2ub8Xn
2ub8Xn
2ub8Xn
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Allana Potash Corp.<br />
Management’s Discussion and Analysis<br />
For the three months ended October 31, 2012<br />
Table 6. Summary of 2011 Measured, Indicated and Inferred Mineral Resources, effective as of June 13,<br />
2011.<br />
CATEGORY POTASH MEMBER IN-SITU TONNAGE (MT) KCl (%)<br />
MEASURED Sylvinite 16.00 29.09<br />
Upper Carnallitite 14.93 19.88<br />
Lower Carnallitite 77.96 12.00<br />
Kainitite 98.73 19.77<br />
Total 207.62 17.57<br />
INDICATED Sylvinite 81.84 30.23<br />
Upper Carnallitite 63.52 18.02<br />
Lower Carnallitite 134.68 12.05<br />
Kainitite 185.49 19.76<br />
Total 465.53 19.13<br />
TOTAL MEASURED AND INDICATED 673.15 18.65<br />
INFERRED Sylvinite 108.25 31.32<br />
Upper Carnallitite 85.61 17.05<br />
Lower Carnallitite 130.69 11.68<br />
Kainitite 271.17 20.33<br />
Total 595.72 19.96<br />
TOTAL INFERRED 595.72 19.96<br />
Notes:<br />
1. MT=Million Tonnes, tonnage is for in-situ resource with no discount for recovery as mining method is to be determined.<br />
2. The numbers for tonnage, average KCl per cent are rounded figures.<br />
3. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty of measured,<br />
indicated or inferred mineral resources, these mineral resources may never be upgraded to proven and probable mineral reserves.<br />
4. Average densities used in resource calculations are 2.14, 1.81, 1.91, and 2.10 for the Sylvinite, UC, LC and Kainitite members<br />
respectively.<br />
To be included in the resource estimate, drill hole intersections must meet the following criteria:<br />
� Sylvinite Member > 20% KCl, minimum width of 2 metres<br />
� UC Member > 40% Carnallite, minimum width of 2 metres<br />
� LC Member > 60% Carnallite+Kieserite, minimum width of 5 metres<br />
� Kainitite Member > 50% Kainite, minimum width of 5 metres<br />
Allana has drilled 23 holes prior to the resource evaluation all of which provided geological information for<br />
the report, but several holes (14, 18, 4) did not meet these criteria and consequently were not included in<br />
the resource.<br />
The resource estimates were calculated by extrapolating grades and widths using the radius of influence<br />
(“ROI”) from each Allana drill hole and historical drill holes based on industry standards for potash<br />
exploration. This process starts with the interpretation of the Radius of Influence of each exploration hole.<br />
The following ROIs were used for the calculation of the area of mineralized material in each of the<br />
resource categories:<br />
� Sylvinite, Upper Carnallitite Members<br />
� Measured Resource 250 metres<br />
� Indicated Resource 750 metres<br />
� Inferred Resource 1500 metres<br />
18