MANAGEMENT PLAN FOR THE DECOMMISSIONING PHASE<br />
The infrastructure will be removed after 6 months<br />
ACTIVITY POTENTIAL IMPACT STATUS &<br />
Construction the project Potential disturbance<br />
to soils and erosion<br />
Potential disturbance<br />
to terrestrial<br />
vegetation<br />
Potential disturbance<br />
to marine ecosystems<br />
Potential disturbance<br />
to the visual<br />
landscape and sense<br />
of place<br />
SIGNIFICANCE<br />
WITHOUT<br />
MITIGATION<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
Medium<br />
Table 3: management ACTIONS for the DECOMMISSIONING phase<br />
(Negative)<br />
PREVENTATIVE MEASURES RESPONSIBLE<br />
All existing roads and tracks must be<br />
used by the applicant when placing<br />
the containers. All disturbed areas<br />
must be utilised for use of the<br />
containers and the pipeline routes.<br />
All existing roads and tracks must be<br />
used by the applicant when placing<br />
the containers. All disturbed areas<br />
must be utilised for use of the<br />
containers and the pipeline routes.<br />
Pipelines and anchors must be<br />
carefully removed over 3 days.<br />
Placing the pilot plant containers on<br />
the Transnet pier and behind alien<br />
vegetation at site 119/0 which is flat<br />
PARTY<br />
Project<br />
Developer<br />
Project<br />
Developer<br />
Project<br />
Developer<br />
Project<br />
Developer<br />
STATUS &<br />
SIGNIFICANCE<br />
WITH<br />
MITIGATION<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
Low<br />
(Negative)<br />
MONITORING<br />
FREQUENCY<br />
Restricted to the<br />
Planning and<br />
Design phase of<br />
the activity<br />
Restricted to the<br />
Planning and<br />
Design phase of<br />
the activity<br />
Restricted to the<br />
Planning and<br />
Design phase of<br />
the activity<br />
Restricted to the<br />
Planning and<br />
Design phase of<br />
the activity