D6 RUMBLESTRIP, MRKING 2010 FAP 658 IL 29<br />

163. St Clair-Clinton 123-1-J,(26,24)-J FAP 805 & FAS 1780 IL 161 & OLD US 50<br />

174. Stephenson 09-00138-01-LS FAP 505 STEPHENSON STREET<br />

246. Various 2009-127 SG VARIOUS VARIOUS<br />

188. Various D 1 GRDRL DELIN MAINT 10-44 VARIOUS VARIOUS<br />

230. Various D 1 GRVD INT PVMNT MRK 10-11 VARIOUS VARIOUS<br />

83. Various D 2 H-T PVMNT MRK RPR 10-21 VARIOUS VARIOUS<br />

106. Various D 3 H-T PVMNT MRK RPR 10-22 VARIOUS VARIOUS<br />

107. Various D 5 H-T PVMNT MRK RPR 10-24 VARIOUS VARIOUS<br />

108. Various D 7 H-T PVMNT MRK RPR 10-26 VARIOUS VARIOUS<br />

103. Various D 8 H-T PVMNT MRK RPR 10-27 VARIOUS VARIOUS<br />

82. Various D2 WEED CONTROL SPRAY 2010 VARIOUS VARIOUS<br />

199. Various D7 WEED CONTROL SPRAYING 2010 FAI 57 & FAI 70 I-57 & I-70<br />

200. Various D9 WEED SPRAY 2010-1 VARIOUS VARIOUS<br />

231. Various SIGN OVERLAY 2010-41 VARIOUS VARIOUS<br />

270. Will 06-00162-01-SW EXCHANGE ST & SANGAMON ST<br />

48. Will 09-00043-00-SW FAU 321 KANKAKEE STREET<br />

237. Will 2009-073 I FAP 852 US 52<br />

146. Will 2009-090 GRR VARIOUS VARIOUS<br />

78. Will 2009-092-GRR VARIOUS VARIOUS<br />

- 4 -<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


AERONAUTICS<br />

6A. Franklin BENTON MUNICIPAL<br />

2A. Jackson SOUTHERN ILLINOIS<br />

7A. Kankakee GREATER KANKAKEE<br />

3A. Lake WAUKEGAN REGIONAL<br />

5A. Logan LOGAN COUNTY<br />

4A. Rock Island QUAD-CITY INTERNATIONAL<br />

1A. Vermilion VERMILION COUNTY<br />

ILLINOIS DEPARTMENT OF NATURAL RESOURCES<br />

2W. Cook CRYSTAL CREEK FLOOD CONTROL PROJECT PHASE IIA<br />

1W. Cook LAKE MICHIGAN/CHICAGO RIVER LEAKAGE CONTROL<br />

- 5 -<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 1 -<br />

1. Contract No. 93512 Christian County District 6<br />

Section 09-00060-00-RS (TAYLORVILLE)<br />

FAU Route 7877 (SPRESSER STREET) Project ARA-M-5067(17)<br />

2.25 miles HMA binder and surface with three-foot aggregate wedge shoulders along each side and pavement marking<br />

on Spresser Street from just north <strong>of</strong> IL Route 148 to West Avenue in Taylorville; includes 105 tons aggregate surface;<br />

3,770 gals bituminous materials; 78 tons aggregate; 3,710 tons polymerized leveling binder; 1,967 sq yds HMA surface<br />

removal; 898 sq yds PCC surface removal; 4,160 tons HMA surface; 7,942 sq yds aggregate shoulders; 75,750 ft<br />

pavement marking; 19,000 sq ft work zone pavement marking removal; 190 raised reflective pavement marker removals;<br />

railroad protective liability insurance; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (40 Working Days) (Job No. C-96-241-10) (6-10429-0000)<br />

(See Special Provisions for DBE Percentage)<br />

2. Contract No. 93517 Christian County District 6<br />

Section 05-00071-05-RS<br />

FAS Route 645 (CH 1) Project ARA-RS-645(112)<br />

6.60 miles milling, HMA binder, surface and shoulders, guardrail, traffic barrier terminals, pavement markings and raised<br />

pavement markings on County Highway 1 beginning at Vanderville and continuing north for 6.60 miles; includes 41 cu yds<br />

earth excavation; 650 cu yds furnished excavation; 0.8 acre seeding; 111 tons aggregate base course; 148 sq yds HMA<br />

base course; 308 tons aggregate surface; 10,937 gals bituminous materials; 210 tons aggregate prime coat; 85,885 sq<br />

yds HMA surface removal; 17,590 tons HMA binder; 8,900 tons HMA surface; 28,061 sq yds aggregate shoulders; 975.5<br />

ft steel plate beam guardrail; 8 traffic barrier terminals; 202,128 ft pavement marking; 292 raised reflective pavement<br />

markers; 16 guardrail markers; 8 terminal markers; removal <strong>of</strong> 292 raised reflective pavement markers; 100 tons recycled<br />

material patching; 379,854 gals bituminous materials; 108,530 sq yds cold in-place recycling bituminous concrete<br />

pavement; 6,412 cu yds shoulder excavation; traffic control and protection; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (60 Working Days) (Job No. C-96-206-10) (6-10279-0000)<br />

(See Special Provisions for DBE Percentage)<br />

This project is eligible for the <strong>Department</strong>’s Mentor-Protégé Program.<br />

3. Contract No. 60H94 Cook County District 1<br />

Section C-RS-7<br />

FAU Route 3587 (MAIN ST/CHICAGO-JOLIET RD)<br />

3.14 miles <strong>of</strong> milling, HMA surface, striping and other work on Main Street (Chicago/Joliet Road) from <strong>Illinois</strong> Street to IL<br />

Route 83 in Lemont; includes 300 units grading and shaping shoulders; 35 sq yds topsoil; 35 sq yds sodding; 2,255 tons<br />

polymerized leveling binder (machine method); 4,600 tons HMA surface course, Mix D; 50 sq ft concrete sidewalk; 54,650<br />

sq yds milling; 2,770 sq yds patching; 1,380 tons aggregate wedge shoulder; 61,360 ft thermoplastic pavement marking;<br />

mobilization; traffic control and protection. (30 Working Days) (Job No. C-91-834-09) (1-76736-0000)<br />

(See Special Provisions for DBE Percentage)<br />

4. Contract No. 60H95 Lake County District 1<br />

Section 44 X-RS-1<br />

FAP Route 335 (IL 83)<br />

0.30 mile <strong>of</strong> patching, milling, HMA surface striping and other work on IL Route 83 from IL Route 60/IL Route 83 to U.S.<br />

Route 45 in Mundelein; includes 60 sq yds topsoil; 60 sq yds sodding; 1,045 tons polymerized HMA surface course, Mix<br />

F; 10,327 sq yds milling; 650 sq yds patching; 440 tons polymerized leveling binder (machine method); 66 ft detector loop<br />

replacement; 7,460 ft thermoplastic pavement marking; mobilization; traffic control and protection. (20 Working Days)<br />

(Job No. C-91-835-09) (1-77144-0000) (See Special Provisions for DBE Percentage)<br />

5. Contract No. 60I07 Cook County District 1<br />

Section 42-Z(2&3)RS-3<br />

FAP Route 341 (STONY ISLAND AVE)<br />

1.16 miles <strong>of</strong> milling, HMA surface, striping and other work on Stony Island Avenue and the exit/entrance ramps <strong>of</strong> I-94<br />

(Bishop Ford Expressway); includes 170 units grading and shaping shoulders; 8,250 tons polymerized HMA surface<br />

course, Mix F; 900 sq ft concrete sidewalk; 42,200 sq yds milling; 5,140 sq yds patching; 3,470 tons polymerized leveling<br />

binder (machine method); 1,800 sq yds concrete surface removal; 39,570 ft thermoplastic pavement marking; 44,320 ft<br />

epoxy pavement marking; mobilization; traffic control and protection. (60 Working Days)<br />

(Job No. C-91-847-09) (1-70065-0000) (See Special Provisions for DBE Percentage)<br />

6. Contract No. 62759 Cook County District 1<br />

Section 3309B-RS-1<br />

FAU Route 1349 (DEVON AVE)<br />

2.7 miles <strong>of</strong> patching, milling and HMA surface on Devon Avenue from North Central Avenue to McCormick Boulevard in<br />

Lincolnwood and Chicago; includes 8,228 tons polymerized HMA surface course, Mix F; 83,960 sq yds milling; 3,398 ft<br />

curb and gutter removal and replacement; 3,358 sq yds patching; 1,045 sq ft concrete sidewalk; 16,055 ft thermoplastic<br />

pavement marking; 3,463 tons polymerized leveling binder (machine method); 2,830 ft detector loop replacement;<br />

mobilization; traffic control and protection. (Completion Date: August 31, 2010 Plus 05 Working Days)<br />

(Job No. C-91-221-04) (1-70103-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 2 -<br />

7. Contract No. 63311 Cook County District 1<br />

Section 09-00030-00-RS (CRESTWOOD)<br />

FAU Route 1596 (135TH STREET) Project ARA-M-9003(384)<br />

0.78 mile HMA resurfacing including surface removal, leveling binder, patching, HMA surface, curbs, sidewalks and<br />

pavement striping on 135th Street from Central Avenue to East Circle Drive in Crestwood; includes 1,730 gals bituminous<br />

materials; 35 tons aggregate; 17,195 sq yds surface removal; 1,420 tons HMA surface; 657 sq ft PCC sidewalk; 176 sq ft<br />

detectable warnings; 657 sq ft sidewalk removal; 92 ft combination concrete curb and gutter removal and replacement;<br />

600 sq yds Class D patches; 604 tons aggregate shoulders; 13,970 ft pavement marking; removal <strong>of</strong> 100 raised reflective<br />

pavement markers; 131 raised reflective pavement markers; traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (35 Working Days)<br />

(Job No. C-91-770-09) (1-20807-0000) (See Special Provisions for DBE Percentage)<br />

8. Contract No. 63326 Will County District 1<br />

Section 09-00027-00-RS (SHOREWOOD)<br />

FAU Route 375 (RAVEN ROAD) Project ARA-M-9003(526)<br />

Project consists <strong>of</strong> HMA surface removal, HMA pavement patching, sidewalk removal and replacement, HMA resurfacing,<br />

adjustment <strong>of</strong> structures, aggregate shoulder installation, thermoplastic pavement markings and all incidental items to<br />

complete the work on FAU Route 375 (Raven Road) from Seil Road to Valencia Drive in the village <strong>of</strong> Shorewood;<br />

includes 88 sq yds aggregate base course; 1,055 gals bituminous materials (prime coat); 443 tons leveling binder<br />

(machine method); 394 sq yds HMA surface removal; 886 tons HMA surface course; 790 sq ft PCC sidewalk; 90 sq ft<br />

detectable warnings; 10,547 sq yds HMA surface removal; 840 sq ft sidewalk removal; 820 ft combination concrete curb<br />

and gutter removal and replacement; 391 sq yds Class D patches; 4,454 ft thermoplastic pavement marking line; 112 sq<br />

yds PCC driveway removal and replacement; 13 drainage and utility structures to be adjusted; traffic control and<br />

protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(20 Working Days) (Job No. C-91-727-09) (1-20749-0000) (See Special Provisions for DBE Percentage)<br />

9. Contract No. 63382 DuPage County District 1<br />

Section 09-00172-00-PK (ELMHURST)<br />

FAU Route 1392 (FIRST STREET) Project ARA-9003(412)<br />

Project consists <strong>of</strong> HMA base course, leveling binder, HMA surface course, aggregate base course, curb and gutter,<br />

drainage structure installation, pavement markings and all other incidental items to complete the work on FAU Rte. 1392<br />

(First Street) from Myrtle Avenue to Clara Place in the city <strong>of</strong> Elmhurst; includes 1,790 cu yds earth excavation; 122 cu<br />

yds trench backfill; 1,388 sq yds topsoil furnish and place; 33 units supplemental watering; 402 sq yds HMA base course;<br />

210 gals bituminous materials (prime coat); 208 tons HMA binder course; 166 tons HMA surface course; 383 sq yds<br />

pavement removal; 782 ft combination curb and gutter removal; 258 ft storm sewers; 2,018 ft combination concrete curb<br />

and gutter; 372 ft guardrail removal; 1,408 ft chain link fence; 1,614 cu yds <strong>special</strong> waste disposal; 158 ft metal posts; 867<br />

ft paint pavement marking line; 1,953 sq yds aggregate subgrade; traffic control and protection; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (30 Working Days)<br />

(Job No. C-91-795-09) (1-20796-0000) (See Special Provisions for DBE Percentage)<br />

10. Contract No. 63390 Cook County District 1<br />

Section 09-00022-00-RS (ORLAND HILLS)<br />

FAU Route 1610 (167TH STREET) Project ARA-M-9003(372)<br />

0.70 mile milling, patching, HMA resurfacing, curb and gutter and minor drainage improvements on 167th Street from 88th<br />

Avenue to Hobart Avenue in Orland Hills; includes 40 cu yds trench backfill; 3,000 gals bituminous materials; 60 tons<br />

aggregate; 1,650 tons HMA surface; 14,700 sq yds HMA surface removal; 1,600 ft combination concrete curb and gutter<br />

removal and replacement; 100 sq ft sidewalk removal and replacement; 1,400 sq yds Class D patches; 385 ft storm<br />

sewers; 22,475 ft pavement marking; 825 tons polymerized leveling binder; 19 structures to be adjusted; 100 sq yds PCC<br />

driveway removal and replacement; 300 sq yds HMA driveway removal and replacement; traffic control and protection;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(35 Working Days) (Job No. C-91-686-09) (1-20774-0010) (See Special Provisions for DBE Percentage)<br />

11. Contract No. 63403 DuPage County District 1<br />

Section 09-00019-00-RS (WILLOWBROOK)<br />

FAU Route 2663 (CLARENDON HILLS RD.) Project ARA-9003(391)<br />

0.51 mile surface removal, HMA leveling binder, patching, HMA surface, aggregate shoulder and striping on Clarendon<br />

Hills Road from 75th Street to 79th Street in Willowbrook; includes 1,500 gals bituminous materials; 20 tons aggregate;<br />

1,180 tons HMA surface; 9,904 sq yds HMA surface removal; 400 sq yds Class D patching; 100 tons aggregate<br />

shoulders; 6,370 ft pavement marking; 162 ft detector loop replacement; 51.4 sq ft temporary information signing; 586<br />

tons polymerized leveling binder; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (15 Working Days) (Job No. C-91-777-09) (1-20812-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 3 -<br />

12. Contract No. 63404 McHenry County District 1<br />

Section 08-00054-00-CH (CARY)<br />

FAP Route 305 (US 14) Project M-ARA-9003(313)<br />

Project consists <strong>of</strong> the installation <strong>of</strong> a right turn lane, HMA surface removal, resurfacing, patching, driveways, curb and<br />

gutter, sidewalks, structure adjustments, traffic signal modifications and all other incidental items to complete the work at<br />

the intersection <strong>of</strong> FAP Rte. 305 (US 14) and East Main Street in the village <strong>of</strong> Cary; includes 631 cu yds earth<br />

excavation; 270 cu yds removal and disposal <strong>of</strong> unsuitable material; 930 sq yds geotechnical fabric for ground<br />

stabilization; 1,895 sq yds topsoil furnish and place; 81 units supplemental watering; 74 lbs temporary erosion control<br />

seeding; 318 ft perimeter erosion barrier; 3,905 sq yds aggregate base course; 695 sq yds HMA base course; 1,872 gals<br />

bituminous materials (prime coat); 103 tons polymerized HMA binder course; 619 tons HMA surface course; 1,009 sq yds<br />

protective coat; 101 sq yds PCC driveway pavement; 6,290 sq ft PCC sidewalk; 220 sq yds pavement removal; 6,580 sq<br />

yds HMA surface removal; 635 ft combination curb and gutter removal; 1,318 sq yds Class D patches; 70 tons aggregate<br />

wedge shoulder; 584 ft storm sewers, Class A; 46 ft storm sewer removal; 15 inlets; 1,380 ft combination concrete curb<br />

and gutter; 6,388 ft thermoplastic pavement marking line; 325 ft conduit in trench; 324 ft trench and backfill for electrical<br />

work; 7,308 ft electric cable in conduit; 3 steel mast arm assemblies and poles; 11 signal heads, LED; 350 ft detector<br />

loop; 6,590 ft remove electric cable from conduit; 885 sq yds aggregate subgrade; 350 sq ft modular segmental block<br />

retaining wall; 493 tons polymerized leveling binder; 2,618 ft fiber optic cable in conduit; traffic control and protection;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(15 Working Days) (Job No. C-91-619-09) (1-20803-0000) (See Special Provisions for DBE Percentage)<br />

13. Contract No. 63411 Cook County District 1<br />

Section 09-00031-00-RS (ROSEMONT)<br />

FAU Route 1349 (DEVON AVENUE) Project ARA-9003(489)<br />

0.38 mile HMA surface removal, leveling binder, HMA surface, pavement patching, sidewalks and detector loops on<br />

Devon Avenue from Higgins Road to Interstate Rte. 294 in Rosemont; includes 50 cu yds remove and dispose unsuitable<br />

material; 50 cu yds subbase granular material; 2,530 gals bituminous materials; 52 tons aggregate; 48 tons mixture for<br />

cracks, joints and flangeways; 13,025 sq yds surface removal; 2,125 tons HMA binder course; 1,100 tons HMA surface<br />

course; 1,190 sq ft PCC sidewalk removal and replacement; 210 sq ft detectable warnings; 400 ft combination concrete<br />

curb and gutter removal and replacement; 1,265 sq yds Class B patches; 11 frames and lids to be adjusted; 6,425 ft<br />

pavement marking; 450 ft detector loop replacement; traffic control and protection; Federally funded; (A Special Provision<br />

for this contract requires insurance that names additional insureds). (25 Working Days)<br />

(Job No. C-91-075-10) (1-20779-0010) (See Special Provisions for DBE Percentage)<br />

14. Contract No. 63429 Cook County District 1<br />

Section 09-00051-00-RS (HARWOOD HEIGHTS)<br />

FAU Route 1366 (MONTROSE AVENUE) Project ARA-9003(500)<br />

Project consists <strong>of</strong> HMA removal, adjustment <strong>of</strong> existing valve boxes, detector loop replacement, HMA surface course,<br />

pavement markings and all other incidental items to complete the work on FAU Route 1366 (Montrose Avenue) from<br />

Sayre Avenue to Forest Preserve Avenue in the village <strong>of</strong> Harwood Heights; includes 1,287 gals bituminous materials<br />

(prime coat); 26 tons aggregate (prime coat); 1,442 tons HMA surface course; 12,872 sq yds HMA surface removal; 6<br />

valve boxes to be adjusted; 36 frames and lids to be adjusted; 24,224 ft thermoplastic pavement marking line; 319 ft<br />

detector loop replacement; 12 butt joints; traffic control and protection; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (15 Working Days) (Job No. C-91-107-10) (1-20765-0010)<br />

(See Special Provisions for DBE Percentage)<br />

15. Contract No. 63434 Cook County District 1<br />

Section 09-00067-00-BT (ORLAND PARK)<br />

FAU Route 2696 (104TH AVENUE) Project ARA-9003(390)<br />

Project consists <strong>of</strong> earth excavation, structure excavation, HMA pavement, segmental concrete block retaining wall,<br />

guardrail modification, storm drainage system, landscaping, signs and all other incidental items to complete the work on<br />

FAU Route 2696 (104th Avenue) from 167th Street to 163rd Place in the village <strong>of</strong> Orland Park; includes 150 cu yds earth<br />

excavation; 220 cu yds renewal and disposal <strong>of</strong> unsuitable material; 312 cu yds furnished excavation; 280 cu yds topsoil<br />

excavation and placement; 2,220 sq yds aggregate base course; 249 tons HMA surface course; 760 cu yds structure<br />

excavation; 420 ft pipe handrail; 135 ft storm sewers; 42 ft pipe underdrains; 420 ft concrete gutter; 118.5 ft metal post;<br />

200 ft thermoplastic pavement marking line; 3,050 sq ft segmental concrete block wall; 400 ft bike path approach<br />

guardrail adjustment; traffic control and protection; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (50 Working Days) (Job No. C-91-776-09) (1-20775-0010)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 4 -<br />

16. Contract No. 64F37 Whiteside County District 2<br />

Section (20-1)M<br />

FAP Route 309 (US 30) Project ACHSIP-309(12)<br />

This project consists <strong>of</strong> intersection improvements located at U.S. Route 30 and IL Route 136 east <strong>of</strong> Fulton; includes<br />

1,545 cu yds earth excavation; 2,295 sq yds topsoil furnish and place; 1,857 tons HMA binder and surface course; 685 ft<br />

strip reflective crack control treatment; 253 tons aggregate shoulders; 859 sq yds HMA shoulders; 4 end sections; 12 ft<br />

pipe culverts; 756 sq ft concrete median surface; 4,384 ft thermoplastic pavement marking line; 71 raised reflective<br />

pavement markers; 1 electric service installation; 318 ft unit duct,600V,2-1C No.8,1/C No 8 ground,(xlp-type use),3/4"<br />

diameter polyethylene; 166 ft trench and backfill for electrical work; 1 lighting controller, photocell relay; 1 traffic signal<br />

post; 185 ft combination concrete curb and gutter; 3,910 sq yds geotechnical reinforcement; 97 sq yds rumble<br />

resurfacing; mobilization; traffic control and protection; Federally funded. (Completion Date: June 25, 2010 Plus 05<br />

Working Days) (Job No. C-92-196-09) (2-30002-0100) (See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

17. Contract No. 70315 Vermillion County District 5<br />

Section (36X,36X-1,34Z-3)RS-1<br />

FAP Route 729 & FAU Route 7052 (US 150)<br />

4.3 miles <strong>of</strong> inlay resurfacing on U.S. Route 150 from west <strong>of</strong> Interstate 74 to Logan Avenue in Danville; includes 4,323<br />

tons leveling binder (machine method); 10,965 tons HMA surface course, N70; 135,420 sq yds HMA surface removal;<br />

3,177 sq yds Class D patches; 1,887 tons aggregate shoulders; 3,612 ft steel plate beam guardrail; 18 traffic barrier<br />

terminals; 490 sq ft sign panel; 74 ft overhead sign structure cantilever; 108,426 ft thermoplastic pavement marking line;<br />

625 raised reflective pavement markers; 495 ft unit duct, 600V, 2-1C No. 6 ground,(XLP-Type use), 1" dia. polyethylene;<br />

1,551 ft detector loop; 65 ft overhead sign structure walkway, cantilever; 9,575 ft cold milling; railroad protective liability<br />

insurance; mobilization; traffic control and protection. (65 Working Days) (Job No. C-95-059-03) (5-51670-0000)<br />

(See Special Provisions for DBE Percentage)<br />

18. Contract No. 74376 Effingham County District 7<br />

Section (12,13)RS-3<br />

FAS Route 1652 (US 45)<br />

Pavement patching, resurfacing, striping and other work along 4.64 miles <strong>of</strong> U.S. Route 45 beginning at the Shelby<br />

County line and continuing southerly, located in Effingham County; includes 2,831 tons leveling binder (machine method);<br />

5,691 tons HMA surface course, Mix C; 67,235 sq yds milling; 1,034 sq yds patching; 1,534 tons aggregate shoulders;<br />

59,960 ft paint pavement marking; mobilization; traffic control and protection. (45 Working Days)<br />

(Job No. C-97-061-09) (7-50218-0000) (See Special Provisions for DBE Percentage)<br />

19. Contract No. 74418 Coles County District 7<br />

Section 4RS-1,114RS-2<br />

FAP Route 832 (IL 49)<br />

4.4 miles <strong>of</strong> patching, milling, HMA surface, striping and other work on IL Route 49 from IL Route 16 to the Clark County<br />

line; includes 5,337 tons HMA surface course, Mix C; 63,260 sq yds milling; 1,315 sq yds patching; 2,115 tons aggregate<br />

shoulders; 57,329 ft paint pavement marking; mobilization; traffic control and protection. (35 Working Days)<br />

(Job No. C-97-133-09) (7-50325-0000) (See Special Provisions for DBE Percentage)<br />

20. Contract No. 89413 Putnam County District 4<br />

Section 07-00020-00-RS<br />

FAS Route 1254 (CH 16) Project ARA-1254(110)<br />

Project consists <strong>of</strong> HMA resurfacing, aggregate shoulders, pavement markings and all other incidental items to complete<br />

the work on FAS Rte. 1254 (CH 16) from IL Rte. 89 east 2 miles to the LaSalle-Putnam County Line; includes 3,358 gals<br />

bituminous materials (prime coat); 50 tons aggregate (prime coat); 152 sq yds HMA surface removal-butt joint; 2,823 tons<br />

HMA surface course; 150 tons aggregate shoulders; 2,068 ft short term pavement marking; 345 sq ft work zone<br />

pavement marking removal; 27,372 ft paint pavement marking line; traffic control and protection; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (15 Working Days)<br />

(Job No. C-94-112-06) (4-10232-0010) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 5 -<br />

21. Contract No. 91429 McLean County District 5<br />

Section 01-00001-01-BT<br />

ROUTE 66 BIKEWAY Project ARA-D5(90)<br />

Construction <strong>of</strong> 10-foot HMA bike path, aggregate shoulders, median replacement, new culverts, culvert extensions<br />

including box culverts, a retaining wall, erosion control, pavement markings and all other incidental items to complete the<br />

work on the Route 66 Bikeway from the village <strong>of</strong> Shirley to the southwest side <strong>of</strong> the city <strong>of</strong> Bloomington at Fox Creek<br />

Road; includes 98 units tree removal; 5,880 cu yds earth excavation; 5,105 cu yds furnished excavation; 35,422 sq yds<br />

topsoil furnish and place; 7.3 acres seeding; 217 sq yds erosion control blanket; 1,464 lbs temporary erosion control<br />

seeding; 790 ft temporary ditch checks; 5,110 ft perimeter erosion barrier; 22,325 sq yds subbase granular material;<br />

12,260 gals bituminous materials (prime coat); 1.722 tons leveling binder (machine method); 1,716 tons HMA surface<br />

course; 222 ft combination curb and gutter removal; 471 sq ft median removal; 5,607 sq yds aggregate shoulders; 4,620<br />

lbs reinforcement bars; 333 ft pipe culverts; 14 end sections; 58 ft combination concrete curb and gutter; 221 sq ft<br />

concrete median surface; 267 sq ft sign panel; 5,304 ft thermoplastic pavement marking line; 36 bollard assemblies; traffic<br />

control complete; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (65 Working Days) (Job No. C-95-301-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

22. Contract No. 93513 Sangamon County District 6<br />

Section 09-00015-00-PV (SHERMAN)<br />

FAU Route 8081 (VILLAGE CENTER DRIVE) Project ARA-167(59)<br />

Project consists <strong>of</strong> constructing a new intersection including turn lanes, curbed median, HMA overlay, traffic signalization<br />

and all other incidental items to complete the work at FAU Route 8081 (Village Center Drive) and FAP Route 666<br />

(Business 55) in the village <strong>of</strong> Sherman; includes 1,820 cu yds earth excavation; 1.4 tons agricultural ground limestone;<br />

200 lbs temporary erosion control seeding; 2,755 sq yds subbase granular material; 958 sq yds HMA base course; 1,499<br />

sq yds HMA base course widening; 562 gals bituminous materials (prime coat); 693 tons HMA surface course; 5,503 sq<br />

yds HMA surface removal; 1,658 ft combination curb and gutter removal; 449 sq yds paved shoulder removal; 908 sq yds<br />

HMA shoulders; 102 ft storm sewers, Class B; 1,342 ft combination concrete curb and gutter; 1,164 sq ft concrete median<br />

surface; 6,368 ft temporary pavement marking line; 4,839 ft thermoplastic pavement marking line; 1,469 ft preformed<br />

plastic pavement marking line; 65 raised reflective pavement markers; 1,074 ft conduit in trench; 1,059 ft trench and<br />

backfill for electrical work; 4,243 ft electric cable in conduit; 3 steel combination mast arm assemblies and poles; 52 ft<br />

concrete foundation; 13 signal heads, polycarbonate, LED; traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (45 Working Days)<br />

(Job No. C-96-210-10) (6-10436-0000) (See Special Provisions for DBE Percentage)<br />

23. Contract No. 93514 Morgan County District 6<br />

Section 09-00123-00-RS (JACKSONVILLE)<br />

FAU Route 8169 (LAFAYETTE AVENUE) Project ARA-5032(29)<br />

Resurfacing project consists <strong>of</strong> HMA surface course and leveling binder, storm sewer, pavement patching, manhole/valve<br />

box adjustments, pavement markings and all other incidental items to complete the work on FAU Route 8169 (Lafayette<br />

Avenue) from Webster Avenue to North Church Street in the city <strong>of</strong> Jacksonville; includes 238 cu yds trench backfill;<br />

1,454 gals bituminous materials (prime coat); 30 tons aggregate (prime coat); 467 tons leveling binder (machine method);<br />

451 sq yds PCC surface removal; 2,151 tons HMA surface course; 1,173 sq ft PCC sidewalk; 358 ft combination curb and<br />

gutter removal; 1,189 sq ft sidewalk removal; 892 sq yds Class C patches; 192 ft storm sewer removal; 200 ft adjusting<br />

water main; 358 ft combination concrete curb and gutter; 200 ft storm sewers; 3,252 ft thermoplastic pavement marking<br />

line; 618 ft storm sewer (water main requirement); traffic control complete; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (35 Working Days) (Job No. C-96-240-10) (6-10434-0010)<br />

(See Special Provisions for DBE Percentage)<br />

24. Contract No. 93518 Sangamon County District 6<br />

Section 09-00447-03-PV (SPRINGFIELD)<br />

FAU Route 7982 (CAPITOL AVENUE) Project HPP-ARA-D6(89)<br />

0.14 mile streetscape including removal <strong>of</strong> existing pavement, sidewalks and lighting and replace with concrete pavers,<br />

planting beds, traffic signals and lighting all on Capitol Avenue between 5th Street and 7th Street in Springfield; includes<br />

320 units tree removal; 3,806 sq yds subbase granular material; 237 tons aggregate for temporary access; 289 sq yds<br />

HMA surface removal; 72 tons HMA surface; 3,353 sq yds PCC pavement; 20,317 sq ft PCC sidewalk; 344 sq ft<br />

detectable warnings; 48 cu yds structure excavation; 467 sq yds HMA surface removal; 25.6 cu yds concrete structures;<br />

3,740 lbs reinforcement bars; 215 ft storm sewers; 2,010 ft pipe underdrains; 2,396 sq yds concrete paver pavement;<br />

1,009 sq yds concrete paver sidewalk; 1,105 ft combination concrete curb and gutter; 4 ornamental lighting units; 46.5 sq<br />

ft sign panel; 199 ft epoxy pavement marking; 356 ft conduit in trench; 500 ft unit duct; 356 ft trench and backfill; 1,625 ft<br />

electric cable in conduit; 8 signal heads; 1,697 plants; 204 shrubs; 2 trainees; traffic control and protection; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (65 Working Days)<br />

(Job No. C-96-222-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 6 -<br />

25. Contract No. 99372 Johnson County District 9<br />

Section 09-00062-00-RS<br />

FAS Route 924 (LICK CREEK ROAD) Project ARA-RS-924(124)<br />

1.99 HMA overlay on existing surface and placement <strong>of</strong> crushed stone shoulders on Lick Creek Road from the Williamson<br />

County line southeasterly 1.99 miles; includes 50 tons aggregate surface course; 2,520 gals bituminous materials; 40<br />

tons aggregate (prime coat); 1,990 tons leveling binder; 345 sq yds HMA surface removal; 480 tons HMA binder course;<br />

1,790 tons HMA surface course; 1,480 tons aggregate shoulders; 58.5 sq ft sign panel; 138.5 ft telescoping steel sign<br />

support; 33,980 ft paint pavement marking; 142 raised reflective pavement markers; traffic control and protection;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(25 Working Days) (Job No. C-99-541-09) (9-10382-0010) (See Special Provisions for DBE Percentage)<br />

26. Contract No. 99396 Franklin County District 9<br />

Section 08-00059-00-RP (BENTON)<br />

FAU Route 9452 (NORTH DUQUOIN ST.) Project ARA-M-5005(11)<br />

Project consists <strong>of</strong> PCC pavement, pavement removal, PCC sidewalks, combination curb and gutter, driveways, storm<br />

sewers and all other incidental items to complete the work on FAU Route 9452 (North Duquoin Street) from McFall Street<br />

north to FAI Route 57 overpass bridge in the city <strong>of</strong> Benton; includes 525 units tree removal; 3,600 cu yds earth<br />

excavation; 625 cu yds removal and disposal <strong>of</strong> unsuitable material; 4 tons agricultural ground limestone; 9,680 sq yds<br />

erosion control blanket; 200 ft temporary ditch checks; 2,398 ft perimeter erosion barrier; 11,742 sq yds subbase granular<br />

material; 595 tons aggregate surface course; 10,621 sq yds PCC pavement; 12,000 sq yds protective coat; 674 sq yds<br />

PCC driveway; 13,232 sq ft PCC sidewalk; 8,696 sq yds pavement removal; 1,294 sq ft sidewalk removal; 325 tons<br />

aggregate shoulders; 372 ft storm sewers, Class A; 522 ft pipe drains; 42 inlets; 1,125 ft steel plate beam guardrail; 3,203<br />

ft paint pavement marking line; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (120 Working Days) (Job No. C-99-509-09) (9-10329-0010)<br />

(See Special Provisions for DBE Percentage)<br />

27. Contract No. 99418 Pope County District 9<br />

Section 06-00038-00-RS<br />

FAS Route 1930 (BAY CITY ROAD) Project ARA-RS-1930(119)<br />

Project consists <strong>of</strong> HMA overlay, placement <strong>of</strong> crushed stone shoulders, pavement markings and all other incidental items<br />

to complete the work on FAS Route 1930 (Bay City Road) at IL Route 146 and extending southerly 4.3 miles; includes 40<br />

tons aggregate surface course; 6,400 gals bituminous materials (prime coat); 100 tons aggregate (prime coat); 4,460 tons<br />

leveling binder (machine method); 202 sq yds HMA surface removal-butt joint; 1,050 tons HMA binder course; 4,600 tons<br />

HMA surface course; 3,290 tons aggregate shoulders; 5 manholes to be adjusted; 4,528 ft short-term pavement marking;<br />

80,710 ft paint pavement marking line; Federally funded; (A Special Provision for this contract requires insurance that<br />

names additional insureds). (30 Working Days) (Job No. C-99-557-06) (9-10223-0010)<br />

(See Special Provisions for DBE Percentage)<br />

28. Contract No. 97430 Madison County District 8<br />

Section 07-00089-03-RS<br />

FAS Route 778 (ST. ROSE ROAD) Project RS-ARA-778(107)<br />

Resurface St. Rose Road from the east corporate limits <strong>of</strong> Highland (Iberg Road) to the Clinton County Line; includes<br />

2,258 sq yds HMA surface removal-butt joint; 4,898 tons HMA surface course; 2,417 tons HMA shoulders; 562 tons<br />

aggregate wedge shoulders; 39,624 ft thermoplastic pavement marking line; Federally funded; (A Special Provision for<br />

this contract requires insurance that names additional insureds). (20 Working Days)<br />

(Job No. C-98-310-10) (8-10307-0000) (See Special Provisions for DBE Percentage)<br />

29. Contract No. 63408 Lake County District 1<br />

Section 04-00038-03-BT<br />

FAU Route 1257 (DEERFIELD ROAD) Project ARA-9003(528)<br />

Project consists <strong>of</strong> aggregate path restoration, at-grade HMA path, construction <strong>of</strong> boardwalk and prefabricated bridge,<br />

HMA shoulder, curb and gutter, excavation and all other incidental items to complete the work on FAU Route 1257<br />

(Deerfield Road) between the Des Plaines River Trail and Thornmeadow Road in the village <strong>of</strong> Riverwoods; includes 100<br />

units tree removal; 1,000 ft temporary fence; 460 cu yds earth excavation; 120 sq yds geotechnical fabric for ground<br />

stabilization; 2,014 sq yds topsoil furnish and place; 100 ft exploration trench; 2,824 sq yds erosion control blanket; 150<br />

sq yds erosion control mat; 1,053 ft perimeter erosion barrier; 574 sq yds aggregate base course; 257 gals bituminous<br />

materials (prime coat); 80 tons HMA binder course; 129 tons HMA surface course; 413 sq ft PCC sidewalk; 20,250 lbs<br />

reinforcement bars; 109 cu yds drilled shaft in soil; 150 ft adjusting sanitary sewers; 425 ft combination concrete curb and<br />

gutter; 1,510 ft temporary pavement marking line; 630 sq ft work zone pavement marking removal; 325 ft temporary<br />

concrete barrier; 1,721 ft thermoplastic pavement marking line; 4,084 sq ft pedestrian truss superstructure; 259 sq yds<br />

stabilized construction entrance; 480 sq yds aggregate subgrade; 7,271 sq ft boardwalk structure; traffic control and<br />

protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(80 Working Days) (Job No. C-91-165-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 7 -<br />

30. Contract No. 64D22 Winnebago County District 2<br />

Section (W-1-15D)BR-1<br />

FAS Route 55 (IL 70) Project RS-55(105)<br />

This project consists <strong>of</strong> removing and replacing the structure (SN 101-0086) carrying IL Route 70 over the south branch <strong>of</strong><br />

Otter Creek located 0.8 mile north <strong>of</strong> IL Route 75 in Durand; includes 2,200 cu yds earth excavation; 4,647 sq yds erosion<br />

control blanket; 712 sq yds stone riprap; 1,374 tons HMA binder and surface course; 678 sq yds protective coat; 254 sq<br />

yds concrete driveway; 36 tons aggregate shoulders; remove existing culverts; remove existing structures; 383 cu yds<br />

concrete; 534 sq yds bridge deck grooving; 755 sq yds protective coat; 81,240 lbs reinforcement bars, epoxy coated;<br />

1,508 ft furnishing and driving steel piles; 158 ft pipe culverts; 234 ft storm sewers; 81 sq yds geocomposite wall drains;<br />

210 ft pipe underdrains; 1,404 ft combination concrete curb and gutter; 11,666 ft paint pavement marking line; 11 raised<br />

reflective pavement markers; 3 shade trees; 1 underwater structure excavation; mobilization; traffic control and protection;<br />

Federally funded. (75 Working Days) (Job No. C-92-194-09) (2-154400-0000)<br />

(See Special Provisions for DBE Percentage)<br />

31. Contract No. 64C68 Jo Daviess County District 2<br />

Section 43T & M<br />

FAP Route 301 (US 20) Project ACNHF-ACHSIP-301(65)<br />

This project consists <strong>of</strong> removing and replacing a box culvert carrying U.S. Route 20 over a drainage ditch and adding left<br />

turn lanes at Camillus Drive in East Dubuque; includes 8,743 cu yds earth excavation; 6,476 sq yds topsoil furnish and<br />

place; 383 sq yds stone riprap; 982 tons leveling binder (machine method); 1,777 tons HMA binder and surface course;<br />

838 sq yds Class B patches; 172 ft saw cuts; 1,420 ft strip reflective crack control treatment; 1,456 sq yds HMA<br />

shoulders; removal <strong>of</strong> existing structures; 398 cu yds structure excavation; 50,940 lbs reinforcement bars; 3 precast<br />

reinforced concrete flared end sections; 50 ft storm sewers; 5,907 sq ft concrete median; 587 ft steel plate beam<br />

guardrail; 7,063 ft thermoplastic pavement marking line; 123 raised reflective pavement markers; 445 tons breaker run<br />

crushed stone; railroad protective liability insurance; mobilization; traffic control and protection; Federally funded. (70<br />

Working Days) (Job No. C-92-053-09) (2-22300-0100 and 2-22310-0100) (See Special Provisions for DBE Percentage)<br />

32. Contract No. 64D92 Jo Daviess County District 2<br />

Section 31T<br />

FAP Route 301 (US 20) Project NHF-301(64)<br />

This project consists <strong>of</strong> removing and replacing the box culvert (SN 043-1080) carrying U.S. Route 20 over a drainage<br />

ditch located west <strong>of</strong> Sand Ridge Road near East Dubuque, and included in this project is the slight realignment and<br />

reconstruction <strong>of</strong> approximately 0.9 mile <strong>of</strong> U.S. Route 20 (EB); includes 38,863 cu yds furnished excavation; 14,586 cu<br />

yds rock excavation; 25,568 cu yds earth excavation; 47,940 sq yds topsoil furnish and place; 2,700 lbs fertilizer nutrient;<br />

16,200 sq yds stone riprap; 822 tons aggregate base course; 22,248 sq yds subbase granular material; 13,308 sq yds<br />

PCC pavement; removal <strong>of</strong> 2 existing structures; 490 ft pipe culverts; 8 end sections; 21 concrete headwalls; 6,569 ft pipe<br />

underdrains; 8,958 ft shoulder rumble strip; 5,000 ft paint pavement marking line; 118 raised reflective pavement markers;<br />

150 shade trees; 105 intermediate trees; upgrade existing weather station; 691 ft combination concrete curb and gutter;<br />

10,580 ft urethane pavement marking line; mobilization; traffic control and protection; Federally funded. (Completion Date:<br />

November 19, 2010) (Job No. C-92-177-09) (2-09760-0100) (See Special Provisions for DBE Percentage)<br />

33. Contract No. 66848 Ford County District 3<br />

Section 104 I & 105 BR-1<br />

FAP Route 796 (IL 115) Project BRF-F-796(14)<br />

This project consists <strong>of</strong> replacing the structure carrying IL Route 115 over the Kelly Creek drainage ditch and replacing a<br />

single span concrete box culvert carrying IL Route 115 over an unnamed drainage ditch, project is located approximately<br />

2.4 miles north and 4.1 miles north <strong>of</strong> IL Route 116 in Ford County; includes 651 cu yds earth excavation; 382 cu yds<br />

furnished excavation; 219 cu yds porous granular embankment; 611 sq yds stone riprap; 158 tons leveling binder; 275<br />

tons HMA surface course; removal <strong>of</strong> 2 existing structures; 294 cu yds concrete; 413 sq yds bridge deck grooving; 59,320<br />

lbs furnishing and erecting structural steel; 55,630 lbs reinforcement bars, epoxy coated; 505 ft furnishing and driving<br />

steel piles; 118 ft pipe underdrains for structures; 250 ft steel plate beam guardrail; 3,060 ft paint pavement marking line;<br />

25 ft precast concrete box culvert; mobilization; traffic control and protection; Federally funded. (65 Working Days)<br />

(Job No. C-93-125-08) (3-42100-0100) (See Special Provisions for DBE Percentage)<br />

34. Contract No. 66914 LaSalle County District 3<br />

Section (H)I-1<br />

FAP Route 623 (US 6) Project ACF-623(27)<br />

This project consists <strong>of</strong> removing and replacing the culvert carrying U.S. Route 6 over an unnamed tributary to the <strong>Illinois</strong><br />

River located 3.6 miles west <strong>of</strong> IL Route 170 at Marseilles; includes removal <strong>of</strong> 790 trees; 710 cu yds earth excavation;<br />

675 cu yds furnished excavation; 221 sq yds stone riprap; 2 end sections; 271 ft storm sewers; 142 tons HMA surface<br />

course; 1,418 sq yds HMA shoulders; removal <strong>of</strong> existing structures; remove existing culverts; 17,420 lbs reinforcement<br />

bars; 87 cu yds concrete box culverts; 44 ft pipe culverts; 475 ft steel plate beam guardrail; 2,250 ft paint pavement<br />

marking line; 127 ft combination concrete curb and gutter; mobilization; traffic control and protection; Federally funded.<br />

(Completion Date: August 22, 2010 Plus 10 Working Days) (Job No. C-93-106-09) (3-50006-2595)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 8 -<br />

35. Contract No. 76706 Madison County District 8<br />

Section 60-15HB-3<br />

FAP Route 310 (IL 255) Project ACNHF-310(140)<br />

Construction <strong>of</strong> a curved structure to carry U.S. Route 67 over and onto IL Route 255 in Godfrey; includes 4,630 cu yds<br />

earth excavation; 12,665 cu yds furnished excavation; 4.5 acres seeding; 12 tons cover coat aggregate; 12 tons seal coat<br />

aggregate; 1,085 sq yds pavement removal; 707 cu yds structure excavation; 1,241.5 cu yds concrete; 2,232 sq yds<br />

bridge deck grooving; 3,380 sq ft form liner textured surface; 339 ft precast, prestressed concrete I-beams; 1,455,200 lbs<br />

structural steel; 4,144 stud shear connectors; 213,650 lbs epoxy coated reinforcement bars; 4,098 ft metal piles; 1,063 sq<br />

ft concrete sealer; 93 ft pipe underdrains; 182 ft paved ditch; 24 high load multi-rotation bearings; mobilization; traffic<br />

control and protection; Federally funded. (180 Working Days) (Job No. C-98-107-03) (8-84045-0000)<br />

(See Special Provisions for DBE Percentage)<br />

36. Contract No. 78159 Pulaski County District 9<br />

Section D9 BSMART FY10-2<br />

FAI Route 57 (I-57) Project ACIM-57-1(200)5<br />

Microsilica overlay, joint replacements, drain extensions and deck patching on the structure carrying I-57 south <strong>of</strong> the<br />

Mounds Interchange over the Canadian National/<strong>Illinois</strong> Central Railroad (SN 077-0003,0004); includes 589 sq yds<br />

milling; 1,536 sq yds milling (deck); 48 tons HMA shoulders; 27.5 cu yds concrete removal; 354 sq yds protective shield;<br />

31.3 cu yds concrete; 1,410 sq yds bridge deck grooving; 3,380 lbs epoxy coated reinforcement bars; 1,280 ft shoulder<br />

rumble strip; 1,466 sq yds bridge deck hydro-scarification; 1,466 sq yds microsilica concrete overlay; 2,063 ft pavement<br />

marking grooving; 2,063 ft preformed plastic pavement marking inlaid; 208 ft preformed joint strip seal; 32 drain<br />

extensions; mobilization; traffic control and protection; Federally funded. (45 Working Days)<br />

