Date Description Effect Accident<br />
Type<br />
24/01/1997Damage to steam injector on the<br />
water supply to the seals on a<br />
gas holder led, indirectly, to loss<br />
<strong>of</strong> water from the seal <strong>and</strong><br />
release <strong>of</strong> gas. No ignition.<br />
07/02/1997Confusion over instructions led<br />
to overfilling <strong>of</strong> a storage tank<br />
with ethanol during ship <strong>of</strong>floading.<br />
No ignition.<br />
04/05/1997High pressure naptha entered a<br />
low pressure 'brine string' on a<br />
brine storage cavity. Release<br />
through relief valve <strong>and</strong> burst<br />
flange seal.<br />
01/07/1997Release from LNG tank during<br />
modification work on piping.<br />
Site Type Category Comment<br />
None Release Gas holder 1 Seal fires addressed (in <strong>protection</strong> <strong>based</strong><br />
assessment)<br />
None<br />
Release Storage <strong>of</strong><br />
flammable liquids<br />
4 injured (on site) Release Brine Cavity<br />
Storage<br />
1 This is a precursor to a pool fire, which sould be<br />
covered by a <strong>protection</strong> <strong>based</strong> assessment for<br />
bulk storage <strong>of</strong> flammable liquids<br />
1 Potential magnitude <strong>of</strong> event similar to that for<br />
the representative event(s) for this type <strong>of</strong><br />
installation<br />
None Release LNG Storage 1 QRA methodology addresses leaks from<br />
storage tanks<br />
06/07/1997Slug catcher shut in <strong>and</strong> pressure None Release Gas Terminal 4 The assessment approach for this type <strong>of</strong><br />
increased due to thermal<br />
expansion. Pressure relieved<br />
through PRV, which failed to reseat.<br />
installation depends on site-specific details.<br />
16/09/1997Failure <strong>of</strong> wall / floor weld on<br />
storage tank led to release <strong>of</strong><br />
xylene. No ignition<br />
01/11/1997Petrol storage tank overfilled<br />
after failure <strong>of</strong> gauging system,<br />
material spilt into bund. No<br />
ignition.<br />
09/03/1998Valve opened during<br />
maintenance work giving release<br />
<strong>of</strong> organic substances. Wrong<br />
valve had been isolated. No<br />
ignition.<br />
22/08/1998Weld failed on floating ro<strong>of</strong><br />
drain on a gasoline storage tank.<br />
Liquid released into bund, no<br />
ignition.<br />
None<br />
None<br />
None<br />
None<br />
Release Storage <strong>of</strong><br />
flammable liquids<br />
Release Storage <strong>of</strong><br />
flammable liquids<br />
Release Chemicals<br />
manufacturing<br />
Release Storage <strong>of</strong><br />
flammable liquids<br />
1 This is a precursor to a pool fire, which sould be<br />
covered by a <strong>protection</strong> <strong>based</strong> assessment for<br />
bulk storage <strong>of</strong> flammable liquids<br />
1 This is a precursor to a pool fire, which sould be<br />
covered by a <strong>protection</strong> <strong>based</strong> assessment for<br />
bulk storage <strong>of</strong> flammable liquids<br />
1 Potential magnitude <strong>of</strong> event less than that for<br />
the representative event(s) for this type <strong>of</strong><br />
installation<br />
1 This is a precursor to a pool fire, which sould be<br />
covered by a <strong>protection</strong> <strong>based</strong> assessment for<br />
bulk storage <strong>of</strong> flammable liquids