10.01.2013 Views

2ub8Xn

2ub8Xn

2ub8Xn

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Allana Potash Corp.<br />

Management’s Discussion and Analysis<br />

For the three months ended October 31, 2012<br />

Table 6. Summary of 2011 Measured, Indicated and Inferred Mineral Resources, effective as of June 13,<br />

2011.<br />

CATEGORY POTASH MEMBER IN-SITU TONNAGE (MT) KCl (%)<br />

MEASURED Sylvinite 16.00 29.09<br />

Upper Carnallitite 14.93 19.88<br />

Lower Carnallitite 77.96 12.00<br />

Kainitite 98.73 19.77<br />

Total 207.62 17.57<br />

INDICATED Sylvinite 81.84 30.23<br />

Upper Carnallitite 63.52 18.02<br />

Lower Carnallitite 134.68 12.05<br />

Kainitite 185.49 19.76<br />

Total 465.53 19.13<br />

TOTAL MEASURED AND INDICATED 673.15 18.65<br />

INFERRED Sylvinite 108.25 31.32<br />

Upper Carnallitite 85.61 17.05<br />

Lower Carnallitite 130.69 11.68<br />

Kainitite 271.17 20.33<br />

Total 595.72 19.96<br />

TOTAL INFERRED 595.72 19.96<br />

Notes:<br />

1. MT=Million Tonnes, tonnage is for in-situ resource with no discount for recovery as mining method is to be determined.<br />

2. The numbers for tonnage, average KCl per cent are rounded figures.<br />

3. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty of measured,<br />

indicated or inferred mineral resources, these mineral resources may never be upgraded to proven and probable mineral reserves.<br />

4. Average densities used in resource calculations are 2.14, 1.81, 1.91, and 2.10 for the Sylvinite, UC, LC and Kainitite members<br />

respectively.<br />

To be included in the resource estimate, drill hole intersections must meet the following criteria:<br />

� Sylvinite Member > 20% KCl, minimum width of 2 metres<br />

� UC Member > 40% Carnallite, minimum width of 2 metres<br />

� LC Member > 60% Carnallite+Kieserite, minimum width of 5 metres<br />

� Kainitite Member > 50% Kainite, minimum width of 5 metres<br />

Allana has drilled 23 holes prior to the resource evaluation all of which provided geological information for<br />

the report, but several holes (14, 18, 4) did not meet these criteria and consequently were not included in<br />

the resource.<br />

The resource estimates were calculated by extrapolating grades and widths using the radius of influence<br />

(“ROI”) from each Allana drill hole and historical drill holes based on industry standards for potash<br />

exploration. This process starts with the interpretation of the Radius of Influence of each exploration hole.<br />

The following ROIs were used for the calculation of the area of mineralized material in each of the<br />

resource categories:<br />

� Sylvinite, Upper Carnallitite Members<br />

� Measured Resource 250 metres<br />

� Indicated Resource 750 metres<br />

� Inferred Resource 1500 metres<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!