(Job No. C-99-014-10) (9-00565-0000) (See Special Provisions for DBE Percentage)<br />

37. Contract No. 93508 Cass County District 6<br />

Section 09-00074-00-BR<br />

FAS Route 575 (CH 12) Project ARA-BRS-575(312)<br />

Bridge replacement with a three-span PPC deck bridge, approach roadway embankments, guardrail, stone riprap and<br />

HMA on CH 12 over Middle Creek 4.5 miles north <strong>of</strong> Newmansville; includes 443 cu yds earth excavation; 385 cu yds<br />

channel excavation; 0.4 acre seeding; 763 tons stone dumped riprap; 631 tons aggregate base course; 346 gals<br />

bituminous materials; 120 tons HMA binder; 104 tons HMA surface; 138 tons aggregate shoulders; remove existing<br />

structure; 179 cu yds structure excavation; 125.2 cu yds concrete structures; 2,803 sq ft PPC deck beams; 11,500 lbs<br />

reinforcement bars; 190 ft steel railing; 897 ft furnish and drive metal shell piles; 26 ft pipe culverts; 317 sq yds<br />

waterpro<strong>of</strong>ing membrane; 210 ft PCC mortar fairing course; 4 traffic barrier terminals; 120 ft pavement marking;<br />

underwater structure excavation protection; traffic control and protection; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (60 Working Days) (Job No. C-96-204-10) (6-10372-0000)<br />

(See Special Provisions for DBE Percentage)<br />

38. Contract No. 93509 Brown County District 6<br />

Section 05-00065-00-BR<br />

FAS Route 1583 (CH 3A) Project ARA-1583(103)<br />

Project consists <strong>of</strong> the removal and reconstruction <strong>of</strong> a cast-in-place concrete deck on the existing steel beam<br />

superstructure and existing closed concrete abutment on FAS Route 1583 (CH 3A) over Logan Creek, one mile south <strong>of</strong><br />

Ripley; includes 237 cu yds earth and channel excavation; 600 ft perimeter erosion barrier; 100 tons riprap, <strong>special</strong>; 280<br />

tons aggregate base course; 105 tons aggregate shoulders; removal <strong>of</strong> 1 existing concrete deck; 64.2 cu yds concrete<br />

superstructure; 1,085 lbs furnishing and erecting structural steel; 1,152 stud shear connectors; cleaning and painting 1<br />

steel bridge; containment and disposal <strong>of</strong> lead paint cleaning residues; 13,650 lbs reinforcement bars; 171 ft steel railing;<br />

32 anchor bolts; 125 ft steel plate beam guardrail; 4 traffic barrier terminals; traffic control and protection; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days)<br />

(Job No. C-96-228-07) (6-10222-0010) (See Special Provisions for DBE Percentage)<br />

39. Contract No. 93515 Cass County District 6<br />

Section 00-00063-00-BR<br />

FAS Route 575 (CH 12) Project BRS-575(306)<br />

Remove existing bridge carrying County Highway 12 over Miller Creek and replace it with a three-span precast,<br />

prestressed concrete deck beam structure including approaches, all located 5 miles northeast <strong>of</strong> Chandlerville; includes<br />

255 cu yds earth excavation; 740 cu yds channel excavation; 0.4 acre seeding; 765 tons stone riprap; 385 tons aggregate<br />

base course; 446 gals bituminous material; 103 tons HMA binder; 68 tons HMA surface; 107 tons aggregate shoulders;<br />

remove existing structures; 660 sq yds slope wall removal; 95 cu yds structure excavation; 116.5 cu yds concrete<br />

structures; 2,918 sq ft precast, prestressed concrete deck beams; 10,170 lbs reinforcement bars; 199 ft steel railing;<br />

1,281 ft furnish and drive metal shell piles; underwater structure excavation; traffic control and protection; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (55 Working Days)<br />

(Job No. C-96-200-03) (6-10009-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 9 -<br />

40. Contract No. 93516 Sangamon County District 6<br />

Section 09-00028-01-DR (CHATHAM)<br />

FAU Route 8153 (GORDON DRIVE) Project ARA-5082(9)<br />

Project consists <strong>of</strong> the extension <strong>of</strong> the existing double 10' X 7' RC box culvert and adding a third barrel next to the<br />

existing twin box culvert, channel excavation upstream and downstream <strong>of</strong> the structure to transition the existing channel<br />

to the widening structure, construction <strong>of</strong> a 5' X 3' precast concrete box culvert with precast concrete box culvert end<br />

sections, steel sheet piling to support the east shoulder, proposed steel plate beam guardrail with traffic barrier terminals,<br />

pavement patching, construction <strong>of</strong> aggregate shoulders and all other incidental items to complete the work on FAU<br />

Route 8153 (Gordon Drive) over Grindstone Creek and unnamed tributary in the village <strong>of</strong> Chatham; includes 56 units<br />

tree removal; 577 cu yds earth and channel excavation; 437 cu yds furnished excavation; 325 cu yds trench backfill; 345<br />

ft perimeter erosion barrier; 953 sq yds stone riprap, Class A 4; 328 sq yds Class D patches; 150 tons aggregate<br />

shoulders; removal <strong>of</strong> existing structures; 1,180 cu yds structure excavation; 58,970 lbs reinforcement bars, epoxy<br />

coated; 104 expansion bolts; 353 cu yds concrete box culverts; 90 ft precast concrete box culverts 5' X 3'; 1,088 sq ft<br />

temporary steel sheet piling (to remain in place); 470 sq yds remove existing riprap; traffic control complete; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (65 Working Days)<br />

(Job No. C-96-216-10) (6-10435-0000) (See Special Provisions for DBE Percentage)<br />

41. Contract No. 93519 Scott County District 6<br />

Section 09-00006-02-BR<br />

FAS Route 605 (CH 3) Project ARA-605(107)<br />

Bridge rehabilitation including removal and replacement <strong>of</strong> the existing PPC deck beam superstructure, HMA surface and<br />

milled and repaved approaches carrying County Highway 3 over Wolf Run Creek one mile NW <strong>of</strong> Bluffs; includes 295<br />

tons stone riprap; 21 gals bituminus materials; 211 sq yds HMA surface removal; 39 tons HMA surface; 7 tons aggregate<br />

shoulders; remove existing superstructure; 4.5 cu yds concrete removal; 4.5 cu yds concrete structures; 1,782 sq ft PPC<br />

deck beams; 370 lbs reinforcement bars; 7 traffic barrier terminals; 68 ft guardrail removal; 423 ft pavement marking; 162<br />

ft steel bridge rail; railroad protective liability insurance; traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (20 Working Days)<br />

(Job No. C-96-200-10) (6-10426-0000) (See Special Provisions for DBE Percentage)<br />

42. DELETED FROM LETTING<br />

43. Contract No. 63271 Cook County District 1<br />

Section 09-00033-00-LT (BURNHAM)<br />

FAU Route 2943 (BURNHAM AVENUE) Project ARA-9003(574)<br />

0.31 mile modernize lighting system with pole foundations, conduit installation, lighting controllers, light pole units and<br />

removal <strong>of</strong> existing lighting units along Burnham Avenue from Brainard Avenue to Burnham Avenue Bridge in Burnham;<br />

includes 100 ft exploration trench; 185 sq yds sodding; 200 sq ft PCC sidewalk removal and replacement; electric service<br />

installation and connection; 215 ft conduit pushed; 1,905 ft unit duct; 60 ft electric cable in conduit; 330 ft trench and<br />

backfill for electrical work; 160 ft light pole foundation; 5 existing lighting unit removals; 5 lighting foundation removals;<br />

1,705 ft unit duct, bored and pulled; 16 ground rods; 15 light poles; 15 ft luminaires; traffic control and protection;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(20 Working Days) (Job No. C-91-657-09) (1-20595-0000) (See Special Provisions for DBE Percentage)<br />

44. Contract No. 63402 DuPage County District 1<br />

Section 09-00020-00-LT (WILLOWBROOK)<br />

FAP Route 344 (IL 83) Project ARA-9003(576)<br />

Project consists <strong>of</strong> the installation <strong>of</strong> new intersection/transition lighting including a new lighting controller cabinet and all<br />

other incidental items to complete the work at the intersection <strong>of</strong> FAP Rte. 344 (IL Rte. 83) and Plainfield Road in the<br />

village <strong>of</strong> Willowbrook; includes 500 sq yds topsoil furnish and place; 325 sq ft PCC sidewalk removal and replacement;<br />

15 sq yds Class D patches; 455 ft conduit pushed; 85 ft electric cable in conduit; 60 ft trench and backfill for electrical<br />

work; 26 luminaires, sodium vapor; 26 light poles, aluminum; 260 ft light pole foundation; 26 breakaway devices; 26<br />

ground rods; 5,040 ft unit duct; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (40 Working Days) (Job No. C-91-752-09) (1-20797-0000)<br />

(See Special Provisions for DBE Percentage)<br />

45. Contract No. 63433 Will County District 1<br />

Section 09-00012-00-LT (BRAIDWOOD)<br />

FAS Route 2320 (IL 113) Project ARA-9003(478)<br />

0.33 mile street lighting including metal foundations, lighting controller, ornamental light poles and decorative luminaires<br />

along IL Route 113 from Center Road to Mitchell Street in Braidwood; includes 825,000 sq ft PCC sidewalk removal and<br />

replacement; electric service installation; electric utility service connection; 130 ft conduit trench 2 1/2" dia. galvanized<br />

steel; 176 ft conduit pushed; 155 ft electric cable in conduit; 500 ft trench and backfill for electrical work; 1 lighting<br />

controller; 2 lighting foundation removals; 37 light pole metal foundations; 3,500 ft polyethylene duct bored and pulled with<br />

electric cable; 37 ornamental light poles and luminaires; traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (35 Working Days)<br />

(Job No. C-91-045-10) (1-20802-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 10 -<br />

46. Contract No. 66939 DeKalb County District 3<br />

Section (116,128)T<br />

FAP Route 573 & 557 (US 30 & IL 72)<br />

This project consists <strong>of</strong> ditch grading and shaping, pipe culvert removal and replacement and box culvert reconstruction<br />

located on U.S. Route 30 from IL Route 23 to Crego Road near Waterman and on IL Route 72 near the Kane County<br />

Line; includes 14,120 ft grading and shaping ditches; 7 acres seeding; 54 tons aggregate surface course; removing 4<br />

existing culverts; 300 lbs reinforcement bars, epoxy coated; 2.5 cu yds concrete box culverts; 120 ft pipe culverts; 6 steel<br />

end sections; 104 sq ft membrane waterpro<strong>of</strong>ing; 121 ft paint pavement marking; debris removal; mobilization; traffic<br />

control and protection. (40 Working Days) (Job No. C-93-075-09) (0-01616-3006)<br />

(See Special Provisions for DBE Percentage)<br />

47. Contract No. 60I36 Kane-Cook Counties District 1<br />

Section 2009-088 I<br />

FAP Route 339 (IL 62) Project HSIP-339(26)<br />

4.30 miles <strong>of</strong> safety improvements including pavement marking, traffic signal modernization and rumble strips along IL<br />

Route 62 (Algonquin Road) from IL Route 25 to IL Route 68 (Dundee Road) in Barrington Hills, also includes milling and<br />

HMA surface and grading and shaping shoulders and other work; includes 6 post mounted flashing beacons; 79 signal<br />

heads; 110 units grading and shaping shoulders; 150 units cu yds furnished excavation; 400 sq yds topsoil; 0.09 acre<br />

seeding; 1,935 tons HMA surface course, Mix D; 17,268 sq yds milling; 20 traffic barrier terminals; 30,794 ft shoulder<br />

rumble strip; 219 tons aggregate wedge shoulder; 941 sq yds HMA shoulders; 754 sq ft sign panel; 99,101 ft<br />

thermoplastic pavement marking; 18,450 ft centerline rumble strip; 5 uninterruptible power supplies; mobilization; traffic<br />

control and protection; Federally funded. (40 Working Days) (Job No. C-91-031-10) (1-78298-0000)<br />

(See Special Provisions for DBE Percentage)<br />

48. Contract No. 63392 Will County District 1<br />

Section 09-00043-00-SW (WILMINGTON)<br />

FAU Route 321 (KANKAKEE STREET) Project ARA-9003(513)<br />

Sidewalk improvements consisting <strong>of</strong> removing and replacing PCC sidewalks, curb removal (<strong>special</strong>), ADA accessible<br />

curb ramps with detectable warnings and all other incidental items to complete the work on FAU Route 321 (Kankakee<br />

Street) from Baltimore Street to Kankakee River Drive in the city <strong>of</strong> Wilmington; includes 1,501 sq yds topsoil furnish and<br />

place; 84 lbs fertilizer nutrients; 1,501 sq yds erosion control blanket; 6,696 sq ft PCC sidewalk; 90 sq ft detectable<br />

warnings; 168 ft curb removal; 6,811 sq ft sidewalk removal, <strong>special</strong>; traffic control and protection; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (15 Working Days)<br />

(Job No. C-91-135-10) (1-20798-0000) (See Special Provisions for DBE Percentage)<br />

49. Contract No. 63421 Cook County District 1<br />

Section 09-00041-00-SW (MARKHAM)<br />

FAU Route 2831 (KEDZIE AVENUE) Project ARA-9003(395)<br />

Project consists <strong>of</strong> earth excavation, sidewalk installation, pavement patching, storm sewers, pavement striping and all<br />

other incidental items to complete the work on FAU Route 2831 (Kedzie Avenue) from 159th Street to 153rd Street in the<br />

city <strong>of</strong> Markham; includes 50 ft temporary fence; 850 cu yds earth excavation; 100 tons porous granular embankment;<br />

4,320 sq yds topsoil furnish and place; 4,320 sq yds erosion control blanket; 30 units supplemental watering; 4,410 ft<br />

perimeter erosion barrier; 23,830 sq ft PCC sidewalk; 65 ft combination concrete curb and gutter removal and<br />

replacement; 225 ft bridge fence railing; 135 ft storm sewers; 191 ft thermoplastic pavement marking line; traffic control<br />

and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (30 Working Days) (Job No. C-91-783-09) (1-20769-0010) (See Special Provisions for DBE Percentage)<br />

50. Contract No. 63430 Cook County District 1<br />

Section 09-00283-00-LS (SKOKIE)<br />

FAP Route 350 (US 41) Project ARA-9003(547)<br />

0.47 mile curb and gutter repair, sidewalk repair, HMA resurfacing, drainage structure adjustments, parkway restoration<br />

and lighting on U.S. Route 41 from Oakton Street to Main Street in the village <strong>of</strong> Skokie; includes 337 units tree removal;<br />

334 sq yds furnish and place topsoil; 334 sq yds sodding; 1,384 sq yds subbase granular material; 838 sq yds PCC<br />

driveway pavement; 20,394 sq ft PCC sidewalk; 194 sq ft detectable warnings; 526 sq yds driveway pavement removal;<br />

1,250 ft combination curb and gutter removal and replacement; 18,032 sq ft sidewalk removal; 30 domestic water service<br />

boxes to be adjusted; 556 ft chain link fence to be removed and re-erected; 2,415 ft conduit pushed; 5,421 ft trench and<br />

backfill for electrical work; 656 ft light pole foundation; 50 ft detector loop replacement; 34 trees; 34 tree grates; 4,912 sq ft<br />

brick paver sidewalk; 546 sq yds PCC underlayment; 5,772 ft unit duct; 82 ornamental street lighting units; 180 sq ft<br />

temporary information signing; 21 temporary access commercial entrances; traffic control and protection; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (60 Working Days)<br />

(Job No. C-91-285-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 11 -<br />

51. Contract No. 63431 Cook County District 1<br />

Section 09-00050-00-LS (LINCOLNWOOD)<br />

Various Routes Project ARA-9003(522)<br />

Project consists <strong>of</strong> supplying, delivering and installing 324 native trees on Cicero Avenue, Crawford Avenue, Devon<br />

Avenue, Lincoln Avenue, Pratt Avenue, Touhy Avenue and McCormick Avenue in the village <strong>of</strong> Lincolnwood; includes<br />

324 trees; 16 hrs street sweeping; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (20 Working Days) (Job No. C-91-154-10) (0-09919-0000)<br />

(See Special Provisions for DBE Percentage)<br />

52. Contract No. 97432 Marion County District 8<br />

Section 10-00070-01-RS (SALEM)<br />

FAU Route 8566 (SOUTH MARION ST.) Project ARA-5064(15)<br />

Resurface South Marion Street from East Lake Street south for 0.36 mile to the fairgrounds entrance in the city <strong>of</strong> Salem;<br />

includes 82 sq yds HMA surface removal-butt joint; 180 tons leveling binder; 397 tons HMA surface course; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days)<br />

(Job No. C-98-317-10) (8-10407-0010) (See Special Provisions for DBE Percentage)<br />

53. Contract No. 93520 Mason County District 6<br />

Section 09-00065-00-ST<br />

Various Routes Project ARA-125(18)<br />

Place hot spray thermoplastic pavement marking line on various routes throughout Mason County; includes 422,045 ft hot<br />

spray thermoplastic pavement marking line; 245 sq ft thermoplastic pavement marking letters and symbols; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days)<br />

(Job No. C-96-252-10) (6-10428-0000) (See Special Provisions for DBE Percentage)<br />

54. Contract No. 97429 Madison County District 8<br />

Section 09-00176-01-LS (GRANITE CITY)<br />

FAP Route 2 (IL 3) Project ARA-5011(300)<br />

Project consists <strong>of</strong> planting trees in the grass median <strong>of</strong> IL Route 3 from Rock Road south to 20th Street in Granite City;<br />

includes 105 trees; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (15 Working Days) (Job No. C-98-314-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

55. Contract No. 99419 Union County District 9<br />

Section 09-00098-00-RS<br />

FAS Route 926 (ST. JOHNS ROAD) Project ARA-926(112)<br />

HMA resurfacing including leveling binder, surface course, aggregate shoulders, pavement markings and all other<br />

incidental items to complete the work on FAU Route 926 (St. John's Road) from the west corporation limits <strong>of</strong> Dongola<br />

westerly to IL Route 127; includes 3,824 gals bituminous materials (prime coat); 4,102 tons leveling binder (machine<br />

method); 6,434 tons HMA surface course; 1,825 tons aggregate shoulders; 6,000 ft short term pavement marking;<br />

104,870 ft temporary pavement marking line; 104,870 ft paint pavement marking line; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (25 Working Days)<br />

(Job No. C-99-514-10) (9-10378-0010) (See Special Provisions for DBE Percentage)<br />

56. Contract No. 99412 Williamson County District 9<br />

Section 08-00058-00-RS (HERRIN)<br />

FAU Route 9588 (EAST HERRIN ST.) Project ARA-M-5029(10)<br />

Project consists <strong>of</strong> HMA surface removal, Class D patching, HMA surface and binder placement, pavement markings and<br />

all other incidental items to complete the work on FAU Route 9588 (East Herrin Street) from IL Route 148 and extends<br />

east <strong>of</strong> Fifth Street in the city <strong>of</strong> Herrin; includes 2,613 gals bituminous materials (prime coat); 1,375 tons HMA binder<br />

course; 1,178 tons HMA surface course; 127 tons incidental HMA surfacing; 15,543 sq yds HMA surface removal; 935 sq<br />

yds Class D patches; 10,026 ft thermoplastic pavement marking line; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-99-546-08) (9-10345-0000)<br />

(See Special Provisions for DBE Percentage)<br />

57. Contract No. 74406 Moultrie County District 7<br />

Section 3RS-5, (4,5)RS-2<br />

FAP Route 758 (IL 32) Project ACF-758(12)<br />

8.32 miles <strong>of</strong> milling, HMA surface, aggregate shoulders, striping and other work on IL Route 32 from IL Route 133 in<br />

Lovington, north to U.S. Route 36; includes 11,095 tons HMA surface course, Mix C; 132,874 sq yds milling; 1,044 sq yds<br />

patching; 997 tons aggregate shoulders; 89,369 ft paint pavement marking; mobilization; traffic control and protection;<br />

Federally funded. (60 Working Days) (Job No. C-97-120-09) (7-50238-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 12 -<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

58. Contract No. 70766 Champaign County District 5<br />

Section 10-37RS-2 & (10,27-38)RS-1<br />

FAI Route 57 (I-57)<br />

7.12 miles <strong>of</strong> resurfacing on Interstate 57 from U.S. Route 136 at Rantoul to the Ford County Line; includes 467 sq yds<br />

patches; 1,755 sq yds HMA surface removal-butt joint; 34,041 tons polymerized HMA surface course; 208,851 sq yds<br />

HMA surface removal; 2,910 ft saw cuts; 3,519 tons aggregate shoulders; 10,040 tons HMA shoulders; 1,410 lbs<br />

furnishing and erecting structural steel; 8 elastomeric bearing assemblies; 148,083 ft shoulder rumble strip; 152,352 ft<br />

thermoplastic pavement marking line; 1,992 raised reflective pavement markers; 34,011 tons material transfer device; 79<br />

sq yds deck slab repair; mobilization; traffic control and protection. (75 Working Days)<br />

(Job No. C-95-023-09) (5-53903-0000) (See Special Provisions for DBE Percentage)<br />

59. Contract No. 46106 Cook County District 1<br />

Section D 1 N COOK CNTY RR 10-42<br />

Various Routes (VARIOUS)<br />

Removal and replacement <strong>of</strong> damaged raised reflective pavement markers and castings at various locations in northern<br />

Cook County; includes 50,000 replacement reflectors; 7,500 raised reflective pavement marker removals; 7,500 raised<br />

reflective pavement markers; mobilization; traffic control and protection. (Completion Date: December 31, 2010) (Job No.<br />

C-60-043-10) (0-00529-0000) (See Special Provisions for DBE Percentage)<br />

60. Contract No. 70584 Champaign County District 5<br />

Section 12BR<br />

FAS Route 1517 (US 150) Project RS-1517(112)<br />

This project consists <strong>of</strong> removing and replacing the existing structure (SN 010-8118) carrying U.S. Route 150 over a ditch<br />

located west <strong>of</strong> Mahomet; includes 205 cu yds furnished excavation; 312 cu yds porous granular embankment; 42 sq yds<br />

stone dumped riprap; 128 sq yds patches; 192 sq yds aggregate shoulders; removal <strong>of</strong> existing structures; 275 cu yds<br />

structure excavation; 17,390 lbs reinforcement bars; 123 cu yds concrete box culverts; 250 ft steel plate beam guardrail;<br />

108 ft paint pavement marking line; mobilization; traffic control and protection; Federally funded. (Completion Date:<br />

August 15, 2010 Plus 03 Working Days) (Job No. C-95-099-06) (5-53440-0000)<br />

(See Special Provisions for DBE Percentage)<br />

61. Contract No. 70758 DeWitt County District 5<br />

Section 124RS-6<br />

FAP Route 760 (IL 48)<br />

5.6 miles <strong>of</strong> patching, milling and resurfacing on IL Route 48 from IL Route 54 to IL Route 10 in Dewitt County; includes<br />

182 tons aggregate (prime coat); 7,068 tons HMA surface course, N 50; 91,526 sq yds HMA surface removal; 617 sq yds<br />

Class D patches; 2,034 tons aggregate shoulders; 71,339 ft paint pavement marking line; 378 raised reflective pavement<br />

markers; mobilization; traffic control and protection. (25 Working Days) (Job No. D-95-015-09) (5-53750-0000)<br />

(See Special Provisions for DBE Percentage)<br />

62. Contract No. 60I10 Cook County District 1<br />

Section 2009-076RS<br />

FAP Route 305 (IL 53 FRONTAGE RD)<br />

4.63 miles <strong>of</strong> patching, milling, HMA structure, striping and other work on IL Route 53 frontage roads in Arlington and<br />

Palatine; includes 16,111 sq yds milling; 2,371 sq yds patching; 5,118 sq yds concrete surface removal; 4,000 sq yds<br />

partial depth removal; 9,934 tons polymerized HMA binder and surface course; 945 tons aggregate wedge shoulder;<br />

68,108 ft thermoplastic pavement marking; 726 ft detector loop replacement; mobilization; traffic control and protection.<br />

(40 Working Days) (Job No. C-91-850-0009) (1-77961-0000) (See Special Provisions for DBE Percentage)<br />

63. Contract No. 70759 DeWitt-Piatt Counties District 5<br />

Section 124RS-6 & 125RS-3<br />

FAP Route 760 (IL 48)<br />

7.4 miles <strong>of</strong> resurfacing on IL Route 48 from IL Route 10 to IL Route 32 near Weldon; includes 10,900 tons HMA surface<br />

course, N50; 129,783 sq yds HMA surface removal; 95 sq yds patches; 1,995 tons aggregate shoulders; 102,713 ft paint<br />

pavement marking line; 515 raised reflective pavement markers; 368 sq yds partial depth removal; 145 tons partial depth<br />

patching; mobilization; traffic control and protection. (25 Working Days) (Job No. C-95-016-09) (5-53760-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 13 -<br />

64. Contract No. 68925 Fulton County District 4<br />

Section (142-BR)I<br />

FAP Route 665 (IL 116)<br />

This project consists <strong>of</strong> miscellaneous repairs to the structure carrying IL Route 116 over Spoon River located on the west<br />

edge <strong>of</strong> London Mills; includes 43 cu yds concrete superstructure; jack and remove 10 existing bearings; 150 lbs<br />

structural steel repair; cleaning and painting steel bridge; 6,640 lbs reinforcement bars, epoxy coated; 10 elastomeric<br />

bearing assemblies; 2,788 ft epoxy pavement marking line; 961 sq ft thermal spraying (metalizing) PPC beam ends; 60 ft<br />

blast cleaning PPC beam ends; 174 sq ft structural repair to concrete; 7 sq yds deck slab repair; mobilization; traffic<br />

control and protection. (60 Working Days) (Job No. C-94-152-09) (0-01616-4011)<br />

(See Special Provisions for DBE Percentage)<br />

Small Business Set-Aside.<br />

65. Contract No. 66996 Grundy County District 3<br />

Section (111)I-6<br />

FAP Route 326 (IL 47)<br />

This project consists <strong>of</strong> constructing two low water crossings and repairs to an access road located at the wetlands<br />

adjacent to IL Route 47 between the <strong>Illinois</strong> River and Pine Bluff Road in Morris; includes 50 cu yds earth excavation; 253<br />

sq yds stone riprap; 200 tons aggregate surface course; 145 sq yds PCC pavement; 63 sq yds slope wall; 66 ft pipe<br />

culverts; mobilization; traffic control and protection. (30 Working Days) (Job No. C-93-054-10) (3-98563-1000)<br />

(See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

66. Contract No. 68472 Knox County District 4<br />

Section 106RS-2;107RS-4;108RS-3<br />

FAS Route 2400 (US 150)<br />

14.14 miles <strong>of</strong> patching, milling and resurfacing on U.S. Route 150 from Interstate 74 to the Peoria County Line; includes<br />

194,191 sq yds HMA surface removal; 8,087 tons polymerized leveling binder (machine method); 16,175 tons HMA<br />

surface course, N50; 2,651 sq yds Class D patches; 5,812 tons aggregate shoulders; 3 concrete headwalls for pipe<br />

drains; 16,464 tons material transfer device; 209,390 ft urethane pavement marking line; mobilization; traffic control and<br />

protection. (55 Working Days) (Job No. C-94-060-05) (4-00001-0200) (See Special Provisions for DBE Percentage)<br />

67. Contract No. 70809 DeWitt County District 5<br />

Section 2010PPP<br />

FAP Route 322 (US 51)<br />

11.9 miles <strong>of</strong> 2P shoulder micro-surfacing from the Macon/Dewitt County Line to the south city limits <strong>of</strong> Wapella; includes<br />

163,591 sq yds HMA surface removal, variable depth; 198,763 ft joint or crack routing (HMA shoulder); 105,345 lbs fiber<br />

asphalt; 163,591 sq yds micro-surfacing, single pass; mobilization; traffic control and protection. (25 Working Days)<br />

(Job No. C-95-042-09) (5-53954-0000) (See Special Provisions for DBE Percentage)<br />

68. Contract No. 70523 McLean County District 5<br />

Section (9,10,11)RS-3<br />

FAS Route 2466 (US 150)<br />

5.94 miles <strong>of</strong> cold milling and resurfacing on U.S. Route 150 from the Woodford County Line to north <strong>of</strong> Interstate 74 at<br />

Bloomington; includes 3,355 tons leveling binder (machine method), N50; 2,919 sq yds HMA surface removal-butt joint;<br />

7,558 tons HMA surface course, N50; 91,625 sq yds HMA surface removal; 734 sq yds patches; 857 tons aggregate<br />

wedge shoulder; 139 tons HMA shoulders; 41 ft pipe culverts; 513 ft steel plate beam guardrail; 81,729 ft paint pavement<br />

marking line; mobilization; traffic control and protection. (30 Working Days) (Job No. C-95-044-06) (5-42840-0000)<br />

(See Special Provisions for DBE Percentage)<br />

69. Contract No. 70075 Champaign County District 5<br />

Section (10-30)RA-I-2<br />

FAI Route 57 (I-57)<br />

4,755 ft <strong>of</strong> rest area parking lot improvements at the <strong>Illinois</strong> Prairie Rest Area located northwest <strong>of</strong> Pesotum; includes<br />

7,790 sq yds pavement removal; 252 ft combination concrete curb and gutter removal; 222 ft storm sewer work; 2,085 ft<br />

combination concrete curb and gutter; 8,072 sq yds PCC pavement; 197 sq yds PCC patching; 3,549 ft pavement<br />

marking line; mobilization; traffic control and protection. (Completion Date: November 19, 2010 Plus 05 Working Days)<br />

(Job No. C-95-035-00) (5-50160-0000) (See Special Provisions for DBE Percentage)<br />

70. Contract No. 74428 Fayette County District 7<br />

Section D7 HMA SAFETY SHLD 2010-1<br />

FAP Route 777 (IL 185) Project ACHSIP-777(17)<br />

Constructing HMA shoulders with rumble strip and an aggregate shoulder along IL Route 185 from the Montgomery<br />

County line to Shaftner Road; includes 372 units excavating and grading existing shoulders; 682 tons aggregate<br />

shoulders; 12,406 sq yds HMA shoulders; 35,092 ft shoulder rumble strip; 49,394 ft paint pavement marking lines;<br />

mobilization; traffic control and protection; Federally funded. (15 Working Days) (Job No. C-97-013-10) (7-76910-1103)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 14 -<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

71. Contract No. 70760 Douglas-Edgar Counties District 5<br />

Section (145,146)RS-3 & 147RS-5<br />

FAP Route 323 (US 36)<br />

12.57 miles <strong>of</strong> patching, resurfacing and aggregate shoulders on U.S. Route 36 from west <strong>of</strong> IL Route 130 to west <strong>of</strong> IL<br />

Route 49 near Murdock; includes 457 tons aggregate (prime coat); 19,597 tons HMA surface course; 233,297 sq yds<br />

HMA surface removal; 1,148 sq yds Class D patches; 2,219 tons aggregate shoulders; 64 permanent survey markers to<br />

be adjusted; 26,989 ft thermoplastic pavement marking line; 143,496 ft paint pavement marking line; 1,055 raised<br />

reflective pavement markers; mobilization; traffic control and protection. (50 Working Days)<br />

(Job No. C-95-017-09) (5-53710-0000) (See Special Provisions for DBE Percentage)<br />

72. Contract No. 46107 Cook County District 1<br />

Section D-1 S COOK CNTY RR 10-43<br />

Various Routes (VARIOUS)<br />

Removal and replacement <strong>of</strong> damaged raised reflective pavement markers and castings at various locations in the<br />

district; includes 50,000 replacement reflectors; removal <strong>of</strong> 7,500 raised reflective pavement markers; 7,500 raised<br />

reflective pavement markers; mobilization; traffic control and protection. (Completion Date: December 31, 2010)<br />

(Job No. C-60-044-10) (0-00529-0000) (See Special Provisions for DBE Percentage)<br />

73. Contract No. 76A59 Marion County District 8<br />

Section 15B-1<br />

FAP Route 327 (US 50) Project ACBRF-327(46)<br />

Replacement <strong>of</strong> an existing slab bridge with a concrete box culvert on new alignment carrying U.S. Route 50 over Lackey<br />

Creek at Salem (SN 061-0036); includes 1,625 cu yds earth excavation; 990 cu yds furnished excavation; 29.8 tons lime;<br />

394 sq yds stone riprap; 1,543 sq yds processing modified soil; 1,409 sq yds milling; 1,873 tons HMA binder and surface<br />

course, Mix D; 559 sq yds aggregate shoulders; 802 sq yds HMA shoulders; removal <strong>of</strong> existing structure; 1,627 sq yds<br />

pavement removal; 41,510 lbs reinforcement bars; 215.1 cu yds concrete box culverts; 426 ft steel plate beam guardrail;<br />

4 traffic barrier terminals; 189.8 tons rock fill-foundation; 467.2 sq ft temporary soil retention system; 221 sq yds biaxial<br />

geogrid; 3,477 ft thermoplastic pavement marking; 750 sq ft temporary soil retention system; mobilization; traffic control<br />

and protection; Federally funded. (65 Working Days) (Job No. C-98-032-07) (8-79750-0100)<br />

(See Special Provisions for DBE Percentage)<br />

74. Contract No. 70507 McLean County District 5<br />

Section (101,102X)R,RS-2&55RS-PRK LN<br />

FAP Route 315/709 (US 136) Project ACF-000S(801)<br />

14.67 miles <strong>of</strong> patching, milling and resurfacing on U.S. Route 136 from U.S. Route 51 in Heyworth to just west <strong>of</strong> U.S.<br />

Route 150 south <strong>of</strong> LeRoy, also 15 culverts/structures to be repaired within the job limits; includes 331 cu yds structure<br />

excavation; 155 cu yds furnished excavation; 223 tons stone riprap; 8,934 tons leveling binder (machine method), N50;<br />

22,831 tons HMA surface course, N50; 278,917 sq yds HMA surface removal; 281 sq yds patches; 149 sq yds HMA<br />

shoulders; 12 box culvert end sections; 190 ft precast concrete box culvert; 3,265 ft steel plate beam guardrail; 36 traffic<br />

barrier terminals; 198,639 ft paint pavement marking line; 945 raised reflective pavement markers; nighttime work zone<br />

lighting; railroad protective liability insurance; mobilization; traffic control and protection; Federally funded.<br />

(85 Working Days) (Job No. C-95-028-06) (5-43610-0000) (See Special Provisions for DBE Percentage)<br />

75. Contract No. 68847 Peoria County District 4<br />

Section 72-[(7)RS-2;(1,7-1)I]<br />

FAP Route 318 (IL 6)<br />

This project consists <strong>of</strong> cold milling, HMA resurfacing and patching on IL Route 6 from the U.S. Route 150 interchange to<br />

south <strong>of</strong> the IL Route 6/ Interstate 474/Interstate 74 interchange near Pottstown; includes 2,539 sq yds HMA surface<br />

removal-butt joint; 219 tons HMA surface course; 913 tons polymerized HMA surface course; 46,214 sq yds HMA surface<br />

removal; 3,864 sq yds patches; 15,455 ft saw cuts; 36,197 sq yds HMA shoulders; 1,226 sq yds waterpro<strong>of</strong>ing membrane<br />

system; 1,775 ft steel plate beam guardrail; 31,365 ft shoulder rumble strip; 38 raised reflective pavement markers; 4,361<br />

ft urethane pavement marking line; 258 ft crack filling; mobilization; traffic control and protection. (50 Working Days)<br />

(Job No. C-94-003-09) (4-01481-0500) (See Special Provisions for DBE Percentage)<br />

76. Contract No. 70223 Douglas County District 5<br />

Section (143BR)BR<br />

FAP Route 323 (US 36)<br />

This project consists <strong>of</strong> replacing the structure carrying U.S. Route 36 over Bear Creek with a double precast concrete<br />

box culvert located just east <strong>of</strong> Atwood; includes 480 cu yds earth excavation; 255 ft exploration trench; 532 sq yds stone<br />

riprap; 795 sq yds HMA surface removal-butt joint; 220 tons HMA binder and surface course; removal <strong>of</strong> existing<br />

structures; 2 box culvert end sections; 104 ft precast concrete box culvert; 500 ft steel plate beam guardrail; 1,380 ft paint<br />

pavement marking line; remove 53 ft <strong>of</strong> existing culverts; mobilization; traffic control and protection. (40 Working Days)<br />

(Job No. C-95-038-02) (5-51190-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 15 -<br />

This project is eligible for the <strong>Department</strong>’s Mentor-Protégé Program.<br />

77. Contract No. 60I06 Cook County District 1<br />

Section 1315 RS-3<br />

FAP Route 358 (TORRENCE AVE)<br />

2.64 miles <strong>of</strong> milling, HMA surface, striping and other work on Torrence Avenue from just north <strong>of</strong> the Calumet River to<br />

103rd Street in Chicago; includes 3,040 sq yds patching; 2,157 ft curb and gutter removal and replacement; 75,924 sq<br />

yds milling; 3,312 tons polymerized leveling binder (machine method); 6,385 tons HMA surface course, Mix D; 36,668 ft<br />

thermoplastic pavement marking; mobilization; traffic control and protection. (35 Working Days)<br />

(Job No. C-91-846-09) (1-75719-0200) (See Special Provisions for DBE Percentage)<br />

78. Contract No. 60I45 Will County District 1<br />

Section 2009-092-GRR<br />

Various Routes (VARIOUS) Project ACHSIP-000S(699)<br />

Replacement <strong>of</strong> guardrail and traffic barrier terminal sections at various locations in eastern Will County; includes 336 cu<br />

yds earth excavation; 420 cu yds furnished excavation; 1,750 ft grading and shaping ditches; 1,085 ft perimeter erosion<br />

barrier; 2,177 sq yds aggregate shoulders; 1 cu yd concrete removal; 20 cu yds concrete; 760 lbs structural steel; 1,900<br />

lbs reinforcement bars; 913 ft steel plate beam guardrail; 33 traffic barrier terminals; mobilization; traffic control and<br />

protection; Federally funded. (45 Working Days) (Job No. C-91-040-10) (1-78302-0000)<br />

(See Special Provisions for DBE Percentage)<br />

79. Contract No. 78158 Pulaski County District 9<br />

Section (120)I-1<br />

FAP Route 726 (IL 37)<br />

Removal <strong>of</strong> the existing culvert and replacement with a precast, 4'X 3', concrete box culvert located two miles south <strong>of</strong><br />

New Grand Chain on IL Route 37; includes 1,264 cu yds porous granular backfill; 0.6 acre seeding; 1,189 sq yds erosion<br />

control blanket; 192 sq yds stabilized subbase; 171 sq yds concrete pavement (jointed); 171 sq yds pavement removal;<br />

28 sq yds aggregate shoulders; 123 ft precast concrete box culvert 4' X 3'; 64 ft concrete gutter; 148 ft paint pavement<br />

marking; mobilization; traffic control and protection. (15 Working Days) (Job No. C-99-013-10) (9-91480-0205)<br />

(See Special Provisions for DBE Percentage)<br />

80. Contract No. 93511 Logan County District 6<br />

Section 09-00074-01-BR<br />

FAS Route 559 (CH 2) Project ARA-559(102)<br />

Project consists <strong>of</strong> rehabilitating the existing bridge including full-depth bridge deck patching, hydro-scarification <strong>of</strong> the<br />

existing deck, microsilica concrete overlay, expansion joint and bearing replacement, approach roadway ramps and all<br />

other incidental items to complete the work on FAS Route 559 (CH 2) 2 miles north <strong>of</strong> Lincoln over Kickapoo Creek;<br />

includes 171 sq yds HMA surface removal; 17 tons HMA surface course; 525 sq yds protective shield; 1,574 sq yds<br />

bridge deck grooving; 1,701 sq yds protective coat; 3,190 lbs furnishing and erecting structural steel; jack and remove 20<br />

existing bearings; 3,065 lbs reinforcement bars, epoxy coated; 20 elastomeric bearing assemblies; 40 anchor bolts; plug<br />

20 existing deck drains; 1,648 sq yds bridge deck microsilica concrete overlay; 155.8 sq yds deck slab repair (full-depth);<br />

1,648 sq yds bridge deck hydro-scarification; 369 sq ft cleaning bridge seats; traffic control and protection; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date:<br />

August 20, 2010) (Job No. C-96-239-10) (6-10427-0000) (See Special Provisions for DBE Percentage)<br />

81. Contract No. 63413 Cook County District 1<br />

Section 09-00044-00-SW (PALOS HEIGHTS)<br />

Various Routes Project ARA-9003(385)<br />

Project consists <strong>of</strong> installation <strong>of</strong> sidewalks, traffic signals, tree replacement, pavement marking, precast block retaining<br />

wall and all other incidental items to complete the work on Harlem Avenue from 119th Street and 131st Street and on<br />

McCarthy Road between 76th Avenue and 123rd Street in the city <strong>of</strong> Palos Heights; includes 144 units tree removal;<br />

pruning 27 trees roots; 765 cu yds earth excavation; 3,214 sq yds topsoil furnish and place; 940 sq yds sodding; 4,428 ft<br />

perimeter erosion barrier; 2,572 sq yds aggregate base course; 23,151 sq ft PCC sidewalk; 442 sq ft sidewalk removal;<br />

265 ft combination concrete curb and gutter removal and replacement; 2,125 ft thermoplastic pavement marking line;<br />

5,010 ft electric cable in conduit; 12 pedestrian signal heads, LED; 1,000 sq ft segmental concrete block wall; 258 sq yds<br />

driveway pavement removal and replacement; 257 sq yds PCC driveway removal and replacement; traffic control and<br />

protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(50 Working Days) (Job No. C-91-771-09) (1-20708-0000) (See Special Provisions for DBE Percentage)<br />

Small Business Set-Aside.<br />

82. Contract No. 64F88 Various Counties District 2<br />

Section D2 WEED CONTROL SPRAY 2010<br />

Various Routes (VARIOUS)<br />

This project consists <strong>of</strong> applying herbicides on state roadsides along various routes in Henry, Lee, Ogle, Rock Island,<br />

Whiteside and Winnebago Counties; includes 279 gals Milestone VM; 23.24 lbs Escort XP herbicide; 202 lbs weed<br />

control, pre-emergent (Sahara DG); mobilization. (Completion Date: October 15, 2010) (Job No. C-92-037-10)<br />

(Formal Contract) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 16 -<br />

83. Contract No. 46083 Various Counties District 2<br />

Section D 2 H-T PVMNT MRK RPR 10-21<br />

Various Routes (VARIOUS)<br />

This project consists <strong>of</strong> removing and placing new pavement markings on various routes throughout District Two as<br />

specified on individual work orders; includes 100 ft aerial speed check marking; 255,000 ft urethane pavement marking<br />

line; 4,000 sq ft thermoplastic pavement marking letter and symbols; 267,000 ft thermoplastic pavement marking line;<br />

1,501 ft hot spray thermoplastic pavement marking line; 70,500 ft polyurea pavement marking line; mobilization.<br />

(Completion Date: December 31, 2010) (Job No. C-60-021-10) (0-01576-0000)<br />

(See Special Provisions for DBE Percentage)<br />

84. Contract No. 68952 Fulton County District 4<br />

Section 18RS-4<br />

FAP Route 315/317 (US 136/US 24)<br />

1.35 miles <strong>of</strong> patching, milling and resurfacing on IL Route 100/U.S. Route 24 from Back Road to the south junction <strong>of</strong><br />

U.S. Route 24 and U.S. Route 136; includes 870 tons polymerized leveling binder (machine method); 173 sq yds HMA<br />

surface removal-butt joint; 1,743 tons HMA surface course; 20,482 sq yds HMA surface removal; 906 sq yds Class D<br />

patches; 446 tons aggregate shoulders; 18,572 ft epoxy pavement marking line; 90 raised reflective pavement markers;<br />

1,743 tons material transfer device; mobilization; traffic control and protection. (15 Working Days)<br />

(Job No. C-94-043-10) (4-00188-0400) (See Special Provisions for DBE Percentage)<br />

85. DELETED FROM LETTING<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

86. Contract No. 64F03 Henry-Whiteside Counties District 2<br />

Section 115 RS-4<br />

FAP Route 22 (IL 78)<br />

8.9 miles <strong>of</strong> HMA resurfacing on IL Route 78 from the north corporate limits <strong>of</strong> Prophetstown to 0.2 mile north <strong>of</strong> IL Route<br />

92; includes 88 tons leveling binder (hand method); 441 sq yds HMA surface removal-butt joint; 14,019 tons HMA surface<br />

course; 39,868 sq yds HMA surface removal; 5,000 ft strip reflective crack control treatment; 4,531 tons aggregate wedge<br />

shoulders; 240,252 ft paint pavement marking line; 32 raised reflective pavement markers; 14,019 tons material transfer<br />

device; construction layout; mobilization; traffic control and protection. (50 Working Days)<br />

(Job No. C-92-139-09) (2-28970-0100 and 2-28980-0100) (See Special Provisions for DBE Percentage)<br />

87. Contract No. 64961 Henry County District 2<br />

Section (125,126)RS-3<br />

FAP Route 22 (IL 78)<br />

1.19 miles <strong>of</strong> milling, patching and resurfacing on IL Route 78 from just north <strong>of</strong> Interstate 80 to South Street in Annawan;<br />

includes 1,696 tons polymerized leveling binder (machine method), N 70; 2,033 sq yds surface removal-butt joint; 2,035<br />

tons polymerized HMA surface course, N 70; 5,664 sq ft median removal partial depth; 1,368 sq yds Class B patches;<br />

7,553 ft saw cuts; 9,956 ft strip reflective crack control treatment; 283 tons aggregate shoulders; 16,336 ft thermoplastic<br />

pavement marking line; 8,250 ft paint pavement marking line; 187 raised reflective pavement markers; railroad protective<br />

liability insurance; mobilization; traffic control and protection. (45 Working Days) (Job No. C-92-059-06) (2-07360-0000)<br />

