Hi Christo<br />
Thanks for the feedback. I have indicated in the BAR Report Recommendations that the pier should be used for the pilot<br />
plant. CapeNature agree with this.<br />
The alternative only exists as a point of reference (often used in EIA) and if there is a technical problem with placing the<br />
container on the pier (e.g. some kind of health and safety regulations for port operations). However, as you know this is<br />
unlikely and the pier will in all likelihood be used.<br />
I will nonetheless put your suggestion into the report before it is issued to government for decision.<br />
Kind regards,<br />
Greg Schreiner<br />
<strong>CSIR</strong><br />
P.O. Box 320<br />
Stellenbosch 7599<br />
Tel: 021 888-2419<br />
Cell: 083 321-4355<br />
Fax: 021 888-2693<br />
Email:gschreiner@csir.co.za<br />
>>> "Christo" 18/06/2012 16:39 >>><br />
Hi Greg,<br />
It is suggested that the option to erect or place a pilot RO plant at site: Farm 949/0 is removed from the EIA process in total,<br />
not an option. This site is located in a sensitive undisturbed protected dune vegetation area (CBA) and access to the<br />
proposed site will cause sensitive vegetation to be disturbed and most probably eliminated during erection. Too much of a<br />
risk.<br />
All the best with the pilot plant trials, I hope the results will direct the final location of the RO plant.<br />
Christo van Wyk<br />
SBWQFT & SBF<br />
From: Greg Schreiner [mailto:GSchreiner@csir.co.za]<br />
Sent: Friday, May 18, 2012 3:33 PM<br />
To: Elmien.DeBruyn@dsp.co.za; metsal@imaginet.co.za; hilltopcottage@telkomsa.net; info@villaverano.co.za<br />
Subject: Draft Basic Assessment Report for Desalination Pilot Plants<br />
Dear Interested and Affected Party<br />
Please find attached the Draft Basic Assessment Report for the operation of two desalination Pilot Plants in the Saldanha Bay<br />
area on Farms 119, 1185 and 949 (Alternative). DEA&DP reference number E12/2/4/1-F4/16-3022/12. There will be a 40 day<br />
commenting period from the date of receipt should you have new concerns or queries.<br />
Please note: the issue raised at the meeting 30 March 2012 at Blue Water Bay Lodge (pre-report release with the SBWQFT<br />
and LRPA) concerning the location of the Pilot Plant plant on the Transnet Pier (as opposed to Farm 949) has been<br />
recognised and the Transnet Pier is the 'Preferred' option for the location of the container (please see report <strong>Appendices</strong>).<br />
This has been discussed with Nicole Jansen, the Environmental Manager at Transnet. The second Pilot Plant will be located at<br />
farm 119 at Danger Bay as originally intended.<br />
Regards,<br />
Greg Schreiner