download deliverable - AIDE
download deliverable - AIDE
download deliverable - AIDE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>AIDE</strong> D4.1.6 Final Activity Report PU Contract N. IST-1-507674-IP<br />
7 Summary of project <strong>deliverable</strong>s<br />
Table 4 below lists all <strong>deliverable</strong>s generated by <strong>AIDE</strong> IP, their dissemination level, the<br />
corresponding lead contractor, and the project month at which the delivery was made.<br />
Dissemination level codes are to be interpreted as follows:<br />
• PU = Public<br />
• PP = Restricted to other 6 th Framework Programme participants (including the Commission<br />
Services)<br />
• CO = Confidential, only for members of the consortium (including the Commission<br />
Services)<br />
Public <strong>deliverable</strong>s, as well as public summaries of non-public ones, can be <strong>download</strong>ed from the<br />
<strong>AIDE</strong> web site www.aide-eu.org.<br />
Table 4. <strong>AIDE</strong> <strong>deliverable</strong>s.<br />
No. Title Dissemination<br />
level<br />
D1.1.1a<br />
D1.1.1b<br />
Synthesis of models for Joint Driver-Vehicle<br />
interaction design.<br />
Requirements for HMI design and driver modelling<br />
D1.1.2 Preliminary model application to existing ADAS<br />
and IVIS and guidelines for implementation in<br />
design process<br />
D1.1.3 Parameters and indicators of behavioural adaptation<br />
to ADAS/IVIS for inclusion in DVE model for<br />
preliminary design of <strong>AIDE</strong> system<br />
Lead<br />
contractor<br />
Delivery<br />
month<br />
08/10/2008 22 VTEC<br />
PU<br />
CO<br />
PP<br />
LIU<br />
JRC<br />
9<br />
9<br />
JRC 20<br />
PP CRF 20<br />
D1.1.4 Final DVE Model Structure PU KITE 33<br />
D1.1.5 Application of existing ADAS and IVIS Functions<br />
to final DVE Model<br />
D1.2.1 Behavioural effects of driver assistance systems and<br />
road situations<br />
D1.2.2 General Experimental Plan for long term<br />
behavioural assessment<br />
PP CRF 41<br />
PU INRETS 8<br />
PP INRETS 12<br />
D1.2.3 Learning and Appropriation phase test and results PU INRETS 21<br />
D1.2.4 Long-term phase test and results PU INRETS 30<br />
D1.3.1 DVE Simulation architecture and preliminary<br />
guidelines for model software implementation<br />
D1.3.2 Driving Simulator Tests and Data Analysis for DVE<br />
model validation<br />
D1.3.3 DVE Model – Results of validation of model<br />
predictions vs Driving Simulator tests<br />
CO KITE 18<br />
PP KITE 38<br />
PP KITE 42<br />
D1.3.4 Final software release and user manual PP KITE 46<br />
D1.3.5 Driving Simulator Tests and Data Analysis for DVE<br />
model tuning<br />
PP CRF 48