(See Special Provisions for DBE Percentage)<br />

88. Contract No. 60H99 Cook County District 1<br />

Section 0811 RS<br />

FAU Route 1477 (PERSHING RD)<br />

The contract consists <strong>of</strong> 1.07 miles <strong>of</strong> pavement patching and resurfacing <strong>of</strong> Pershing Road from Central Avenue to IL<br />

Route 50 (Cicero Avenue) within the town <strong>of</strong> Cicero and the village <strong>of</strong> Stickney; includes 62 tons mixture for cracks, joints<br />

and flangeways; 20 tons leveling binder (hand method); 4,100 tons polymerized HMA surface course; 400 ft combination<br />

concrete curb and gutter removal and replacement; 1,000 sq yds Class D pavement patches; 1,700 ft storm sewers to be<br />

cleaned; 16,100 ft thermoplastic pavement marking line; 460 raised reflective pavement markers; 900 ft detector loop<br />

replacement; 1,700 tons polymerized leveling binder (machine method); 7,300 sq yds PCC removal; mobilization; traffic<br />

control and protection. (30 Working Days) (Job No. C-91-839-09) (1-77149-0400)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 17 -<br />

89. Contract No. 63350 DuPage County District 1<br />

Section 09-00075-00-RS (WEST CHICAGO)<br />

FAU Route 2530 (POWIS ROAD) Project ARA-9003(403)<br />

Project consists <strong>of</strong> HMA surface removal and resurfacing with HMA level binder and surface course, reflective crack<br />

control, grading and shaping aggregate shoulders, detector loop replacement, pavement markings and all other incidental<br />

items to complete the work on FAU Route 2530 (Powis Road) from North Avenue to Smith Road in the city <strong>of</strong> West<br />

Chicago; includes 145 sq yds grading existing shoulder; 1,253 gals bituminous materials (prime coat); 25 tons aggregate<br />

(prime coat); 1,053 tons HMA surface course; 12,530 sq yds HMA surface removal; 500 sq yds Class D patches; 12,530<br />

sq yds area reflective crack control treatment; 500 ft strip reflective crack control treatment; 180 tons aggregate wedge<br />

shoulder; 825 ft steel plate beam guardrail; 325 ft guardrail removal; 18,977 ft temporary pavement marking line; 19,255 ft<br />

thermoplastic pavement marking line; 147 raised reflective pavement markers; 285 ft detector loop replacement; 526 tons<br />

polymerized leveling binder (machine method); traffic control and protection; Federally funded; (A Special Provision for<br />

this contract requires insurance that names additional insureds). (30 Working Days)<br />

(Job No. C-91-804-09) (1-20724-0000) (See Special Provisions for DBE Percentage)<br />

90. Contract No. 63365 Cook County District 1<br />

Section 09-00020-00-RS (PHOENIX)<br />

FAU Route 3598 (VINCENNES ROAD) Project ARA-9003(575)<br />

Project consists <strong>of</strong> the removal <strong>of</strong> existing HMA surface and subsequent replacement with HMA surface for the full width<br />

with pavement marking, patching <strong>of</strong> deteriorated and/or cracked concrete base and removal and replacement <strong>of</strong> any<br />

deteriorated curb and gutter, removal and replacement <strong>of</strong> sidewalk for detectable warnings and all other incidental items<br />

to complete the work on FAU Route 3598 (Vincennes Road) from Halsted Street to Thornton Road in the village <strong>of</strong><br />

Phoenix; includes 321 sq yds topsoil furnish and place; 1,375 gals bituminous materials (prime coat); 236 sq yds HMA<br />

surface removal; 1,447 sq yds temporary ramp; 1,985 tons HMA binder course; 1,155 tons HMA surface course; 1,855 sq<br />

ft PCC sidewalk; 440 sq ft detectable warnings; 13,510 sq yds HMA surface removal; 1,838 sq ft sidewalk removal; 572 ft<br />

combination concrete curb and gutter removal and replacement; 1,500 sq yds Class B patches; 13,510 sq yds area<br />

reflective crack control treatment; 700 ft short term pavement marking; 250 sq ft work zone pavement marking removal;<br />

6,384 ft thermoplastic pavement marking line; 1,800 dowel bars; traffic control and protection; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (40 Working Days)<br />

(Job No. C-91-714-09) (1-20776-0010) (See Special Provisions for DBE Percentage)<br />

91. Contract No. 97427 Madison County District 8<br />

Section 09-00080-04-RS<br />

FAU Route 9010 (NINTH STREET) Project ARA-5011(280)<br />

Project consists <strong>of</strong> HMA surface removal, HMA surface course, HMA shoulders, concrete gutter removal and replacement<br />

and pavement marking from Airline Drive to a point 230 feet north <strong>of</strong> Old Edwardsville Road in the city <strong>of</strong> Wood River;<br />

includes 25,068 sq yds HMA surface removal, 1 1/2"; 1,837 tons HMA surface course; 564 tons HMA shoulders; 232 ft<br />

concrete curb and gutter remove and replace; 23,272 ft thermoplastic pavement marking line; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (20 Working Days)<br />

(Job No. C-98-356-09) (8-10388-0010) (See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

92. Contract No. 68605 Warren County District 4<br />

Section 103RS;(1,3)RS-3<br />

FAS Route 411 (IL 164)<br />

9.2 miles <strong>of</strong> milling, patching and resurfacing on IL Route 164 from U.S. Route 34 near Monmouth to the Knox County<br />

Line; includes 399 tons aggregate (prime coat); 5,575 tons polymerized leveling binder (machine method), N 50; 490 sq<br />

yds HMA surface removal-butt joint; 11,253 tons HMA surface course, N 50; 99,251 sq yds HMA surface removal; 1,221<br />

sq yds Class D patches; 1,834 tons aggregate shoulders; 118,258 ft epoxy pavement marking-line; 608 raised reflective<br />

pavement markers; 11,253 tons material transfer device; mobilization; traffic control and protection. (40 Working Days)<br />

(Job No. C-94-095-06) (4-00164-0000) (See Special Provisions for DBE Percentage)<br />

93. Contract No. 62548 Cook County District 1<br />

Section 1316 RS-2<br />

FAU Route 2743 (GREENWOOD AVE)<br />

The contract consists <strong>of</strong> 1.61 miles <strong>of</strong> pavement patching and resurfacing <strong>of</strong> Greenwood Avenue from West Lake Avenue<br />

to IL Route 58 (Golf Road) within the village <strong>of</strong> Glenview; includes 49 tons mixture for cracks, joints and flangeways;<br />

2,749 tons HMA surface course; 30,009 sq yds HMA surface removal; 1,037 ft combination concrete curb and gutter<br />

removal and replacement; 4,540 sq ft median removal; 1,270 sq yds Class D pavement patches; 687 tons aggregate<br />

wedge shoulder; 4,540 sq ft corrugated median; 21,177 ft thermoplastic pavement marking line; 291 raised reflective<br />

pavement markers; 1,765 ft detector loop replacement; 953 sq yds PCC surface removal; 75 tons partial depth patching;<br />

1,833 tons polymerized leveling binder (machine method); mobilization; traffic control and protection. (Completion Date:<br />

July 16, 2010 Plus 05 Working Days) (Job No. C-91-375-02) (1-77148-0200)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 18 -<br />

94. Contract No. 90875 Champaign County District 5<br />

Section (10-6HB-5)BR<br />

FAI Route 74 (I-74)<br />

This project consists <strong>of</strong> the replacing the bridge carrying C.H. 24 over Interstate 74 located approximately 3 miles west <strong>of</strong><br />

St. Joseph; includes 2,499 cu yds earth excavation; 10,839 cu yds furnished excavation; 2,711 tons HMA binder and<br />

surface course; 100 sq yds bridge approach pavement connector; 3,734 sq yds HMA surface removal; 1,056 sq yds<br />

aggregate shoulders; 544 tons HMA shoulders; removal <strong>of</strong> existing structures; 454 cu yds concrete; 279,450 lbs<br />

furnishing and erecting structural steel; 90,650 lbs reinforcement bars, epoxy coated; 1,354 ft furnishing and driving steel<br />

piles; 43 ft pipe culverts; 119 ft pipe underdrains; 2,012 ft steel plate beam guardrail; 1,680 ft shoulder rumble strip; 5,255<br />

ft paint pavement marking line; mobilization; traffic control and protection. (85 Working Days)<br />

(Job No. C-95-013-97) (5-92640-0100) (See Special Provisions for DBE Percentage)<br />

95. Contract No. 63400 Will County District 1<br />

Section 09-00418-00-RS (JOLIET)<br />

Various Routes Project ARA-9003(465)<br />

Resurfacing project consisting <strong>of</strong> HMA surface removal, combination concrete curb and gutter removal and replacement,<br />

resurfacing with surface and binder courses, placement <strong>of</strong> thermoplastic pavement markings and all other incidental items<br />

to complete the work on Draper Avenue from Woodruff Road to Route 6 on Theodore Street from River Road to Route<br />

59, on Black Road from Prairie Avenue to Raynor Avenue, on Washington Street from the E J & E Railroad to Briggs<br />

Street, on Raynor Avenue from John Street to Glenwood Avenue and on Western Avenue from William Street to Raynor<br />

Avenue in the city <strong>of</strong> Joliet; includes 600 tons mixture for cracks, joints and flangeways; 5,538 gals bituminous materials<br />

(prime coat); 140 tons aggregate (prime coat); 69,362 sq yds HMA surface removal; 7,716 tons HMA binder courses;<br />

5,147 tons HMA surface course; 3,200 sq yds Class D patches; 163 ft combination concrete curb and gutter removal and<br />

replacement; 26,997 ft temporary pavement marking line; 26,997 ft thermoplastic pavement marking line; 170 raised<br />

reflective pavement markers; 825 ft detector loop replacement; 550 sq ft temporary information signing; traffic control and<br />

protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(45 Working Days) (Job No. C-91-011-10) (1-20748-0000) (See Special Provisions for DBE Percentage)<br />

96. Contract No. 63374 DuPage County District 1<br />

Section 09-00074-00-RS (WEST CHICAGO)<br />

FAU Route 2534 (JOLIET STREET) Project M-ARA-9003(405)<br />

Project consists <strong>of</strong> HMA surface removal and resurfacing with HMA leveling binder and surface course, reflective crack<br />

control, curb and gutter removal and replacement, detectable warnings, detector loop replacement, pavement markings<br />

and all other incidental items to complete the work on FAU Route 2534 (Joliet Street) from IL Route 59 to Geneva Street<br />

in the city <strong>of</strong> West Chicago; includes 3,901 gals bituminous materials (prime coat); 78 tons aggregate (prime coat); 3,276<br />

tons HMA surface course; 260 sq ft PCC sidewalk; 39,009 sq yds HMA surface removal; 750 ft combination curb and<br />

gutter removal; 500 sq yds Class D patches; 39,009 sq yds area reflective crack control treatment; 140 tons aggregate<br />

wedge shoulder; 750 ft combination concrete curb and gutter; 31,585 ft thermoplastic pavement marking line; 177 raised<br />

reflective pavement markers; 538 ft detector loop replacement; traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (55 Working Days)<br />

(Job No. C-91-802-09) (1-20723-0000) (See Special Provisions for DBE Percentage)<br />

97. Contract No. 64E78 Lee County District 2<br />

Section 75RS-3<br />

FAP Route 694 (US 52)<br />

1.44 miles <strong>of</strong> milling, patching and resurfacing on U.S. Route 52 from 0.2 mile south <strong>of</strong> IL Route 38 in Dixon to Eldena<br />

Road; includes 176 tons HMA replacement over patches; 2,282 tons HMA surface course, N 50; 23,742 sq yds HMA<br />

surface removal; 584 sq yds HMA removal over patches; 137 sq yds pavement patching; 150 ft saw cuts; 20,036 ft<br />

thermoplastic pavement marking line; 32 raised reflective pavement markers; mobilization; traffic control and protection,<br />

(15 Working Days) (Job No. C-92-128-09) (2-14000-0000) (See Special Provisions for DBE Percentage)<br />

98. Contract No. 68928 Woodford County District 4<br />

Section (114 BR-1)I<br />

FAP Route 702 (IL 117)<br />

This project consists <strong>of</strong> miscellaneous repairs to the structure (SN 102-0041) carrying IL Route 117 over Mill Creek<br />

located 36 miles south <strong>of</strong> U.S. Route 24 in Eureka; includes 57 cu yds earth excavation (widening); 227 sq yds base<br />

course widening; 15 tons HMA surface course; 178 sq yds HMA surface removal-butt joint; 263 sq yds bridge wearing<br />

surface removal; 8 cu yds concrete superstructure; 263 sq yds bridge deck grooving; 2,352 lbs reinforcement bars, epoxy<br />

coated; 1,290 ft epoxy pavement marking line; 414 sq ft thermal spraying (metalizing) PPC beam ends; 18 sq ft structural<br />

repair <strong>of</strong> concrete; 263 sq yds bridge deck latex concrete overlay; 263 sq yds concrete bridge deck scarification;<br />

mobilization; traffic control and protection. (35 Working Days) (Job No. C-94-155-09) (0-01616-4014)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 19 -<br />

99. Contract No. 99420 Williamson County District 9<br />

Section 09-00109-00-RS (MARION)<br />

Various Routes Project ARA-5041(23)<br />

Project consists <strong>of</strong> HMA surface removal and HMA resurfacing on various routes in the city <strong>of</strong> Marion, Main Street from<br />

North Carbon Street to Monroe Street, East Main Street from Williams Street to Fairground Street. East Main Street from<br />

Creal Springs Road to just west <strong>of</strong> IL Route 13, Morgan Avenue from Halfway Road to Miners Drive, North Russell Street<br />

from Kimmel Street to West Goodall Street and Norman Road from Broeking Road to Calico Road; includes 11,250 sq<br />

yds HMA surface removal; 5,525 tons HMA surface course; 175 cu yds aggregate shoulders; 10,611 ft thermoplastic<br />

pavement marking line; 226 raised reflective pavement markers; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (25 Working Days) (Job No. C-99-533-10) (9-10384-0010)<br />

(See Special Provisions for DBE Percentage)<br />

100. Contract No. 60H96 Cook County District 1<br />

Section 0307 RS-5<br />

FAU Route 3596 (DOLTON AVE)<br />

The contract consists <strong>of</strong> the patching and resurfacing <strong>of</strong> 3,513 feet <strong>of</strong> Dolton Avenue from 142nd Street to FAI Route 94<br />

(Bishop Ford Expressway) in the village <strong>of</strong> Dolton; includes 31 tons mixture for cracks, joints and flangeways; 833 tons<br />

polymerized leveling binder (machine method); 1,695 tons HMA surface course; 20,172 sq yds HMA surface removal;<br />

406 sq yds Class D pavement patches; 3,750 ft storm sewer to be cleaned; 16,378 ft thermoplastic pavement marking<br />

line; 120 raised reflective pavement markers; nighttime work zone lighting; mobilization; traffic control and protection.<br />

(20 Working Days) (Job No. C-91-836-09) (1-76724-0000) (See Special Provisions for DBE Percentage)<br />

101. Contract No. 74373 Moultrie County District 7<br />

Section (101,102,105)RS-1<br />

SBI Route 132 (OLD IL 121)<br />

Patching, milling and resurfacing at various locations along old IL Route 121 for 1.29 miles beginning at CH 57 and<br />

continuing to IL Route 121 in Moultrie County; includes 686 tons leveling binder (machine method); 1,063 tons HMA<br />

surface course, Mix C; 9,224 sq yds milling; 1,031 sq yds patching; 414 tons aggregate shoulders; 7,007 ft paint<br />

pavement marking; mobilization; traffic control and protection. (20 Working Days) (Job No. C-97-058-09) (7-50327-0000)<br />

(See Special Provisions for DBE Percentage)<br />

102. Contract No. 76D28 Greene County District 8<br />

Section (102,103)RS<br />

FAP Route 761 (IL 108)<br />

1.20 miles <strong>of</strong> milling, HMA surface, striping and other work on IL Route 108 from 0.10 mile west <strong>of</strong> 11th Street to 0.10 mile<br />

east <strong>of</strong> Bonfoys Street in Carrollton; includes 2,985 tons HMA binder and surface course, Mix C; 23,504 sq yds milling;<br />

1,164 sq yds patching; 41 tons aggregate wedge shoulder; 12 inlets; 60 ft concrete curb and gutter; 13,626 ft<br />

thermoplastic pavement marking; mobilization; traffic control and protection. (30 Working Days)<br />

(Job No. C-98-074-10) (8-00241-0000) (See Special Provisions for DBE Percentage)<br />

103. Contract No. 46089 Various Counties District 8<br />

Section D 8 H-T PVMNT MRK RPR 10-27<br />

Various Routes (VARIOUS)<br />

Placing assorted types, sizes and widths <strong>of</strong> pavement marking at locations specified on individual work orders; includes<br />

122,389 ft preformed plastic pavement marking; 244,778 ft grooving for recessed pavement marking; mobilization.<br />

(Completion Date: December 31, 2010) (Job No. C-60-027-10) (0-01576-0000)<br />

(See Special Provisions for DBE Percentage)<br />

104. Contract No. 97415 St. Clair County District 8<br />

Section 06-00092-02-PV<br />

FAU Route 9294 (CONCORDIA CHURCH RD.) Project ARA-5011(297)<br />

Project consists <strong>of</strong> constructing a full-depth HMA pavement with area <strong>of</strong> concrete curb and gutter or aggregate shoulders,<br />

installation <strong>of</strong> new storm sewers and culverts, grading <strong>of</strong> slopes, pavement markings and all other incidental items to<br />

complete the work on FAU Route 9294 (Concordia Church Road) from just east <strong>of</strong> IL Route 158 to F. Scott Parkway;<br />

includes 1,963 cu yds earth excavation; 1,106 cu yds trench backfill; 2.5 acres seeding; 250 lbs temporary erosion control<br />

seeding; 5,484 ft perimeter erosion barrier; 14,967 sq yds processing modified soil; 373.5 tons lime; 15,609 sq yds<br />

subbase granular material; 361 sq yds aggregate base course; 276 gals bituminous materials (prime coat); 4,718.6 tons<br />

HMA binder course; 2,229 tons HMA surface course; 11,114 sq yds pavement removal; 173 sq yds aggregate shoulders;<br />

302 ft pipe culvert removal; 8,954 ft storm sewers; 50 inlets; 8,662 ft combination concrete curb and gutter; 2,965 ft paint<br />

pavement marking line; traffic control and protection; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (105 Working Days) (Job No. C-98-373-09) (8-10401-0010)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 20 -<br />

105. Contract No. 63354 Will County District 1<br />

Section 09-00039-00-RS (NEW LENOX)<br />

Various Routes Project ARA-9003(486)<br />

Project consists <strong>of</strong> HMA surface removal, HMA resurfacing, thermoplastic pavement markings, detector loops<br />

replacement and all other incidental items to complete the work at various locations on Haven Avenue, Vine Street, Cedar<br />

Road, Gougar Road and Nelson Road in the village <strong>of</strong> New Lenox; includes 2,704 gals bituminous materials (prime coat);<br />

204 tons aggregate (prime coat); 3,032 tons HMA surface course; 27,054 sq yds HMA surface removal; 260 sq yds Class<br />

D patches; 8,697 ft temporary paint pavement marking line; 14,991 ft thermoplastic pavement marking line; 330 ft<br />

detector loop replacement; traffic control and protection; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (20 Working Days) (Job No. C-91-074-10) (1-20806-0000)<br />

(See Special Provisions for DBE Percentage)<br />

106. Contract No. 46084 Various Counties District 3<br />

Section D 3 H-T PVMNT MRK RPR 10-22<br />

Various Routes (VARIOUS)<br />

This project consists <strong>of</strong> placing various widths <strong>of</strong> pavement marking lines, letters and symbols on various routes within the<br />

limits specified on individual work orders; includes 21,500 ft thermoplastic pavement marking line; 2,750 ft hot spray<br />

thermoplastic pavement marking line; 20,000 ft preformed plastic pavement marking; 292,800 ft epoxy pavement marking<br />

line; 64,000 ft polyurea pavement marking line; 3,000 sq ft pavement marking removal; 110,500 ft grooving for recessed<br />

pavement marking line; 135,900 ft urethane pavement marking line; mobilization; traffic control and protection.<br />

(Completion Date: December 31, 2010) (Job No. C-60-022-10) (0-01576-0000)<br />

(See Special Provisions for DBE Percentage)<br />

107. Contract No. 46086 Various Counties District 5<br />

Section D 5 H-T PVMNT MRK RPR 10-24<br />

Various Routes (VARIOUS)<br />

This project consists <strong>of</strong> placing various widths <strong>of</strong> pavement marking lines, letters and symbols on various routes as<br />

specified on individual work orders; includes 203,175 ft hot spray thermoplastic pavement marking line; 512,000 ft<br />

urethane pavement marking line; 233,000 ft grooving for recessed pavement marking; 500 sq ft urethane pavement<br />

marking-letters and symbols; 500 sq ft grooving for recessed pavement marking; mobilization; traffic control and<br />

protection. (Completion Date: December 31, 2010) (Job No. C-60-024-10) (0-01576-0000)<br />

(See Special Provisions for DBE Percentage)<br />

108. Contract No. 46088 Various Counties District 7<br />

Section D 7 H-T PVMNT MRK RPR 10-26<br />

Various Routes (VARIOUS)<br />

Placing assorted types, sizes and widths <strong>of</strong> pavement markings at various locations as specified on individual work<br />

orders; includes 342,815 ft thermoplastic pavement marking; 224,120 ft hot spray thermoplastic pavement marking; 9,450<br />

ft preformed plastic pavement marking; 9,450 ft epoxy pavement marking; 127,075 ft polyurea pavement marking; 57,300<br />

ft grooving recessed pavement marking; mobilization. (Completion Date: December 31, 2010)<br />

(Job No. C-60-026-10) (0-01576-0000) (See Special Provisions for DBE Percentage)<br />

109. Contract No. 46070 Rock Island County District 2<br />

Section BLACK HAWK STATE HISTORIC SITE<br />

PARK ROADS (PARK ROADS)<br />

This project consists <strong>of</strong> upgrades within the Black Hawk Historic Site consisting <strong>of</strong> new sidewalks, a paving block<br />

pathway, resurfacing and other related work; includes 703 sq yds topsoil, furnish and place; 48 tons HMA binder and<br />

surface course; 5,474 sq ft PCC sidewalk; 2 sq ft sign panel; 2,350 sq ft paver blocks, <strong>special</strong>; mobilization.<br />

(15 Working Days) (Job No. C-30-003-10) (0-01626-2002) (See Special Provisions for DBE Percentage)<br />

110. Contract No. 63328 Will County District 1<br />

Section 09-00018-00-RS (UNIVERSITY PARK)<br />

FAU Route 2967 (UNIVERSITY PARKWAY) Project ARA-9003(431)<br />

Project consists <strong>of</strong> HMA resurfacing including placement <strong>of</strong> HMA level binder, surface course and area reflective crack<br />

control treatment, pavement markings, signage and all other incidental items to complete the work on FAU Route 2967<br />

(University Parkway) from Crawford Avenue to Steger-Monee Road in the village <strong>of</strong> University Park; includes 4,400 sq<br />

yds topsoil furnish and place; 400 ft perimeter erosion barrier; 4,200 gals bituminous materials (prime coat); 2,500 tons<br />

HMA surface course; 720 tons leveling binder (machine method); 1,200 sq yds HMA surface removal; 900 sq yds Class D<br />

patches; 15,600 sq yds area reflective crack control treatment; 1,100 tons aggregate shoulders; 4,710 ft temporary<br />

pavement marking line; 15,530 ft thermoplastic pavement marking line; 70 raised reflective pavement markers; traffic<br />

control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (35 Working Days) (Job No. C-91-866-09) (1-20751-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 21 -<br />

111. Contract No. 63341 McHenry County District 1<br />

Section 09-00003-00-SP (PORT BARRINGTON)<br />

FAU Route 3702 (RAWSON BRIDGE ROAD) Project ARA-9003(476)<br />

Project consists <strong>of</strong> resurfacing, removal and replacement <strong>of</strong> a culvert, guardrail, pavement markings, signage and all<br />

other incidental items to complete the work on FAU Route 3702 (Rawson Bridge Road) west <strong>of</strong> Arbor Villa Drive in the<br />

village <strong>of</strong> Port Barrington; includes 60 ft perimeter erosion barrier; 1,903 gals bituminous materials (prime coat); 726 tons<br />

leveling binder (machine method); 1,452 tons HMA surface course; 1,317 sq yds HMA surface removal; 179 tons<br />

aggregate wedge shoulder; remove 1 existing culvert; 28 ft storm sewers; 138 ft steel plate beam guardrail; 17,968 ft<br />

thermoplastic pavement marking line; 50 sq yds restoration; 673 sq yds HMA surface removal-driveway butt joint; traffic<br />

control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (25 Working Days) (Job No. C-91-059-10) (1-20744-0000) (See Special Provisions for DBE Percentage)<br />

112. Contract No. 63397 Cook County District 1<br />

Section 09-00247-00-RS (OAK PARK)<br />

FAU Route 2783 (RIDGELAND AVENUE) Project ARA-9003(505)<br />

Project consists <strong>of</strong> HMA surface removal, HMA leveling binder and surface course, pavement patching, curb and gutter<br />

replacement, pavement markings and all other incidental items to complete the work on FAU Route 2783 (Ridgeland<br />

Avenue) from Roosevelt Road to Garfield Street in the village <strong>of</strong> Oak Park; includes 625 sq yds subbase granular<br />

material; 2,095 gals bituminous materials (prime coat); 21 tons aggregate (prime coat); 1,480 tons leveling binder; 21,320<br />

sq yds HMA surface removal; 2,085 tons HMA surface course; 1,850 sq ft PCC sidewalk; 730 sq ft detectable warnings;<br />

1,850 sq ft sidewalk removal; 1,695 ft combination concrete curb and gutter removal and replacement; 227 sq yds Class<br />

C patches; 14,270 ft strip reflective crack control treatment; 43 frames and lids to be adjusted; 12,280 ft thermoplastic<br />

pavement marking line; 770 ft detector loop replacement; 400 sq yds PCC surface removal; traffic control and protection;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(30 Working Days) (Job No. C-91-124-10) (1-20773-0010) (See Special Provisions for DBE Percentage)<br />

113. Contract No. 63418 Kane County District 1<br />

Section 09-00056-00-LS (WEST DUNDEE)<br />

FAP Route 341 (IL 72) Project ARA-9003(529)<br />

Project consists <strong>of</strong> removing, salvaging and reinstalling bluestone sidewalk, installation <strong>of</strong> PCC sidewalks, construction <strong>of</strong><br />

14 architectural precast concrete planter boxes and all other incidental items to complete the work on FAP Route 341 (IL<br />

Route 72) from 2nd Street to Fox River in the village <strong>of</strong> West Dundee; includes 1,400 sq ft PCC sidewalks; 225 ft concrete<br />

retaining wall; 6 valve boxes to be adjusted; 572 ft precast concrete curb; 336 ft limestone masonry veneer; 234 ft precast<br />

modular retaining wall; 1,024 sq ft brick paver removal; 307 sq ft remove and reinstall brick paver; 50 ft curb and gutter<br />

removal and replacement; 1 pre-construction videotaping; 168 ft ornamental metal fence; 1,450 sq ft anti-graffiti fence;<br />

252 sq ft masonry wall construction; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (60 Working Days) (Job No. C-91-188-10) (0-09910-0000)<br />

(See Special Provisions for DBE Percentage)<br />

114. Contract No. 63424 Cook County District 1<br />

Section 09-00049-00-SW (RICHTON PARK)<br />

Various Routes Project ARA-9003(418)<br />

Project consists <strong>of</strong> sidewalk installation consisting <strong>of</strong> earthwork, detectable warning panels, restoration, traffic control,<br />

utility adjustments, sign relocations, tree removal and all other incidental items to complete the work on Governors<br />

Highway from 22013 to 22301 Governors Highway and Sauk Trail from Arquilla Avenue to Thomas Drive in the village <strong>of</strong><br />

Richton Park; includes 32 units tree removal; 432 cu yds earth excavation; 380 cu yds removal and disposal <strong>of</strong> unsuitable<br />

materials; 3,337 sq yds topsoil furnish and place; 3,337 sq yds sodding, salt tolerant; 1,535 sq yds aggregate base<br />

course; 13,808 sq ft PCC sidewalk; 210 sq ft detectable warnings; 35 sq ft pavement removal; relocate 11 signs, <strong>special</strong>;<br />

1 gas valve to be adjusted; traffic control and protection; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (15 Working Days) (Job No. C-91-812-09) (1-20777-0010)<br />

(See Special Provisions for DBE Percentage)<br />

115. Contract No. 66532 Livingston County District 3<br />

Section 114RS-2<br />

FAP Route 681 (IL 116) Project ESP-681(38)<br />

0.71 mile <strong>of</strong> widening, resurfacing and intersection upgrades on IL Route 116 from IL Route 47 to east <strong>of</strong> Maple Street in<br />

Saunemin; includes 1,969 cu yds furnished excavation; 17,975 sq yds sodding; 3,280 ft perimeter erosion barrier; 27<br />

inlets and pipe protection; 1,535 sq yds HMA base course widening; 1,540 tons leveling binder (machine method); 1,422<br />

tons HMA binder and surface course; 1,565 sq yds PCC driveway pavement; 1,049 sq ft PCC sidewalk; 5,137 sq yds ;<br />

400 sq yds Class D patches; 7,140 ft strip reflective crack control treatment; 2,346 ft storm sewers, Class A; 27 manholes;<br />

86 inlets; 7,346 ft combination concrete curb and gutter; 5,199 ft thermoplastic pavement marking line; 94 raised reflective<br />

pavement markers; 200 ft conduit in trench; 1,130 ft storm sewers, water main quality pipe; 7,140 ft saw cutting; 225 ft<br />

sanitary sewer; mobilization; traffic control and protection; Federally funded. (115 Working Days)<br />

(Job No. C-93-006-05) (3-36110-0100) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 22 -<br />

116. Contract No. 66986 Kankakee County District 3<br />

Section (102)I<br />

FAS Route 1323 (IL 115)<br />

This project consists <strong>of</strong> removing and replacing an existing box culvert on IL Route 115 located approximately 3 miles<br />

east <strong>of</strong> Hersher; includes 83 cu yds furnished excavation; 160 ft grading and shaping ditches; 40 sq ft stone riprap; 52 sq<br />

yds aggregate base course; 104 sq yds HMA base course; 64 tons HMA surface course, N 50; 714 sq yds HMA surface<br />

removal; removal <strong>of</strong> existing structures; 38 ft PCC box culvert; 390 ft paint pavement marking line; 2 PCC box culvert end<br />

sections; mobilization; traffic control and protection. (15 Working Days) (Job No. C-93-065-10) (3-11546-0100)<br />

(See Special Provisions for DBE Percentage)<br />

117. Contract No. 68214 Hancock County District 4<br />

Section (6G-WPSO)BR<br />

FAP Route 522 (IL 96) Project ACF-522(7)<br />

This project consists <strong>of</strong> removing the existing concrete arch box culvert (SN 034-2005) and replacing it with a 12' x 10'<br />

cast in place double box culvert, also new HMA pavement and storm sewers; includes 968 cu yds earth excavation; 718<br />

cu yds rock excavation; 1,307 sq yds sodding; 129 sq yds stone riprap; 479 tons HMA binder and surface course; 1,146<br />

sq ft concrete sidewalk; 1 removal <strong>of</strong> existing structure; 1,260 cu yds structure excavation; 20 cu yds concrete; 109,675<br />

lbs reinforcement bars; 448 cu yds concrete box culverts; 176 ft storm sewers; 184 ft ductile iron water main; 8 inlets; 412<br />

ft combination concrete curb and gutter; 1,191 ft epoxy pavement marking line; 94 ft sanitary sewer; construction layout;<br />

traffic control and protection; mobilization; Federally funded. (90 Working Days) (Job No. C-94-023-02) (4-09315-0100)<br />

(See Special Provisions for DBE Percentage)<br />

PREVIOUS LETTING: January 15, 2010 (Item 203)<br />

118. Contract No. 68682 Peoria County District 4<br />

Section Z[9D-15D)RS-6;(15D)RS-3],GRS-2<br />

FAS Route 1388 (IL 8) Project ACRS-1388(102)<br />

This project consists <strong>of</strong> 4.65 miles <strong>of</strong> patching, milling and resurfacing located on IL Route 8 from Kickapoo/Edwards<br />

Road to west <strong>of</strong> Reservoir Boulevard at Peoria; includes 1,164 sq yds HMA surface removal-butt joint; 6,625 tons HMA<br />

surface course; 72,707 sq yds HMA surface removal; 1,238 sq yds patches; 1,613 tons aggregate shoulders; 147 tons<br />

HMA shoulders; 44,135 ft epoxy pavement marking line; 337 raised reflective pavement markers; 6,149 tons material<br />

transfer device; mobilization; traffic control and protection. (35 Working Days) (Job No. C-94-015-07) (4-00033-0300)<br />

(See Special Provisions for DBE Percentage)<br />

119. Contract No. 68747 Stark County District 4<br />

Section (11,12)RS-2;(6W)RS-3;101RS-4<br />

FAP Route 643 (IL 17/IL 91) Project ACF-643(87)<br />

12.68 miles <strong>of</strong> patching, milling and resurfacing on IL Route 17 from IL Route 91 in Toulon to IL Route 40 west <strong>of</strong><br />

Wyoming; includes 8,428 tons polymerized leveling binder (machine method); 4,361 sq yds HMA surface removal-butt<br />

joint; 17,249 tons HMA surface course; 203,439 sq yds HMA surface removal; 2,200 sq yds Class D patches; 133,501 ft<br />

strip reflective crack control treatment; 4,048 tons aggregate shoulders; 1,938 ft steel plate beam guardrail; 200,287 ft<br />

epoxy pavement marking line; 914 raised reflective pavement markers; mobilization; traffic control and protection;<br />

Federally funded. (55 Working Days) (Job No. C-94-114-07) (4-00143-1100)<br />

(See Special Provisions for DBE Percentage)<br />

120. Contract No. 68913 Peoria County District 4<br />

Section 12RS-3; 13RS-4<br />

FAP Route 317 (US 150) Project NHF-317(83)<br />

1.08 miles <strong>of</strong> patching, milling and resurfacing on U.S. Route 150 (War Memorial Drive) from just east <strong>of</strong> IL Route 40<br />

(Knoxville Avenue) to just east <strong>of</strong> the Prospect Avenue intersection; includes 1,909 tons polymerized leveling binder<br />

(machine method); 1,622 s yds HMA surface removal-butt joint; 3,818 tons polymerized HMA surface course; 1,443 sq<br />

yds Class B patches; 8,856 ft saw cuts; 477 ft combination concrete curb and gutter; 3,137 sq ft concrete median; 17,728<br />

ft epoxy pavement marking line; 452 raised reflective pavement markers; 2 full-actuated controllers and cabinets; 215 ft<br />

electric cable in conduit; 3,439 ft detector loop; mobilization; traffic control and protection; Federally funded. (45 Working<br />

Days) (Job No. C-94-122-09) (4-00051-0500) (See Special Provisions for DBE Percentage)<br />

121. Contract No. 68930 Warren County District 4<br />

Section 4RS<br />

SBI Route 8A (OLD US 34)<br />

0.65 mile <strong>of</strong> HMA resurfacing on Old U.S. Route 34 located on the south side <strong>of</strong> Monmouth; includes 577 tons HMA<br />

surface course, N 50; 7,722 ft paint pavement marking line; 434 tons polymerized leveling binder (machine method), N<br />

50; mobilization. (15 Working Days) (Job No. C-94-157-09) (0-01616-4016 - CONT.MAINT.)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 23 -<br />

122. Contract No. 68945 Peoria County District 4<br />

Section 12-I-5;11-I-2<br />

FAP Route 64 & FAU Route 6659 (IL 29 & UNMARKED) Project ACHSIP-000S(803)<br />

This project consists <strong>of</strong> installing radar speed limit signs at two locations along IL Route 29 (Galena Road) between the<br />

4700 block and the 5700 block and one location along Farmington Road near the 4100 block; includes 3 light pole<br />

foundations, metal; 3 traffic signal posts, galvanized steel; 3 radar speed signs; mobilization; Federally funded.<br />

(15 Working Days) (Job No. C-94-021-10) (4-40610-2610) (See Special Provisions for DBE Percentage)<br />

123. Contract No. 70121 Champaign County District 5<br />

Section (28Z)RS-5<br />

FAP Route 808 (US 150/US 45)<br />

1.13 miles <strong>of</strong> patching, milling and resurfacing on U.S. Routes 150/45 from Wright Street to east <strong>of</strong> Race Street in<br />

Urbana; includes 1,693 tons polymerized leveling binder (machine method), N90; 3,076 tons polymerized HMA surface<br />

course, N90; 42,344 sq yds HMA surface removal; 836 sq yds patches; 32 water valves to be adjusted; 37 manholes to<br />

be adjusted; 21,701 ft thermoplastic pavement marking line; 495 raised reflective pavement markers; 4,801 ft detector<br />

loop; 8,516 ft cold milling; railroad protective liability insurance; mobilization; traffic control and protection. (Completion<br />

Date: July 30, 2010 Plus 05 Working Days) (Job No. C-95-113-00) (5-50150-0000)<br />

(See Special Provisions for DBE Percentage)<br />

124. Contract No. 70427 Champaign County District 5<br />

Section (105BR)BR<br />

FAP Route 709 (US 136) Project BRF-709(26)<br />

This project consists <strong>of</strong> replacing the bridge (SN 010-0062) carrying U.S. Route 136 over Wildcat Slough located east <strong>of</strong><br />

Fisher; includes 2,010 cu yds channel excavation; 105 cu yds porous granular embankment; 1,311 sq yds stone riprap;<br />

111 sq yds HMA surface removal butt-joint; 47 tons HMA surface course; 43 sq yds bridge approach pavement<br />

connector; removal <strong>of</strong> existing structures; 386 cu yds structure excavation; 500 cu yds concrete; 654 sq yds bridge deck<br />

grooving; 11 cu yds concrete encasement; 94,700 lbs furnishing and erecting structural steel; 91,260 lbs reinforcement<br />

bars, epoxy coated; 960 ft furnishing and driving metal shell piles; 12 elastomeric bearing assemblies; 104 ft pipe<br />

underdrains for structures; 450 ft steel plate beam guardrail; 900 ft paint pavement marking line; mobilization; traffic<br />

control and protection; Federally funded. (80 Working Days) (Job No. C-95-071-04) (5-52290-0000)<br />

(See Special Provisions for DBE Percentage)<br />

125. DELETED FROM LETTING<br />

126. Contract No. 74426 Richland-Edwards Counties District 7<br />

Section D7 GUARDRAIL 2010-1<br />

FAP Route 116 (IL 130) Project ACHSIP-116(52)<br />

Installing guardrail at 8 different locations along IL Route 130 in Richland and Edwards counties; includes 300 tons<br />

aggregate shoulders; 4,128 ft steel plate beam guardrail; 31 traffic barrier terminals; 72 guardrail markers; 27 terminal<br />

markers; mobilization; traffic control and protection; Federally funded. (25 Working Days)<br />

(Job No. C-97-011-10) (7-76910-1104) (See Special Provisions for DBE Percentage)<br />

127. Contract No. 76132 Washington County District 8<br />

Section 95-AC & 32B-I<br />

OR Route 322/SBI 2 (OLD US 51/DELAWARE RD)<br />

The contract consists <strong>of</strong> the removal <strong>of</strong> a single span bridge, which carries Old U.S. Route 51/Delaware Road over a<br />

tributary to Rayes Creek, removal <strong>of</strong> the pavement south <strong>of</strong> the existing structure on Old U.S. Route 51/Delaware Road,<br />

resurfacing <strong>of</strong> the pavement north <strong>of</strong> the existing structure on Old U.S. Route 51/Delaware Road and the construction <strong>of</strong> a<br />

new service road connecting U.S. Route 51 to Old U.S. Route 51/Delaware Road, all located east <strong>of</strong> Richview; includes<br />

254 units tree removal; 1,260 cu yds earth excavation; 436 cu yds channel excavation; 2,665 cu yds furnished<br />

excavation; 2,572 sq yds aggregate base course; 511 tons leveling binder (machine method); 832 tons HMA surface<br />

course; 1,153 sq yds pavement removal; 533 sq yds HMA surface removal; 602 ft gutter removal; 116 sq yds aggregate<br />

shoulders; removal <strong>of</strong> existing structure; remove and re-erect 3 traffic barrier terminals; 10,291 ft thermoplastic pavement<br />

marking line; 10 raised reflective pavement markers; 22 trees; mobilization; traffic control and protection. (40 Working<br />

Days) (Job No. C-98-049-05) (8-83570-0100, 8-83571-0000) (See Special Provisions for DBE Percentage)<br />

128. DELETED FROM LETTING<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 24 -<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

129. Contract No. 76323 Madison County District 8<br />

Section 60-15, 60-15B<br />

FAP Route 310 (IL 255) Project ACNHF-310(139)<br />

The project is for IL Route 255 beginning west <strong>of</strong> Seminary Road and extending northwest to US Route 67 in Godfrey and<br />

will consists <strong>of</strong> the construction <strong>of</strong> four-lane pavement, diamond interchanges at Humbert Road and IL Route 111, ramp<br />

pavement and the construction <strong>of</strong> box culverts; includes 991 raised reflective pavement markers; removal <strong>of</strong> 5 buildings;<br />

removal <strong>of</strong> friable and non-friable asbestos; 1,342 units tree removals; 775,915 cu m earth excavation; 371,210 cu m<br />

furnished excavation; 12,186 sq m stone dumped riprap; 5,695 m tons riprap for stilling basin; 163,342 sq m processing<br />

modified soil; 29,014 m tons subbase granular material; 96,911 sq m HMA pavement (full-depth); 1,662 sq m bridge<br />

approach pavement; 14,526 m tons aggregate shoulders; 57,234 sq m HMA shoulders; 529,240 kg reinforcement bars;<br />

181 m precast concrete box culvert; 2,878 cu m concrete box culverts; 827 m pipe culverts; 16,586 m pipe underdrains;<br />

2,515 m steel plate beam guardrail; 19,261 m shoulder rumble strip; 11,615 m woven wire fence; 27,857 m thermoplastic<br />

pavement marking line; 753 m paint pavement marking line; 2,688 m epoxy pavement marking line; mobilization; traffic<br />

control and protection; Federally funded. (295 Working Days)<br />

(Job No. C-98-108-03) (8-83990-0100, 8-83990-0200, 8-05100-0307) (See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

130. Contract No. 76830 Madison-St Clair Counties District 8<br />

Section 60-(30,31,128)-1<br />

FAP Route 600 (IL 159) Project ACNHF-600(60)<br />

1.02 miles <strong>of</strong> pavement widening to provide 4 through lanes (and a left turn lane) on IL 159 from South Morrison to<br />

Church Street in Collinsville; includes 4 evergreens; 37,949 cu yds earth excavation; 12,402 cu yds trench backfill; 6<br />

acres seeding; 7,395 sq yds stabilized subbase - HMA; 32,404 sq yds aggregate base course; 127 sq yds concrete base<br />

course; 5,579 tons HMA binder course; 5,573 tons polymerized HMA surface course, Mix E; 44,578 sq ft concrete<br />

sidewalk; 12,921 sq yds pavement removals; 13,824 sq yds milling; 885 sq yds patching; removal <strong>of</strong> existing structure;<br />

311 cu yds structure excavation; 183.6 cu yds concrete structures; 924 stud shear connectors; 1,750 sq ft untreated<br />

timber lagging; 96,537 lbs epoxy coated reinforcement bars; 2,255 ft soldier piles; 1,939 ft precast concrete box culverts;<br />

8,157 ft storm sewers; 6,610 ft water main; 19 manholes; 12,971 ft concrete curb and gutter; 700 ft steel plate beam<br />

guardrail; 13 traffic barrier terminals; 377 sq ft sign panel; 25,005 ft thermoplastic pavement marking; 2 controllers; 9,630<br />

ft electric cable; 6 steel mast arm assemblies and poles; 20 signal heads; 2,275 ft detector loop; 22 shade trees; 52<br />

intermediate trees; 16,547 cu ft drilling and setting soldier piles (in soil); mobilization; traffic control and protection;<br />

Federally funded. (210 Working Days) (Job No. C-98-086-09) (8-82159-0314)<br />

(See Special Provisions for DBE Percentage)<br />

PREVIOUS LETTING: January 15, 2010 (Item 240)<br />

131. Contract No. 76977 Monroe County District 8<br />

Section 67-1HBR<br />

FAP Route 809 (IL 158) Project ACF-809(5)<br />

Replacement <strong>of</strong> the existing bridge with a 4-span, steel beam structure carrying IL Route 158 over IL Route 3 (SN 067-<br />

0042) and raising the pr<strong>of</strong>ile grade, concrete pavement patching and resurfacing on IL Route 158 located south <strong>of</strong><br />

Columbia; includes 325 cu yds earth excavation; 1,315 furnished excavation; 1.25 acres seeding; 1,990 ft perimeter<br />

erosion barrier; 6,650 sq yds HMA base course; 600 tons leveling binder (machine method); 1,820 tons HMA binder<br />

course; 1,100 tons HMA surface course, Mix D; 840 sq yds pavement removal; 288 sq yds patching; 1,725 tons HMA<br />

shoulders; removal <strong>of</strong> existing structure; 1,018 sq yds protective shield; 157 cu yds structure excavation; 349 cu yds rock<br />

excavation for structures; 1,370 cu yds concrete; 1,022 sq yds bridge deck grooving; 403,400 lbs structural steel; 6,960<br />

stud shear connectors; 202,020 lbs epoxy coated reinforcement bars; 4,300 ft concrete curb and gutter; 10,900 sq ft<br />

concrete median surface; 4,375 ft steel plate beam guardrail; 15 traffic barrier terminals; 15,645 ft thermoplastic pavement<br />

marking; 2,760 ft locating underground cable; 3,980 ft unit duct; 2,760 ft trench and backfill; temporary support system;<br />

mobilization; traffic control and protection; Federally funded. (165 Working Days) (Job No. C-98-003-06) (8-89344-0000)<br />

