Hi Christo<br />

Thanks for the feedback. I have indicated in the BAR Report Recommendations that the pier should be used for the pilot<br />

plant. CapeNature agree with this.<br />

The alternative only exists as a point of reference (often used in EIA) and if there is a technical problem with placing the<br />

container on the pier (e.g. some kind of health and safety regulations for port operations). However, as you know this is<br />

unlikely and the pier will in all likelihood be used.<br />

I will nonetheless put your suggestion into the report before it is issued to government for decision.<br />

Kind regards,<br />

Greg Schreiner<br />

<strong>CSIR</strong><br />

P.O. Box 320<br />

Stellenbosch 7599<br />

Tel: 021 888-2419<br />

Cell: 083 321-4355<br />

Fax: 021 888-2693<br />

Email:gschreiner@csir.co.za<br />

>>> "Christo" 18/06/2012 16:39 >>><br />

Hi Greg,<br />

It is suggested that the option to erect or place a pilot RO plant at site: Farm 949/0 is removed from the EIA process in total,<br />

not an option. This site is located in a sensitive undisturbed protected dune vegetation area (CBA) and access to the<br />

proposed site will cause sensitive vegetation to be disturbed and most probably eliminated during erection. Too much of a<br />

risk.<br />

All the best with the pilot plant trials, I hope the results will direct the final location of the RO plant.<br />

Christo van Wyk<br />

SBWQFT & SBF<br />

From: Greg Schreiner [mailto:GSchreiner@csir.co.za]<br />

Sent: Friday, May 18, 2012 3:33 PM<br />

To: Elmien.DeBruyn@dsp.co.za; metsal@imaginet.co.za; hilltopcottage@telkomsa.net; info@villaverano.co.za<br />

Subject: Draft Basic Assessment Report for Desalination Pilot Plants<br />

Dear Interested and Affected Party<br />

Please find attached the Draft Basic Assessment Report for the operation of two desalination Pilot Plants in the Saldanha Bay<br />

area on Farms 119, 1185 and 949 (Alternative). DEA&DP reference number E12/2/4/1-F4/16-3022/12. There will be a 40 day<br />

commenting period from the date of receipt should you have new concerns or queries.<br />

Please note: the issue raised at the meeting 30 March 2012 at Blue Water Bay Lodge (pre-report release with the SBWQFT<br />

and LRPA) concerning the location of the Pilot Plant plant on the Transnet Pier (as opposed to Farm 949) has been<br />

recognised and the Transnet Pier is the 'Preferred' option for the location of the container (please see report <strong>Appendices</strong>).<br />

This has been discussed with Nicole Jansen, the Environmental Manager at Transnet. The second Pilot Plant will be located at<br />

farm 119 at Danger Bay as originally intended.<br />

Regards,<br />

Greg Schreiner