MANAGEMENT PLAN FOR THE OPERATIONAL PHASE<br />
This operational phase refers to the operation of the RO pilot plants.<br />
ACTIVITY POTENTIAL IMPACT STATUS &<br />
Operation of the Project Potential disturbance<br />
to soils and erosion<br />
Potential disturbance<br />
to terrestrial<br />
vegetation<br />
Potential disturbance<br />
to marine ecosystems<br />
Potential disturbance<br />
to the visual<br />
landscape and sense<br />
of place<br />
SIGNIFICANCE<br />
WITHOUT<br />
MITIGATION<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
Medium<br />
(Negative)<br />
PREVENTATIVE MEASURES RESPONSIBLE<br />
The pilot plants must be placed at<br />
the positions identified by the EAP<br />
on a flat surface.<br />
All existing roads and tracks must be<br />
used by the applicant when placing<br />
the containers. All disturbed areas<br />
must be utilised for use of the<br />
containers and the pipeline routes.<br />
Sandy beaches must be followed<br />
by the pipeline routes. No rocky<br />
areas for reefs must be traversed by<br />
the pipeline. The feedwater buoy<br />
must be anchored on a sandy<br />
beach with no sensitive marine<br />
systems.<br />
The stipulations of the CWDP must<br />
be adhered to.<br />
Placing the pilot plant containers on<br />
the Transnet pier and behind alien<br />
vegetation at site 119/0 which is flat<br />
PARTY<br />
Project<br />
Developer<br />
Project<br />
Developer<br />
Project<br />
Developer<br />
Project<br />
Developer<br />
STATUS &<br />
SIGNIFICANCE<br />
WITH<br />
MITIGATION<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
MONITORING<br />
FREQUENCY<br />
Restricted to the<br />
Planning and<br />
Design phase of<br />
the activity<br />
Restricted to the<br />
Planning and<br />
Design phase of<br />
the activity<br />
Restricted to the<br />
Planning and<br />
Design phase of<br />
the activity<br />
Restricted to the<br />
Planning and<br />
Design phase of<br />
the activity