(See Special Provisions for DBE Percentage)<br />

132. Contract No. 78160 Alexander County District 9<br />

Section D9 DECK SEAL 2010-1<br />

FAI Route 57 (I-57)<br />

Repairs to the structure carrying I-57 over the Mississippi River in Alexander County including sealing <strong>of</strong> cracks in the<br />

deck, application <strong>of</strong> protective coat to the deck surface and parapets along with minor joint repairs (SN 002-0022);<br />

includes 32,178 sq yds protective coat; 429 ft silicone joint sealer; 0.6 cu ft polymer concrete; 10,000 ft bridge deck<br />

concrete crack sealer; mobilization; traffic control and protection. (20 Working Days)<br />

(Job No. C-99-015-10) (9-00347-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 25 -<br />

133. Contract No. 90952 Douglas County District 5<br />

Section (15,21-25HB-2)BR<br />

FAI Route 57 (I-57)<br />

This project consists <strong>of</strong> removing and replacing the deck on structure (SN 021-0024) carrying IL Route 133 over Interstate<br />

57 located on the east edge <strong>of</strong> Arcola; includes 2,019 sq yds PCC base course; 179 tons leveling binder (machine<br />

method); 391 tons HMA surface course, N 50; 374 sq yds bridge approach pavement; 3,022 sq yds HMA surface<br />

removal; 452 sq yds HMA surface removal; 303 ft saw cuts; 183 tons HMA shoulders; removal <strong>of</strong> 1 existing concrete<br />

deck; 500 cu yds concrete; 654 sq yds bridge deck grooving; 3,530 lbs furnishing and erecting structural steel; 105,095<br />

lbs reinforcement bars epoxy coated; 200 sq yds slope wall; 18 elastomeric bearing assemblies; 1,717 ft pipe<br />

underdrains; 9,519 sq ft concrete median; 665 sq ft corrugated median; 350 ft steel plate beam guardrail; 5,357 ft paint<br />

pavement marking line; 74 raised reflective pavement markers; 1,616 ft unit duct 2#6XLP, 1#6 bare ground 1.5<br />

polyethylene; 1,416 ft trench and backfill for electrical work; 997 sq yds diamond grinding bridge section; mobilization;<br />

traffic control and protection. (90 Working Days) (Job No. C-95-052-98) (5-93910-0100)<br />

(See Special Provisions for DBE Percentage)<br />

134. Contract No. 99411 Jefferson County District 9<br />

Section 09-00130-00-RP (MT. VERNON)<br />

FAU Route 8749 (NORTH DAVIDSON AVENUE) Project M-ARA-5049(23)<br />

Project consists <strong>of</strong> 24-foot PCC pavement with curb and gutter, storm sewers, pavement markings and all other incidental<br />

items to complete the work on FAU Route 8749 (N. Davidson Avenue) just north <strong>of</strong> IL Route 15 in the city <strong>of</strong> Mt. Vernon;<br />

includes 12 units tree removal; 2,053 cu yds earth excavation; 144 cu yds trench backfill; 2 acres seeding; 200 lbs<br />

temporary erosion control seeding; 2,775 ft perimeter erosion barrier; 248 sq yds stone riprap; 5,955 sq yds processing<br />

modified soil; 96 tons lime; 5,955 sq yds aggregate base course; 100 tons aggregate surface course; 100 tons aggregate<br />

for temporary access; 4,830 sq yds PCC pavement; 4,830 sq yds protective coat; 72 ft precast concrete box culvert;<br />

1,561 ft storm sewers; 3,305 ft combination concrete curb and gutter; 10 sq ft remove and replace sign panel; 1,730 ft<br />

paint pavement marking line; 48 dowel bars; traffic control and protection; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-99-563-09) (9-10383-0000)<br />

(See Special Provisions for DBE Percentage)<br />

135. Contract No. 60B92 DuPage County District 1<br />

Section 10HB-R<br />

FAP Route 311 (US 34) Project ACBHF-311(41)<br />

Bridge deck replacement and resurfacing <strong>of</strong> approaches on the structure carrying US 34 over IL 53 in Lisle; includes 432<br />

cu yds porous granular embankment; 524 tons leveling binder (machine method); 443 tons HMA surface course, MIX F;<br />

2,874 sq ft median removal; 60.6 cu yds concrete removal; removal <strong>of</strong> existing concrete deck; 871 sq yds protective<br />

shield; 489.4 cu yds structure excavation; 786.3 cu yds concrete; 1,200 sq yds bridge deck grooving; 1,284 sq ft form liner<br />

textured surface; 330 lbs structural steel; 5,664 stud shear connectors; cleaning and painting steel bridge; containment<br />

and disposal <strong>of</strong> lead paint cleaning residue; 146,150 lbs epoxy coated reinforcement bars; 177 ft pipe underdrains; 4<br />

traffic barrier terminals; 186.2 sq yds staining concrete structures; 73 ft detector loop replacement; 2,822 ft thermoplastic<br />

pavement marking; mobilization; traffic control and protection; Federally funded. (Completion Date: October 31, 2010 Plus<br />

05 Working Days) (Job No. C-91-023-07) (1-75694-0100) (See Special Provisions for DBE Percentage)<br />

PREVIOUS LETTING: November 6, 2009 (Item 96)<br />

136. Contract No. 60H62 Will County District 1<br />

Section (535B-6R&536)RS-4<br />

FAP Route 351 (IL 7)<br />

2.31 miles <strong>of</strong> milling and resurfacing along IL Route 7 from IL Route 53 to I-355 in Lockport; includes 5 cu yds earth<br />

excavation; 54 units grading and shaping shoulders; 190 sq yds sodding; 77 sq yds concrete base course; 195 sq yds<br />

HMA base course; 9,522 tons polymerized HMA binder and surface course, Mix F; 500 sq ft concrete sidewalk; 69,160 sq<br />

yds milling; 1,230 sq yds patching; 4,050 ft detector loop replacement; 54,620 ft thermoplastic pavement marking;<br />

mobilization; traffic control and protection. (45 Working Days) (Job No. C-91-760-09) (1-77031-0102, 1-77031-0002)<br />

(See Special Provisions for DBE Percentage)<br />

137. Contract No. 60H72 Cook County District 1<br />

Section 2009-066 I<br />

FAU Route 3565 (IL 171/ARCHER AVE) Project ACHSIP-3565(3)<br />

3.70 miles <strong>of</strong> safety improvements along IL Route 171/Archer Avenue from IL Route 83 to 104th Street/Willow Springs<br />

Road in Willow Springs; includes 8,210 units tree removal; 10,000 cu yds earth excavation; 25 units grading and shaping<br />

shoulders; 50 cu yds trench backfill; 16,000 sq yds compost; 12 acres seeding; 16,000 sq yds erosion control blanket;<br />

25,600 ft perimeter erosion barrier; 20,050 sq yds aggregate base course; 16,100 sq yds HMA base course; 2,250 tons<br />

HMA surface course, Mix D; 2,250 sq yds pavement removal; 4,050 sq yds milling; 3,580 tons aggregate shoulders; 1 cu<br />

yd concrete removal; 3 cu yds structure excavation; 180 lbs epoxy coated reinforcement bars; 60 sq ft concrete sealer;<br />

1,413 ft steel plate beam guardrail; 12 traffic barrier terminals; 36,800 ft shoulder rumble strip; 278 sq ft sign panel;<br />

37,000 ft thermoplastic pavement marking; 12 acres selective clearing; 4 flashing beacons, post-mounted, solar-powered;<br />

mobilization; traffic control and protection; Federally funded. (60 Working Days) (Job No. C-91-778-09) (1-78105-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 26 -<br />

138. Contract No. 60H91 Cook County District 1<br />

Section 3293 RS-2<br />

FAP Route 305 (IL 50/CICERO AVE)<br />

2.24 miles <strong>of</strong> milling, HMA surface, striping and other work on Cicero Avenue/ IL Route 50 from 46th Street to Marquette<br />

Road in Chicago and Bedford Park; includes 12,100 tons HMA surface course, Mix F; 1,500 sq ft concrete sidewalk;<br />

2,470 sq yds patching; 5,100 tons polymerized leveling binder (machine method); 14,400 sq yds concrete surface<br />

removal; 1,884 ft detector loop replacement; 63,750 ft thermoplastic pavement marking; mobilization; traffic control and<br />

protection. (Completion Date: October 15, 2010) (Job No. C-91-831-09) (1-78136-0000)<br />

(See Special Provisions for DBE Percentage)<br />

139. Contract No. 60H97 Cook County District 1<br />

Section 44RS-6<br />

FAU Route 2820 (GOVERNORS HWY)<br />

4.57 miles <strong>of</strong> milling and resurfacing on Governor's Highway from Crawford Avenue to 175th Street in Hazel Crest,<br />

Homewood, Flossmoor and Olympia Fields; includes 371 units grading and shaping ditches; 5,199 tons polymerized<br />

leveling binder (machine method); 10,586 tons HMA surface course, Mix D; 126,915 sq yds milling; 6,257 sq yds<br />

patching; 742 tons aggregate wedge shoulder; 1,062.5 ft steel plate beam guardrail; 4,240 ft electric cable; 427 ft detector<br />

loop; mobilization; traffic control and protection. (Completion Date: September 15, 2010 Plus 05 Working Days)<br />

(Job No. C-91-837-09) (1-76723-0000) (See Special Provisions for DBE Percentage)<br />

140. Contract No. 60H98 Will County District 1<br />

Section 121 RS-1<br />

FAU Route 323 (IL 126)<br />

2.27 miles <strong>of</strong> milling, HMA surface, striping and other work on IL Route 126 from I-55 to U.S. Route 30 (Lockport Street)<br />

in Plainfield; includes 208 units grading and shaping shoulders; 3,810 tons HMA surface course, Mix D; 1,800 tons<br />

polymerized leveling binder (machine method); 45,300 sq yds milling; 380 sq yds patching; 510 tons aggregate wedge<br />

shoulder; 240 ft detector loop replacement; 34,000 ft thermoplastic pavement marking; mobilization; traffic control and<br />

protection. (20 Working Days) (Job No. C-91-838-09) (1-77031-0010) (See Special Provisions for DBE Percentage)<br />

141. Contract No. 60I03 Cook County District 1<br />

Section (145&146)RS-7<br />

FAU Route 2857 (ASHLAND AVE/WOOD ST)<br />

The contract consists <strong>of</strong> 3.08 miles <strong>of</strong> pavement patching and resurfacing <strong>of</strong> Ashland Avenue/Wood Street from 123rd<br />

Street to IL Route 83 (Sibley Boulevard) within the villages <strong>of</strong> Calumet Park, Riverdale and Dixmoor; includes 100 units<br />

grading and shaping shoulders; 140 tons mixture for cracks, joints and flangeways; 20 tons leveling binder (hand<br />

method); 7,772 tons HMA surface course; 500 sq ft PCC sidewalk; 94,000 sq yds HMA surface removal; 570 ft<br />

combination concrete curb and gutter removal and replacement; 1,390 sq yds Class D pavement patches; 2,500 ft storm<br />

sewers to be cleaned; 73,050 ft thermoplastic pavement marking line; 1,650 raised reflective pavement markers; 2,500 ft<br />

detector loop replacement; 3,820 tons polymerized leveling binder (machine method); mobilization; traffic control and<br />

protection. (50 Working Days) (Job No. C-91-843-09) (1-77130-0500) (See Special Provisions for DBE Percentage)<br />

142. Contract No. 60I04 Cook County District 1<br />

Section 3248 RS-1<br />

FAU Route 2843 (DIXIE HWY)<br />

1.93 miles <strong>of</strong> milling and resurfacing on Dixie Highway from U.S. Route 6 (159th Street) to Governor's Highway in East<br />

Hazel Crest, Hazel Crest, Markham and Harvey; includes 87 units grading and shaping shoulders; 160 cu yds furnished<br />

excavation; 458 sq yds topsoil; 0.09 acre seeding; 425 sq yds erosion control blanket; 2,375 tons polymerized leveling<br />

binder (machine method); 4,836 tons HMA surface course, Mix D; 57,568 sq yds milling; 2,880 sq yds patching; 240 sq<br />

yds aggregate shoulders; 686 tons aggregate wedge shoulder; 4 traffic barrier terminals; 989 ft detector loop<br />

replacement; 39,015 ft thermoplastic pavement marking; mobilization; traffic control and protection. (60 Working Days)<br />

(Job No. C-91-844-09) (1-77978-0000) (See Special Provisions for DBE Percentage)<br />

143. Contract No. 60I11 Cook County District 1<br />

Section 2009-077 RS<br />

FAP Route 307 (IL 64)<br />

1.61 miles <strong>of</strong> milling, HMA surface, striping and other work on IL Route 64 from Elmwood Avenue to Ridgeland Avenue<br />

and Austin Avenue to IL Route 50 (Cicero Avenue) in Oak Park and Chicago; includes 2,972 tons polymerized leveling<br />

binder (machine method); 7,060 tons polymerized HMA surface course, Mix F; 72,036 sq yds milling; 1,274 sq yds<br />

patching; 1,016 ft detector loop replacement; 26,610 ft thermoplastic pavement marking; mobilization; traffic control and<br />

protection. (50 Working Days) (Job No. C-91-851-09) (1-78135-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 27 -<br />

144. Contract No. 60I14 Cook County District 1<br />

Section 1316 RS-4<br />

FAU Route 3778 (CRAWFORD AVE)<br />

0.98 mile <strong>of</strong> milling, HMA surface, striping and other work on Crawford Avenue from U.S. Routes 12/20 (95th Street) to<br />

103rd Street in Oaklawn, Evergreen Park and Chicago; includes 134 sq yds topsoil; 134 sq yds sodding; 3,218 tons<br />

polymerized HMA surface course, Mix F; 7,820 sq yds milling; 1,230 sq yds patching; 701 ft detector loop replacement;<br />

5,324 sq yds concrete surface removal; 1,293 tons polymerized leveling binder; 23,191 ft thermoplastic pavement<br />

marking; mobilization; traffic control and protection. (30 Working Days) (Job No. C-91-854-09) (1-75276-0000)<br />

(See Special Provisions for DBE Percentage)<br />

145. Contract No. 60I39 Will County District 1<br />

Section (H & 10)RS-7<br />

FAP Route 876 (IL 1)<br />

1.69 miles <strong>of</strong> milling, HMA surface, striping and other work on IL Route 1 (Main Street) from Union Avenue to Burville<br />

Road in Crete; includes 3,440 tons HMA surface course, Mix D; 225 sq ft concrete sidewalk; 40,900 sq yds milling; 1,635<br />

sq yds patching; 928 ft detector loop replacement; 1,690 tons polymerized leveling binder (machine method); 22,120 ft<br />

thermoplastic pavement marking; mobilization; traffic control and protection. (30 Working Days)<br />

(Job No. C-91-034-10) (1-77130-0100) (See Special Provisions for DBE Percentage)<br />

146. Contract No. 60I43 Will County District 1<br />

Section 2009-090 GRR<br />

Various Routes (VARIOUS) Project ACHSIP-000S(698)<br />

Replacement <strong>of</strong> steel plate beam guardrail and traffic barrier terminals at various locations in northern Will County;<br />

includes 48 units grading and shaping existing shoulders; 2,694 sq yds aggregate shoulders; 675 ft steel plate beam<br />

guardrail; 58 traffic barrier terminals; 1,974 sq yds turf establishment; 196 units mowing; mobilization; traffic control and<br />

protection; Federally funded. (40 Working Days) (Job No. C-91-038-10) (1-78303-0000)<br />

(See Special Provisions for DBE Percentage)<br />

147. Contract No. 60I44 Will County District 1<br />

Section 2009-091 GRR<br />

Various Routes (VARIOUS) Project ACHSIP-000S(697)<br />

Replacement <strong>of</strong> steel plate beam guardrail and traffic barrier terminals at various locations in southern Will County;<br />

includes 478 units grading and shaping existing shoulders; 6,930 sq yds aggregate shoulders; 250 ft steel plate beam<br />

guardrail; 100 traffic barrier terminals; 3,391 ft guardrail removal; 3,162 sq yds turf establishment; 478 units mowing;<br />

mobilization; traffic control and protection; Federally funded. (45 Working Days) (Job No. C-91-039-10) (1-88307-0000)<br />

(See Special Provisions for DBE Percentage)<br />

148. Contract No. 60I50 Lake County District 1<br />

Section (106-2 & 117) RS-1<br />

FAP Route 334 (US 12/IL 59)<br />

2.87 miles <strong>of</strong> milling, HMA surface, striping and other work on U.S. Route 12/ IL Route 59 from IL Route 59 to East Street<br />

(McHenry County line) in Fox Lake; includes 20 units grading and shaping shoulders; 12 cu yds furnished excavation; 325<br />

sq yds topsoil; 4,175 tons polymerized leveling binder (machine method); 9,915 tons polymerized HMA surface course,<br />

Mix F; 100 sq ft concrete sidewalk; 101,200 sq yds milling; 4,500 sq yds patching; 85 tons aggregate wedge shoulder; 3<br />

traffic barrier terminals; 1,603 ft detector loop replacement; 53,300 ft thermoplastic pavement marking; 300 sq yds<br />

sodding; mobilization; traffic control and protection. (45 Working Days) (Job No. C-91-049-10) (1-75113-0000)<br />

(See Special Provisions for DBE Percentage)<br />

149. Contract No. 60I71 Cook County District 1<br />

Section 524-1-N<br />

FAP Route 344 (IL 83) Project ACHSIP-344(50)<br />

Traffic signal modification, extension <strong>of</strong> a left-turn lane, milling and HMA surface at the intersection <strong>of</strong> IL Route 83 and<br />

127th Street in Alsip and Crestwood; includes 1,347 tons HMA surface course, Mix F; 12,493 sq yds milling; 549 sq yds<br />

patching; 3,988 ft thermoplastic pavement marking; uninterruptible power supply; 70 sq ft sign panel; 1 controller; 12,558<br />

ft electric cable; 16 signal heads; 488 ft detector loop; mobilization; traffic control and protection; Federally funded.<br />

(45 Working Days) (Job No. C-91-128-10) (1-78300-0000) (See Special Provisions for DBE Percentage)<br />

150. Contract No. 60J03 Cook County District 1<br />

Section 8 Y-RS-5<br />

FAP Route 311 (US 34)<br />

1.03 miles <strong>of</strong> milling, HMA surface, striping and other work on U.S. Route 34 from Bassford Avenue to the Burlington,<br />

Northern, Santa Fe Railway Company railroad in LaGrange; includes 100 sq yds topsoil; 100 sq yds sodding; 1,085 tons<br />

polymerized leveling binder (machine method); 2,570 tons polymerized HMA surface course, Mix F; 150 sq ft concrete<br />

sidewalk; 26,200 sq yds milling; 1,050 sq yds patching; 1,189 ft detector loop replacement; 14,950 ft thermoplastic<br />

pavement marking; mobilization; traffic control and protection. (25 Working Days) (Job No. C-91-151-10) (1-78072-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 28 -<br />

151. Contract No. 64D50 Winnebago County District 2<br />

Section 1-HBR-2<br />

FAP Route 301 (US 20) Project NHF-301(63)<br />

This project consists <strong>of</strong> removing and replacing the existing superstructure on the bridge (SN 101-0096) carrying Meridian<br />

Road over U.S. Route 20 located at the south edge <strong>of</strong> Rockford; includes 1,030 cu yds furnished excavation; 1,288 ft<br />

perimeter erosion barrier; 151 tons HMA surface course; 214 sq yds bridge approach pavement; removal <strong>of</strong> existing<br />

superstructures; 660 sq yds HMA shoulders; 310 cu yds concrete structures; 690 sq yds bridge deck grooving; 164,480<br />

lbs erecting structural steel; 71,980 lbs reinforcement bars, epoxy coated; 24 erecting elastomeric bearing assemblies;<br />

156 ft pipe underdrains for structures; 59 sq yds geocomposite wall drain; 387 ft steel plate beam guardrail; 8 traffic<br />

barrier terminals; 5,280 ft paint pavement marking line; 261 ft unit duct, 600V, 2-1C no. 6 ground (xlp-type), 1-inch dia.<br />

polyethylene; 154 ft trench and backfill for electrical work; 2 light pole foundations; relocate 1 existing lighting unit; traffic<br />

control for road closure; mobilization; traffic control and protection; Federally funded. (Completion Date: October 18,<br />

2010) (Job No. C-92-032-09) (2-15500-0000) (See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

152. Contract No. 64F43 Lee County District 2<br />

Section 115RS-4<br />

FAP Route 573 (US 30)<br />

7.3 miles <strong>of</strong> cold milling and HMA resurfacing on U.S. Route 30 from IL Route 251 to the Dekalb County Line; includes<br />

5,455 tons leveling binder (machine method), N 70; 1,300 sq yds HMA surface removal-butt joint; 12,157 tons surface<br />

course; 1,190 sq yds PCC pavement; 18,417 sq yds HMA surface removal; 605 sq yds patches; 2,807 ft saw cuts; 9,524<br />

tons aggregate wedge shoulders; 225,025 ft paint pavement marking line; 436 raised reflective pavement markers;<br />

mobilization; traffic control and protection. (60 Working Days) (Job No. C-92-001-10) (2-12100-0000)<br />

(See Special Provisions for DBE Percentage)<br />

153. Contract No. 64F67 Rock Island County District 2<br />

Section D2 MRS 2010-5<br />

FAS Route 1205 (IL 192)<br />

8.3 miles <strong>of</strong> intermittent HMA resurfacing on IL Route 192 from Taylor Ridge to 98th Street near Edgington; includes<br />

1,137 tons leveling binder (machine method); 1,421 tons HMA surface course, N 50; 296 sq yds HMA surface removalbutt<br />

joint; 542 tons aggregate shoulders; 30,134 ft paint pavement marking line; mobilization; traffic control and protection.<br />

(15 Working Days) (Job No. C-92-016-10) (0-01616-2013) (See Special Provisions for DBE Percentage)<br />

154. Contract No. 64F94 Rock Island County District 2<br />

Section 17(D)BR-M<br />

FAP Route 599 (US 67)<br />

This project consists <strong>of</strong> replacing expansion joints on the structure (SN 081-0038) carrying U.S. Route 67 over the north<br />

channel <strong>of</strong> the Rock River in Milan; includes 55.3 cu yds concrete superstructure; 4,880 lbs reinforcement bars, epoxy<br />

coated; 404 ft preformed joint strip seal; 69 ft neoprene expansion joint; 3,240 ft paint pavement marking line;<br />

maintenance <strong>of</strong> 100 flexible delineators; mobilization; traffic control and protection. (40 Working Days)<br />

(Job No. C-92-058-10) (0-01616-2026) (See Special Provisions for DBE Percentage)<br />

155. Contract No. 64F93 Winnebago County District 2<br />

Section 41RS-1<br />

FAP Route 303 (US 20 BUS)<br />

1.24 miles <strong>of</strong> cold milling and HMA resurfacing on U.S. Business Route 20 (West State Street) from Day Avenue to DME<br />

Railroad in Rockford; includes 1,005 tons leveling binder (machine method); 1,508 tons HMA surface course, N50; 17,951<br />

sq yds HMA surface removal; 3 water valves to be adjusted; 3,244 ft thermoplastic pavement marking line; 82 raised<br />

reflective pavement markers; mobilization; traffic control and protection. (25 Working Days)<br />

(Job No. C-92-059-10) (2-19860-0100) (See Special Provisions for DBE Percentage)<br />

156. Contract No. 72C49 Cass-Sangamon Counties District 6<br />

Section 105(RS-6); 106(RS-4)<br />

FAP Route 67 (IL 125) Project ACF-67(81)<br />

Milling, patching, HMA surface, striping, addition <strong>of</strong> left-turn lanes, lighting and other work on IL Route 125 from Buchanan<br />

Street/Fulton Lane in Ashland to the east limits <strong>of</strong> Pleasant Plains; includes 1,461 cu yds earth excavation; 3,875 ft<br />

perimeter erosion barrier; 2,946 sq yds subbase granular material; 2,412 sq yds HMA base course widening; 439 tons<br />

leveling binder (machine method); 8,377 tons HMA surface course, Mix D; 31 sq yds pavement removal; 97,208 sq yds<br />

milling; 200 sq yds patching; 1,359 tons aggregate shoulders; 1,711 sq yds HMA shoulders; 56,370 ft paint pavement<br />

marking; 1,595 ft unit duct; 1,200 ft trench and backfill; 11 luminaires; 11 aluminum light poles; 66 ft concrete curb and<br />

gutter; 3 solar powered flashing beacon assemblies; mobilization; traffic control and protection; Federally funded. (55<br />

Working Days) (Job No. C-96-028-09) (6-00469-0100, 6-00351-0100) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 29 -<br />

157. Contract No. 72D19 Sangamon County District 6<br />

Section D6 RUMBLESTRIP, MRKING 2010<br />

FAP Route 658 (IL 29) Project ACHSIP-658(23)<br />

Milling <strong>of</strong> centerline rumble strips, pavement marking and tree removal on IL Route 29 from north <strong>of</strong> Cantrall to north <strong>of</strong><br />

Hackmore Drive in Springfield; includes 35,243 ft centerline-rumble strip; 114,600 ft paint pavement marking; 23 units tree<br />

removal; 8,181 ft thermoplastic pavement marking; mobilization; traffic control and protection; Federally funded. (15<br />

Working Days) (Job No. C-96-123-10) (0-00883-6002) (See Special Provisions for DBE Percentage)<br />

PREVIOUS LETTING: November 6, 2009 (Item 179)<br />

PREVIOUS LETTING: January 15, 2010 (Item 152)<br />

158. Contract No. 72D33 Montgomery County District 6<br />

Section (112)SEAL COAT<br />

FAS Route 1769 (FRI-55 WEST)<br />

Bituminous surface treatment from 2.5 miles south <strong>of</strong> Macoupin Creek continuing north for 2.50 miles in Montgomery<br />

County; includes 65.2 tons bituminous materials (cover and seal coats); 440 tons seal coat aggregate; 3,300 ft paint<br />

pavement marking; mobilization; traffic control and protection. (15 Working Days) (Job No. C-96-157-10) (0-01616-6012)<br />

(See Special Provisions for DBE Percentage)<br />

159. Contract No. 72D38 Macoupin County District 6<br />

Section (1)I-2<br />

FAS Route 731 (SCOTTVILLE ROAD)<br />

Shoulder reconstruction on Scottville Road from east <strong>of</strong> Crum Road (TR 74) to 0.3 mile west <strong>of</strong> Bob White Road (TR 104)<br />

between Scottville and Modesto; includes 262 units excavating and grading existing shoulder; 8,747 sq yds HMA<br />

shoulders; 29,525 ft paint pavement marking; 0.9 acre seeding; mobilization; traffic control and protection.<br />

(15 Working Days) (Job No. C-96-166-10) (0-01616-6016) (See Special Provisions for DBE Percentage)<br />

160. DELETED FROM LETTING<br />

161. Contract No. 76D27 Madison County District 8<br />

Section (101,102)RS-3<br />

FAP Route 604 (IL 159) Project ACF-604(24)<br />

6.66 miles <strong>of</strong> milling, HMA surface and other work on IL Route 159 from 0.1 mile north <strong>of</strong> IL Route 140 to the Macoupin<br />

County line; includes 8,119 tons HMA surface course; 96,652 sq yds milling; 427 sq yds patching; 95,366 ft thermoplastic<br />

pavement marking; 1,635 ft detector loop replacement; mobilization; traffic control and protection; Federally funded.<br />

(45 Working Days) (Job No. C-98-073-10) (8-00242-0000) (See Special Provisions for DBE Percentage)<br />

162. Contract No. 76D37 Washington County District 8<br />

Section 2RS-3<br />

FAP Route 42 (IL 127) Project ACF-42(101)<br />

5.5 miles <strong>of</strong> milling, HMA surface, HMA shoulders, pavement marking and other work on IL Route 127 from the<br />

Washington County line to IL Route 177; includes 570 units excavating and grading existing shoulders; 240 cu yds<br />

furnished excavation; 3,190 tons leveling binder (machine method); 6,379 tons HMA surface course, Mix C; 75,935 sq<br />

yds milling; 991 sq yds patching; 18,984 sq yds HMA shoulders; 67,514 ft thermoplastic pavement marking; mobilization;<br />

Federally funded. (65 Working Days) (Job No. C-98-013-10) (8-70080-1000)<br />

(See Special Provisions for DBE Percentage)<br />

163. Contract No. 76D41 St Clair-Clinton Counties District 8<br />

Section 123-1-J,(26,24)-J<br />

FAP Route 805 & Route FAS 1780 (IL 161 & OLD US 50) Project ACHSIP-000S(804)<br />

The project consists <strong>of</strong> the placement <strong>of</strong> guardrail terminal markers, guardrail markers, traffic barrier terminals and<br />

guardrail removal at the intersection <strong>of</strong> IL Route 161 and Helen Street in Swansea and at eight locations along Old U.S.<br />

Route 50 between Aviston and Beckemeyer; includes 1,513 ft steel plate beam guardrail; 250 ft steel plate beam<br />

guardrail, attached to structures; 23 traffic barrier terminals; 1,875 ft guardrail removal; 39 guardrail markers; 22 terminal<br />

markers-direct applied; mobilization; traffic control and protection; Federally funded. (60 Working Days)<br />

(Job No. C-98-004-10) (8-08800-2802) (See Special Provisions for DBE Percentage)<br />

Small Business Set-Aside.<br />

164. Contract No. 76D45 Madison County District 8<br />

Section D-8 BRIDGE CLEANING 2010-1<br />

FAI Route 270 & Route FAP 2 (I-270 & IL 3)<br />

The contract will consist <strong>of</strong> bridge washing <strong>of</strong> 11 structures on FAI Route 270 and IL Route 3 at various locations in<br />

Madison County; includes 33,746 sq yds protective coat; 8,793 sq ft concrete sealer; bridge washing <strong>of</strong> 11 structures;<br />

mobilization; traffic control and protection. (40 Working Days) (Job No. C-98-008-10) (0-01616-8002)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 30 -<br />

165. Contract No. 63184 Cook County District 1<br />

Section 01-P4019-05-BT<br />

MARQUETTE DRIVE Project TE-D1(622)<br />

Removal and replacement <strong>of</strong> a HMA bicycle/walking path with aggregate base course, pavement striping, seeding, tree<br />

planting, and all other incidental items to complete the work on Marquette Drive from Stony Island Avenue to Richards<br />

Drive; includes 58 units tree removal; 600 ft temporary fence; 10 units supplemental watering; 554 cu yds earth<br />

excavation; 700 cu yds furnished excavation; 4,829 sq yds geotechnical fabric for ground stabilization; 4,742 sq yds<br />

topsoil furnish and place; 4,723 sq yds erosion control blanket; 4,928 sq yds aggregate base course; 708 tons HMA<br />

surface course; 1,395 sq ft PCC sidewalk; 430 sq ft detectable warnings; 275 ft combination concrete curb and gutter;<br />

8,611 ft thermoplastic pavement marking line; 6 trees; 100 ft sediment control, silt fence; 2,402 sq yds HMA surface<br />

removal (variable depth); 121 ft fence (<strong>special</strong>); traffic control and protection; Federally funded; (A Special Provision for<br />

this contract requires insurance that names additional insureds). (65 Working Days)<br />

(Job No. C-91-206-02) (0-00990-0000) (See Special Provisions for DBE Percentage)<br />

166. Contract No. 63187 DuPage County District 1<br />

Section 08-00086-00-SW (BENSENVILLE)<br />

FAU Route 1376 (GRAND AVENUE) Project CMM-9003(53)<br />

Project consists <strong>of</strong> installing new PCC sidewalk, curb and gutter removal and replacement, structure adjustments,<br />

pavement markings and all other incidental items to complete the work on FAU Rte. 1376 (Grand Avenue) from Church<br />

Road to York Road in the village <strong>of</strong> Bensenville; includes removal <strong>of</strong> 82 trees; 830 cu yds earth excavation; 477 sq yds<br />

topsoil furnish and place; 2,500 sq yds sodding salt tolerant; 220 ft combination concrete curb and gutter removal and<br />

replacement; 20 tons aggregate for temporary access; 1,000 ft thermoplastic pavement marking line; 14,120 sq ft PCC<br />

sidewalk; 264 sq ft detectable warnings; 32 ft trench and backfill for electrical work; 456 ft electric cable in conduit, signal;<br />

6 trees; 5 structures to be adjusted; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (15 Working Days) (Job No. C-91-492-08) (1-11010-0000)<br />

(See Special Provisions for DBE Percentage)<br />

167. Contract No. 63188 Cook County District 1<br />

Section 08-00202-00-SW (DES PLAINES)<br />

DES PLAINES RIVER TRAIL Project CMM-9003(116)<br />

Project consists <strong>of</strong> the construction <strong>of</strong> a multiuse trail, existing trail will be removed and a new trail will be constructed<br />

using an aggregate surface course, the limits for the south trail are from Toughy Avenue north to Algonquin Road, the<br />

north trail limits are from Bellard Road north to Golf Road, along Ballard Road from Rand Road east to East River Road to<br />

approximately 700 feet west, located in the city <strong>of</strong> Des Plaines; includes 14 acres clearing; 5,840 cu yds earth excavation;<br />

16,690 sq yds geotechnical fabric for ground stabilization; 16,525 sq yds aggregate base course, Type A; 16,820 sq yds<br />

aggregate surface course, Type B; 1,550 sq ft PCC sidewalk; 1,000 sq ft sidewalk removal; 870 ft thermoplastic<br />

pavement marking line; 21 ft conduit pushed; 380 ft electric cable in conduit, signal; 6 traffic signal posts; 2 pedestrian<br />

signal heads; 1,125 sq ft modular block retaining wall; 15,550 ft temporary construction fence; 13,310 sq yds erosion<br />

control blanket; 11,350 ft perimeter erosion barrier; 5.5 acres seeding; 13,500 sq yds topsoil furnish and place; 35 trees;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(100 Working Days) (Job No. C-91-125-09) (1-11010-0000) (See Special Provisions for DBE Percentage)<br />

168. Contract No. 63360 Cook County District 1<br />

Section 08-00169-00-PK (GLENVIEW)<br />

LEHIGH AVE. & COMPASS RD. Project CMM-9003(191)<br />

Work to be performed under this contract consists <strong>of</strong> parking lot improvements to the West Lot South Pod Parking Lot, the<br />

West Lot North Pod Parking Lot and the Compass Road South Parking Lot within the city <strong>of</strong> Glenview. This work will<br />

include, but not be limited to, HMA surface course, sidewalk replacement, thermoplastic pavement markings, lighting and<br />

all incidental and collateral work necessary to complete the project, located in the city <strong>of</strong> Glenview, <strong>Illinois</strong> at Lehigh<br />

Avenue: Intersection <strong>of</strong> Compass Road/Lehigh Avenue; and Compass Road: Intersection <strong>of</strong> Lehigh/West Lake; includes<br />

1,202 cu yds earth excavation; 15,436 sq yds aggregate base course, Type B; 7,036 sq yds HMA base course; 986 tons<br />

HMA binder course; 593 tons HMA surface course; 3,958 sq yds pervious asphalt; 4,442 sq yds pervious concrete; 1,047<br />

sq ft sidewalk removal; 3,804 sq ft PCC sidewalk; 5,699 ft combination concrete curb and gutter; 294 ft storm sewer;<br />

7,396 ft thermoplastic pavement marking line; 2,000 ft conduit in trench; 2,176 ft electric cable in conduit; 22 light poles<br />

and assemblies; 81 trees; 4,651 sq yds topsoil furnish and place; 4,694 sq yds sodding, salt tolerant; 50 shrubs; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days)<br />

(Job No. C-91-248-09) (1-11010-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 31 -<br />

169. Contract No. 63416 Kane County District 1<br />

Section 08-00370-00-SP<br />

FAP Route 363 (FABYAN PARKWAY) Project HSIP-9003(56)<br />

Project consists <strong>of</strong> widening, resurfacing, earth excavation, construction <strong>of</strong> storm sewers and drainage structures,<br />

landscaping, pavement markings and all other incidental items to complete the work on FAP Rte. 363 (Fabyan Parkway)<br />

at Van Nortwick Avenue; includes 100 cu yds earth excavation; 2,632 cu yds removal and disposal <strong>of</strong> unsuitable material;<br />

1,471 sq yds topsoil furnish and place; 375 ft perimeter erosion barrier; 693 sq yds subbase granular material; 462 sq yds<br />

HMA base course; 506 sq yds HMA base course widening; 1,203 gals bituminous materials (prime coat); 51.7 tons HMA<br />

surface course; 1,215 tons polymerized HMA surface course; 656 sq yds protective coat; 11,117 sq yds HMA surface<br />

removal; 1,948.5 ft combination curb and gutter removal; 3,320 sq yds Class D patches; 75 ft pipe culverts; 1,968 ft<br />

combination concrete curb and gutter; 11,676 ft temporary pavement marking line; 12,224.5 ft epoxy pavement marking<br />

line; 202 raised reflective pavement markers; 2,515 sq ft pavement marking removal; 1,958 tons aggregate subgrade;<br />

1,056 tons polymerized leveling binder (machine method); traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (30 Working Days)<br />

(Job No. C-91-510-08) (0-01661-0000) (See Special Provisions for DBE Percentage)<br />

170. Contract No. 99405 Jackson County District 9<br />

Section 05-00118-00-RP (CARBONDALE)<br />

REED STATION PARKWAY Project HPP-321(117)<br />

Project consists <strong>of</strong> the construction <strong>of</strong> an acceleration/deceleration lane along westbound IL Rte 13 and the construction<br />

<strong>of</strong> new roadway connecting westbound IL Rte. 13 to the existing Reed Station Parkway, located in the city <strong>of</strong> Carbondale;<br />

includes 2,341 cu yds earth excavation; 16,608 cu yds borrow excavation; 7,272 sq yds processing modified soil 12"; 802<br />

tons polymerized HMA binder course; 625 tons polymerized HMA surface course; 1,800 ft combination curb and gutter;<br />

3,672 sq ft PCC sidewalk; 198 ft precast concrete box culvert; 806 ft storm sewer; 5,060 ft thermoplastic pavement<br />

marking line; 3.7 acres seeding; 507 tons stone dumped riprap; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (80 Working Days) (Job No. C-99-515-06) (9-10178-0000)<br />

(See Special Provisions for DBE Percentage)<br />

171. Contract No. 63427 DuPage County District 1<br />

Section 09-00098-00-RS (ADDISON)<br />

FAU Route 3884 & FAU Route 2625 (ARMY TRAIL BLVD & MILL RD) Project M-9003(474)<br />

Project consists <strong>of</strong> HMA surface removal and resurfacing, HMA pavement patching, completion <strong>of</strong> new water main, curb<br />

and gutter removal and replacement, sidewalk removal and replacement, adjustment <strong>of</strong> structures and all other incidental<br />

items to complete the work on FAU Rte 3884 (Army Trail Boulevard) from Mill Road to US Rte. 20 and on FAU Rte. 2625<br />

(Mill Road) from Army Trail Boulevard to US Rte. 20 in the village <strong>of</strong> Addison; includes 11 units tree removal; 6,200 ft<br />

temporary fence; 293 units supplemental watering; 135 cu yds removal and disposal <strong>of</strong> unsuitable material; 6,070 cu yds<br />

trench backfill; 3,700 sq yds excelsior blanket, <strong>special</strong>; 15 transplanted salvaged trees; 1,506 sq yds aggregate base<br />

course; 6,688 gals bituminous materials (prime coat); 136 tons aggregate (prime coat); 968 sq yds HMA surface removalbutt<br />

joint; 4,842 tons HMA binder course; 4,063 tons HMA surface course; 2,955 sq yds protective coat; 649 sq yds PCC<br />

driveway pavement; 13,000 sq ft PCC sidewalk; 866 sq ft detectable warnings; 33,440 sq yds HMA surface removal;<br />

12,395 sq ft sidewalk removal; 10,000 ft combination concrete curb and gutter removal and replacement; 7,762 sq yds<br />

Class D patches; 682 ft storm sewers, Class A; 5,830 ft ductile iron water main; 1,270 ft water service line; 16 inlets; 25<br />

frames and grates; 44 frames and lids; 1,100 sq ft concrete median; 1 BETX soil analysis; 17,650 ft short term pavement<br />

marking; 52,290 ft temporary paint pavement marking line; 14,750 ft thermoplastic pavement marking line; 80 raised<br />

reflective pavement markers; 1,740 ft detector loop replacement; 47 water service connections; 68 ductile iron water main<br />

fittings; 330 ft ductile iron water main; 854 ft storm sewer (water main requirements); 1 preconstruction videotaping; traffic<br />

control and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (138 Calendar Days) (Job No. C-91-056-10) (1-20799-0000) (See Special Provisions for DBE Percentage)<br />

172. Contract No. 63428 Cook County District 1<br />

Section 09-00129-00-PV (MAYWOOD)<br />

FAU Route 1397 (ST. CHARLES ROAD) Project M-9003(267)<br />

Reconstruction and resurfacing with removal and replacement <strong>of</strong> curb and gutter, sidewalk, driveway apron, storm sewer<br />

and drainage structures, pavement markings and all other incidental items to complete the work on FAU Rte. 1397 (St.<br />

Charles Road) from 21st Avenue to 5th Avenue in the village <strong>of</strong> Maywood; includes 6,580 cu yds earth excavation; 7,000<br />

cu yds removal and disposal <strong>of</strong> unsuitable material; 4,000 sq yds topsoil furnish and place; 79 inlets; 29,322 sq yds<br />

aggregate base course; 209 gals bituminous materials (prime coat); 400 sq yds HMA surface removal-butt joint; 150 tons<br />

HMA surface course; 95 tons incidental HMA surfacing; 29,500 sq yds PCC pavement; 35,570 sq yds protective coat;<br />

1,364 sq yds PCC driveway pavement; 23,000 sq ft PCC sidewalk; 29,500 sq yds pavement removal; 12,500 ft<br />

combination curb and gutter removal; 27,000 sq ft sidewalk removal; 370 ft adjusting watermain; 80 domestic water<br />

service boxes; 76 frames and lids; 12,300 ft combination concrete curb and gutter; 18,480 ft pavement marking tape; 824<br />

ft metal post; 16,712 ft polyurea pavement marking line; 1,163 ft conduit in trench; 1,832 ft conduit pushed; 12,000 ft unit<br />

duct; 1,153 ft trench and backfill for electrical work; 72 light poles, aluminum; 648 ft light pole foundation; 5,925 ft electric<br />

cable in conduit, signal; 8 steel mast arm assemblies and poles; 5,490 ft railroad track removal; 1,625 ft storm sewers;<br />

33,300 sq yds biaxal geogrid; 718 ft electric cable in conduit, grounding; traffic control and protection for detour route;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (155 Working<br />

Days) (Job No. C-91-392-09) (1-20550-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 32 -<br />

173. Contract No. 85419 Stephenson County District 2<br />

Section 04-00164-00-BR<br />

FAS Route 62 (GOLDMINE ROAD) Project BRS-62(108)<br />

Remove existing single-span steel wide flange beam bridge with concrete deck and construct a three-span reinforced<br />

concrete slab bridge on pile bent abutments and piers, located 3 miles west <strong>of</strong> Pearl City, over East Plum River; includes<br />

620 cu yds channel excavation; 64 cu yds structure excavation; 73 cu yds concrete structures; 115 cu yds concrete<br />

Superstructure; 34,380 lbs reinforcement bars, epoxy coated; 476 ft furnish and drive steel piles; 66 ft steel plate beam<br />

guardrail attached to structure; 156 ft steel railing; 1,140 sq yds pavement removal; 753 tons aggregate base course,<br />

Type B; 255 tons HMA binder course; 141 tons HMA surface course; 232 tons stone riprap; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (55 Working Days)<br />

(Job No. C-92-008-08) (2-10268-0000) (See Special Provisions for DBE Percentage)<br />

174. Contract No. 85501 Stephenson County District 2<br />

Section 09-00138-01-LS (FREEPORT)<br />

FAP Route 505 (STEPHENSON STREET) Project TE-D2(137)<br />

Improvement consists <strong>of</strong> (0.28 miles) streetscape improvements with trees, shrubs, perennials, sidewalk, driveway,<br />

seeding, curb and gutter replacement on FAP Rte. 505 (Stephenson Street) from Sheridan Avenue to Mary Avenue in<br />

Freeport; includes 47 trees; 10 shrubs; 104 perennials; 600 sq yds topsoil; 0.2 acres seeding, mulch, tree removal; 277<br />

tons aggregate base course; 30 tons incidental HMA surfacing; 71 sq yds PCC driveway pavement; 5,239 sq ft PCC<br />

sidewalk; 215 ft combination concrete curb and gutter; 17 ft wood sign support; traffic control and protection; Federally<br />

funded; (A Special Provision for this contract requires insurance that names additional insureds). (35 Working Days)<br />

(Job No. C-92-191-09) (0-00990-0000) (See Special Provisions for DBE Percentage)<br />

175. Contract No. 85506 Whiteside County District 2<br />

Section 06-00183-00-BR<br />

FAS Route 76 (LYNDON ROAD) Project BRS-76(104)<br />

Remove existing two span PPC deck beam bridge and construct a three span PPC deck beam bridge on pile bent piers<br />

and spill-thru abutments, located 4.2 miles north <strong>of</strong> US 30, over Rock Creek; includes 815 cu yds earth excavation; 93 cu<br />

yds structure excavation; 115 cu yds concrete structures; 4,103 sq ft precast prestressed deck beams 21"; 8,800 lbs<br />

reinforcement bars; 1,200 ft furnish and drive metal shell piles; 1,231 ft portland cement mortar fairing course; 287 ft steel<br />

plate beam guardrail; 278 ft steel railing; 53 tons HMA surface course; 550 tons aggregate surface course; 720 sq yds<br />

stone riprap; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(Completion Date: September 03, 2010 Plus 05 Working Days) (Job No. C-92-102-09) (2-10293-0000)<br />

(See Special Provisions for DBE Percentage)<br />

176. Contract No. 87408 LaSalle County District 3<br />

Section 09-00161-00-SW (OTTAWA)<br />

Various Routes Project SRTS-4008(108)<br />

Project consists <strong>of</strong> constructing new sidewalk, sidewalk removal and replacement, PCC driveway and combination curb<br />

and gutter removal and replacement, at various locations in the city <strong>of</strong> Ottawa; includes 346 tons aggregate base course,<br />

Type B; 21,693 sq ft PCC sidewalk; 6,398 sq ft sidewalk removal; 255 sq yds PCC driveway pavement; 897 sq yds<br />

erosion control blanket; 0.18 acres seeding Class 1 A; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (30 Working Days) (Job No. C-40-028-08) (0-01681-0000)<br />

(See Special Provisions for DBE Percentage)<br />

177. Contract No. 87431 Iroquois County District 3<br />

Section 07-00222-01-BR<br />

FAS Route 1322 (CH 37) Project BRS-1322(124)<br />

Improvement consists <strong>of</strong> the removal <strong>of</strong> existing structure and replace with a double cast-in-place concrete box culvert,<br />

HMA surface and aggregate shoulders carrying FAS Route 1322 (CH 37) over the west branch <strong>of</strong> Horse Creek<br />

approximately four miles east <strong>of</strong> Cabery; includes 380 cu yds earth excavation; 135 cu yds furnished excavation; 180 cu<br />

yds porous granular embankment; 455 ft perimeter erosion barrier; 715 tons stone riprap; 700 sq yds filter fabric; 476 tons<br />

aggregate base course; 549 gals bituminous materials; 127 tons HMA binder course; 82 tons HMA surface course; 113<br />

tons aggregate shoulder; 29,400 lbs reinforcement bars; 131 cu yds concrete box culverts; 116 ft steel plate beam<br />

guardrail; 4 traffic barrier terminals; 100 ft temporary pavement marking line; removal <strong>of</strong> existing structure; traffic control<br />

complete; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(40 Working Days) (Job No. C-93-165-09) (3-10252-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 33 -<br />

178. Contract No. 95610 Coles County District 7<br />

Section 09-00182-00-RS (MATTOON)<br />

Various Routes Project ARA-M-5042(18)<br />

Project consists <strong>of</strong> HMA surface removal, Class C and D patching, partial depth patching, PCC side walk, curb and gutter,<br />

leveling binder, HMA surface course, pavement markings and all other incidental items to complete the work at various<br />

locations in the city <strong>of</strong> Mattoon; includes 2,000 ft short term pavement marking removal and replacement; 130.7 sq yds<br />

stone driveway removal; 41.5 tons partial depth patching; 1,929 gals bituminous materials (prime coat); 1,295 tons<br />

leveling binder (machine method); 7,786.4 sq yds HMA surface removal; 3,366 tons HMA surface course; 1,268 sq ft<br />

PCC sidewalk; 951 sq ft sidewalk removal; 219 ft combination concrete curb and gutter removal and replacement; 102.8<br />

sq yds Class D patches; 317 ft combination concrete curb and gutter; 17,958 ft thermoplastic pavement marking line;<br />

traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names<br />

additional insureds). (45 Working Days) (Job No. C-97-030-10) (7-10508-0010)<br />

(See Special Provisions for DBE Percentage)<br />

179. Contract No. 95618 Coles County District 7<br />

Section 09-00092-00-RS (CHARLESTON)<br />

Various Routes Project ARA-5013(17)<br />

Project consists <strong>of</strong> milling, HMA leveling binder and surface course, pavement markings and all other incidental items to<br />

complete the section located on FAU Route 7622 (Jackson Avenue) from 7th Street to 14th Street, FAU Route 7623<br />

(Harrison Avenue) from 11th Street to 18th Street and on FAU Route 7648 (11th Street) from Harrison Avenue to<br />

Madison Avenue in the city <strong>of</strong> Charleston; includes 14 tons aggregate surface course; 1,667 gals bituminous materials<br />

(prime coat); 202.6 sq yds temporary ramp; 740 tons level binder (machine method); 1,565 tons HMA surface course;<br />

69.1 gals bituminous materials; 96.8 tons incidental HMA surfacing; 13,889 sq yds HMA surface removal; 32.9 sq yds<br />

Class D patches; 11 water valves to be adjusted; 700 ft short term pavement marking; 788 ft thermoplastic pavement<br />

marking line; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that<br />

names additional insureds). (30 Working Days) (Job No. C-97-033-10) (7-10507-0010)<br />

(See Special Provisions for DBE Percentage)<br />

180. Contract No. 97419 St. Clair County District 8<br />

Section 05-00016-01-PV (LEBANON)<br />

FAU Route 9247 (ST. LOUIS ST.) Project M-5011(301)<br />

Improvement consists <strong>of</strong> 0.13 mile removal and replacement <strong>of</strong> brick pavement and cut stone curb with new brick and<br />

stone, aggregate base course, HMA binder course storm sewer, PCC sidewalk on FAU Route 9247 (St. Louis Street)<br />

from Horner Street to Monroe Street in Lebanon; includes 1,182 cu yds earth excavation; 3,691 sq yds aggregate base<br />

course; 1,384 gals bituminous materials; 620 tons HMA binder course; 22 sq yds PCC driveway pavement; 370 sq ft PCC<br />

sidewalk; 940 sq yds pavement removal; 1,277 ft curb removal; 2,891 sq yds pavement removal <strong>special</strong>; 154 ft storm<br />

sewers; 30 ft concrete curb; 588 ft stone curb reinstalled; 3,691 sq yds brick surface course; 104 ft concrete edge<br />

restraint; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that<br />

names additional insureds). (120 Calendar Days) (Job No. C-98-316-10) (8-10315-0000)<br />

(See Special Provisions for DBE Percentage)<br />

181. Contract No. 97420 St. Clair County District 8<br />

Section 09-00049-01-SW (MADISON)<br />

OHIO AVENUE Project ARA-5011(275)<br />

Construct a 10-foot wide HMA pedestrian path with concrete barriers along the north side <strong>of</strong> Ohio Avenue from IL Route<br />

203 east to Old Madison Road in the city <strong>of</strong> Madison; includes 203 cu yds earth excavation; 646 sq yds HMA surface<br />

removal; 683 sq yds aggregate base course; 551 sq yds HMA base course widening; 135 tons HMA surface course; 128<br />

sq yds PCC driveway pavement; 375 ft temporary concrete barrier; 677 ft strip reflective crack control treatment; 553 ft<br />

thermoplastic pavement marking line; 34 ft combination concrete curb and gutter; Federally funded; (A Special Provision<br />

for this contract requires insurance that names additional insureds). (20 Working Days)<br />

(Job No. C-98-353-09) (8-10393-0000) (See Special Provisions for DBE Percentage)<br />

182. Contract No. 97422 Jersey County District 8<br />

Section 09-00034-02-SW (JERSEYVILLE)<br />

FAU Route 8801 & FAU Route 8818 (FAIRGROUNDS AVE. & JUNE ST.) Project ARA-5033(9)<br />

Improvement consists <strong>of</strong> 1.18 miles <strong>of</strong> sidewalk installation, selective curb and gutter removal on FAU Route 8801<br />

(Fairgrounds Avenue) from Cemetery Road to June Street and FAU Route 8818 (June Street) from Fairgrounds Avenue<br />

to East Carpenter Street in Jerseyville; includes 1,078 cu yds earth excavation; 4,165 sq yds aggregate base course;<br />

37,500 sq ft PCC sidewalk; 180 ft combination curb and gutter removal; traffic control complete; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (45 Working Days)<br />

(Job No. C-98-386-09) (8-10385-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 34 -<br />

183. Contract No. 97423 St. Clair County District 8<br />

Section 09-00044-00-RS (CAHOKIA)<br />

FAU Route 9199 (DORIS AVENUE) Project ARA-5011(287)<br />

Improvement consists <strong>of</strong> 1.36 miles <strong>of</strong> surface removal, HMA resurfacing, curb and gutter removal and replacement,<br />

sidewalk removal and replacement on FAU Route 9199 (Doris Avenue) from Range Lane to Jerome Lane in Cahokia;<br />

includes 2,170 gals bituminous materials; 43 tons aggregate; 2,431 tons HMA surface course; 29 sq yds PCC driveway;<br />

2,435 sq ft PCC sidewalk; 21,703 sq yds HMA surface removal; 446 ft combination curb and gutter removal and<br />

replacement; 1,447 sq ft sidewalk removal; 94 sq yds Class D patches; 15,816 ft thermoplastic pavement marking line; 42<br />

sq ft sign panel; 112 ft metal posts; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (35 Working Days) (Job No. C-98-369-09) (8-10397-0010)<br />

(See Special Provisions for DBE Percentage)<br />

184. Contract No. 99292 Gallatin-Saline Counties District 9<br />

Section 05-00002-00-BT (SALINE VALLEY CON DISTRIC)<br />

PEDESTRAIN TRAIL Project ARA-TE-D9(84)<br />

Improvement consists <strong>of</strong> 5.6 miles <strong>of</strong> construction <strong>of</strong> a pedestrian/bike trail, which work includes earth excavation,<br />

aggregate base course with cover and seal coating, pipe culverts, PCC concrete sidewalks, signing and a pedestrian<br />

bridge on Pedestrian Trail from the Gallatin County Visitor's Center in Equality to the Glen O. Jones Lake in Saline<br />

County; includes 8 acres tree removal; 16,900 cu yds earth excavation; 180 cu yds rock excavation; 10,300 cu yds<br />

borrow excavation; 21,900 sq yds geotechnical fabric; 7.5 acres seeding; 175 lbs temporary erosion control seeding;<br />

2,000 ft perimeter erosion barrier; 350 tons stone dumped riprap; 8,450 tons aggregate base course; 17,860 gals<br />

bituminous materials; 340 tons cover and seal aggregate; 1,050 sq ft PCC sidewalk; 1,200 lbs reinforcement bars; 200 ft<br />

furnish and drive steel piles; 982 ft pipe culverts; 265 sq ft sign panel; 890 ft telescoping steel sign support; 600 sq ft<br />

pedestrian truss superstructure; construction layout; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (90 Working Days) (Job No. C-99-505-05) (0-09910-0000)<br />

(See Special Provisions for DBE Percentage)<br />

185. Contract No. 63300 Kane County District 1<br />

Section 08-00270-00-TL (AURORA)<br />

FAU Route 1521 (GALENA BOULEVARD) Project CMM-9003(42)<br />

Project consists <strong>of</strong> installing an interconnect system and integrating it with the city's centralized transportation<br />

management system, including removal and replacement or modification <strong>of</strong> the existing traffic signals, minor sidewalk<br />

modifications, pavement markings and all other incidental items to complete the work on FAU Route 1521 (Galena<br />

Boulevard) between Lake Street and Ohio Street in the city <strong>of</strong> Aurora; includes 1,047 sq ft PCC sidewalk; 855 sq ft<br />

sidewalk removal; 694 ft thermoplastic pavement marking line; 4,863 ft conduit in trench; 2,288 ft conduit pushed; 19<br />

traffic signal posts, galvanized steel; 5,047 ft trench and backfill for electrical work; 11 luminaires; 22,414.5 ft electric<br />

cable in conduit, signal; 14 steel combination mast arm assemblies and poles; 88 ft concrete foundation; 47 signal heads,<br />

LED; 808.4 ft detector loop; 22,554.5 ft remove electric cable from conduit; 5,142 ft fiber optic cable in conduit; 4<br />

intersection video traffic monitoring systems with PTZ cameras; 1 centralized system field integration/setup; traffic control<br />

and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (Completion Date: November 01, 2010 Plus 15 Working Days) (Job No. C-91-437-08) (1-11010-0000)<br />

(See Special Provisions for DBE Percentage)<br />

186. Contract No. 60H93 Will-Cook Counties District 1<br />

Section 144RS-5<br />

FAU Route 3778 (GOVERNORS HWY)<br />

4.67 miles <strong>of</strong> milling, HMA surface, patching, striping and other work along Governor's Highway in University Park and<br />

Mattson; includes 5,495 sq yds patching; 10,415 tons HMA surface course, Mix D; 5,090 tons leveling binder (machine<br />

method); 120,690 sq yds milling; 2,033 ft detector loop replacement; 99,775 ft thermoplastic pavement marking;<br />

mobilization; traffic control and protection. (Completion Date: September 15, 2010 Plus 05 Working Days)<br />

(Job No. C-91-833-09) (1-76572-0000) (See Special Provisions for DBE Percentage)<br />

187. Contract No. 46102 Bureau-LaSalle Counties District 3<br />

Section D-3 OVD SIN STR REPL 2010-37<br />

FAI Route 80 (I-80)<br />

This project consists <strong>of</strong> maintenance and repairs to overhead sign structures at various locations on Interstate 80;<br />

includes 149 ft remove and reinstall walkway; 1,571 sq ft removal and reinstall sign panel; relocate 2 electric services;<br />

120 sq yds attenuator base; 353 ft overhead sign structure span; 89 ft overhead sign structure walkway; 4 structural steel<br />

supports for overhead sign structure spans; mobilization; traffic control and protection. (Completion Date: June 03, 2011)<br />

(Job No. C-60-039-10) (0-99986-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 35 -<br />

188. Contract No. 46108 Various Counties District 1<br />

Section D 1 GRDRL DELIN MAINT 10-44<br />

Various Routes (VARIOUS)<br />

Replacement <strong>of</strong> reflectorized guardrail markers as specified on individual work orders; includes 7,500 guardrail markers;<br />

10,000 barrier wall markers; 7,500 delineators; remove and reinstall 5,000 delineators; mobilization; traffic control and<br />

protection. (Completion Date: December 31, 2010) (Job No. C-60-045-10) (0-00630-0000)<br />

(See Special Provisions for DBE Percentage)<br />

189. Contract No. 46109 Madison-St Clair Counties District 8<br />

Section D 8 OVD SIN STR REPL 2010-45<br />

Various Routes (VARIOUS)<br />

Overhead sign structure repair and maintenance to the structures as shown at various locations; includes replace 34 Ubolts;<br />

24 saddle shim blocks; repair 2 concrete foundations for overhead structures; 24 overhead sign supports grout<br />

repair; 6 truss dampers; 12 safety chains; repair 4 handrail locking pin connections; disconnect and re-connect 6 electric<br />

services; 549 ft overhead sign structure walkway; mobilization; traffic control and protection. (Completion Date: June 30,<br />

2011) (Job No. C-60-046-10) (0-99986-0000) (See Special Provisions for DBE Percentage)<br />

190. Contract No. 63414 Cook County District 1<br />

Section 09-00046-00-RS (HILLSIDE)<br />

Various Routes Project HPP-2421(2)<br />

Project consists <strong>of</strong> milling, HMA resurfacing, aggregate base repair, pavement markings and all other incidental items to<br />

complete the work at various locations throughout the city <strong>of</strong> Hillside; includes 2,000 tons aggregate base repair (<strong>special</strong>);<br />

45,250 gals bituminous material (prime coat); 280 tons aggregate (prime coat); 4,790 tons leveling binder (machine<br />

method); 1,390 tons HMA binder course; 4,755 tons HMA surface course; 1,825 sq ft PCC sidewalk; 56,565 sq yds HMA<br />

surface removal; 340 ft combination concrete curb and gutter removal and replacement; 2,988 ft thermoplastic pavement<br />

marking line; traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that<br />

names additional insureds). (25 Working Days) (Job No. C-91-041-10) (1-20131-0000)<br />

(See Special Provisions for DBE Percentage)<br />

191. Contract No. 64F72 Ogle County District 2<br />

Section D2 PATCHING 2010-3<br />

FAP Route 742 (IL 2)<br />

0.5 mile <strong>of</strong> full depth concrete patching on IL Route 2 located at the south edge <strong>of</strong> Oregon; includes 523 sq yds Class B<br />

patches; 2,271 ft saw cuts; 130 sq yds stabilized subbase replacement; 1,120 dowel bars; mobilization; traffic control and<br />

protection. (15 Working Days) (Job No. C-92-020-10) (0-01616-2024) (See Special Provisions for DBE Percentage)<br />

192. Contract No. 64F82 Lee County District 2<br />

Section (103-1,103-2)SHLD<br />

FAI Route 39 (I-39) Project ACNHI-39-1(28)97<br />

This project consists <strong>of</strong> shoulder reconstruction along Interstate 39 from the LaSalle County line to the Ogle County line;<br />

includes 3,940 units excavating and grading shoulders; 8,945 sq yds Class A patches; 29,680 ft saw cuts; 60,015 tons<br />

aggregate shoulders; 336,162 sq yds concrete shoulders; 650 removing and replacing delineators; 117,350 ft paint<br />

pavement marking line; 336,162 sq yds cold milling; traffic control and protection; mobilization; Federally funded.<br />

(Completion Date: November 01, 2010) (Job No. C-92-030-10) (2-17410-0100)<br />

(See Special Provisions for DBE Percentage)<br />

193. Contract No. 74110 Fayette County District 7<br />

Section 114B-1(1) & 114B-1(2)<br />

FAP Route 750 & FAS Route 719 (IL 185) Project ACF-ACRS-000S(691)<br />

This project will consist <strong>of</strong> the replacement <strong>of</strong> two single span bridges with box culverts, one bridge is located one-half<br />

mile north and one-half mile west <strong>of</strong> the IL Route 185/Interstate 57 interchange near the northwest corner <strong>of</strong> Farian and<br />

the other bridge is located in Farina between Interstate 57 and IL Route 37; includes 572 cu yds earth excavation; 121 cu<br />

yds removal and disposal <strong>of</strong> unsuitable material; 91 cu yds furnished excavation; 599 cu yds porous granular<br />

embankment, <strong>special</strong>; 253 tons aggregate base course; 263 sq yds base course widening; 609 sq yds HMA pavement<br />

(full-depth); 720 sq ft PCC sidewalk; 110 sq yds pavement removal; 374 ft combination curb and gutter removal; 469 sq ft<br />

sidewalk removal; 169 tons aggregate shoulders; 792 sq yds HMA shoulders; 665 cu yds structure excavation; 65,600 lbs<br />

reinforcement bars; 1,480 lbs epoxy coated reinforcement bars; 1,355 sq ft temporary sheet piling; 419 cu yds concrete<br />

box culverts; 374 ft combination concrete curb and gutter; 300 ft steel plate beam guardrail; 314 ft guardrail removal; 725<br />

ft temporary concrete barrier; 3,399 ft paint pavement marking line; 247 tons rock fill-replacement; mobilization; traffic<br />

control and protection; Federally funded. (110 Working Days) (Job No. C-97-074-05) (7-7950-0000 and 7-79270-0000)<br />

(See Special Provisions for DBE Percentage)<br />

PREVIOUS LETTING: January 15, 2010 (Item 206)<br />

194. DELETED FROM LETTING<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 36 -<br />

195. Contract No. 76D60 Madison County District 8<br />

Section 60-(30,31,128)DM<br />

FAP Route 600 (IL 159)<br />

Demolition <strong>of</strong> 11 buildings along IL Route 159 from Church Street to 0.2 mile north <strong>of</strong> Morrison Avenue in Collinsville;<br />

includes removal <strong>of</strong> 11 buildings; 0.9 acre mulch; removal and disposal <strong>of</strong> non-friable asbestos; removal and disposal <strong>of</strong><br />

friable asbestos; mobilization. (45 Working Days) (Job No. C-98-040-10) (8-82159-0424)<br />

(See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

196. Contract No. 74371 Clay County District 7<br />

Section (106,107)RS-2<br />

FAP Route 828 (N/A)<br />

12.18 miles <strong>of</strong> patching, milling, HMA surface, striping and other work on unmarked route from north <strong>of</strong> Clay City to just<br />

south <strong>of</strong> Bible Grove Road; includes 67 sq yds HMA widening; 283 tons aggregate surface course; 6,537 tons leveling<br />

binder (machine method); 13,201 tons HMA surface course, Mix C; 156,171 sq yds milling; 228 sq yds patching; 14,500<br />

tons aggregate shoulders; 154,068 ft paint pavement marking; mobilization; traffic control and protection.<br />

(45 Working Days) (Job No. C-97-056-09) (7-50209-0000) (See Special Provisions for DBE Percentage)<br />

197. Contract No. 74398 Cumberland-Clark Counties District 7<br />

Section D7 PAVT PATCHING 2010-4<br />

FAI Route 70 (I-70)<br />

Class A pavement patching along 22.8 miles <strong>of</strong> I-70 from the Effingham/ Cumberland County line to the Casey<br />

Interchange; includes 586 sq yds patching; 25 tie bars; 1,203 barricades; 4,502 ft saw cuts; mobilization; traffic control<br />

and protection. (25 Working Days) (Job No. C-97-111-09) (0-01616-7011) (See Special Provisions for DBE Percentage)<br />

198. Contract No. 74399 Clark-Coles Counties District 7<br />

Section D7 PAVT PATCHING 2010-5<br />

FAS Route 691/689 & FAS Route 677 (CLEONE RD & OAKLAND RD)<br />

Class D pavement patching on the Oakland/Ashmore Road and resulting on Cleone Road at the Martinsville interchange;<br />

includes 560 tons leveling binder (machine method); 1,676 sq yds patching; 13,474 sq yds bituminous surface treatment,<br />

(preventive maintenance); 27,328 ft thermoplastic pavement marking; mobilization; traffic control and protection.<br />

(40 Working Days) (Job No. C-97-112-09) (0-01616-7008) (See Special Provisions for DBE Percentage)<br />

199. Contract No. 74442 Various Counties District 7<br />

Section D7 WEED CONTROL SPRAYING 2010<br />

FAI Route 57 & FAI Route 70 (I-57 & I-70)<br />

Weed spraying along I-57 and I-70 throughout the district; includes 475 gals 2, 4-D and Picloram mixture; 45 gals weed<br />

control, broadleaf in turf; mobilization. (Completion Date: June 18, 2010) (Job No. C-97-050-10) (Formal Contract)<br />

(See Special Provisions for DBE Percentage)<br />

Small Business Set-Aside.<br />

200. Contract No. 78177 Various Counties District 9<br />

Section D9 WEED SPRAY 2010-1<br />

Various Routes (VARIOUS)<br />

Application <strong>of</strong> selective herbicide spray mixtures to the turf areas <strong>of</strong> various routes in the district; includes 236 gals<br />

herbicide 2, 4-D Amine; 59 gals non-ionic surfactant; mobilization. (Completion Date: May 24, 2010)<br />

(Job No. C-99-032-10) (Formal Contract) (See Special Provisions for DBE Percentage)<br />

201. Contract No. 85463 JoDaviess County District 2<br />

Section 08-00043-00-SW (GALENA)<br />

RIDGE STREET Project SRTS-4008(36)<br />

Sidewalk construction, curb and gutter replacement along Ridge Street/Mars Avenue from Kelly Lane to Dodge Lane in<br />

the city <strong>of</strong> Galena; includes 476 cu yds earth excavation; 1,880 sq yds aggregate base course; 3,780 sq ft sidewalk<br />

removal; 6,160 sq ft PCC sidewalk; 1,158 ft combination curb and gutter; 974 sq yds HMA surface removal; 120 tons<br />

HMA binder and surface course; 264 ft thermoplastic pavement marking line; Federally funded; (A Special Provision for<br />

this contract requires insurance that names additional insureds). (55 Working Days)<br />

(Job No. C-40-018-08) (0-01681-0000) (See Special Provisions for DBE Percentage)<br />

202. Contract No. 85505 Ogle County District 2<br />

Section 06-00242-00-RS<br />

FAS Route 90 (RIVER ROAD) Project RS-90(102)<br />

Resurface River Road from IL Route 72 to IL Route 64, 8.98 miles; includes 15,646 tons HMA surface course; 486 tons<br />

HMA shoulder; 7,245 tons aggregate shoulder, Type B; 159,621 ft thermoplastic pavement marking line; 217 raised<br />

reflective pavement markers; Federally funded; (A Special Provision for this contract requires insurance that names<br />

additional insureds). (50 Working Days) (Job No. C-92-051-08) (2-10261-0000) (See Special Provisions for DBE<br />

Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 37 -<br />

203. Contract No. 89554 Peoria County District 4<br />

Section 09-00318-00-RS (PEORIA)<br />

FAU Route 6593 (UNIVERSITY STREET) Project ARA-5093(150)<br />

Improvement consists <strong>of</strong> 0.92 mile <strong>of</strong> HMA surface removal and HMA leveling binder and surface replacement on FAU<br />

Route 6593 (University Street) from Nebraska Avenue north to Forest Hill Avenue in the city <strong>of</strong> Peoria; includes 11 tons<br />

bituminous materials; 57 tons aggregate; 2,005 tons leveling binder; 2,807 tons polymerized HMA surface course; 28,645<br />

sq yds HMA surface removal; 1,620 ft short term pavement marking; 2,807 tons material transfer device; traffic control<br />

and protection; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (25 Working Days) (Job No. C-94-147-09) (4-10442-0010) (See Special Provisions for DBE Percentage)<br />

PREVIOUS LETTING: November 6, 2009 (Item 24)<br />

204. Contract No. 89564 Stark County District 4<br />

Section 09-00001-00-LT (WYOMING)<br />

FAP Route 643 (WILLIAMS ST.) Project ARA-D4(102)<br />

Install decorative lighting, sidewalk removal and replacement at the intersection <strong>of</strong> Williams Street and 7th Street, located<br />

in the city <strong>of</strong> Wyoming downtown area; includes 4,470 sq ft sidewalk removal; 5,026 sq ft PCC sidewalk; 220 ft conduit<br />

pushed; 50 ft conduit bored and pulled; 3,350 ft unit duct; 6 luminaires; 228 ft light pole foundations; 56 ornamental light<br />

poles; 1 electric service installation; Federally funded; (A Special Provision for this contract requires insurance that names<br />

additional insureds). (70 Working Days) (Job No. C-94-024-10) (0-09910-0000)<br />

(See Special Provisions for DBE Percentage)<br />

205. Contract No. 95614 Cumberland County District 7<br />

Section 09-00061-01-RS<br />

FAS Route 662 Project ARA-RS-662(102)<br />

Construction <strong>of</strong> HMA binder and surface courses and other items necessary to complete the work on FAS Route 662<br />

approximately 5 miles east <strong>of</strong> Burma Road east across the Embarras River to IL Route 130; includes 171 cu yds earth<br />

excavation; 2,630 tons HMA binder course; 1,834 tons HMA surface course; 1,566 gals bituminous materials; 617 sq yds<br />

waterpro<strong>of</strong>ing membrane system; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (Completion Date: August 13, 2010 Plus 15 Working Days)<br />

(Job No. C-97-049-10) (7-10517-0010) (See Special Provisions for DBE Percentage)<br />

206. Contract No. 95616 Richland County District 7<br />

Section 09-00117-00-RS<br />

FAS Route 801 (EAST DUNDAS LANE) Project ARA-801(232)<br />

Improvement consists <strong>of</strong> 1.25 miles HMA surface with aggregate shoulders on FAS Route 801 (East Dundas Lane) from<br />

FAS Route 705 to TR 186 east <strong>of</strong> Dundas; includes 2,800 tons HMA surface; 500 tons aggregate wedge shoulders; 214<br />

sq yds PCC surface removal; traffic control complete; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (10 Working Days) (Job No. C-97-032-10) (7-10518-0010)<br />

(See Special Provisions for DBE Percentage)<br />

207. Contract No. 97428 Madison County District 8<br />

Section 09-00075-01-LS<br />

FAU Route 8902 (GOVERNORS PARKWAY) Project ARA-5011(299)<br />

Improvement consists <strong>of</strong> 2.7 miles <strong>of</strong> planting various species <strong>of</strong> trees at various locations along FAU Route 8902<br />

(Governor's Parkway) from Troy Road to IL Route 143; includes 228 trees; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (15 Working Days)<br />

(Job No. C-98-315-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

Small Business Set-Aside.<br />

208. Contract No. 98907 Franklin County District 9<br />

Section D9 MITIGATE WETLAND SUGAR CAMP<br />

FAP Route 853 (IL 14)<br />

Wetland mitigation located along Sugar Camp Creek, 8 miles north <strong>of</strong> Benton; includes 405 shrubs; 156 units seedlings;<br />

4,220 gals weed control; 13 cu yds concrete for drainage control structures; 33,755 cu yds earth excavation; 42.25 acres<br />

seeding; 80 acres mulch; 765 lbs reinforcement bars; 9,347 ft perimeter erosion barrier; mobilization. (Completion Date:<br />

November 30, 2010) (Job No. C-99-019-05) (9-00252-0200) (See Special Provisions for DBE Percentage)<br />

209. DELETED FROM LETTING<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 38 -<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

210. Contract No. 76C55 St Clair County District 8<br />

Section 82-1-1HB<br />

FAI Route 70 (I-70/I-55)<br />

Removal <strong>of</strong> the existing structure and replacement with a 2-span, 1 @ 133'-0", 1 @ 163'-0" bridge carrying Exchange<br />

Avenue over I-55, pavement reconstruction, ramp modifications, retaining wall construction and other work all on I-55/I-70<br />

in East St. Louis (SN 082-0378); includes 4.51 acres tree removal; 60,004 cu yds earth excavation; 8,860 cu yds trench<br />

backfill; 8.25 cu yds trench backfill; 1,755 ft perimeter erosion barrier; 24,559 sq yds aggregate base course; 9,434 sq yds<br />

concrete pavement; 5,315 sq ft concrete sidewalk; 16,568 sq ft pavement removal; 182 sq yds patching; 566 tons<br />

aggregate shoulders; 5,836 sq yds HMA shoulders; 1,286 sq yds concrete shoulders; removal <strong>of</strong> 4 existing structures;<br />

removal <strong>of</strong> existing superstructure; 1,243 sq yds structure excavation; 3,379 cu yds structure excavation; 1,796.8 cu yds<br />

concrete; 927 sq yds bridge deck grooving; 4,678 sq ft from liner textures surface; 573,700 lbs structural steel; 4,859 stud<br />

shear connectors; 1,792 sq ft untreated timber lagging; 293,980 lbs epoxy coated reinforcement bars; 11,080 ft metal<br />

piles; 1,351 ft soldier piles; 3,145 ft storm sewers; 28 manholes; 2,571 ft concrete curb and gutter; 937.5 ft steel plate<br />

beam guardrail; 5 traffic barrier terminals; 296 sq ft sign panel; 16,953 ft polyurea pavement marking; 950 ft unit duct;<br />

1,100 ft aerial cable; 5 luminaires; 8 underpass luminaires; 2,570 ft fiber optic cable; removal <strong>of</strong> 5 buildings; removal and<br />

disposal <strong>of</strong> non-friable asbestos; removal <strong>of</strong> friable asbestos; mobilization; traffic control and protection.<br />

(450 Calendar Days) (Job No. C-98-064-09) (8-9000-0300) (See Special Provisions for DBE Percentage)<br />

PREVIOUS LETTING: January 15, 2010 (Item 239)<br />

211. Contract No. 76D31 Madison County District 8<br />

Section 42RS-2<br />

FAS Route 776 (POSSUM HILL RD)<br />

Cape seal on Possum Hill Road from 0.3 mile west <strong>of</strong> IL Route 4 to Worden in Madison County; includes 294 tons<br />

aggregate wedge shoulder; 15,708 sq yds cape seal; 1,000 ft fiber-modified asphalt crack sealing; 23,018 ft thermoplastic<br />

pavement marking; mobilization; traffic control and protection. (15 Working Days) (Job No. C-98-082-09) (8-83210-0821)<br />

(See Special Provisions for DBE Percentage)<br />

212. Contract No. 76D32 Madison County District 8<br />

Section 261-RS-1<br />

FAP Route 789 (IL 111)<br />

0.67 mile <strong>of</strong> microsurfacing on IL Route 11 from U.S. Route 67 to IL Route 3; includes 25,120 ft micro-surfacing rut filling;<br />

22,740 sq yds micro-surfacing, single pass; 13,540 ft thermoplastic pavement marking; mobilization; traffic control and<br />

protection. (20 Working Days) (Job No. C-98-083-09) (8-83210-0831) (See Special Provisions for DBE Percentage)<br />

213. Contract No. 76D33 Madison County District 8<br />

Section 31-15RS-3<br />

FAU Route 9110 (VADALABENE DRIVE)<br />

0.94 mile <strong>of</strong> micro-surfacing on Vadalabene Drive from IL Route 162 to IL Route 159 in Maryvillle; includes 400 sq ft<br />

micro-surfacing rut-filling; 14,387 sq yds micro-surfacing, single pass; 11,820 ft fiber-modified asphalt crack sealing;<br />

14,389 ft thermoplastic pavement marking; mobilization; traffic control and protection. (15 Working Days)<br />

(Job No. C-98-084-09) (8-83210-0841) (See Special Provisions for DBE Percentage)<br />

214. Contract No. 76D46 Marion County District 8<br />

Section 101RS<br />

FAP Route 805 (IL 161)<br />

The contract consists <strong>of</strong> 2.40 miles <strong>of</strong> pavement patching and resurfacing on IL Route 161 from 0.2 mile, west <strong>of</strong> Park<br />

Lane Drive east to Moonglow Road in Centralia; includes 205 cu yds earth excavation; 1,831 tons leveling binder<br />

(machine method); 3,662 tons HMA surface course; 43,625 sq yds HMA surface removal; 385 sq yds pavement patching;<br />

402 tons aggregate wedge shoulder; 313 tons HMA shoulders; 438 ft steel plate beam guardrail; 41,726 ft thermoplastic<br />

pavement marking line; 265 raised reflective pavement markers; mobilization; traffic control and protection.<br />

(35 Working Days) (Job No. C-98-009-10) (8-80240-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 39 -<br />

215. Contract No. 63266 McHenry County District 1<br />

Section 00-00246-01-FP<br />

FAU Route 85 (WALKUP ROAD) Project CMM-7003(964)<br />

The project consists <strong>of</strong> the widening and resurfacing <strong>of</strong> Walkup Road to provide a full with painted median in both the<br />

northbound and southbound directions <strong>of</strong> travel, work to be performed under this contract shall include pavement<br />

removal, bituminous surface removal and removal <strong>of</strong> other miscellaneous items, bituminous patching, bituminous<br />

resurfacing, bituminous pavement widening, bituminous shoulders, concrete curb and gutter, storm sewers and<br />

appurtenances, culverts, pipe underdrains, landscaping, ground mounted signs, pavement markings, traffic signals and<br />

intersection lighting, shared use patch construction and all incidental and collateral work necessary to complete the<br />

project from Live Oak Road to Crystal Springs Road in the village <strong>of</strong> Bull Valley; includes 12,755 cu yds earth excavation;<br />

5,710 cu yds furnished excavation; 12,983 cu yds removal and disposal <strong>of</strong> unsuitable material; 3,560 cu yds porous<br />

granular embankment; 21,717 sq yds subbase granular material, Type B; 8,179 sq yds aggregate base course, Type A;<br />

13,983 sq yds HMA base course; 9,441 tons HMA binder course; 5,086 tons HMA surface course; 6,369 sq yds HMA<br />

surface removal, variable depth; 1,911 ft combination curb and gutter removal; 19,247 ft strip reflective crack control<br />

treatment; 82 cu yds structure excavation; 173 cu yds concrete structures; 21,140 lbs reinforcement bars, epoxy coated;<br />

656 stud shear connectors; 500 ft parapet railing; 879 ft furnish soldier piles; 11,998 sq ft PCC sidewalk; 9,425 ft storm<br />

sewers; 950 ft ductile iron water main; 19,247 ft combination concrete curb and gutter; 892 ft combination curb and gutter,<br />

Type B, abutting existing pavement; 36,052 ft thermoplastic pavement marking line; 952 ft conduit in trench; 1,039 ft<br />

conduit pushed; 21,886 ft electric cable in conduit; 16 traffic signal posts; 14 steel combination mast arm assemblies and<br />

poles; 14 luminaires; 4 full-actuated controllers and Type IV cabinets; 52 signal heads; 4 video detection system complete<br />

intersection; 4,080 cu ft drill and set soldier piles in soil; 5,060 sq ft permanent steel sheet piling; 6.75 acres seeding;<br />

23,948 sq yds sodding; 14,900 ft perimeter erosion barrier; 32,670 sq yds erosion control blanket; 56,049 sq yds topsoil<br />

furnish and place; Federally funded; (A Special Provision for this contract requires insurance that names additional<br />

insureds). (Completion Date: June 30, 2011 Plus 05 Working Days) (Job No. C-91-374-00) (1-110010-0000)<br />

(See Special Provisions for DBE Percentage)<br />

216. Contract No. 63321 Cook County District 1<br />

Section 09-00056-00-LS (HICKORY HILLS)<br />

FAP Route 29 (95TH STREET) Project ARA-9003(343)<br />

Project consists <strong>of</strong> street in-fill planting, pedestrian signals, decorative stamped and colored concrete crosswalks, paver<br />

intersection corners and lighting enhancements on 95th Street from 88th Avenue to 76th Avenue in the city <strong>of</strong> Hickory<br />

Hills; includes 1,311 cu yds earth excavation; 600 sq yds pavement removal; 8,204 sq ft sidewalk removal; 3,475 sq ft<br />

PCC sidewalk 10", <strong>special</strong>; 4,000 sq ft brick pavers; 26,172 sq ft modular concrete pavers; 1,561 ft concrete curb; 1,455 ft<br />

electric cable in conduit, signal; 10 pedestrian signal heads; modify 2 existing controllers; 138 trees; 27 shrubs; 24 units<br />

perennial plants; 120 sq yds sodding; 2,660 sq yds sod stripping; 58 cu yds mulch-shredded hardwood bark; 0.25 acre<br />

interseeding; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(110 Working Days) (C-91-658-09) (1-20703-0010) (See Special Provisions for DBE Percentage)<br />

217. Contract No. 63383 Cook County District 1<br />

Section 05-00161-00-CH (GLENVIEW)<br />

FAU Route 2743 (GREENWOOD ROAD) Project CMM-M-8003(543)<br />

Project consists <strong>of</strong> roadway widening and resurfacing, construct storm sewers and watermain, PCC base course<br />

widening, HMA binder and surface courses, curb and gutter, sidewalks and traffic signal modernization, located on<br />

Greenwood Road from 1,480 feet south <strong>of</strong> Glenview Road to 1,400 feet north <strong>of</strong> Glenview Road and on Glenview Road<br />

from 460 feet west <strong>of</strong> Greenwood Road to 480 feet east <strong>of</strong> Greenwood Road, located in the village <strong>of</strong> Glenview; includes<br />

4,405 cu yds earth excavation; 1,375 cu yds furnished excavation; 1,231 cu yds porous granular embankment subgrade;<br />

483 sq yds pavement removal; 15,762 sq yds HMA surface removal; 8,129 sq yds subbase granular material, Type B;<br />

4,584 sq yds PCC base course; 1,247 sq yds high early strength PCC base course; 4,486 tons HMA binder course; 1,779<br />

tons HMA surface course; 873 tons polymerized leveling binder; 9,514 sq ft sidewalk removal; 4,258 ft combination curb<br />

and gutter removal; 26,550 sq ft PCC sidewalk; 6,801 ft combination concrete curb and gutter; 5,174 ft storm sewers;<br />

4,494 ft storm sewer removal; 1,412 ft ductile iron water main; 1,255 cu yds non-<strong>special</strong> waste disposal; 797 gals <strong>special</strong><br />

waste ground water disposal; <strong>special</strong> waste plans and reports; 13,545 ft thermoplastic pavement marking line; 263 raised<br />

reflective pavement markers; 577 ft conduit in trench; 854 ft conduit pushed; 1 full-actuated controller and Type IV<br />

cabinet; 9,032 ft electric cable in conduit; 14 signal heads; 8 pedestrian signal heads; 1,265 ft detector loop; 1<br />

uninterruptible power supply; 12 trees; 10 transplant salvaged trees; 8,905 sq yds sodding, salt tolerant; 82 trees to be<br />

pruned; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(Completion Date: November 30, 2010 Plus 10 Working Days) (Job No. C-91-069-06) (1-20047-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 40 -<br />

218. Contract No. 63409 McHenry County District 1<br />

Section 06-00005-00-BR (WONDER LAKE)<br />

FAU Route 4081 (THOMPSON ROAD) Project BRM-8003(722)<br />

Remove existing three-span precast prestressed concrete deck beam bridge supported by spill-thru abutments and open<br />

pile bent piers, 133' - 9" by 26' and construct a three-span structure with a cast-in-place deck on wide flange beams,<br />

integral abutments and concrete encased metal shell pile bent piers, 148' - 8" by 43', project is located in the village <strong>of</strong><br />

Wonder Lake, over Nippersink Creek; includes 365 cu yds furnished excavation; remove 1 existing structure; 334 cu yds<br />

structure excavation; 217 cu yds concrete structures; 328 cu yds concrete superstructure; 111,540 lbs furnish and erect<br />

structural steel; 2,412 stud shear connectors; 86,870 lbs reinforcement bars epoxy coated; 2,375 ft metal shell piles; 450<br />

ft steel piles; 2,825 ft driving pile; 45 sq yds bridge approach pavement connector; 50 tons HMA surface course; 465 sq<br />

yds HMA shoulders; 907 sq yds stone riprap; 0.1 acre seeding; 1,300 sq yds heavy duty erosion control blanket; 1,490 ft<br />

epoxy pavement marking line; Federally funded; (A Special Provision for this contract requires insurance that names<br />

additional insureds). (75 Working Days) (Job No. C-91-075-07) (1-20277-0000)<br />

(See Special Provisions for DBE Percentage)<br />

219. Contract No. 63412 Cook County District 1<br />

Section 09-00108-00-LS (TINLEY PARK)<br />

FAP Route 348 (HARLEM AVENUE) Project ARA-D1(809)<br />

Project consists <strong>of</strong> hardscape and landscape improvements <strong>of</strong> select medians and embankments, stamped and colored<br />

concrete medians and the planting <strong>of</strong> trees, shrubs and flowers from 191st Street to 159th Street in the village <strong>of</strong> Tinley<br />

Park; includes 3,665 cu yds earth excavation; 10,734 sq ft concrete median surface removal; 8,100 ft combination curb<br />

and gutter removal; 10,734 sq ft stamped concrete median surface; 1,703 cu yds aggregate backfill; 8,100 ft combination<br />

concrete curb and gutter; 180 tons polymerized HMA surface course; 80 tons leveling binder; 9,100 ft thermoplastic<br />

pavement marking line; 3,000 dowel bars; 57 trees; 2,411 shrubs; 10,657 perennials; 1 irrigation system; 1,500 sq yds<br />

sodding salt tolerant; 3,200 cu yds topsoil for planting; 2,410 sq yds mulch; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (55 Working Days)<br />

(Job No. C-91-137-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

220. Contract No. 63437 Cook County District 1<br />

Section 09-00071-00-BR (NORTHLAKE)<br />

WHITEHALL AVE. &PRATER AVE. Project ARA-9003(399)<br />

Remove existing superstructure on Whitehall Avenue over Addison Creek and replace with a wide flange steel beam and<br />

concrete deck and roadway improvements, includes placing riprap under and adjacent to the structure on Prater Avenue<br />

over Addison Creek, both structures are located in the city <strong>of</strong> Northlake; includes remove 1 existing superstructure; 27 cu<br />

yds concrete structures; 154 cu yds concrete superstructure; 13,590 lbs furnish and erect structural steel; 648 stud shear<br />

connectors; 33,960 lbs reinforcement bars, epoxy coated; 34 ft aluminum railing; 8 traffic barrier terminals; 65 sq yds<br />

aggregate base course; 30 tons HMA surface course; 40 sq yds bridge approach pavement; 400 sq ft PCC sidewalk; 235<br />

ft thermoplastic pavement marking line; 75 ft conduit in trench; 45 ft conduit attached to structure; 600 ft electric cable in<br />

conduit; 0.25 acre seeding; 1,000 sq yds erosion control blanket; 650 sq yds stone riprap; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (35 Working Days)<br />

(Job No. C-91-808-09) (1-20772-0010) (See Special Provisions for DBE Percentage)<br />

221. Contract No. 74104 Crawford County District 7<br />

Section (21,BY)B-1<br />

FAU Route 8324 (TRIMBLE ROAD)<br />

Replacement <strong>of</strong> the existing single span slab bridge with a double barrel cast-in-place box culvert, along with resurfacing,<br />

aggregate shoulders and striping on Trimble Road located 0.8 mile northeast <strong>of</strong> Robinson; includes 100 cu yds earth<br />

excavation; 434 cu yds removal and disposal <strong>of</strong> unsuitable material; 294 cu yds furnished excavation; 962 cu yds porous<br />

granular embankment; 0.5 acre seeding; 425 tons HMA binder course; 153 tons HMA surface course, Mix C; 91 sq yds<br />

HMA pavement (full-depth); 91 sq yds pavement removal; 1,304 sq yds milling; 79 tons aggregate shoulders; removal <strong>of</strong><br />

existing structure; 36,250 lbs reinforcement bars; 1,720 lbs epoxy coated reinforcement bars; 246.1 cu yds concrete box<br />

culverts; 304 ft steel plate beam guardrail; 4 traffic barrier terminals; 890 tons rock fill-replacement; 2,760 ft paint<br />

pavement marking; 27 shade trees; 9 evergreens; mobilization; traffic control and protection. (Completion Date: August<br />

13, 2010) (Job No. C-97-068-05) (7-80910-0000) (See Special Provisions for DBE Percentage)<br />

222. Contract No. 74400 Effingham County District 7<br />

Section D7 BRIDGE REPAIRS 2010-1<br />

FAP Route 328 (US 45)<br />

Bridge repairs for the structure carrying U.S. Route 45 over Big Salt Creek (SN 025-0083) located 3 miles south <strong>of</strong> the IL<br />

Route 37 junction; includes 50 tons stone dumped riprap; 289 sq yds concrete base course widening; 108 tons HMA<br />

surface course, Mix C; 1,275 sq yds milling; 12.7 cu yds concrete removal; 12.7 cu yds concrete; 1,620 lbs structural<br />

steel; 12 jack and remove existing bearings; 1,980 lbs epoxy coated reinforcement bars; 89 ft preformed joint strip seal;<br />

1,275 sq yds waterpro<strong>of</strong>ing membrane system; 2,160 ft paint pavement marking; 25 sq ft structural repair <strong>of</strong> concrete; 152<br />

sq yds deck slab repair; mobilization; traffic control and protection. (50 Working Days)<br />

(Job No. C-97-113-09) (0-01616-7012) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 41 -<br />

223. Contract No. 89476 Woodford County District 4<br />

Section 86-00075-01-AS<br />

FAS Route 358 (CH 1) Project RS-358(104)<br />

Project consists <strong>of</strong> regrading and shaping <strong>of</strong> the entire roadway placing aggregate base course, removal <strong>of</strong> all existing<br />

drainage structures and the construction <strong>of</strong> new drainage features and all other incidental items to complete the work on<br />

FAS Rte. 358 (CH 1) from IL Rte. 116 and ends south <strong>of</strong> 1700N; includes 28,881 cu yds earth excavation; 231 cu yds<br />

furnished excavation; 20.92 acre seeding; 5,649 lbs fertilizer nutrients; 1,533 sq yds heavy duty erosion control blanket;<br />

6,277 lbs temporary erosion control seeding; 16,693 ft perimeter erosion barrier; 3,106 sq yds stone riprap; 32,432 tons<br />

aggregate base course; 1,082 tons aggregate surface course; 800 tons aggregate for temporary access; 210 ft precast<br />

concrete box culvert; 1,403 ft pipe culverts; 1,800 ft storm sewers, <strong>special</strong>; traffic control complete; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (85 Working Days)<br />

(Job No. C-94-078-07) (4-10256-0010) (See Special Provisions for DBE Percentage)<br />

224. Contract No. 93510 Menard County District 6<br />

Section 08-10110-00-BR<br />

TR 166 Project BROS-129(23)<br />

Improvement consists <strong>of</strong> the removal <strong>of</strong> existing structure and replace with a 3 span (1 @ 16'6" & 2 @ 25'0") precast<br />

prestressed concrete deck beam bridge and approaches carrying TR166 over Pike Creek approximately three miles<br />

northeast <strong>of</strong> Greenview; includes 231 cu yds earth excavation; 396 cu yds channel excavation; 224 cu yds furnished<br />

excavation; 100 lbs temporary erosion control seeding; 569 tons stone dumped riprap; 871 sq yds filter fabric; 441 tons<br />

aggregate surface course; 106 cu yds structure excavation; 48 cu yds concrete structures; 1,970 sq ft precast prestressed<br />

concrete deck beams; 6,160 lbs reinforcement bars; 144 ft steel railing; 982 ft furnish and drive metal shell piles; 2 test<br />

piles; 4 traffic barrier terminals; remove existing structure; traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (45 Working Days)<br />

(Job No. C-96-230-09) (6-10376-0000) (See Special Provisions for DBE Percentage)<br />

225. Contract No. 95611 Clay County District 7<br />

Section 09-00053-00-PV (FLORA)<br />

FAU Route 8526 (WORTHEY STREET) Project M-ARA-5023(10)<br />

Improvement consists <strong>of</strong> (0.27 miles) pavement removal and construction <strong>of</strong> concrete pavement with integral curb, storm<br />

sewers and paint pavement marking on FAU Rte 8526 (Worthey Street) from near 8th Street northerly to 12th Street in<br />

Flora; includes 1,740 cu yds earth excavation; 385 cu yds trench backfill; 1.6 acres seeding; 400 lbs temporary erosion<br />

control seeding; 5,504 sq yds processing modified soil; 191 tons lime; 96 tons aggregate base course; 40 tons aggregate<br />

surface course; 48 tons incidental HMA surface; 531 sq yds PCC driveway pavement; 3,302 sq yds pavement removal;<br />

336 sq yds driveway pavement removal; 3 precast reinforced concrete flared end sections; 2 grating for concrete flared<br />

end sections; 2,640 ft storm sewers; 574 ft storm sewer water main quality; 26 ft pipe drains; 6 manholes; 76 inlets; 402 ft<br />

paint pavement marking line; 5,170 sq yds PCC pavement; 15 pipe teas; 10 mailboxes removed and relocated; 7 street<br />

signs removed and reset; traffic control and protection; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (70 Working Days) (Job No. C-97-027-10) (7-10506-0010)<br />

(See Special Provisions for DBE Percentage)<br />

226. Contract No. 95615 Richland County District 7<br />

Section 09-00080-00-PV (OLNEY)<br />

FAU Route 8484 (BUTLER STREET) Project ARA-M-5051(11)<br />

Improvement consists <strong>of</strong> (0.24 miles) pavement removal and construction <strong>of</strong> concrete pavement with integral curb, storm<br />

sewers and paint pavement marking on FAU Rte. 8484 (Butler Street) from East Street easterly to Lincoln Street in Olney;<br />

includes 1,345 cu yds earth excavation; 400 lbs temporary erosion control seeding; 1,235 tons aggregate base course; 35<br />

tons aggregate surface course; 15 tons incidental HMA surfacing; 332 sq yds pcc driveway pavement; 5,387 sq ft pcc<br />

sidewalk; 3,253 sq ft pavement removal; 549 ft combination curb and gutter removal; 7,077 sq ft sidewalk removal; 2,085<br />

ft storm sewers; 5 manholes; 54 inlets; 462 ft paint pavement marking; 5,866 sq yds pcc pavement with integral curb; 24<br />

pipe teas; 11 street signs removed and reset; traffic control and protection; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (70 Working Days) (Job No. C-97-016-10) (7-10510-0010)<br />

(See Special Provisions for DBE Percentage)<br />

227. Contract No. 97424 St. Clair County District 8<br />

Section 09-00219-00-RS (EAST ST. LOUIS)<br />

FAU Route 9223 (17TH STREET) Project ARA-5011(295)<br />

Improvement consists <strong>of</strong> (0.76 miles) <strong>of</strong> milling existing surface, patching, HMA surfacing, curb and gutter replacement,<br />

sidewalk removal and replacement and pavement marking on FAU Rte. 9223 (17th Street) from Russell Avenue to East<br />

Broadway Avenue in East St. Louis; includes 1,733 gals bituminous material; 35 tons aggregate; 256 sq yds temporary<br />

ramp; 1,941 tons HMA surface course; 5,549 sq ft pcc sidewalk; 2,120 sq yds HMA surface removal; 988 ft curb removal;<br />

4,837 sq ft sidewalk removal; 543 sq yds Class D patching; 580 ft strip reflective crack control; 1,312 ft concrete curb; 83<br />

ft combination concrete curb and gutter; 708 ft short term pavement marking; 885 ft temporary pavement marking; 194 sq<br />

ft sign panel; 4,221 ft thermoplastic pavement marking line; 14,838 sq yds pcc surface removal; traffic control and<br />

protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(35 Working Days) (Job No. C-98-371-09) (8-10398-0010) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 42 -<br />

228. Contract No. 99383 Saline County District 9<br />

Section 06-00082-00-BT (HARRISBURG)<br />

PEDESTRIAN PATH Project ARA-D9(94)<br />

Project consists <strong>of</strong> grading and shaping 5 miles <strong>of</strong> rail bed and existing ROW to construct a bike/pedestrian path,<br />

including PCC sidewalk, aggregate path, three pedestrian structures, culverts and all other incidental items to complete<br />

the work on the Harrisburg to Eldorado Bike Path beginning at Small Street extending northerly towards Eldorado to<br />

Greenhill Road in the city <strong>of</strong> Harrisburg; includes 267 units grading and shaping roadway; 131 cu yds trench backfill;<br />

1,800 lbs temporary erosion control seeding; 300 ft temporary ditch checks; 1,450 ft perimeter erosion barrier; 365 tons<br />

stone dumped riprap; 900 tons aggregate base course; 300 tons HMA surface course; 97,344 sq ft PCC sidewalk; 168.3<br />

cu yds concrete structures; 13,160 lbs reinforcement bars; 460 ft furnishing and driving steel piles; 5,108 sq ft pedestrian<br />

truss Superstructure; 31 precast reinforced concrete flared end sections; 7,665 ft woven wire fence removal and<br />

replacement; 3,797 ft paint pavement marking line; 7,588 sq ft segmental concrete block wall; 12,920 sq yds aggregate<br />

bicycle path; 1 removal and disposal <strong>of</strong> non-friable asbestos, building No. 1; Federally funded; (A Special Provision for<br />

this contract requires insurance that names additional insureds). (125 Working Days)<br />

(Job No. C-99-504-07) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

229. Contract No. 64F44 Whiteside County District 2<br />

Section 110RS-4<br />

FAP Route 309, FAS Route 1197 (US 30)<br />

5.69 miles <strong>of</strong> cold milling, patching and resurfacing on US Rte. 30 from Emerson Road to Galt Road and on the US Rte.<br />

30 connector from Interstate 88. This project is located west <strong>of</strong> Sterling; includes 847 tons stone riprap; 7,531 tons<br />

leveling binder (machine method); 1,359 sq yds HMA surface removal-butt joint; 7,544 tons HMA surface course; 6,005<br />

tons polymerized HMA surface course; 59,239 sq yds HMA surface removal; 984 sq yds Class B patches; 3,564 ft saw<br />

cuts; 14,527 ft strip reflective crack control treatment; 3,492 tons aggregate wedge shoulder; 2,175 sq yds HMA<br />

shoulders; 3,362 ft steel plated beam guardrail; 8 traffic barrier terminal; 101,091 ft thermoplastic pavement marking line;<br />

1,086 raised reflective pavement marker; 1,838 ft combination concrete curb and gutter; mobilization; traffic control and<br />

protection. (60 Working Days) (Job No. C-92-081-10) (2-07110-0000) (See Special Provisions for DBE Percentage)<br />

230. Contract No. 46073 Various Counties District 1<br />

Section D 1 GRVD INT PVMNT MRK 10-11<br />

Various Routes (VARIOUS)<br />

Pavement marking removal and replacement with various types, sizes and widths <strong>of</strong> pavement markings as shown on<br />

individual work orders; includes 131,000 ft thermoplastic pavement marking; 381,075 ft hot spray thermoplastic pavement<br />

markings; 191,000 ft polyurea pavement marking; 10,000 sq ft pavement marking removal; 15,000 ft preformed plastic<br />

pavement marking; 227,500 ft grooving for recessed pavement marking; mobilization; traffic control and protection.<br />

(Completion Date: December 31, 2010) (Job No. C-60-011-10) (0-01576-0000)<br />

(See Special Provisions for DBE Percentage)<br />

231. Contract No. 46105 Various Counties District TR<br />

Section SIGN OVERLAY 2010-41<br />

Various Routes (VARIOUS)<br />

Repair and replacement <strong>of</strong> damaged signs and sign structure components as specified on individual work orders;<br />

includes 15,000 sq ft install sign panel overlay-ground mount; 4,500 sq ft install sign panel overlay-overhead mount; 500<br />

sq ft install extruded sign panel; 60 calendar days speed indicator sign; mobilization; traffic control and protection.<br />

(Completion Date: June 30, 2011) (Job No. C-60-042-10) (0-01566-0000) (See Special Provisions for DBE Percentage)<br />

232. Contract No. 60C31 Will County District 1<br />

Section (99-1&2)AC-3<br />

FAI Route 55 (I-55) Project ACIM-55-6(239)243<br />

Interchange ramp and frontage road reconstruction on I-55 at Arsenal Road in Will County; includes 183,050 cu yds earth<br />

excavation; 7,915 cu yds rock excavation; 79,670 cu yds removal and disposal <strong>of</strong> unsuitable material; 198,245 cu yds<br />

furnished excavation; 7,257 cu yds trench backfill; 34,500 cu yds topsoil; 219,736 sq yds compost; 88.8 acres seeding;<br />

1,575 tons HMA binder course; 79 tons HMA surface course, MIX C; 1,251 tons HMA surface course MIX D; 15,892 sq<br />

yds HMA pavement (full-depth); 29,074 sq yds concrete pavement (jointed); 40,795 sq yds pavement removal; 11,279 sq<br />

yds milling; 11,690 sq yds aggregate shoulders; 6,069 sq yds HMA shoulders; 11,037 sq yds concrete shoulders; 2,581<br />

cu yds rock excavation; 395 cu yds concrete; 56,560 lbs epoxy coated reinforcement bars; 1,295 ft precast concrete box<br />

culvert; 10 traffic barrier terminals; 1,913 ft steel plate beam guardrail; 4,650 cu yds non-<strong>special</strong> waste disposal; 444 sq ft<br />

sign panel; 2,508 lbs structural steel sign support-breakaway; 34,044 ft thermoplastic pavement marking; 2,636 ft aerial<br />

cable; 10 luminaires; 66,788 sq yds aggregate subgrade; 24,904 sq ft mechanically stabilized earth retaining wall; 1,664<br />

units perennial plants; mobilization; traffic control and protection; Federally funded. (Completion Date: October 29, 2010<br />

Plus 10 Working Days) (Job No. C-91-200-07) (1-71437-0200) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 43 -<br />

233. Contract No. 60D12 DuPage County District 1<br />

Section 55WRS<br />

FAU Route 1453 (22ND STREET) Project ACM-1453(11)<br />

1.29 miles <strong>of</strong> roadway reconstruction and widening, additional lanes, traffic signal modernization, interconnect and lighting<br />

on 22nd Street from IL 56 (Butterfield Road) to IL 83 (Kingery Highway) in Oakbrook and Oakbrook Terrace; includes<br />

27,976 cu yds earth excavation; 11,407 cu yds removal and disposal <strong>of</strong> unsuitable material; 2,364 cu yds furnished<br />

excavation; 12,282 cu yds trench backfill; 34,757 sq yds topsoil; 1.25 acres seeding; 29,067 sq yds sodding; 1,565 units<br />

supplemental watering; 5,324 sq yds HMA base course; 1,297 tons HMA surface course, MIX C; 618 sq yds HMA<br />

pavement (full-depth); 73,958 sq yds concrete pavement (jointed); 48,726 sq ft concrete sidewalk; 1,065 sq yds patching;<br />

3,614 ft watermain; 564 sq ft sign panel; 6,013 ft thermoplastic pavement marking; 38,816 ft polyurea pavement marking;<br />

4 controllers; 61,340 ft electric cable; 19 steel mast arm assemblies and poles; 94 signal heads; 567 ft detector loop; 23<br />

intermediate trees; 165 shrubs; 759 ft sleeper slab; 26,618 sq yds temporary pavement; 92,401 sq yds aggregate<br />

subgrade; 39 luminaires; 8,300 sq yds high-early-strength concrete pavement (jointed); 10,122 ft trench and backfill;<br />

mobilization; traffic control and protection; Federally funded. (Completion Date: October 30, 2011 Plus 10 Working Days)<br />

(Job No. C-91-312-07) (1-71237-0100) (See Special Provisions for DBE Percentage)<br />

234. Contract No. 60H77 Cook County District 1<br />

Section 2009-069BR<br />

Various Routes (VARIOUS)<br />

Bridge substructure repairs on various structures at Circle interchange in Chicago; includes 2.9 cu yds concrete removal;<br />

3 cu yds concrete; 1,060 lbs epoxy coated reinforcement bars; 3,325 sq ft structural repair <strong>of</strong> concrete; temporary shoring<br />

and cribbing; 8 temporary support systems; mobilization. (60 Working Days) (Job No. C-91-813-09) (0-01616-1005)<br />

(See Special Provisions for DBE Percentage)<br />

235. Contract No. 60H78 Cook County District 1<br />

Section 2009-070 BR<br />

FAP Route 348 (IL 43 (HARLEM AVE))<br />

Beam replacement and bridge repairs on the structures carrying IL Route 43 (Harlem Avenue) over Stevenson<br />

Expressway (SN 016-0316) in Forest View and over U.S. Routes 12/20 (95th Street) (SN 016-0320) in Bridgeview;<br />

includes beam straightening; temporary shoring and cribbing; 30.5 cu yds concrete removal; 30.5 cu yds concrete; 20,620<br />

lbs structural steel; 392 stud shear connectors; 695 ft polyurea pavement marking; 18,830 lbs structural steel removal;<br />

660 lbs structural steel repair; mobilization; traffic control and protection. (25 Working Days)<br />

(Job No. C-91-814-09) (0-01616-1006) (See Special Provisions for DBE Percentage)<br />

Small Business Set-Aside.<br />

236. Contract No. 60H82 Lake County District 1<br />

Section 2009-072 I<br />

Various Routes (VARIOUS)<br />

Drainage repairs and concrete curb and gutter improvements at various locations; includes 8 cu yds furnished excavation;<br />

360 sq yds topsoil; 360 sq yds sodding; 66 sq ft concrete sidewalk; 119 sq yds patching; 11 tons aggregate shoulders; 14<br />

sq yds concrete shoulders; 24 sq yds HMA shoulders; 148 ft pipe culverts; 307 ft paved ditch; 258 sq ft concrete median<br />

surface; 1,712 sq ft corrugated median; mobilization; traffic control and protection. (55 Working Days)<br />

(Job No. C-91-818-09) (0-01616-1011) (See Special Provisions for DBE Percentage)<br />

Small Business Set-Aside.<br />

237. Contract No. 60H83 Will County District 1<br />

Section 2009-073 I<br />

FAP Route 852 (US 52)<br />

Shoulder repair along U.S. Route 52 from IL Route 53 to north <strong>of</strong> Joliet Road in Manhattan, Joliet, New Lenox and Wilton<br />

Townships; includes 428 units grading and shaping shoulders; 1,251 tons aggregate wedge shoulder; mobilization; traffic<br />

control and protection. (15 Working Days) (Job No. C-91-819-09) (0-01616-1012)<br />

(See Special Provisions for DBE Percentage)<br />

238. Contract No. 60I00 Kane County District 1<br />

Section 126 RS-5<br />

FAP Route 307 (IL 64)<br />

6.94 miles <strong>of</strong> resurfacing on IL Route 64 from IL Route 47 to Campton Hill Road in St. Charles; includes 5 cu yds earth<br />

excavation; 739 sq yds topsoil; 607 ft grading and shaping ditches; 4,701 tons polymerized leveling binder (machine<br />

method); 15,045 tons HMA surface course, Mix D; 178,947 sq yds milling; 1,205 sq yds patching; 920 ft detector loop<br />

replacement; 159,776 ft thermoplastic pavement marking; mobilization; traffic control and protection. (Completion Date:<br />

September 30, 2010 Plus 05 Working Days) (Job No. C-91-840-09) (1-77056-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 44 -<br />

This project is eligible for the <strong>Department</strong>’s Mentor-Protégé Program.<br />

239. Contract No. 60I01 Cook County District 1<br />

Section 3271(A&B)RS-4<br />

FAP Route 348 (IL 43)<br />

3.11 miles <strong>of</strong> resurfacing on IL Route 43 from Willow Road to IL Route 58 (Golf Road) in Glenview, Northfield, Morton<br />

Grove and Maine Township; includes 2,125 sq yds topsoil; 2,125 sq yds sodding; 4,826 tons polymerized leveling binder<br />

(machine method); 11,464 tons polymerized HMA surface course, Mix F; 4,500 sq ft concrete sidewalk; 116,977 sq yds<br />

milling; 7,019 sq yds patching; 4,181 ft detector loop replacement; 78,975 ft thermoplastic pavement marking;<br />

mobilization; traffic control and protection. (45 Working Days) (Job No. C-91-841-09) (1-76505-0000)<br />

(See Special Provisions for DBE Percentage)<br />

240. Contract No. 60I05 Cook County District 1<br />

Section (1616&1718)RS-3<br />

FAP Route 39 (PERSHING RD)<br />

2.09 miles <strong>of</strong> resurfacing on Pershing Road from Ashland Avenue to Martin Luther King Drive in Chicago; includes 2,876<br />

tons polymerized leveling binder (machine method); 5,855 tons HMA surface course Mix D; 2,576 sq ft concrete sidewalk;<br />

350 ft detector loop replacement; 4,181 sq yds patching; 282,034 ft thermoplastic pavement marking; mobilization; traffic<br />

control and protection. (Completion Date: October 16, 2010 Plus 05 Working Days)<br />

(Job No. C-91-845-09) (1-77149-1000) (See Special Provisions for DBE Percentage)<br />

241. Contract No. 60I12 Cook County District 1<br />

Section (2021-Y-1&3128)RS-3<br />

FAP Route 348 (IL 43)<br />

Pavement patching, milling, HMA surface, striping and other work on IL Route 43 (Harlem Avenue) from IL Route 7 (SW<br />

Highway) to 79th Street in Bridgeview, Chicago Ridge, Oaklawn, Worth, Burbank and Palos Hills; includes 8,620 sq yds<br />

patching; 15,387 sq ft corrugated median removal; 14,490 tons polymerized HMA surface course, Mix F; 5,820 tons<br />

polymerized HMA leveling binder; 6,200 ft detector loop; 53,339 ft thermoplastic pavement marking; 135,822 sq yds<br />

milling; mobilization; traffic control and protection. (Completion Date: October 15, 2010 Plus 05 Working Days)<br />

(Job No. C-91-852-09) (1-77357-0000) (See Special Provisions for DBE Percentage)<br />

This project is eligible for the <strong>Department</strong>’s Mentor-Protégé Program.<br />

242. Contract No. 60I42 Cook County District 1<br />

Section 2009-131 RS<br />

FAU Route 3562 & FAU Route 1504 (JOLIET RD & 55TH ST)<br />

0.87 mile <strong>of</strong> patching, milling, HMA surface and other work along Joliet Road and 55th Street from East Avenue/Eberly<br />

Avenue to Joliet Road in Lyons, Hodgkins, McCook and Countryside; includes 19,761 tons polymerized HMA surface<br />

course, Mix F; 201,649 sq yds milling; 3,585 ft curb and gutter removal and replacement; 7,545 sq yds patching; 111,975<br />

ft thermoplastic pavement marking; 8,728 tons polymerized leveling binder (machine method); 2,721 sq yds concrete<br />

surface removal; 7,403 ft detector loop replacement; mobilization; traffic control and protection. (Completion Date:<br />

September 15, 2010 Plus 05 Working Days) (Job No. C-91-037-10) (1-78041-0000 and 1-78331-0000)<br />

(See Special Provisions for DBE Percentage)<br />

243. Contract No. 60I53 Will County District 1<br />

Section 99 (1&2) RS-11<br />

FAI Route 55 (I-55)<br />

7.25 miles <strong>of</strong> resurfacing on I-55 from the Grundy County line to the Kankakee River in Diamond and Braidwood; includes<br />

1,550 units grading and shaping shoulders; 9,820 tons HMA binder course; 7,667 tons HMA surface course, Mix D;<br />

299,859 sq yds milling; 662 sq yds patching; 11,089 tons aggregate wedge shoulder; 5.2 cu yds concrete removal; 9 cu<br />

yds structure excavation; 2,000 lbs reinforcement bars; 5.2 cu yds concrete box culverts; 140,293 ft shoulder rumble strip;<br />

158,869 ft thermoplastic pavement marking; 50,988 tons polymerized HMA binder and surface course, Stone Matrix<br />

Asphalt; 50,988 tons material transfer device; mobilization; traffic control and protection. (Completion Date: August 31,<br />

2010 Plus 05 Working Days) (Job No. C-91-060-10) (1-77325-0000 and 1-77325-0002)<br />

(See Special Provisions for DBE Percentage)<br />

244. Contract No. 60J01 Kane County District 1<br />

Section 2009-105 TS<br />

Various Routes (VARIOUS) Project ACHSIP-000S(696)<br />

Traffic signal modernization at seven intersections in Elgin and South Elgin; includes 25 cu yds earth excavation; 80 sq<br />

yds subbase granular material; 18 tons HMA surface course, MIX D; 2,010 sq ft concrete sidewalk; 80 sq yds patching;<br />

99.5 sq ft sign panel; 600 ft thermoplastic pavement marking; 2,383 ft conduit in trench; 1,194 ft conduit pushed; 4<br />

controllers; 21,065 ft electric cable; 9 steel mast arm assemblies and poles; 82 signal heads; 1,396 ft detector loop; 1,926<br />

ft fiber optic cable in conduit; 115 ft sawing pavement; radio activated solar advance flashing beacon system (complete);<br />

mobilization; traffic control and protection; Federally funded. (70 Working Days)<br />

(Job No. C-91-142-10) (1-78306-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 45 -<br />

245. Contract No. 60J19 Cook County District 1<br />

Section 0203-100 1HB-I<br />

FAI Route 57 (I-57)<br />

Bridge beam replacement for the structure carrying I-57 at Sauk Trail Road in Richton Park (SN 016-0575); includes 0.5<br />

cu yds concrete removal; 0.5 cu yds concrete; 12,490 lbs structural steel; temporary shoring and cribbing; temporary slab<br />

support system; mobilization; traffic control and protection. (15 Working Days) (Job No. C-91-206-10) (0-01616-1035)<br />

(See Special Provisions for DBE Percentage)<br />

246. Contract No. 60J87 Various Counties District 1<br />

Section 2009-127 SG<br />

Various Routes (VARIOUS)<br />

Sign installation and repair along various expressways and arterial routes in the district; includes 250 delineators; 5,000 ft<br />

telescoping steel sign support; 2,500 ft wood sign support; 200 tubular traffic sign posts; install 10,550 sq ft sign panel;<br />

install 1,500 sq ft street sign; remove 1,250 sq ft sign panel; (Completion Date: January 31, 2011)<br />

(Job No. C-91-277-10) (0-01616-1030) (See Special Provisions for DBE Percentage)<br />

247. Contract No. 63380 McHenry County District 1<br />

Section 09-00366-00-RS<br />

FAU Route 167 (CHAPEL HILL ROAD) Project ARA-9003(475)<br />

Project consists <strong>of</strong> HMA surface removal and resurfacing, shoulders, curb and gutter removal and replacement frame and<br />

lid adjustment, pavement markings and all other incidental items to complete the work on FAU Route 167 (Chapel Hill<br />

Road) from Charles J. Miller Road to south <strong>of</strong> Johnsburg Road; includes 5,149 tons bituminous materials (prime coat);<br />

456 sq yds HMA surface removal; 4,056 tons HMA binder course; 2,704 tons HMA surface course; 33,864 sq yds HMA<br />

surface removal, <strong>special</strong>; 322 sq yds Class D patches; 34,727 ft thermoplastic pavement marking line; 2,956 sq yds<br />

aggregate shoulders; 7,406 ft short-term pavement marking (<strong>special</strong>); traffic control and protection; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (25 Working Days)<br />

(Job No. C-91-058-10) (1-20800-0010) (See Special Provisions for DBE Percentage)<br />

248. Contract No. 63387 Cook County District 1<br />

Section 09-00173-00-BT (OAK LAWN)<br />

STONY CREEK TRAIL Project ARA-9003(366)<br />

Construction <strong>of</strong> a 10-foot wide asphalt bike trail with grass shoulders, including drainage improvements, grading, seeding<br />

and all other incidental items to complete the work on Stony Creek Trail from Austin Avenue to Mansfield Avenue in the<br />

village <strong>of</strong> Oak Lawn; includes 552 units tree removal; 760 cu yds earth excavation; 1,840 cu yds removal and disposal <strong>of</strong><br />

unsuitable material; 1,150 cu yds furnished excavation; 2,825 sq yds geotechnical fabric for ground stabilization; 6,000 sq<br />

yds topsoil furnish and place; 390 lbs fertilizer nutrients; 1,000 sq yds erosion control blanket; 1,715 sq yds sodding, salt<br />

tolerant; 20 units supplemental watering; 3,277 ft perimeter erosion barrier; 3,894 sq yds aggregate base course; 129 gals<br />

bituminous materials (prime coat); 746 tons HMA surface course; 614 sq ft PCC sidewalk; 644 sq yds HMA surface<br />

removal-variable depth; 527 ft chain link fence; 596 ft thermoplastic pavement marking line; 30 trees; traffic control and<br />

protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(25 Working Days) (Job No. C-91-683-09) (1-20770-0010) (See Special Provisions for DBE Percentage)<br />

249. Contract No. 63405 Cook County District 1<br />

Section 06-00162-03-SW (LANSING)<br />

FAU Route 1008 (CLAIRE BOULEVARD) Project CMM-9003(80)<br />

Sidewalk improvement consisting <strong>of</strong> earth excavation, PCC sidewalk, curb and gutter removal and replacement,<br />

pavement markings and all other incidental items to complete the work on FAU Rte. 1008 (Claire Boulevard) from<br />

Springfield Avenue to Interstate 294 in the village <strong>of</strong> Lansing; includes 156 units tree removal; 213 cu yds earth<br />

excavation; 50 tons porous granular embankment; 1,152 sq yds topsoil furnish and place; 1,152 sq yds erosion control<br />

blanket; 920 ft perimeter erosion barrier; 515 sq yds subbase granular material; 48 tons aggregate surface course; 4,368<br />

sq ft PCC sidewalk; 17 ft combination concrete curb and gutter removal and replacement; 72 ft storm sewers; 100 ft paint<br />

pavement marking line; traffic control and protection; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (15 Working Days) (Job No. C-91-019-09) (1-11010-0000)<br />

(See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

250. Contract No. 64F47 Ogle County District 2<br />

Section 9RS-8<br />

FAP Route 567 (IL 38)<br />

0.77 mile <strong>of</strong> milling and resurfacing on IL Route 38 from west <strong>of</strong> Washington Street to 0.1 mile east <strong>of</strong> Carson Drive in<br />

Rochelle; includes 2,329 tons polymerized leveling binder (machine method); 2,872 tons polymerized HMA surface<br />

course, N 70; 38,430 sq yds HMA surface removal; 7,016 ft thermoplastic pavement marking line; 376 raised reflective<br />

pavement markers; 1,352 ft detector loop; 1 microwave detection unit; mobilization; traffic control and protection.<br />

(25 Working Days) (Job No. C-92-023-10) (2-18400-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 46 -<br />

251. Contract No. 64F52 Winnebago County District 2<br />

Section 3TS-3<br />

FAP Route 303 (IL 251) Project ACHSIP-303(46)<br />

This project consists <strong>of</strong> modernizing the traffic signals at the intersection <strong>of</strong> IL Route 251 with Harlem Road in Machesney<br />

Park; includes 2,616 sq ft island surface removal and replacement; 40 sq ft sign panel; 268 ft polyurea pavement marking<br />

line; 1 service installation; 14,136 ft electric cable in conduit; 4 luminaires, sodium vapor; maintenance <strong>of</strong> existing traffic<br />

signals; 4 steel combination mast arm assemblies and poles; 59 ft concrete foundation; 23 signal heads; 782 ft conduit<br />

installed; 1 emergency vehicle priority system; 1 video camera detector system; 4 pedestrian push button <strong>special</strong>s; 8<br />

pedestrian signal head, polycarbonate, LED, 1-face bracket mounted; mobilization; traffic control and protection; Federally<br />

funded. (30 Working Days) (Job No. C-92-067-10) (2-21130-0100) (See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

252. Contract No. 68470 Knox-Henry Counties District 4<br />

Section 2RS-5,3RS-3,4RS-4<br />

FAP Route 37 (US 34)<br />

7.92 miles <strong>of</strong> milling and resurfacing located on U.S. Route 34 from Oneida to <strong>Illinois</strong> Route 17; includes 347 tons<br />

aggregate (prime coat); 4,598 tons polymerized leveling binder (machine method); 327 sq yds HMA surface removal-butt<br />

joint; 9,217 tons HMA surface course, N 50; 118,644 sq yds HMA surface removal; 1,488 sq yds Class D patches; 3,058<br />

tons aggregate shoulders; 25 traffic barrier terminals; 115,286 ft epoxy pavement marking line; 555 raised reflective<br />

pavement markers; 187 tons guardrail aggregate erosion control; mobilization; traffic control and protection.<br />

(45 Working Days) (Job No. C-94-058-05) (4-14055-0000) (See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

253. Contract No. 68687 Knox-Stark Counties District 4<br />

Section (132,133,133EXT)RS-3<br />

FAS Route 392 (IL 17)<br />

6.6 miles <strong>of</strong> patching, milling and resurfacing on IL Route 17 from IL Route 189 to IL Route 78 near LaFayette; includes<br />

3,782 tons polymerized leveling binder (machine method), N 50; 3,069 sq yds HMA surface removal-butt joint; 7,991 tons<br />

HMA surface course, N 50; 90,173 sq yds HMA surface removal; 585 sq yds pavement patching; 2,790 tons aggregate<br />

shoulders; 1,313 tons HMA shoulders; 8 traffic barrier terminals; 4,245 ft shoulder rumble strip; 104,172 ft epoxy<br />

pavement marking line; 36 raised reflective pavement markers; 11,774 tons material transfer device; mobilization; traffic<br />

control and protection. (40 Working Days) (Job No. C-94-019-07) (4-00143-0900)<br />

(See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

254. Contract No. 68815 Henry-Knox Counties District 4<br />

Section 132RS-4;110RS-5<br />

FAS Route 1195 (IL 17/IL 180)<br />

3.89 miles <strong>of</strong> patching, milling and resurfacing on IL Route 17 from 6th Street in Galva to the IL Route 17/180 intersection<br />

located west <strong>of</strong> Lafayette in Knox County; includes 2,548 tons polymerized leveling binder (machine method), N 50; 284<br />

sq yds HMA surface removal-butt joint; 5,435 tons HMA surface course; 64,614 sq yds HMA surface removal; 1,197 sq<br />

yds Class D patches; 1,764 tons aggregate shoulders; 187 ft steel plate beam guardrail; 10 traffic barrier terminals;<br />

69,004 ft epoxy pavement marking line; 309 raised reflective pavement markers; 14 guardrail markers; mobilization; traffic<br />

control and protection. (25 Working Days) (Job No. C-94-072-08) (4-00143-1200)<br />

(See Special Provisions for DBE Percentage)<br />

255. Contract No. 68891 Fulton County District 4<br />

Section 21RS-4,22RS-6<br />

FAP Route 630 (IL 100)<br />

4.44 miles <strong>of</strong> patching, milling and resurfacing located on IL Route 100 from IL Route 78 to Bryant; includes 1,016 sq yds<br />

HMA surface removal-butt joint; 5,944 tons HMA surface course, N 50; 72,197 sq yds HMA surface removal; 704 sq yds<br />

Class D patches; 637 tons aggregate shoulders; 3,828 ft shoulder rumble strip; 305 raised reflective pavement markers;<br />

5,944 tons material transfer device; 65,901 ft urethane pavement marking-line; railroad protective liability insurance;<br />

mobilization; traffic control and protection; (30 Working Days) (C-94-083-09) (4-00101-0100)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 47 -<br />

256. Contract No. 68915 Putnam-Marshall Counties District 4<br />

Section 123RS-4;(122,124)RS-5;2RS-3ETC<br />

FAP Route 649 & 698 (IL 89 & IL 17) Project ESP-HSIP-000S(802)<br />

15.36 miles <strong>of</strong> patching, milling, resurfacing and shoulder widening on IL Route 89 from north <strong>of</strong> IL Route 18 in Putnam<br />

County to IL Route 17 south <strong>of</strong> Varna and on IL Route 17 from the eastern city limits <strong>of</strong> Lacon IL Route 89; includes 1,138<br />

sq yds HMA surface removal-butt joint; 19,844 tons HMA surface course, N 50; 237,916 sq yds HMA surface removal;<br />

4,400 sq yds Class D patches; 24,899 tons HMA shoulders; 2 precast reinforced concrete flared end sections; 125 ft steel<br />

plate beam guardrail; 138,958 ft shoulder rumble strip; 223,534 ft epoxy pavement marking line; 1,105 raised reflective<br />

pavement markers; mobilization; traffic control and protection; Federally funded. (80 Working Days)<br />

(Job No. C-94-131-09) (4-00150-1000) (See Special Provisions for DBE Percentage)<br />

257. Contract No. 68916 Warren-Henderson Counties District 4<br />

Section 105RS-2<br />

FAS Route 1412 (IL 94)<br />

6.49 miles <strong>of</strong> surface maintenance located on IL Route 94 from IL Route 135 to south <strong>of</strong> Township Road 29, south <strong>of</strong> Bald<br />

Bluff; includes 1,052 sq yds HMA surface removal-butt joint; 7,685 tons HMA surface course; 89,831 sq yds HMA surface<br />

removal; 1,117 sq yds Class D patches; 730 tons aggregate shoulders; 104,321 ft epoxy pavement marking line; 438<br />

raised reflective pavement markers; 7,685 tons material transfer device; mobilization; traffic control and protection.<br />

(20 Working Days) (Job No. C-94-132-09) (4-00158-0500) (See Special Provisions for DBE Percentage)<br />

258. Contract No. 68938 Knox County District 4<br />

Section (42B)I-1<br />

FAP Route 626 (IL 97)<br />

This project consists <strong>of</strong> bracing a deck beam on the structure (SN 048-0014) carrying IL Route 97 over Haw Creek<br />

tributary located 6.5 miles north <strong>of</strong> Maquon; includes 2,770 lbs furnishing and erecting structural steel; mobilization; traffic<br />

control and protection. (15 Working Days) (Job No. C-94-003-10) (0-01516-4001)<br />

(See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

259. Contract No. 68962 Knox County District 4<br />

Section (13,16,15)RS-4<br />

FAP Route 574 (IL 41)<br />

5.7 miles <strong>of</strong> milling, patching and resurfacing from 0.1 mile north <strong>of</strong> Hunter Street in Abingdon to 0.1 mile north <strong>of</strong> IL Route<br />

116; includes 4,951 sq yds HMA surface removal-butt joint; 8,950 tons HMA surface course, N 50; 110,963 sq yds HMA<br />

surface removal; 1,941 sq yds Class D patches; 2,355 tons aggregate shoulders; 357 tons HMA shoulders; 88,409 ft<br />

epoxy pavement marking line; 625 raised reflective pavement markers; 468 ft detector loop; 8,950 tons material transfer<br />

device; traffic control and protection. (45 Working Days) (Job No. C-94-050-10) (4-00130-0200)<br />

(See Special Provisions for DBE Percentage)<br />

260. Contract No. 70251 Champaign-Douglas Counties District 5<br />

Section (21-28,21-10-29,10-30)RS-1<br />

FAI Route 57 (I-57) Project IM-57-5(194)212<br />

12.19 miles <strong>of</strong> patching, milling and resurfacing on Interstate 57 from 0.3 mile north <strong>of</strong> US Route 36 at Tuscola continuing<br />

north to Sadorus Road; includes 460 cu yds furnished excavation; 343,927 sq yds HMA surface removal; 297 tons<br />

polymerized leveling binder (machine method); 4,620 sq yds HMA surface removal-butt joint; 57,063 tons polymerized<br />

HMA binder and surface course; 8,131 sq yds patches; 4,655 sq yds patching reinforcement; 19,826 ft saw cuts; 19,552<br />

tons HMA shoulders; 28 cu yds concrete Superstructure; 49 sq yds bridge deck grooving; 73 ft furnishing and erecting<br />

PPC I-beams; 3,150 lbs furnishing and erecting structural steel; 6,190 lbs reinforcement bars, epoxy coated; 28<br />

elastomeric bearing assembly; 16 concrete headwall for pipe drains; 168 sq ft sign panel; 30 ft overhead sign structurecantilever;<br />

268,961 ft thermoplastic pavement marking line; 3,871 raised reflective pavement marker; 515 ft unit duct,<br />

600V, 2-1C No. 6, 1/C No. 6 ground, (XLP-type use), 1 " dia. polyethylene; 69,693 tons material transfer device; beam<br />

straightening; 17,007 tons polymerized HMA binder course; traffic control and protection; mobilization; Federally funded.<br />

(Completion Date: November 20, 2010 Plus 05 Working Days) (Job No. C-95-093-02) (5-93090-0000)<br />

(See Special Provisions for DBE Percentage)<br />

261. Contract No. 74430 Effingham County District 7<br />

Section (12R)RS-1<br />

FAP Route 328/FAU Route 8379 (US 45)<br />

0.6 mile <strong>of</strong> resurfacing on U.S. Route 45 from north <strong>of</strong> Rickelman Avenue to south <strong>of</strong> I-57/70 on-ramp; includes 870 tons<br />

polymerized leveling binder (machine method); 1,424 tons polymerized HMA surface course, Mix D; 10,302 sq yds HMA<br />

surface removal complete; 5,668 sq yds milling; 457 sq yds patching; 71 tons aggregate shoulders; 1 traffic barrier<br />

terminal; 687 ft detector loop; 15,233 ft thermoplastic pavement marking; mobilization; traffic control and protection.<br />

(25 Working Days) (Job No. C-97-028-10) (7-50345-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 48 -<br />

262. Contract No. 85504 Lee County District 2<br />

Section 09-P4000-01-BT<br />

LOWELL TRAIL Project ARA-D2(140)<br />

Improvement consists <strong>of</strong> (0.08 miles) a multi-use path, sidewalks, retaining walls and parking area at Howell Park along<br />

the Rock River from east <strong>of</strong> the Galena Avenue bridge to Ottawa Avenue. Project also includes on-street bike path<br />

signing from Reynolds Field to Meadow Trail and Lowell Parkway Trail all in Dixon; includes 425 cu yds earth excavation;<br />

34 units tree removal; 774 sq yds topsoil furnished and placed; 194 sq yds heavy duty erosion control blanket; 580 sq yds<br />

sodding; 430 ft perimeter erosion barrier; 109 sq yds precast block revetment mat; 53 tons HMA surface course; 5,434 sq<br />

ft PCC sidewalk; 175 sq yds HMA surface removal; 2,805 sq ft sidewalk removal; 58 cu yds concrete structures; 100 lbs<br />

reinforcement bars; 4,860 lbs epoxy coated reinforcement bars; 300 ft pipe handrail; 122 ft concrete gutter; 89 ft<br />

combination concrete curb and gutter; 169 sq ft sign panel; 588 ft telescoping steel sign supports; 106 ft paint pavement<br />

marking line; 112 ft storm sewers; 6 trees; 148 ft seawall removal; 68 ft decorative steel railing; 105 sq yds aggregate<br />

subgrade; 110 sq ft masonry steps; 190 ft stone masonry wall; traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (50 Working Days)<br />

(Job No. C-92-044-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

263. Contract No. 89563 Peoria County District 4<br />

Section 09-00066-01-SW (BARTONVILLE)<br />

FAU Route 6679 (PFEIFFER ROAD) Project HD-ARA-D4(103)<br />

Construction consists <strong>of</strong> (0.71 miles) <strong>of</strong> PCC sidewalk/bike path and concrete curb and gutter on FAU Rte. 6679 (Pfeiffer<br />

Road) from Airport Road east to Ricketts Avenue in the village <strong>of</strong> Bartonville; includes 3,462 sq yds topsoil; 3,400 tons<br />

aggregate base course; 1,985 sq yds PCC driveway pavement; 24,224 sq ft PCC sideways; 4,106 sq yds pavement<br />

removal; 3,596 ft combination curb and gutter removal; 1,733 sq ft sidewalk removal; 100 ft bicycle railing; 3 manholes;<br />

3,574 ft combination concrete curb and gutter; 74 sq ft sign panel; 11 metal posts; 605 ft thermoplastic pavement<br />

marking; 20 mailboxes relocated; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (Completion Date: August 15, 2010)<br />

(Job No. C-94-032-10) (0-09910-0000) (See Special Provisions for DBE Percentage)<br />

264. Contract No. 95613 Clay County District 7<br />

Section 09-00082-00-BR<br />

FAS Route 801 (CH 16) Project ARA-BRS-801(231)<br />

Improvement consists <strong>of</strong> the removal <strong>of</strong> existing structure and the construction <strong>of</strong> 3 span (1 @ 56'-2", 2 @ 55'-6") precast<br />

prestressed concrete deck beam bridge and approaches carrying FAS Rte. 801 over Laws Creek approximately 1.5 miles<br />

east <strong>of</strong> Ingraham; includes 1 removal <strong>of</strong> existing structure; 384 cu yds earth excavation; 102 cu yds channel excavation;<br />

834 cu yds furnished excavation; 0.4 acres seeding; 1,325 tons stone dumped riprap; 41 cu yds concrete structures; 81<br />

cu yds concrete Superstructure; 18 cu yds concrete encasement; 4,704 sq ft precast prestressed concrete deck beams;<br />

5,220 lbs reinforcement bars; 18,380 lbs epoxy coated reinforcement bars; 400 ft steel railing; 480 ft furnish and drive<br />

steel piles; 2 test piles; 8 traffic barrier terminals; traffic control complete; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (70 Working Days) (Job No. C-97-031-100 (7-10499-0010)<br />

(See Special Provisions for DBE Percentage)<br />

265. Contract No. 97417 Madison County District 8<br />

Section 09-00048-00-RS (VENICE)<br />

FAU Route 9097 (BROADWAY AVENUE) Project ARA-5011(278)<br />

Project consists <strong>of</strong> milling, resurfacing with HMA, selective areas <strong>of</strong> patching, sidewalk removal and replacement,<br />

detectable warnings, curb and gutter removal and replacement, pavement markings and all other incidental items to<br />

complete the work on FAU Route 9097 (Broadway Avenue) from Klein Avenue to State Street in the city <strong>of</strong> Venice;<br />

includes 903 gals bituminous materials (prime coat); 326 sq yds temporary ramp; 1,626 tons HMA surface course; 934 sq<br />

ft PCC sidewalk; 12,904 sq yds HMA surface removal; 1,040 sq ft sidewalk removal; 699 sq ft median removal; 281 sq<br />

yds Class B patches; 1,017 ft saw cuts; 4,576 ft strip reflective crack control treatment; 699 sq ft corrugated median;<br />

4,894 ft temporary pavement marking line; 4,770 ft thermoplastic pavement marking line; traffic control and protection;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(30 Working Days) (Job No. C-98-355-09) (8-10389-0010) (See Special Provisions for DBE Percentage)<br />

266. Contract No. 99408 White County District 9<br />

Section 08-07120-00-BR<br />

FAS Route 890 Project BROS-193(42)<br />

Improvement consists <strong>of</strong> the removal <strong>of</strong> existing structure and construction <strong>of</strong> a single span (1 @ 51'-4") precast<br />

prestressed concrete deck beam bridge with aggregate approaches carrying FAS Rte. 890 over a Little Wabash Tributary<br />

approximately one mile east <strong>of</strong> Herald; includes 192 cu yds channel excavation; 18 tons aggregate; 85 tons aggregate<br />

surface course; 230 tons stone dumped riprap; 45 tons stone riprap ditch; 22 cu yds concrete structures; 1,200 sq ft<br />

precast prestressed concrete deck beams; 2,430 lbs reinforcement bars; 95 ft steel railing; 490 ft furnish and drive piles; 1<br />

test pile; removal <strong>of</strong> existing structure; Federally funded; (A Special Provision for this contract requires insurance that<br />

names additional insureds). (25 Working Days) (Job No. C-99-519-09) (9-10354-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 49 -<br />

267. Contract No. 99417 Massac County District 9<br />

Section 09-00038-00-BT (METROPOLIS)<br />

GEORGE ROGERS CLARK (DISCOVERY TRAIL) Project ARA-5045(9)<br />

Improvement consists <strong>of</strong> (3.85 miles) <strong>of</strong> a pedestrian/bike path with pcc sidewalk, HMA surface course, two pedestrian<br />

structures and other miscellaneous items necessary to complete the project located on the George Rogers Clark<br />

Discovery Trail beginning at the entrance <strong>of</strong> Fort Massac Park extending to Strawberry Road in Massac County; includes<br />

6,348 cu yds earth excavation; 1,266 cu yds furnished excavation; 2 acres seeding; 540 cu ft peat moss; 4,264 ft<br />

perimeter erosion barrier; 217 tons stone dumped riprap; 2,342 tons aggregate base course; 804 tons HMA binder<br />

course; 893 tons HMA surface course; 1,080 gals bituminous material; 148,275 sq ft pcc sidewalk; 500 sq ft detectable<br />

warnings; 939 tons aggregate shoulders; 253 cu yds structure excavation; 110 cu yds concrete structures; 4,364 lbs<br />

reinforcement bars; 13,473 lbs reinforcement bars epoxy coated; 1,544 ft furnish and drive steel piles; 3,232 ft chain link<br />

fence; 12 cal mos engineer's field <strong>of</strong>fice; 221 sq ft sign panel; 807 ft wood sign supports; 665 ft paint pavement marking<br />

line; 16 bumper blocks; 1 construction layout; 57 trees; 69 perennial; 5 bicycle racks; 139 wood bollards; 2 information<br />

kiosk; traffic control and protection; 325 sq yds planting soil amendment; 7,205 sq ft pedestrian truss Superstructure; 4<br />

flashing beacon installations; 1 wood guardrail repair; Federally funded; (A Special Provision for this contract requires<br />

insurance that names additional insureds). (225 Working Days) (Job No. C-99-508-10) (0-09910-0000)<br />

(See Special Provisions for DBE Percentage)<br />

268. Contract No. 76D34 Madison County District 8<br />

Section 30-ZRS-1<br />

FAU Route 9122 (BELTLINE RD)<br />

2.14 miles microsurfacing on Beltline Road from IL Route 157 to IL Route 159 in Madison County; includes 84,320 ft<br />

micro-surfacing rut filling; 55,128 sq yds micro-surfacing, single pass; 53,544 ft thermoplastic pavement marking;<br />

mobilization; traffic control and protection. (20 Working Days) (Job No. C-98-085-09) (8-83210-0851)<br />

(See Special Provisions for DBE Percentage)<br />

269. Contract No. 60956 Lake County District 1<br />

Section (46-1S&47)WRS-2<br />

FAP Route 344 (US 45)<br />

1.55 miles <strong>of</strong> roadway reconstruction, adding lanes and traffic signal modernization along US 45 from IL 120 (Belvidere<br />

Road) to Washington Street in Grayslake, Third Lake and Lake County; includes 9,835 sq yds HMA base course; 4,187<br />

tons HMA binder course; 884 tons polymerized HMA binder course; 601 tons HMA surface course, MIX C; 352 tons HMA<br />

surface course, MIX D; 151 tons polymerized HMA surface course, MIX F; 66,028 sq yds concrete pavement (jointed);<br />

2,282 sq ft concrete sidewalk; 58,027 sq yds pavement removal; 1,524 sq yds patching; 945 sq yds HMA shoulders;<br />

44,746 cu yds earth excavation; 16,621 cu yds removal and disposal <strong>of</strong> unsuitable material; 7,607 cu yds trench backfill;<br />

61,845 sq yds topsoil; 10.2 acres seeding; 47,691 sq yds erosion control blanket; 3,734 ft pipe underdrains; 34,080 ft<br />

concrete curb and gutter; 7,606 sq ft concrete median; 4 traffic barrier terminals; 4,137 cu yds non-<strong>special</strong> waste disposal;<br />

581 sq ft sign panel; 39,287 ft thermoplastic pavement marking; 15 steel mast arm assemblies and poles; 4 controllers;<br />

25,322 ft electric cable; 50 signal heads; 179 ft detector loop; 101 shade trees; 74 intermediate trees; 30 lbs flocculation<br />

powder; 96,274 sq yds aggregate subgrade; mobilization; traffic control and protection; Federally funded. (Completion<br />

Date: October 31, 2011 Plus 10 Working Days) (Job No. C-91-208-00) (1-71097-0300)<br />

(See Special Provisions for DBE Percentage)<br />

270. Contract No. 63435 Will County District 1<br />

Section 06-00162-01-SW (LANSING)<br />

EXCHANGE ST & SANGAMON ST Project CMM-9003(77)<br />

Project consists <strong>of</strong> sidewalk and crosswalk construction, combination concrete curb and gutter, pavement markings and<br />

all other incidental items to complete the work on Exchange Street from Independence Boulevard to Peoria Street and on<br />

Sangamon Avenue from Naoma Drive to Wayne Drive in the Village <strong>of</strong> Lansing; includes 18 units tree removal; 550 cu<br />

yds earth excavation; 1,520 sq yds topsoil furnish and place; 2,250 ft perimeter erosion barrier; 1,182 sq yds subbase<br />

granular material; 49 sq yds HMA base course; 10,634 sq ft PCC sidewalk; 121 ft combination curb and gutter removal;<br />

16 sq yds Class D patches; 137 ft combination concrete curb and gutter; 744 ft thermoplastic pavement marking line;<br />

traffic control and protection; Federally funded; (A Special Provision for this contract requires insurance that names<br />

additional insureds). (15 Working Days) (Job No. C-91-022-09) (1-11010-0000)<br />

(See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 50 -<br />

271. Contract No. 66857 LaSalle County District 3<br />

Section (5)N<br />

FAP Route 311 (IL 71) Project ACHSIP-311(42)<br />

This project consists <strong>of</strong> widening IL Route 71 to provide a left turn lane onto C.H. 18 (Dayton Road) and extending a 6'X<br />

6' box culvert, which project is located just north <strong>of</strong> Interstate 80 near Ottawa; includes 1,531 cu yds earth excavation; 219<br />

sq yds stone riprap; 247 sq yds PCC base course widening; 244 tons leveling binder (machine method); 840 tons HMA<br />

binder and surface course; 111 sq yds PCC driveway pavement; 3,116 sq yds HMA surface removal; 554 ft saw cuts;<br />

2,212 sq yds HMA shoulders; 1,490 lbs reinforcement bars; 17 cu yds concrete box culverts; 16 ft precast concrete box<br />

culvert; 50 ft pipe culverts; 144 ft combination concrete curb and gutter; 437 ft steel plate beam guardrail; 2,212 ft<br />

shoulder rumble strip; 8,800 ft epoxy pavement marking line; 103 raised reflective pavement markers; 125 ft unit duct,<br />

600V, 2-1C no.10,1/C ground,(XLP-type use),3/4 diameter polyethylene; 1 light pole foundation; 83 sq yds Class B<br />

patches; relocate existing light pole; mobilization; traffic control and protection; Federally funded. (50 Working Days)<br />

(Job No. C-93-126-09) (3-36140-1602) (See Special Provisions for DBE Percentage)<br />

272. Contract No. 68467 Tazewell-Woodford Counties District 4<br />

Section 17RS-6;18RS-1;35RS-8<br />

FAP Route 317 (US 24) Project NHF-317(84)<br />

9.25 miles <strong>of</strong> patching, milling and resurfacing on US Rte. 24 from Cummings Lane in Washington to Myers Street in<br />

Eureka; includes 7,971 tons polymerized leveling binder (machine method), N50; 689 sq yds HMA surface removal-butt<br />

joint; 16,639 tons polymerized HMA surface course, N50; 304,899 sq yds HMA surface removal; 677 sq yds Class D<br />

patches; 13,376 tons HMA shoulders; 113 ft steel plate beam guardrail; 93,627 ft shoulder rumble strip; 1,330 raised<br />

reflective pavement marker; 1,671 ft detector loop; 16,639 tons material transfer device; 239,015 ft Urethane pavement<br />

marking line; 1,296 ft electric cable in conduit; traffic control and protection; mobilization; Federally funded.<br />

(70 Working Days) (Job No. C-94-055-05) (4-00019-0200) (See Special Provisions for DBE Percentage)<br />

273. Contract No. 68940 Tazewell County District 4<br />

Section (6)TS,J<br />

FAS Route 2466 (US 150) Project ACHSIP-2466(111)<br />

This project consists <strong>of</strong> the installation <strong>of</strong> a four-way stop with flashing lights at the intersection <strong>of</strong> U.S. Route 150 and the<br />

Washington Blacktop located east <strong>of</strong> Morton; includes 114 cu yds furnished excavation; 625 sq yds topsoil furnish and<br />

place; 740 ft perimeter erosion barrier; 205 sq yds HMA base course widening; 109 sq yds HMA surface removal-butt<br />

joint; 58 tons HMA surface course, N 50; 334 sq yds HMA surface removal; 1,437 sq ft concrete median; 179 sq yds HMA<br />

shoulders; 30 ft pipe culverts, Class D; 296 ft combination concrete curb and gutter; 362 ft steel plate beam guardrail; 791<br />

ft paint pavement marking line; 1 service installation; 1 light pole, wood, 40-ft.; 1 flashing controller; 287 ft electric cable<br />

aerial suspended, signal no. 14 3C; 3 signal heads; mobilization; traffic control and protection; Federally funded.<br />

(20 Working Days) (Job No. C-94-005-10) (4-40610-2310) (See Special Provisions for DBE Percentage)<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

274. Contract No. 68966 Henderson County District 4<br />

Section (114,116)RS-3<br />

FAP Route 657 (IL 164)<br />

5.94 miles <strong>of</strong> cold milling and resurfacing on IL Route 164 from Schuyler Street in Oquawka to just north <strong>of</strong> US Route 34<br />

in Henderson County; includes 2,174 sq yds HMA surface removal-butt joint; 8,552 tons HMA surface course, N 50;<br />

94,118 sq yds HMA surface removal; 2,211 tons aggregate shoulders; 3,571 sq yds protective coat; 78,866 ft epoxy<br />

pavement marking line; 382 raised reflective pavement markers; 7,469 tons material transfer device; railroad protective<br />

liability insurance; mobilization; traffic control and protection. (25 Working Days) (Job No. C-94-053-10) (4-00164-0200)<br />

(See Special Provisions for DBE Percentage)<br />

275. Contract No. 70234 Douglas-Moultrie Counties District 5<br />

Section 120RS-3<br />

FAP Route 749 (IL 133) Project ESP-F-749(22)<br />

1.16 miles <strong>of</strong> milling and resurfacing on IL Rte. 133 from just west <strong>of</strong> the Moultrie/Douglas County Line to the eastern city<br />

limits <strong>of</strong> Arthur; includes 179 cu yds earth excavation; 1,412 tons leveling binder (machine method); 3,196 sq yds HMA<br />

surface removal-butt joint; 1,488 tons HMA surface course, N70; 945 sq yds Portland cement concrete; 27,898 sq yds<br />

HMA surface removal; 1,911 sq yds Class D patches; 802 tons HMA shoulders; 179 cu yds structure excavation; 68 ft<br />

precast concrete box culvert; 325 ft combination concrete curb and gutter; 14,783 ft thermoplastic pavement marking line;<br />

77 raised reflective pavement marker; 1 service installation; 2 light pole, wood, 40 foot, Class 3; 1 flasher controller; 200 ft<br />

electric cable; 2 signal head; traffic control and protection; mobilization; Federally funded. (45 Working Days)<br />

(Job No. C-95-058-02) (5-51420-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 51 -<br />

276. Contract No. 78153 Pope County District 9<br />

Section 3(I-1)<br />

SBI Route 34 (IL 34)<br />

Repairs to the existing structure carrying IL Route 34 over Gibbons Creek, located near the Hardin County Line; includes<br />

84 sq yds HMA shoulders; 8.5 cu yds concrete removal; 9.1 cu yds concrete; 1,260 lbs epoxy coated reinforcement bars;<br />

78 ft preformed joint strip seal; 25 ft steel plate beam guardrail; traffic barrier terminals; 1,500 ft paint pavement marking;<br />

mobilization; traffic control and protection. (30 Working Days) (Job No. C-99-007-10) (0-01616-9009)<br />

(See Special Provisions for DBE Percentage)<br />

277. Contract No. 89559 Mercer County District 4<br />

Section 06-00094-05-DR<br />

FAS Route 206 (CH 4) Project ARA-RS-206(117)<br />

Improvement consists <strong>of</strong> (3.24 miles) <strong>of</strong> pavement patching, HMA resurfacing, aggregate wedge shoulders, paint<br />

pavement markings and pipe culvert replacement along FAS Rte. 206 (CH 4) from south <strong>of</strong> Edwards River Bridge to<br />

south <strong>of</strong> 110th Avenue northeast <strong>of</strong> New Windsor; includes 2,103 ft grading and shaping ditches; 223 sq yds erosion<br />

control blanket; 20 tons aggregate base repair; 498 tons aggregate surface course; 7,048 gals bituminous materials; 294<br />

sq yds HMA surface removal; 4,689 tons HMA binder course; 3,516 tons HMA surface course; 226 tons incidental HMA<br />

surface; 2,833 sq yds Class D patches; 7,740 ft saw cuts; 1,936 tons aggregate wedge shoulder; 1,496 ft pipe culvert<br />

removal; 1,990 ft pipe culverts; 18 steel end sections; 3,430 ft short term pavement marking; 1,460 ft temporary pavement<br />

marking; 56,010 ft paint pavement marking line; 0.75 acres seeding; traffic control and protection; Federally funded; (A<br />

Special Provision for this contract requires insurance that names additional insureds). (60 Working Days)<br />

(Job No. C-94-010-10) (4-10286-0010) (See Special Provisions for DBE Percentage)<br />

278. Contract No. 93501 Macoupin County District 6<br />

Section 06-00086-00-PV<br />

FAS Route 2729 (CH 3) Project ARA-RS-2729(105)<br />

Project consists <strong>of</strong> the construction <strong>of</strong> a two-lane HMA surface on aggregate base with aggregate shoulders, earthwork,<br />

drainage structures, pavement markings and all other incidental items to complete the work on FAS Route 2729 (CH 3)<br />

from the new intersection at IL Route 4 easterly to Cottonwood Road; includes 15,030 cu yds earth and channel<br />

excavation; 13,775 cu yds furnished excavation; 27,026 ft perimeter erosion barrier; 16,493 tons aggregate base course;<br />

462 tons aggregate surface course; 19,174 gals bituminous materials; 7,391 tons HMA binder course; 3,696 tons HMA<br />

surface course; 5,861 tons aggregate shoulders; 81 tons HMA shoulders; 1,130 lbs reinforcement bars; 370 ft precast<br />

concrete box culverts; 473 ft pipe culverts; 26,010 ft pipe underdrains; 31,348 ft paint pavement marking line; 12 box<br />

culvert end sections; 6,800 sq yds degrading roadway; traffic control and protection; Federally funded; (A Special<br />

Provision for this contract requires insurance that names additional insureds). (165 Working Days)<br />

(Job No. C-96-244-09) (6-10330-0010) (See Special Provisions for DBE Percentage)<br />

279. Contract No. 95609 Macon County District 7<br />

Section 03-00184-00-BR<br />

FAU Route 7352 (CH 20) Project ARA-5169(44)<br />

Improvement consists <strong>of</strong> the removal <strong>of</strong> two structures and the construction <strong>of</strong> two PPC deck beam bridge, construction<br />

also includes approach pavement, aggregate shoulders and paint pavement marking, carrying FAU Rte. 7352 (CH 20)<br />

over Stevens Creek and Stevens Creek Tributary approximately 1.5 miles west <strong>of</strong> Forsyth; includes 294 cu yds earth<br />

excavation; 318 cu yds channel excavation; 1,934 cu yds furnished excavation; 0.7 acres seeding; 1,015 sq yds stone<br />

riprap and filter fabric; 3,237 sq yds processing modified soil; 140 tons portland cement; 61 tons HMA surface course;<br />

2,969 sq yds HMA pavement; 130 sq yds PCC pavement and pavement fabric; 2,836 sq yds pavement removal; 543 tons<br />

aggregate shoulders; 240 cu yds structure excavation; 82 cu yds concrete structures; 3,915 sq ft precast prestressed<br />

concrete deck beams; 7,010 lbs reinforcement bars, epoxy coated; 268 ft steel railing; 969 ft furnish and drive steel piles;<br />

2 test piles; 76 ft storm sewers; 435 sq yds waterpro<strong>of</strong>ing membrane system; 94 ft combination concrete curb and gutter;<br />

8 traffic barrier terminals; 2,820 ft paint pavement marking line; 2 structures removed; traffic control and protection;<br />

Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(110 Working Days) (Job No. C-97-025-10) (7-10403-0010) (See Special Provisions for DBE Percentage)<br />

280. Contract No. 95612 Clark County District 7<br />

Section 09-00268-00-DR<br />

FAS Route 1660 (CH 12) Project ARA-1660(105)<br />

Improvement consists <strong>of</strong> the removal <strong>of</strong> existing structure and construction <strong>of</strong> a double 8' x 8' concrete box culvert,<br />

construction also includes approaches and guardrail, carrying FAS Rte. 1660 over Hawks Creek approximately one mile<br />

west <strong>of</strong> Dennison; includes 426 cu yds earth excavation; 555 tons porous granular embankment; 2,745 sq yds erosion<br />

control blanket; 200 tons riprap; 188 tons stone riprap ditch; 395 tons aggregate base course; 72 tons aggregate<br />

shoulders; 5,704 cu yds structure excavation; 42,670 lbs epoxy coated reinforcement bars; 222 cu yds concrete box<br />

culverts; 475 ft steel plate beam guardrail; 4 traffic barrier terminals; removal <strong>of</strong> existing structure; traffic control and<br />

protection; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds).<br />

(35 Working Days) (Job No. C-97-053-10) (7-10502-0010) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 52 -<br />

281. Contract No. 95617 Wayne County District 7<br />

Section 06-00047-00-BR (FAIRFIELD)<br />

EAST 4TH STREET Project BRM-ARA-5022(12)<br />

Improvement consists <strong>of</strong> the removal <strong>of</strong> existing structure and construction <strong>of</strong> a cast-in-place box culvert, construction<br />

also includes PCC pavement, combination curb and gutter, carrying East 4th Street over a branch <strong>of</strong> Pond Creek in the<br />

city <strong>of</strong> Fairfield; includes 61 units tree removal; 96 cu yds channel excavation; 435 tons porous granular embankment;<br />

255 tons stone riprap; 193 sq yds PCC pavement; 51 sq yds PCC driveway pavement; 787 sq ft PCC sidewalk; 272 sq ft<br />

sidewalk removal; 38,850 lbs reinforcement bars epoxy coated; 89 ft bicycle railing; 193 cu yds concrete box culverts; 2<br />

precast reinforced concrete flared end sections; 90 ft storm sewer; 86 ft storm sewer removal; 97 ft combination concrete<br />

curb and gutter; removal <strong>of</strong> existing structure; traffic control and protection; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (50 Working Days) (Job No. C-97-059-10) (7-10400-0010)<br />

(See Special Provisions for DBE Percentage)<br />

282. Contract No. 95620 Jasper County District 7<br />

Section 05-10127-00-BR<br />

TR 186A Project BROS-79(140)<br />

Improvement consists <strong>of</strong> the removal <strong>of</strong> existing structure and construction <strong>of</strong> a single span (1 @ 74'0") precast<br />

prestressed concrete deck beam bridge with aggregate approaches carrying TR 186A over Brush Creek approximately<br />

.75 miles east <strong>of</strong> Newton; includes removal <strong>of</strong> existing structure; 4 traffic barrier terminals; 5 setting piles in rock; 177 units<br />

tree removal; 70 cu yds earth excavation; 240 cu yds channel excavation; 2,800 cu yds furnish excavation; 965 ft<br />

perimeter erosion barrier; 180 tons stone dumped riprap; 120 tons stone riprap ditch; 85 tons aggregate base course; 26<br />

cu yds concrete structures; 2,025 sq ft precast prestressed concrete deck beams; 3,000 lbs epoxy coated reinforcement<br />

bars; 150 ft steel railing; 187 ft furnish steel piles; 120 ft driving piles; Federally funded; (A Special Provision for this<br />

contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-97-062-10) (7-10311-0000)<br />

(See Special Provisions for DBE Percentage)<br />

283. Contract No. 97425 Marion County District 8<br />

Section 09-00096-00-RS (CENTRALIA)<br />

FAU Route 8623 & FAU Route 8609 (W BROADWAY & BROOKSIDE AVE) Project ARA-5012(19)<br />

Project consists <strong>of</strong> milling and resurfacing two-lane roads HMA surface course, areas <strong>of</strong> curb and gutter removal and<br />

replacement, selective sidewalk construction, pavement markings and all other incidental items to complete the work on<br />

FAU Rte. 8623 (West Broadway) from <strong>Illinois</strong> Rte. 161 to Pullen Avenue and on FAU Rte. 8609 (Brookside Avenue) from<br />

Broadway to 4th Street in the city <strong>of</strong> Centralia; includes 161 ft grading and shaping ditches; 1,712 gals bituminous<br />

materials (prime coat); 33 tons aggregate (prime coat); 354 tons leveling binder (machine method); 2,188 tons HMA<br />

surface course; 73 tons incidental HMA surfacing; 8,441 sq ft PCC sidewalk; 16,671 sq yds HMA surface removal; 80 ft<br />

storm sewers, Class B; 65 ft combination concrete curb and gutter; 18,324 ft thermoplastic pavement marking line; 263 ft<br />

polyurea pavement marking type; traffic control and protection; Federally funded; (A Special Provision for this contract<br />

requires insurance that names additional insureds). (40 Working Days) (Job No. C-98-313-10) (9-10395-0010)<br />

(See Special Provisions for DBE Percentage)<br />

284. Contract No. 60G54 Will County District 1<br />

Section 112T-1<br />

FAU Route 327 (WEST RIVER ROAD) Project M-327(47)<br />

Removal <strong>of</strong> the existing box culvert and replacement with a double-barrel, 9' X 6' precast concrete box culvert carrying<br />

West River Road over an unnamed tributary to the Kankakee River in Wilmington (SN 099-0521); includes 284 cu yds<br />

earth excavation; 14 cu yds trench backfill; 497 sq yds compost; 497 sq yds erosion control blanket; 48 sq yds HMA base<br />

course; 34 tons leveling binder (machine method); 306 tons HMA binder course; 73 tons HMA surface course, Mix C; 599<br />

sq yds pavement removal; 472 sq yds HMA shoulders; removal <strong>of</strong> existing structure; 328 cu yds structure excavation;<br />

3,523 lbs reinforcement bars; 421 lbs epoxy coated reinforcement bars; 47 cu yds concrete box culverts; 103 ft precast<br />

concrete box culvert; 424 ft steel plate beam guardrail; 4 traffic barrier terminals; 768 sq yds aggregate subgrade;<br />

temporary clear water diversion; 899 ft thermoplastic pavement marking; selective clearing; 952 cu yds coarse aggregate<br />

backfill; mobilization; traffic control and protection; Federally funded. (Completion Date: July 30, 2010 Plus 05 Working<br />

Days) (Job No. C-91-496-09) (1-77954-0000) (See Special Provisions for DBE Percentage)<br />

285. Contract No. 60I09 Cook County District 1<br />

Section 0103 RS-2<br />

FAP Route 370 (WESTERN AVE)<br />

1.05 miles <strong>of</strong> resurfacing on Western Avenue from 119th Street to 127th Street in Blue Island and Chicago; includes<br />

3,526 tons HMA surface course, Mix D; 1,000 sq ft concrete sidewalk; 41,975 sq yds milling; 1,763 tons polymerized<br />

leveling binder (machine method); 3,150 sq yds patching; 1,640 ft detector loop replacement; mobilization; traffic control<br />

and protection. (45 Working Days) (Job No. C-91-849-09) (1-77337-0000) (See Special Provisions for DBE Percentage)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 53 -<br />

In accordance with the requirements <strong>of</strong> the Governor’s Executive Order #2003-13, this project contains a Project Labor<br />

Agreement.<br />

286. Contract No. 64F12 Whiteside County District 2<br />

Section (32-4)RS-2<br />

FAP Route 561 (IL 2)<br />

2.46 miles <strong>of</strong> milling and resurfacing located on IL Rte. 2 from east <strong>of</strong> 4th Street to 45th Avenue in Sterling; includes 6,926<br />

tons polymerized HMA surface course, N70; 100,443 sq yds HMA surface removal; 290 ft combination curb and gutter<br />

removal; 2,418 sq yds Class A patches; 21,377 ft saw cuts; 838 tons HMA shoulders; 34 manholes to be adjusted; 63<br />

inlets to be adjusted; 290 ft combination concrete curb and gutter; 61,575 ft thermoplastic pavement marking line; 480<br />

raised reflective pavement marker; 5,772 tons polymerized leveling binder (machine method); 5 video camera detection<br />

system; traffic control and protection; mobilization. (60 Working Days) (Job No. C-92-120-09) (2-28400-0000)<br />

(See Special Provisions for DBE Percentage)<br />

287. Contract No. 76B27 Clinton County District 8<br />

Section 14-12BR-1<br />

FAP Route 327 (US 50)<br />

The contract involves two bridges, one carrying IL Route 160 over U.S. Route 50 in Trenton and the other one is carrying<br />

U.S. Route 50 over Sugar Creek east <strong>of</strong> Trenton, which work will consist <strong>of</strong> a microsilica overlay, expansion joint,<br />

replacement, deck sealing, parapet retr<strong>of</strong>it, deck repairs, bearing replacement and substructure repair; includes 545 cu<br />

yds earth excavation; 907 sq yds PCC base course; 48 tons HMA surface course; 1,136 sq yds HMA surface removal;<br />

5,976 sq ft concrete median surface removal; 2,687 sq yds paved shoulder removal; 22 sq yds Class A patches; 109 cu<br />

yds concrete removal; 1,172 ft bridge rail removal; 111 cu yds concrete superstructure; 8,340 lbs furnish and erecting<br />

structural steel; 18 jack and remove existing bearings; 4,770 lbs structural steel removal; 17,675 lbs epoxy coated<br />

reinforcement bars; 5,256 sq ft concrete median; 1,150 ft steel plate beam guardrail; 12 traffic barrier terminals; 1,658 ft<br />

guardrail removal; 1,116 ft thermoplastic pavement marking line; 6,606 ft polyurea pavement marking line; 14 raised<br />

reflective pavement markers; 118 plug existing deck drains; 913 sq ft structural repair <strong>of</strong> concrete; 1,096 sq yds bridge<br />

deck microsilica concrete overlay; 748 sq ft cleaning bridge seats; 49 sq yds deck slab repair; 1,106 ft retr<strong>of</strong>it concrete<br />

parapet; mobilization; traffic control and protection. (95 Working Days) (Job No. C-98-107-07) (8-00134-1000)<br />

(See Special Provisions for DBE Percentage)<br />

288. Contract No. 76D30 Madison County District 8<br />

Section 60-3HB-1-HDF<br />

FAI Route 270 (I-270)<br />

Bridge repairs on the existing structure carrying I-270 over IL Route 111 in Madison County; includes 214 sq yds<br />

protective shield; 11,290 lbs structural steel; 11,290 lbs structural steel removal; 124 sq ft sign panel; temporary shoring<br />

and cribbing; temporary slab support system; beam straightening; mobilization; traffic control and protection.<br />

(25 Working Days) (Job No. C-98-081-09) (MCHD Funds) (See Special Provisions for DBE Percentage)<br />

Pursuant to the Rules for Prequalification <strong>of</strong> Contractors and Issuance <strong>of</strong> Plans and Proposals, 44 <strong>Illinois</strong> Administrative<br />

Code 650.70,…”This contract requires, in addition to the normal IDOT pre-qualifications requirements, that the Contractor<br />

be SSPC-QP1 and QP2 certified. Evidence <strong>of</strong> certification must be provided prior to receiving authorization to bid.”<br />

Contractors are required to submit copies <strong>of</strong> current certificates for each Letting. These certificates must be submitted<br />

along with the contractors’ original BC 57 Affidavit <strong>of</strong> Availability.<br />

289. Contract No. 74401 Cumberland County District 7<br />

Section D7 BRIDGE PAINTING 2010-1<br />

FAI Route 57 (I-57)<br />

Cleaning and painting three steel structures on FAI 57 located east and south <strong>of</strong> Neoga; includes cleaning and painting<br />

steel bridges; mobilization; traffic control and protection. (55 Working Days) (Job No. C-97-114-09) (0-01616-7006)<br />

(See Special Provisions for DBE %)<br />

PREVIOUS LETTING: January 15, 2010 (Item 112)<br />

290. Contract No. 74425 Macon County District 7<br />

Section D7 SAFETY TREE REM 2010-1<br />

FAP Route 714 (IL 48) Project ACHSIP-714(18)<br />

Tree removal along IL Route 48 from U.S. Route 51 southeast <strong>of</strong> Decatur to the Christian County line; includes 1,339<br />

units tree removal; mobilization; traffic control and protection; Federally funded. (40 Working Days)<br />

(Job No. C-97-010-10) (7-76910-1105) (See Special Provisions for DBE %)<br />

PREVIOUS LETTING: January 15, 2010 (Item 192)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


- 54 -<br />

ILLINOIS DEPARTMENT OF NATURAL RESOURCES<br />

WATERWAYS<br />

1W. (Contract 401)<br />

Cook County<br />

LAKE MICHIGAN/CHICAGO RIVER LEAKAGE CONTROL<br />

The project consists <strong>of</strong> repairing leaks from Lake Michigan into the Chicago Rive at the headland <strong>of</strong> the Chicago River.<br />

Due to site requirements, some <strong>of</strong> the work will need to be performed from a barge. Work will consist <strong>of</strong> furnishing and<br />

driving steel sheet piling, installing walers for the piling, filling behind some <strong>of</strong> the piling with lean concrete, boring and<br />

filling seepage control grout holes, underwater joint sealing (welding) for the existing steel sheet pile sea wall, pressure<br />

grouting, removal and replacement <strong>of</strong> existing riprap, removing and rebuilding some concrete cap on a seal wall and all<br />

appurtenant work required to complete the project located along the North Pier separating the Chicago River from Lake<br />

Michigan in Cook County, <strong>Illinois</strong> immediately south <strong>of</strong> Navy Pier; includes 58.3 cu yds concrete removal; 58.3 cu yds<br />

concrete structures; 160 ft steel piles HP 14x73; 4,036 sq ft steel sheet piling; 1 lump sum electric service relocation; 70<br />

cu yds lean concrete fill; 200-foot underwater joint repair and 330 to 780 bags <strong>of</strong> pressure grouting. (Completion Date:<br />

September 30, 2010)(CS4D% % DBE)<br />

2W. (Contract 413)<br />

Cook County<br />

CRYSTAL CREEK FLOOD CONTROL PROJECT PHASE IIA<br />

0.40 mile <strong>of</strong> channel improvement on Crystal Creek beginning approximately 150 feet downstream <strong>of</strong> 25th Avenue and<br />

ending just upstream <strong>of</strong> Wehrman Avenue in Schiller Park, <strong>Illinois</strong>. Work consists <strong>of</strong> revising an existing channel with a<br />

varied side slope to a rectangular channel with an 18 to 28-foot side bottom and 9 to 12-foot tall side walls constructed <strong>of</strong><br />

segmental concrete blocks. Seven existing pedestrian bridges will be removed and replaced with six PCC deck beam<br />

bridges 23 to 25 feet long and one culvert extension. Two stream crossings will have an additional box culvert barrel<br />

constructed and three crossings will have the existing culvert replaced with a double box culvert. The work will also<br />

include the removal <strong>of</strong> a garage and existing bridge abutments and all appurtenant work required to complete the project.<br />

Proposed work included 556 units tree removal (6 to 15 units diameter); 846 unit tree removal (over 15 units diameter);<br />

2,339 cu yds channel excavation; 50,000 lbs reinforcement bars; 700 sq yds stone riprap, Class A4; 324 tons stone<br />

dumped riprap, Class A4; 4,543 cu yds structure excavation; 60 cu yds concrete structures; 593 sq ft precast prestressed<br />

concrete deck beams (11" depth); 250 cu yds concrete box culvert; 50.5-foot precast concrete box culvert 10'x4' (M273);<br />

229-foot precast concrete box culvert 10'x5' (M273); 3,088-foot chain link fence, 6'; 2,115-foot chain link fence to be<br />

removed and re-erected; 1 lump sum traffic control and protection, (<strong>special</strong>); 28,659 sq ft segmental concrete block wall<br />

and 1 lump sum temporary c<strong>of</strong>ferdam system. (Completion Date: December 30, 2011) (CS4D% % DBE)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


-A1-<br />

STATE OF ILLINOIS<br />

<strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />

Division <strong>of</strong> Aeronautics<br />

This Bulletin constitutes <strong>of</strong>ficial notification to Contractors <strong>of</strong> the intention to<br />

receive bids for Airport related work. The <strong>Transportation</strong> Bulletin is available on<br />

the <strong>Department</strong>’s Internet website at http://www.dot.il.gov. The following phone<br />

numbers and e-mail address are available if assistance is needed:<br />

Phone: 217/782-7806; Fax: 217/785-1141; TDD: 217/524-4875;<br />

E-mail: Ryan.Sheley@illinois.gov.<br />

INVITATION FOR BIDS<br />

1. TIME AND PLACE OF OPENING PROPOSALS: Sealed bids, subject to the conditions<br />

contained herein, will be received by the <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> at the<br />

Auditorium in the Harry R. Hanley Building, 2300 South Everett McKinley Dirksen<br />

Parkway, Springfield, <strong>Illinois</strong>, until 10:00 A.M. prevailing time, March 5, 2010.<br />

These bids will, at that time, be publicly opened and read for furnishing all<br />

labor and materials, and performing all work for the Project(s) listed and defined<br />

in Paragraph 3.0 <strong>of</strong> this Service Bulletin for the Division <strong>of</strong> Aeronautics.<br />

2. INSTRUCTIONS TO BIDDERS:<br />

a. Plans and Contract Documents. Plans and Contract Documents for those<br />

Project(s) specified in Paragraph 3.0 <strong>of</strong> this Service Bulletin for the<br />

Division <strong>of</strong> Aeronautics may be examined and reviewed at the following<br />

<strong>of</strong>fices:<br />

(1) <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>, Division <strong>of</strong> Aeronautics, One<br />

Langhorne Bond Drive, Capital Airport, Springfield, <strong>Illinois</strong>.<br />

(2) <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>, Harry R. Hanley Building, Plans and<br />

Contracts Office, Room 323, 2300 South Everett McKinley Dirksen<br />

Parkway, Springfield, <strong>Illinois</strong>.<br />

(3) Office <strong>of</strong> the consulting engineer(s).<br />

b. Contract documents for bidding will not be loaned to prospective bidders.<br />

Electronic plans and proposals may be downloaded from the <strong>Department</strong>’s web site<br />

at http://www.dot.il.gov/desenv/delett.html.<br />

Contractors wanting to bid must submit the properly completed “Request for<br />

Authorization to Bid/or Not For Bid Status” (BDE 124 INT) and the<br />

properly completed ORIGINAL “Affidavit <strong>of</strong> Availability” (BC 57) to Room 322<br />

or 323 no later than 4:30 p.m. prevailing time, three (3) days prior to<br />

letting date. The Authorization to Bid request cut-<strong>of</strong>f date is 4:30 p.m.<br />

prevailing time, March 2, 2010.<br />

c. Each bid shall be accompanied by one (1) copy <strong>of</strong> a Bid Bond on Form BDE 356B<br />

in the amount, which is not less than five (5) percent <strong>of</strong> the aggregate<br />

amount <strong>of</strong> the bid.<br />

d. Pre-Qualification Rating. The <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> prequalification<br />

ratings and other applicable evidence <strong>of</strong> competency <strong>of</strong> bidders<br />

to perform the work contemplated will be utilized for all Service Bulletin<br />

items. This pre-qualification rating will be established on the basis <strong>of</strong> a<br />

Financial Statement and Experience Questionnaire.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


-A2-<br />

e. Requirements for Corporations outside the State <strong>of</strong> <strong>Illinois</strong>. Before any<br />

Contract is executed, a Corporation from another State must conform to the<br />

Statutes <strong>of</strong> the State <strong>of</strong> <strong>Illinois</strong>, and may be asked to furnish a copy <strong>of</strong> the<br />

certificate from the Secretary <strong>of</strong> State, State <strong>of</strong> <strong>Illinois</strong>, showing that such<br />

foreign corporation is authorized to do business in the State <strong>of</strong> <strong>Illinois</strong>.<br />

f. Civil Rights Act <strong>of</strong> 1964. The <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>,<br />

Division <strong>of</strong> Aeronautics, in accordance with Title VI <strong>of</strong> the Civil Rights Act<br />

<strong>of</strong> 1964, 78 Stat. 252, 42 U.S.C. 2000d-4 and Title 49, Code <strong>of</strong> Federal<br />

Regulations, <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>, Subtitle A, Office <strong>of</strong> the<br />

Secretary, Part 21, Nondiscrimination in Federally-assisted programs <strong>of</strong> the<br />

<strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> issued pursuant to such Act, hereby notifies all<br />

bidders that it will affirmatively insure that in any contract entered into<br />

pursuant to this advertisement, minority business enterprises will be<br />

afforded full opportunity to submit bids in response to this invitation and<br />

will not be discriminated against on the grounds or race, color, or national<br />

origin in consideration for an award.<br />

In a case in which a bidder or prospective contractor or proposed<br />

subcontractor who has participated in a previous contract or subcontract<br />

subject to the equal opportunity clause has not filed a compliance report due<br />

under applicable instructions, such bidder, prospective contractor, or<br />

proposed subcontractor shall submit a compliance report prior to the award <strong>of</strong><br />

the proposed contract or subcontract. When a determination has been made to<br />

award a contract to a specific contractor, such contractor shall prior to<br />

award, furnish such other pertinent information regarding his own employment<br />

policies and practices as well as those <strong>of</strong> his proposed subcontractors as the<br />

Sponsor, or the Executive Vice Chairman <strong>of</strong> the President's Committee may<br />

require.<br />

For any contract or subcontract for $50,000.00 or more, and having 50 or more<br />

employees, the contractor or subcontractor will be required to maintain a<br />

written Affirmative Action Plan.<br />

g. Special Requirements.<br />

(1) Payment to Labor. The successful bidder will be required to pay to the<br />

laborers, workmen, mechanics, and other employees for the work under the<br />

contracts, not less than the general prevailing wage for each craft, trade or<br />

occupation, and not less than the minimum wage rates as shall be established<br />

by the U. S. Secretary <strong>of</strong> Labor for federally assisted projects and by the<br />

<strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> Labor for state/local projects.<br />

(2) Affirmative Action Requirements - Equal Employment Opportunity. Various<br />

contractor, union and minority organizations have prepared specific plans for<br />

Equal Employment Opportunity. Should such a plan or plans apply to the<br />

proposed project(s) listed below, the Bid Conditions will be included in the<br />

Contract Document for that project, and all bidder's, prospective contractors<br />

and/or subcontractors shall be required to comply with any and all provisions<br />

set forth therein.<br />

h. Specifications. The proposed work is to be constructed in accordance with the<br />

requirements <strong>of</strong> the <strong>Illinois</strong> Standard Specifications for Construction <strong>of</strong><br />

Airports, dated January, 1985, the Supplemental Specifications and Recurring<br />

Special Provisions, adopted July 1, 2004 and the Special Provisions specified in<br />

the proposal. The <strong>Illinois</strong> Standard Specifications for Construction <strong>of</strong> Airports<br />

and the Supplemental Specifications and Recurring Special Provisions are available<br />

at www.dot.il.gov/aero/airspecs.html. Printed copies <strong>of</strong> the <strong>Illinois</strong> Standard<br />

Specifications for Construction <strong>of</strong> Airports may be obtained by applying to the<br />

<strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>, Division <strong>of</strong> Aeronautics, Bureau <strong>of</strong> Engineering,<br />

Design Section, at Capital Airport/One Langhorne Bond Drive, Springfield,<br />

<strong>Illinois</strong> 62707-8415. The order should be accompanied by a check made payable to<br />

the Division <strong>of</strong> Aeronautics in the amount <strong>of</strong> $10.00 for each copy ordered.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


3. Proposed Work:<br />

-A3-<br />

1A Vermilion County Airport<br />

Danville, <strong>Illinois</strong><br />

Vermilion County<br />

Ill. Proj. DNV-3921<br />

AIP No. 3-17-0032-xx<br />

Contract No. VE046<br />

Rehab. Taxiway A Edge Lighting System – which includes the following major<br />

work items: 11,770 L.F. UG Cable in UD; 83 Each MITL; 71 Each Remove Stake<br />

Mounted Light; 13 Each Remove Taxi Guidance Sign; 13 Each Taxi Guidance<br />

Sign<br />

Pre-Bid meeting: N/A<br />

(DBE 4.0%)<br />

2A Southern <strong>Illinois</strong> Airport<br />

Carbondale, <strong>Illinois</strong><br />

Jackson County<br />

Ill. Proj. MDH-3920<br />

AIP No. 3-17-0009-B30<br />

Contract No. SO079<br />

Replace HIRL on Runway 18L/36R & var. Electrical Upgrades – which includes<br />

the following major work items: Base Bid: 1 Each L-807 WC-12’ Internally<br />

Lit; 2 Each Repl. Wind Cone; 16,600 L.F. UG Cable; 1,200 L.F. Control<br />

Cable; 1 L.S. Install Elect. Equip.; 1 L.S. L-821 Control Panel; 1 L.S.<br />

Lighting Control System; 780 L.F. 4” Directional Bore; 14,000 L.F. 2” PVC<br />

Duct Dir. Bury; 6 Each Elect. Handhole; 66 Each HIRL, Base Mounted; 16<br />

Each HI Thres. Light Base Mtd; 31 Each Rem. Base Mounted Light; 5 Each<br />

Adj. Rwy. Dist. Remain Sign; 6 Each Relo. Taxi Guid. Sign; 1 Pair Reloc.<br />

REILs; 1 L.S. Traffic Maint. Add. Alt.1: 1 Each Refurbish 36” Beacon;<br />

1,200 L.F. 1/C #8 XLP-USE; 62 Each Mod. Exist. Sign Panel; 1 L.S. Upgrade<br />

A/P Rotating Beacon<br />

Pre-Bid meeting: N/A<br />

(DBE 4.0%)<br />

3A Waukegan Regional Airport<br />

Waukegan, <strong>Illinois</strong><br />

Lake County<br />

Ill. Proj. UGN-3887<br />

AIP No. 3-17-0105-B43<br />

Contract No. WA060<br />

Paving, Grading & Utilities for SRE Building – which includes the<br />

following major work items: 102 L.F. Conc Encased Duct; 1,575 C.Y. Uncl.<br />

Excavation; 70 S.Y. Riprap; 100 Ton Bit. Base Course; 2,937 S.Y. Crushed<br />

Agg. Base Course; 100 Ton Bit. Surface Course; 2,022 S.Y. 7” PCC Pavement;<br />

582 S.F. 4” PCC Sidewalk; 351 L.F. RCP; 3 Each Manhole 4’; 95 L.F. 6”<br />

Ductile Iron Water Main; 1 Each Fire hydrant; 2 Each Water Main Connect;<br />

245 L.F. Twin 4” PVC Duct, Direct Bury; 2 Each Sanitary Sewer Connect;<br />

91.9 L.F. 12” DIP for Storm Sewer; 0.7 Acre Seed & Mulch; 350 C.Y.<br />

Topsoiling (from on site); 10 Each Parking Block<br />

Pre-Bid meeting: N/A<br />

(DBE 5.5%)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


-A4-<br />

4A Quad-City International Airport<br />

Moline, <strong>Illinois</strong><br />

Rock Island County<br />

Ill. Proj. MLI-3943<br />

AIP No. 3-17-0068-66<br />

Contract No. QU013<br />

Taxiway D Relocation – which includes the following major work items:<br />

6,255 L.F. UG Cable in UD; 260 L.F. 2-Way Conc Encased Duct; 115 L.F. Conc<br />

Duct Rem.; 19 Each MITL-Base Mounted; 13 Each Taxi Guid. Sign; 7 Each<br />

Remove Taxi Guid. Sign; 34 Each Relocate Base Mounted Light; 1 L.S.<br />

Traffic Maint.; 5,650 C.Y. Uncl. Excavation; 36,550 C.Y. Offsite Borrow<br />

Excavation; 380 S.Y. Riprap; 5,320 Ton Crushed Agg. Base Course; 230 Ton<br />

Bit. Surface Course; 9,725 S.Y. PCC Pavement; 6,140 S.Y. Rem. PCC<br />

Pavement; 8,025 S.F. Pavement Marking; 245 L.F. RCP; 2,725 L.F. 6” Perf.<br />

Underdrain; 11 Each Manhole-Spec; 20 Each Supply Taxi Guid. Sign Panel; 23<br />

Acre Seed & Mulch<br />

Pre-Bid meeting: N/A<br />

(DBE 5.0%)<br />

5A Logan County Airport<br />

Lincoln, <strong>Illinois</strong><br />

Logan County<br />

Ill. Proj. AAA-3956<br />

AIP No. 3-17-0062-B16<br />

Contract No. LO026<br />

Rehab. Runway Access Taxiway & T-Hangar Pavements – which includes the<br />

following major work items: 97 L.F. UG Cable in UD; 1 L.S. Haul Route; 940<br />

S.Y. Shoulder Adjustment; 6,166 L.F. Clean & Seal Bit. Cracks; 423 Ton<br />

Bit. Surface Course-Method 1; 1,027 S.Y. Butt Joint Construction; 220 S.Y.<br />

Remove & Replace Bit. Pavement; 7,860 S.Y. Porous Friction Course, 0.10’;<br />

3,139 Gal. Bit. Tack Coat; 6,646 S.F. Pavement Marking-Waterborne; 0.2<br />

Acre Seeding & Mulching<br />

Pre-Bid meeting: N/A<br />

(DBE 6.0%)<br />

6A Benton Municipal Airport<br />

Benton, <strong>Illinois</strong><br />

Franklin County<br />

Ill. Proj. H96-3772<br />

AIP No. 3-17-0005-B12<br />

Contract No. BN014<br />

Pavement Marking on Runway 18/36 – which includes the following major work<br />

items: 31,000 S.F. Pavement Marking-Waterborne; 7,500 S.F. Pavement<br />

Marking-Black Border<br />

Pre-Bid meeting: N/A<br />

(DBE 0.0%)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


-A5-<br />

7A Greater Kankakee Airport<br />

Kankakee, <strong>Illinois</strong><br />

Kankakee County<br />

Ill. Proj. IKK-3902<br />

AIP No. 3-17-0057-B17<br />

Contract No. KA041<br />

Rehab. Terminal Apron & Taxiway H, Phase 2 – which includes the following<br />

major work items: Base Bid: 1 L.S. Mobilization; 17 S.Y. Riprap; 12,000<br />

L.F. Clean & Seal HMA Cracks; 2,270 Ton Bit. Surface Course; 19,320 S.Y.<br />

HMA Pavement Milling; 800 S.Y. Rem. & Rep. HMA Pavement; 3,435 Ton Bit.<br />

Base Course; 48 Each Tie Down; 51 Each Remove Tie Down; 8,565 Gal. Bit.<br />

Tack Coat; 6,615 S.Y. Tar Emulsion Seal Coat; 0.3 Acre Seeding; 1,345 S.Y.<br />

Topsoiling; Add. Alt.1: 450 C.Y. Uncl. Excavation; 140 C.Y. Porous Gran.<br />

Embankment; 1,435 S.Y. Crushed Agg. Base Course-11”; 165 Ton Bit. Surface<br />

Course; 1,380 Rem. HMA Pavement; 330 Ton Bit. Base Course; 415 Gal. Bit.<br />

Tack Coat; 0.1 Acre Seeding; 475 S.Y. Topsoiling<br />

Pre-Bid meeting: N/A<br />

(DBE 4.0%)<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


PRE-BID CONFERENCE<br />

DISTRICT 4 –PRE- BID CONFERENCE<br />

Plans and Special Provisions for all District 4 contracts for the Letting <strong>of</strong><br />

March 5, 2010 will be available for your review at the District 4 <strong>of</strong>fice, 6 th<br />

floor Training Room from 5:30 P.M to 7:00 PM on Tuesday, February 23,<br />

2010. The District 4 Office is located at 401 Main Street, Peoria, <strong>Illinois</strong>.<br />

All prime contractors and DBE firms are encouraged to attend. There will<br />

be members from IDOT’s Supportive Services and District 4 to answer any<br />

questions that you may have. This will be an opportunity for prime<br />

contractors to indicate projects on which they are interested in receiving<br />

quotations from DBE firms. Both prime contractors and DBE firms are<br />

encouraged to review the project goals prior to this pre-bid conference.<br />

This will be an open house type format and no formal presentation will be<br />

given.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


REVISIONS TO THE ILLINOIS PREVAILING WAGE RATES<br />

The Prevailing rates <strong>of</strong> wages are included in the Contract proposals which are<br />

subject to Check Sheet #5 <strong>of</strong> the Supplemental Specifications and Recurring Special<br />

Provisions. The rates have been ascertained and certified by the <strong>Illinois</strong> <strong>Department</strong><br />

<strong>of</strong> Labor for the locality in which the work is to be performed and for each craft or<br />

type <strong>of</strong> work or mechanic needed to execute the work <strong>of</strong> the Contract. As required<br />

by Prevailing Wage Act (820 ILCS 130/0.01, et seq.) and Check Sheet #5 <strong>of</strong> the<br />

Contract, not less than the rates <strong>of</strong> wages ascertained by the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong><br />

Labor and as revised during the performance <strong>of</strong> a Contract shall be paid to all<br />

laborers, workers and mechanics performing work under the Contract. Post the<br />

scale <strong>of</strong> wages in a prominent and easily accessible place at the site <strong>of</strong> work.<br />

If the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> Labor revises the prevailing rates <strong>of</strong> wages to be paid as<br />

listed in the specification <strong>of</strong> rates, the contractor shall post the revised rates <strong>of</strong> wages<br />

and shall pay not less than the revised rates <strong>of</strong> wages. Current wage rate<br />

information shall be obtained by visiting the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> Labor web site at<br />

http://www.state.il.us/agency/idol/ or by calling 312-793-2814. It is the responsibility<br />

<strong>of</strong> the contractor to review the rates applicable to the work <strong>of</strong> the contract at regular<br />

intervals in order to insure the timely payment <strong>of</strong> current rates. Provision <strong>of</strong> this<br />

information to the contractor by means <strong>of</strong> the <strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> Labor web site<br />

satisfies the notification <strong>of</strong> revisions by the <strong>Department</strong> to the contractor pursuant to<br />

the Act, and the contractor agrees that no additional <strong>notice</strong> is required. The<br />

contractor shall notify each <strong>of</strong> its subcontractors <strong>of</strong> the revised rates <strong>of</strong> wages.<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


CONTRACTS AWARDED<br />

-----------------<br />

THE FOLLOWING AWARDS HAVE BEEN MADE SINCE THE PREVIOUS TRANSPORTATION BULLETIN:<br />

-------------------------------------------------------------------------------------<br />

-----------------------<br />

SEPTEMBER 18, 2009 LETTING<br />

DESCRIPTION CONTRACTOR<br />

----------- ----------<br />

ITEM NO. 005A CURRAN CONTRACTING COMPANY<br />

CONTRACT NO. LK007 286 MEMORIAL COURT<br />

COUNTY(S) MCHENRY CRYSTAL LAKE, IL 60014<br />

SECTION LAKE IN THE HILLS<br />

PROJECT(S) 3170112B12-3CK /387/7<br />

ROUTE<br />

DISTRICT 01<br />

AWARDED DATE 12/15/2009<br />

AWARDED AMOUNT $2,734,867.50<br />

13 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 033 D. CONSTRUCTION, INC.<br />

CONTRACT NO. 83894 1488 SO. BROADWAY<br />

COUNTY(S) WILL COAL CITY, IL 60416<br />

SECTION 01-00056-15-BR<br />

PROJECT(S) BHS-0295/103/000<br />

ROUTE FAU 369<br />

DISTRICT 01<br />

AWARDED DATE 01/11/2010<br />

AWARDED AMOUNT $823,897.03<br />

7 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 063 K-FIVE CONSTRUCTION CORPORATION<br />

CONTRACT NO. 63203 13769 MAIN STREET<br />

COUNTY(S) COOK LEMONT, IL 60439-9733<br />

SECTION 08-00165-00-RS<br />

PROJECT(S) ARA-9003/176/000<br />

ROUTE FAU 2779<br />

DISTRICT 01<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $658,990.70<br />

2 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 092 VIRGIL COOK & SON, INC.<br />

CONTRACT NO. 63246 119 NORTH 8TH STREET<br />

COUNTY(S) KANE P. O. BOX 805<br />

SECTION 08-00271-00-TL DEKALB, IL 60115<br />

PROJECT(S) CMM-9003/044/000<br />

ROUTE FAU 1503<br />

DISTRICT 01<br />

AWARDED DATE 12/09/2009<br />

AWARDED AMOUNT $273,381.87<br />

10 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 136 HANK'S EXCAVATING & LANDSCAPING, INC.<br />

CONTRACT NO. 97393 5825 W. STATE ROUTE 161<br />

COUNTY(S) ST. CLAIR BELLEVILLE, IL 62223-7921<br />

SECTION 06-00216-00-SW<br />

PROJECT(S) ARA-00D8/131/000<br />

ROUTE FAU 9187<br />

DISTRICT 08<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $728,310.81<br />

3 UNSUCCESSFUL BIDDERS<br />

-------------------------------------------------------------------------------------<br />

-----------------------<br />

NOVEMBER 06, 2009 LETTING<br />

DESCRIPTION CONTRACTOR<br />

----------- ----------<br />

ITEM NO. 008 KEELEY & SONS, INC.<br />

CONTRACT NO. 97397 6303 COLLINSVILLE ROAD (62201)<br />

COUNTY(S) MADISON P.O. BOX 837<br />

SECTION 09-00046-00-RS EAST ST. LOUIS, IL 62203<br />

PROJECT(S) ARA-5011/293/000<br />

ROUTE FAU 9008<br />

DISTRICT 08<br />

AWARDED DATE 12/14/2009<br />

AWARDED AMOUNT $178,618.91<br />

3 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 011 AURORA BLACKTOP INC.<br />

CONTRACT NO. 63299 1065 SARD AVENUE<br />

COUNTY(S) KANE MONTGOMERY, IL 60538-1218<br />

SECTION 09-00041-00-RS<br />

PROJECT(S) ARA-9003/320/000<br />

ROUTE FAU 2508<br />

DISTRICT 01<br />

AWARDED DATE 12/03/2009<br />

AWARDED AMOUNT $471,720.35<br />

2 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 012 CENTRAL BLACKTOP CO., INC.<br />

CONTRACT NO. 63302 6160 EAST AVENUE<br />

COUNTY(S) COOK HODGKINS, IL 60525<br />

SECTION 08-00058-00-RS P.O. BOX 2080<br />

PROJECT(S) ARA-9003/067/000 LAGRANGE, IL 60525-8180<br />

ROUTE FAU 2792<br />

DISTRICT 01<br />

AWARDED DATE 12/21/2009<br />

AWARDED AMOUNT $457,818.45<br />

4 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 016 PLOTE CONSTRUCTION INC.<br />

CONTRACT NO. 63294 1100 BRANDT DRIVE<br />

COUNTY(S) KANE HOFFMAN ESTATES, IL 60192<br />

SECTION 09-00109-00-RS<br />

PROJECT(S) ARA-9003/316/000<br />

ROUTE FAU 1395<br />

DISTRICT 01<br />

AWARDED DATE 12/03/2009<br />

AWARDED AMOUNT $685,101.80<br />

6 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 036 OPEN ROAD PAVING COMPANY LLC<br />

CONTRACT NO. 91408 1414 WEST ANTHONY DRIVE<br />

COUNTY(S) CHAMPAIGN URBANA, IL 61802<br />

SECTION 09-00281-00-RS P.O. BOX 1700<br />

PROJECT(S) ARA-5181/046/000 CHAMPAIGN, IL 61824-1700<br />

ROUTE FAU 7138<br />

DISTRICT 05<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $1,160,459.18<br />

1 UNSUCCESSFUL BIDDER<br />

ITEM NO. 039 CROSS CONSTRUCTION, INC.<br />

CONTRACT NO. 91419 3615 N. COUNTRYVIEW RD.<br />

COUNTY(S) VERMILION URBANA, IL 61802<br />

SECTION 08-00026-00-RS<br />

PROJECT(S) ARA-5016/039/000<br />

ROUTE FAU 7015<br />

DISTRICT 05<br />

AWARDED DATE 12/15/2009<br />

AWARDED AMOUNT $379,000.00<br />

1 UNSUCCESSFUL BIDDER<br />

ITEM NO. 040 CROSS CONSTRUCTION, INC.<br />

CONTRACT NO. 91421 3615 N. COUNTRYVIEW RD.<br />

COUNTY(S) PIATT URBANA, IL 61802<br />

SECTION 08-00115-01-RS<br />

PROJECT(S) ARA-0535/102/000<br />

ROUTE FAS 535<br />

DISTRICT 05<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $636,000.00<br />

1 UNSUCCESSFUL BIDDER<br />

ITEM NO. 044 CROSS CONSTRUCTION, INC.<br />

CONTRACT NO. 70623 3615 N. COUNTRYVIEW RD.<br />

COUNTY(S) CHAMPAIGN DOUGLAS URBANA, IL 61802<br />

SECTION (205,57,105)RS-2<br />

PROJECT(S) ACF-0808/036/000<br />

ROUTE FAP 808<br />

DISTRICT 05<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $7,922,709.10<br />

1 UNSUCCESSFUL BIDDER<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 045 MIDWEST BRIDGE AND CRANE, INC.<br />

CONTRACT NO. 68478 135 S. CHESTNUT STREET<br />

COUNTY(S) PEORIA P.O. BOX 188<br />

SECTION (ZC-15D-BR)BR GOOD HOPE, IL 61438<br />

PROJECT(S) BRM-6658/003/000<br />

ROUTE FAU 6658<br />

DISTRICT 04<br />

AWARDED DATE 12/21/2009<br />

AWARDED AMOUNT $1,313,653.84<br />

4 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 048 PETER BAKER & SON CO.<br />

CONTRACT NO. 63278 1349 ROCKLAND ROAD<br />

COUNTY(S) COOK P.O. BOX 187<br />

SECTION 09-00062-00-RS LAKE BLUFF, IL 60044-0187<br />

PROJECT(S) ARA-9003/368/000<br />

ROUTE FAU 2744<br />

DISTRICT 01<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $570,586.85<br />

3 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 050 CENTRAL BLACKTOP CO., INC.<br />

CONTRACT NO. 63291 6160 EAST AVENUE<br />

COUNTY(S) COOK HODGKINS, IL 60525<br />

SECTION 09-00015-00-RS P.O. BOX 2080<br />

PROJECT(S) ARA-9003/218/000 LAGRANGE, IL 60525-8180<br />

ROUTE FAU 1704<br />

DISTRICT 01<br />

AWARDED DATE 12/21/2009<br />

AWARDED AMOUNT $256,059.00<br />

0 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 052 CROSS CONSTRUCTION, INC.<br />

CONTRACT NO. 91428 3615 N. COUNTRYVIEW RD.<br />

COUNTY(S) CHAMPAIGN URBANA, IL 61802<br />

SECTION 09-00103-00-RS<br />

PROJECT(S) ARA-5059/013/000<br />

ROUTE FAU 7101<br />

DISTRICT 05<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $335,000.00<br />

1 UNSUCCESSFUL BIDDER<br />

ITEM NO. 053 MIDWEST BRIDGE AND CRANE, INC.<br />

CONTRACT NO. 93497 135 S. CHESTNUT STREET<br />

COUNTY(S) HANCOCK P.O. BOX 188<br />

SECTION 05-00014-00-BR GOOD HOPE, IL 61438<br />

PROJECT(S) BROS-0067/136/000<br />

ROUTE 4TH STREET<br />

DISTRICT 06<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $387,499.34<br />

6 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 054 HOWELL ASPHALT COMPANY &<br />

CONTRACT NO. 95596 HOWELL PAVING, INC.<br />

COUNTY(S) WABASH 1020 N. 13TH STREET<br />

SECTION 09-00080-00-RS P.O. BOX 1009<br />

PROJECT(S) ARA-RS-1819/107/000 MATTOON, IL 61938-1009<br />

ROUTE FAS 1819<br />

DISTRICT 07<br />

AWARDED DATE 12/03/2009<br />

AWARDED AMOUNT $948,557.14<br />

0 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 060 UTILITY DYNAMICS CORPORATION<br />

CONTRACT NO. 63041 23 COMMERCE DRIVE<br />

COUNTY(S) COOK OSWEGO, IL 60543<br />

SECTION 06-00199-00-LS<br />

PROJECT(S) ARA-00D1/795/000<br />

ROUTE VARIOUS<br />

DISTRICT 01<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $1,073,255.90<br />

9 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 062 SWALLOW CONSTRUCTION CORPORATION<br />

CONTRACT NO. 63297 4250 LACEY ROAD<br />

COUNTY(S) DUPAGE DOWNERS GROVE, IL 60515<br />

SECTION 08-00086-00-RS<br />

PROJECT(S) ARA-9003/425/000<br />

ROUTE FAU 2678<br />

DISTRICT 01<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $2,330,000.00<br />

10 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 063 BRANDT CONSTRUCTION CO.<br />

CONTRACT NO. 64A04 700 - 4TH ST., WEST<br />

COUNTY(S) HENRY MILAN, IL 61264-2725<br />

SECTION 129BR<br />

PROJECT(S) ACBRF-0638/012/000<br />

ROUTE FAP 638<br />

DISTRICT 02<br />

AWARDED DATE 12/18/2009<br />

AWARDED AMOUNT $977,017.15<br />

7 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 068 IROQUOIS PAVING CORPORATION<br />

CONTRACT NO. 66862 1889 E. US HWY. 24<br />

COUNTY(S) FORD P.O. BOX 466<br />

SECTION [(27-1)VBR&VBR-1]DM WATSEKA, IL 60970-0466<br />

PROJECT(S) ACIM-0576/185/262<br />

ROUTE FAI 57<br />

DISTRICT 03<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $1,299,389.92<br />

2 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 080 KEELEY & SONS, INC.<br />

CONTRACT NO. 76C38 6303 COLLINSVILLE ROAD (62201)<br />

COUNTY(S) ST CLAIR P.O. BOX 837<br />

SECTION 82-1-10N,TS EAST ST. LOUIS, IL 62203<br />

PROJECT(S)<br />

ROUTE FAU 9166/9180<br />

DISTRICT 08<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $1,286,298.05<br />

2 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 081 PETROFF TRUCKING COMPANY, INC.<br />

CONTRACT NO. 76C68 3469 RT 111<br />

COUNTY(S) ST CLAIR PONTOON BEACH, IL 62040<br />

SECTION 82-1DM-1 P.O. BOX 838<br />

PROJECT(S) COLLINSVILLE, IL 62234<br />

ROUTE FAP 998<br />

DISTRICT 08<br />

AWARDED DATE 12/11/2009<br />

AWARDED AMOUNT $717,837.00<br />

4 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 083 KEELEY & SONS, INC.<br />

CONTRACT NO. 76867 6303 COLLINSVILLE ROAD (62201)<br />

COUNTY(S) ST CLAIR P.O. BOX 837<br />

SECTION 82-2VB-2 EAST ST. LOUIS, IL 62203<br />

PROJECT(S) ACBHI-0641/123/002<br />

ROUTE FAI 64<br />

DISTRICT 08<br />

AWARDED DATE 12/21/2009<br />

AWARDED AMOUNT $9,056,189.02<br />

2 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 086 R. A. CULLINAN & SON, INC.<br />

CONTRACT NO. 89415 121 WEST PARK<br />

COUNTY(S) FULTON P. O. BOX 166<br />

SECTION 03-00125-02-RS TREMONT, IL 61568-0166<br />

PROJECT(S) ARA-RS-1458/103/000<br />

ROUTE FAS 1458<br />

DISTRICT 04<br />

AWARDED DATE 01/11/2010<br />

AWARDED AMOUNT $2,124,575.01<br />

1 UNSUCCESSFUL BIDDER<br />

ITEM NO. 100 LORIG CONSTRUCTION COMPANY<br />

CONTRACT NO. 60407 250 EAST TOUHY AVE.<br />

COUNTY(S) COOK DES PLAINES, IL 60018<br />

SECTION 465VB-R-1<br />

PROJECT(S) ACBRF-0330/058/000<br />

ROUTE FAP 330<br />

DISTRICT 01<br />

AWARDED DATE 12/10/2009<br />

AWARDED AMOUNT $11,788,898.65<br />

10 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 101 LORIG CONSTRUCTION COMPANY<br />

CONTRACT NO. 63178 250 EAST TOUHY AVE.<br />

COUNTY(S) DUPAGE DES PLAINES, IL 60018<br />

SECTION 98-00313-00-BR<br />

PROJECT(S) HPP-2106/002/000<br />

ROUTE ILLINOIS PRAIRIE PATH<br />

DISTRICT 01<br />

AWARDED DATE 12/14/2009<br />

AWARDED AMOUNT $813,421.50<br />

10 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 106 P. T. FERRO CONSTRUCTION CO.<br />

CONTRACT NO. 63263 700 S. ROWELL AVE. (60433)<br />

COUNTY(S) WILL P.O. BOX 156<br />

SECTION 09-00034-06-RS JOLIET, IL 60434-0156<br />

PROJECT(S) ARA-9003/466/000<br />

ROUTE FAP 357<br />

DISTRICT 01<br />

AWARDED DATE 12/17/2009<br />

AWARDED AMOUNT $1,116,949.77<br />

3 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 108 HECKER AND COMPANY, INC.<br />

CONTRACT NO. 63270 250 E. INDUSTRIAL LANE<br />

COUNTY(S) COOK WHEELING, IL 60090<br />

SECTION 08-00086-00-LT<br />

PROJECT(S) M-9003/087/000<br />

ROUTE FAU 1583<br />

DISTRICT 01<br />

AWARDED DATE 12/14/2009<br />

AWARDED AMOUNT $275,630.00<br />

15 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 110 ARROW ROAD CONSTRUCTION COMPANY<br />

CONTRACT NO. 63281 3401 S. BUSSE ROAD<br />

COUNTY(S) COOK P.O. BOX 334<br />

SECTION 09-00282-00-RS MT. PROSPECT, IL 60056-0334<br />

PROJECT(S) ARA-9003/376/000<br />

ROUTE FAU 1329<br />

DISTRICT 01<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $914,637.28<br />

7 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 111 ABBEY PAVING & SEALCOATING CO.<br />

CONTRACT NO. 63284 2319 DIEHL ROAD<br />

COUNTY(S) COOK AURORA, IL 60504<br />

SECTION 09-00058-00-RS<br />

PROJECT(S) ARA-9003/394/000<br />

ROUTE FAU 3734<br />

DISTRICT 01<br />

AWARDED DATE 12/14/2009<br />

AWARDED AMOUNT $320,016.45<br />

4 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 114 PLOTE CONSTRUCTION INC.<br />

CONTRACT NO. 63295 1100 BRANDT DRIVE<br />

COUNTY(S) KANE HOFFMAN ESTATES, IL 60192<br />

SECTION 09-00017-00-RS<br />

PROJECT(S) ARA-9003/318/000<br />

ROUTE FAU 98<br />

DISTRICT 01<br />

AWARDED DATE 12/21/2009<br />

AWARDED AMOUNT $408,516.56<br />

4 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 115 PLOTE CONSTRUCTION INC.<br />

CONTRACT NO. 63301 1100 BRANDT DRIVE<br />

COUNTY(S) KANE HOFFMAN ESTATES, IL 60192<br />

SECTION 09-00177-00-RS<br />

PROJECT(S) M-9003/314/000<br />

ROUTE FAU 1302<br />

DISTRICT 01<br />

AWARDED DATE 12/18/2009<br />

AWARDED AMOUNT $659,142.85<br />

4 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 116 BRANDT CONSTRUCTION CO.<br />

CONTRACT NO. 64F30 700 - 4TH ST., WEST<br />

COUNTY(S) WHITESIDE MILAN, IL 61264-2725<br />

SECTION (7B)M-3<br />

PROJECT(S)<br />

ROUTE FAP 309<br />

DISTRICT 02<br />

AWARDED DATE 12/21/2009<br />

AWARDED AMOUNT $118,837.00<br />

1 UNSUCCESSFUL BIDDER<br />

ITEM NO. 118 MIDWEST BRIDGE AND CRANE, INC.<br />

CONTRACT NO. 72B95 135 S. CHESTNUT STREET<br />

COUNTY(S) SCHUYLER P.O. BOX 188<br />

SECTION (87B)BR GOOD HOPE, IL 61438<br />

PROJECT(S) ACBHF-0310/138/000<br />

ROUTE FAP 310<br />

DISTRICT 06<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $1,119,300.14<br />

4 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 124 CROSS CONSTRUCTION, INC.<br />

CONTRACT NO. 91393 3615 N. COUNTRYVIEW RD.<br />

COUNTY(S) CHAMPAIGN URBANA, IL 61802<br />

SECTION 07-00419-00-RS<br />

PROJECT(S) ARA-HSIP-0531/108/000<br />

ROUTE FAS 531<br />

DISTRICT 05<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $2,327,000.00<br />

1 UNSUCCESSFUL BIDDER<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 127 CROSS CONSTRUCTION, INC.<br />

CONTRACT NO. 91418 3615 N. COUNTRYVIEW RD.<br />

COUNTY(S) VERMILION URBANA, IL 61802<br />

SECTION 05-00050-00-RS<br />

PROJECT(S) ARA-M-5031/008/000<br />

ROUTE FAU 6982<br />

DISTRICT 05<br />

AWARDED DATE 12/11/2009<br />

AWARDED AMOUNT $775,000.00<br />

2 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 128 CHARLES E. MAHONEY CO.<br />

CONTRACT NO. 97399 209 SERVICE STREET<br />

COUNTY(S) CALHOUN BELLEVILLE, IL 62226<br />

SECTION 09-00046-01-RS<br />

PROJECT(S) ARA-0754/113/000<br />

ROUTE FAS 754<br />

DISTRICT 08<br />

AWARDED DATE 12/14/2009<br />

AWARDED AMOUNT $142,718.51<br />

2 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 129 KEELEY & SONS, INC.<br />

CONTRACT NO. 97400 6303 COLLINSVILLE ROAD (62201)<br />

COUNTY(S) RANDOLPH P.O. BOX 837<br />

SECTION 09-00059-00-RS EAST ST. LOUIS, IL 62203<br />

PROJECT(S) ARA-5014/009/000<br />

ROUTE VARIOUS<br />

DISTRICT 08<br />

AWARDED DATE 01/05/2010<br />

AWARDED AMOUNT $263,057.75<br />

1 UNSUCCESSFUL BIDDER<br />

ITEM NO. 137 K-FIVE CONSTRUCTION CORPORATION<br />

CONTRACT NO. 63296 13769 MAIN STREET<br />

COUNTY(S) COOK LEMONT, IL 60439-9733<br />

SECTION 09-00124-00-RS<br />

PROJECT(S) ARA-9003/302/000<br />

ROUTE FAU 2732<br />

DISTRICT 01<br />

AWARDED DATE 12/03/2009<br />

AWARDED AMOUNT $694,417.50<br />

6 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 140 LORIG CONSTRUCTION COMPANY<br />

CONTRACT NO. 62881 250 EAST TOUHY AVE.<br />

COUNTY(S) DUPAGE DES PLAINES, IL 60018<br />

SECTION 532B-1<br />

PROJECT(S) ACM-2578/005/000<br />

ROUTE FAU 2578<br />

DISTRICT 01<br />

AWARDED DATE 12/03/2009<br />

AWARDED AMOUNT $3,649,224.15<br />

10 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 144 DAVIS CONCRETE CONSTRUCTION COMPANY<br />

CONTRACT NO. 63253 11633 SOUTH MAYFIELD AVENUE<br />

COUNTY(S) DUPAGE ALSIP, IL 60803-2495<br />

SECTION 09-00040-00-SW<br />

PROJECT(S) ARA-9003/515/000<br />

ROUTE FAU 2684<br />

DISTRICT 01<br />

AWARDED DATE 12/21/2009<br />

AWARDED AMOUNT $201,677.18<br />

16 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 146 ABBEY PAVING & SEALCOATING CO.<br />

CONTRACT NO. 63267 2319 DIEHL ROAD<br />

COUNTY(S) COOK AURORA, IL 60504<br />

SECTION 09-00031-00-PV<br />

PROJECT(S) ARA-9003/387/000<br />

ROUTE FAU 2796<br />

DISTRICT 01<br />

AWARDED DATE 12/14/2009<br />

AWARDED AMOUNT $471,970.77<br />

5 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 147 PLOTE CONSTRUCTION INC.<br />

CONTRACT NO. 63274 1100 BRANDT DRIVE<br />

COUNTY(S) COOK HOFFMAN ESTATES, IL 60192<br />

SECTION 09-00084-00-RS<br />

PROJECT(S) ARA-9003/345/000<br />

ROUTE FAU 2537 & FAU 1344<br />

DISTRICT 01<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $1,249,367.35<br />

5 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 149 A. LAMP CONCRETE CONTRACTORS, INC.<br />

CONTRACT NO. 63269 800 W. IRVING PARK RD.<br />

COUNTY(S) COOK SCHAUMBURG, IL 60193<br />

SECTION 09-00059-00-CH<br />

PROJECT(S) ARA-9003/340/000<br />

ROUTE FAP 348<br />

DISTRICT 01<br />

AWARDED DATE 12/23/2009<br />

AWARDED AMOUNT $792,789.00<br />

14 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 163 CHARLES E. MAHONEY CO.<br />

CONTRACT NO. 97401 209 SERVICE STREET<br />

COUNTY(S) MADISON BELLEVILLE, IL 62226<br />

SECTION 09-00190-00-RS<br />

PROJECT(S) ARA-5011/274/000<br />

ROUTE FAU 9100<br />

DISTRICT 08<br />

AWARDED DATE 12/14/2009<br />

AWARDED AMOUNT $292,513.83<br />

5 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 167 DUNNET BAY CONSTRUCTION COMPANY<br />

CONTRACT NO. 62539 115 N. BRANDON DR.<br />

COUNTY(S) COOK GLENDALE HEIGHTS, IL 60139<br />

SECTION 3249B-R<br />

PROJECT(S) BRM-2843/007/000<br />

ROUTE FAU 2843<br />

DISTRICT 01<br />

AWARDED DATE 12/17/2009<br />

AWARDED AMOUNT $2,827,333.92<br />

7 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 168 IROQUOIS PAVING CORPORATION<br />

CONTRACT NO. 62542 1889 E. US HWY. 24<br />

COUNTY(S) WILL P.O. BOX 466<br />

SECTION 2002-113R WATSEKA, IL 60970-0466<br />

PROJECT(S) ACF-ACBHF-000S/688/000<br />

ROUTE FAP 332/876<br />

DISTRICT 01<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $7,548,608.85<br />

5 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 171 CURRAN CONTRACTING COMPANY<br />

CONTRACT NO. 63234 286 MEMORIAL COURT<br />

COUNTY(S) MCHENRY CRYSTAL LAKE, IL 60014<br />

SECTION 09-00011-00-RS<br />

PROJECT(S) ARA-9003/352/000<br />

ROUTE FAU 166<br />

DISTRICT 01<br />

AWARDED DATE 12/02/2009<br />

AWARDED AMOUNT $230,002.41<br />

6 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 172 GALLAGHER ASPHALT CORPORATION<br />

CONTRACT NO. 63259 18100 SOUTH INDIANA AVENUE<br />

COUNTY(S) COOK THORNTON, IL 60476<br />

SECTION 09-00058-00-RS<br />

PROJECT(S) M-9003/339/000<br />

ROUTE FAU 1029<br />

DISTRICT 01<br />

AWARDED DATE 12/23/2009<br />

AWARDED AMOUNT $667,001.20<br />

4 UNSUCCESSFUL BIDDERS<br />

ITEM NO. 175 D. CONSTRUCTION, INC.<br />

CONTRACT NO. 66908 1488 SO. BROADWAY<br />

COUNTY(S) BUREAU COAL CITY, IL 60416<br />

SECTION 06-[7BR&BR-1,7VB-M,6BR&6,7ETC]<br />

PROJECT(S) ACBRF-ACNHI-0802/065/062<br />

ROUTE FAI 80<br />

DISTRICT 03<br />

AWARDED DATE 12/21/2009<br />

AWARDED AMOUNT $22,241,876.65<br />

3 UNSUCCESSFUL BIDDERS<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


ITEM NO. 191 HANK'S EXCAVATING & LANDSCAPING, INC.<br />

CONTRACT NO. 97342 5825 W. STATE ROUTE 161<br />

COUNTY(S) ST. CLAIR BELLEVILLE, IL 62223-7921<br />

SECTION 05-00207-00-PV<br />

PROJECT(S) M-HPP-0162/007/000<br />

ROUTE FAU 9167<br />

DISTRICT 08<br />

AWARDED DATE 12/18/2009<br />

AWARDED AMOUNT $1,901,222.90<br />

5 UNSUCCESSFUL BIDDERS<br />

-------------------------------------------------------------------------------------<br />

-----------------------<br />

CONTRACTS REJECTED<br />

------------------<br />

THE FOLLOWING REJECTIONS HAVE BEEN MADE SINCE THE PREVIOUS TRANSPORTATION BULLETIN<br />

-------------------------------------------------------------------------------------<br />

-----------------------<br />

JANUARY 15, 2010 LETTING<br />

DESCRIPTION CONTRACTOR<br />

----------- ----------<br />

ITEM NO. 112 ERA-VALDIVIA CONTRACTORS, INC.<br />

CONTRACT NO. 74401 11909 SOUTH AVENUE O<br />

COUNTY(S) CUMBERLAND CHICAGO, IL 60617<br />

SECTION D7 BRIDGE PAINTING 2010-1<br />

PROJECT(S)<br />

ROUTE FAI 57<br />

DISTRICT 07<br />

REJECTED AMOUNT $342,013.20<br />

ITEM NO. 192 HOMER TREE SERVICE, INC.<br />

CONTRACT NO. 74425 14000 S. ARCHER AVENUE<br />

COUNTY(S) MACON LOCKPORT, IL 60441<br />

SECTION D7 SAFETY TREE REM 2010-1<br />

PROJECT(S) ACHSIP-0714/018/000<br />

ROUTE FAP 714<br />

DISTRICT 07<br />

REJECTED AMOUNT $179,323.76<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


THIS PAGE INTENTIONALLY LEFT BLANK<br />

Notice <strong>of</strong> Letting Bulletin March 5, 2010 Letting published January 29, 2010


Part I. Work Under Contract<br />

Affidavit <strong>of</strong> Availability<br />

For the Letting <strong>of</strong><br />

Instructions: Complete this form by either typing or using black ink. "Authorization to Bid" will not be issued<br />

unless both sides <strong>of</strong> this form are completed in detail. Use additional forms as needed to list all work.<br />

List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded<br />

or rejected. In a joint venture, list only that portion <strong>of</strong> the work which is the responsibility <strong>of</strong> your company. The uncompleted dollar value is to be based upon<br />

the most recent engineer's or owners estimate, and must include work subcontracted to others. If no work is contracted, show NONE.<br />

County and Section Number<br />

Contract With<br />

Estimated Completion Date<br />

Total Contract Price<br />

Uncompleted Dollar Value if Firm is<br />

the Prime Contractor<br />

Uncompleted Dollar Value if Firm is<br />

the Subcontractor<br />

Part II. Awards Pending and Uncompleted Work to be done with your own forces.<br />

1 2 3 4 Awards Pending<br />

Total Value <strong>of</strong> All Work<br />

List below the uncompleted dollar value <strong>of</strong> work for each contract and awards pending to be completed with your own forces. All work<br />

subcontracted to others will be listed on the reverse <strong>of</strong> this form. In a joint venture, list only that portion <strong>of</strong> the work to be done by your<br />

company. If no work is contracted, show NONE.<br />

Earthwork<br />

Portland Cement Concrete Paving<br />

HMA Plant Mix<br />

HMA Paving<br />

Clean & Seal Cracks/Joints<br />

Aggregate Bases & Surfaces<br />

Highway, R.R. and Waterway Structures<br />

Drainage<br />

Electrical<br />

Cover and Seal Coats<br />

Concrete Construction<br />

Landscaping<br />

Fencing<br />

Guardrail<br />

Painting<br />

Signing<br />

Cold Milling, Planning & Rotomilling<br />

Demolition<br />

Pavement Markings (Paint)<br />

Other Construction (List)<br />

Totals<br />

Bureau <strong>of</strong> Construction<br />

2300 South Dirksen Parkway/Room 322<br />

Springfield, <strong>Illinois</strong> 62764<br />

Accumulated<br />

Totals<br />

Accumulated<br />

Totals<br />

Disclosure <strong>of</strong> this information is REQUIRED to accomplish the statutory purpose as outlined in the “<strong>Illinois</strong> Procurement Code." Failure to comply will result in<br />

non-issuance <strong>of</strong> an "Authorization To Bid." This form has been approved by the State Forms Management Center.<br />

Printed 11/21/2008 Page 1 <strong>of</strong> 2 BC 57 (Rev. 08/20/08)


Part III. Work Subcontracted to Others.<br />

For each contract described in Part I, list all the work you have subcontracted to others.<br />

Subcontractor<br />

Type <strong>of</strong> Work<br />

Subcontract Price<br />

Amount<br />

Uncompleted<br />

Subcontractor<br />

Type <strong>of</strong> Work<br />

Subcontract Price<br />

Amount<br />

Uncompleted<br />

Subcontractor<br />

Type <strong>of</strong> Work<br />

Subcontract Price<br />

Amount<br />

Uncompleted<br />

Subcontractor<br />

Type <strong>of</strong> Work<br />

Subcontract Price<br />

Amount<br />

Uncompleted<br />

Subcontractor<br />

Type <strong>of</strong> Work<br />

Subcontract Price<br />

Amount<br />

Uncompleted<br />

Total Uncompleted<br />

1 2 3 4 Awards Pending<br />

I, being duly sworn, do hereby declare that this affidavit is a true and correct statement relating to ALL uncompleted contracts <strong>of</strong> the<br />

undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded<br />

or rejected and ALL estimated completion dates.<br />

Subscribed and sworn to before me<br />

this day <strong>of</strong> , Type or Print Name<br />

Notary Public<br />

My commission expires<br />

(Notary Seal)<br />

Signed<br />

Company<br />

Address<br />

Officer or Director Title<br />

Printed 11/21/2008 Page 2 <strong>of</strong> 2 BC 57 (Rev. 08/20/08)


TYPE OR USE BLACK INK<br />

SPECIAL NOTICE<br />

ELECTRONIC PLANS AND PROPOSALS<br />

Request for Authorization to<br />

Bid/or Not For Bid Status<br />

Contractor Number<br />

Letting Date<br />

Plans and/or proposals may be downloaded from the <strong>Department</strong>’s Web Site located at http://www.dot.il.gov at no cost.<br />

Firms wishing to bid directly to the <strong>Department</strong> MUST request Authorization to Bid. Prospective bidders must also submit an<br />

Affidavit <strong>of</strong> Availability. Does not apply to Small Business Set-Asides.<br />

Firms downloading plans and/or proposals that do not wish to bid directly to the <strong>Department</strong> will not be placed on the Not For<br />

Bid list unless they request to be added to the list. Such requests shall be made by submitting a Request for Authorization to<br />

Bid/or Not For Bid Status form (BDE 124INT).<br />

The <strong>Department</strong> <strong>of</strong>fers plans and proposals in electronic format ONLY.<br />

Part A: I plan to bid as a prime contractor and hereby request Authorization to Bid the following items:<br />

Upon receipt <strong>of</strong> the required original Affidavit <strong>of</strong> Availability, IDOT will review the request and issue an "Authorization to Bid" only on the items listed in<br />

Part A. Firms wishing to be listed on the FOR BID list for Small Business Set-Asides may also complete Part A.<br />

Requestor Remarks:<br />

Bureau <strong>of</strong> Design & Environment<br />

2300 South Dirksen Parkway / Room 326<br />

Springfield, <strong>Illinois</strong> 62764<br />

Part B: Please list our Company on the Not For Bid List for the following items:<br />

TO EXPEDITE THIS REQUEST, FOLLOW INSTRUCTIONS ON PAGE TWO.<br />

E-Mail:<br />

Requestor Phone No.:<br />

Company:<br />

Street Address:(**)<br />

Requestor Fax No.:<br />

Post Office Box No.:(**)<br />

For United Parcel Delivery<br />

City State Zip Code<br />

Box No. For First Class Delivery<br />

City State Zip Code<br />

Requested By Dept. Of Human Rights No.(*) Exp. Date<br />

(*) To be obtained from <strong>Department</strong> <strong>of</strong> Human Rights, Compliance Division Copies to:<br />

Public Contracts Unit, 100 W. Randolph, Suite 10-100, Chicago, <strong>Illinois</strong> 60601<br />

(**) Complete street address and post <strong>of</strong>fice box are required.<br />

Construction Plans & Proposal<br />

On joint venture request use address <strong>of</strong> joint venture. <strong>Department</strong> Customer<br />

Printed 10/29/2009 Page 1 <strong>of</strong> 2 BDE 124INT (Rev. 10/22/09)


Instructions<br />

Requests for Authorization to Bid must be accompanied by an original Form BC-57, Affidavit <strong>of</strong> Availability. Does not apply for Small<br />

Business Set-Asides.<br />

Authorization to Bid will not be issued after the time and date specified in paragraph 1 (a) and 1 (b) <strong>of</strong> the <strong>Transportation</strong> Bulletin.<br />

How to Expedite this Request<br />

1. Using Black Ink complete the request form listing all item numbers requested in numerical order.<br />

2. E-mail the completed request form to D&Econtracts@dot.il.gov or Fax to 217-785-1141.<br />

3. Do Not make any changes on the request form after it has been faxed. Additional items will require a supplemental request.<br />

4. Mail hard copy <strong>of</strong> the request form to IDOT. If requesting Authorization to Bid, the requestor should also include the required<br />

Affidavit <strong>of</strong> Availability with an original signature. The preceding does not apply to Small Business Set-Asides.<br />

ABOUT IDOT PROPOSALS: All proposals issued by IDOT are potential bidding proposals. Each proposal contains all Certifications<br />

and Affidavits, a Proposal Signature Sheet and a Proposal Bid Bond required for Prime Contractors to submit a bid after written<br />

Authorization to Bid has been issued by IDOT’s Central Bureau <strong>of</strong> Construction. Small Business Set-Asides do not require<br />

Authorization to Bid or a Proposal Bid Bond.<br />

ADDENDA/REVISIONS: Those contractors downloading proposals from the internet are responsible for checking the <strong>Department</strong>’s web<br />

site (http://www.dot.il.gov) for any ADDENDA or REVISIONS that may effect the downloaded proposal. An Addenda/Revision tracking<br />

sheet is on the <strong>Department</strong>’s web site and notification may be e-mailed, upon subscribing to <strong>Department</strong>s’ subscription service. Once an<br />

Addendum or Revision is confirmed, the updated material may be downloaded from the internet. It is the contractor’s responsibility to<br />

download the updated Proposal to receive the updated information.<br />

HOW TO OBTAIN ELECTRONIC PLANS & PROPOSALS? Download from IDOT’s website at http://www.dot.il.gov.<br />

WHO CAN BID? Bids will be accepted from only those companies that request and receive written Authorization to Bid from IDOT.<br />

The preceding does not apply to items designated as Small Business Set-Asides.<br />

WHAT CONSTITUTES WRITTEN AUTHORIZATION TO BID? When a prospective prime bidder submits this form, he/she must<br />

indicate at that time which items are being requested For Bidding purposes. Only those items requested For Bidding will be analyzed.<br />

After the request has been analyzed, the bidder will be issued a Proposal Denial and/or Authorization Form, approved by the<br />

Central Bureau <strong>of</strong> Construction that indicates which items have been approved For Bidding. If Authorization to Bid cannot be<br />

approved, the Proposal Denial and/or Authorization Form will indicate the reason for denial. The preceding does not apply to items<br />

designated as Small Business Set-Asides.<br />

ABOUT AUTHORIZATION TO BID: Firms that have not received an authorization form within a reasonable time <strong>of</strong> complete and<br />

correct original document submittal should contact the department as to status. This is critical in the week before the letting. These<br />

documents must be received by three days before the letting date. Firms unsure as to authorization status should call the<br />

Prequalification Section <strong>of</strong> the Bureau <strong>of</strong> Construction at the number listed at the end <strong>of</strong> these instructions for items subject to<br />

prequalification. For Small Business Set-aside items contact the Contracts Office. The preceding does not apply to items designated as<br />

Small Business Set-Asides.<br />

WHAT MUST BE INCLUDED WHEN BIDS ARE SUBMITTED? Bidders need not return the entire proposal when bids are submitted.<br />

That portion <strong>of</strong> the proposal that must be returned includes all documents from the Proposal Cover Sheet through the Proposal Bid Bond<br />

and other <strong>special</strong> documentation and/or information that may be required by the contract <strong>special</strong> provisions. All proposal documents,<br />

including Proposal Guaranty Checks or Proposal Bid Bonds, should be stapled together to prevent loss when bids are processed by<br />

IDOT personnel.<br />

ABOUT SUBMITTING BIDS: It is recommended that bidders deliver bids in person to insure they arrive at the proper location prior to<br />

the time specified for the receipt <strong>of</strong> bids. Any bid received at the place <strong>of</strong> letting after the time specified will not be accepted.<br />

WHO SHOULD BE CALLED IF ASSISTANCE IS NEEDED?<br />

Questions Regarding Call<br />

Prequalification and/or Authorization to Bid 217/782-3413<br />

Preparation and submittal <strong>of</strong> bids (Contracts Office) 217/782-7806<br />

Electronic plans/proposals 217/782-7806<br />

Printed 10/29/2009 Page 2 <strong>of</strong> 2 BDE 124INT (Rev. 10/22/09)