<strong>AIDE</strong> D4.1.6 Final Activity Report PU Contract N. IST-1-507674-IP<br />

WP 2.2<br />

Off-line workload<br />

assessment<br />

WP 2.1<br />

Final <strong>AIDE</strong> evaluation<br />

methodology<br />

WP 2.3<br />

Risk (reduction)<br />

estimate<br />

WP 2.4<br />

Evaluation of SP3<br />

prototypes<br />

Figure 10 – Graphical illustration of the relation between the different work packages of SP2<br />

8.2.2 Report per work package<br />

8.2.2.1 WP2.0 Sub-project 2 Technical Coordination<br />

Work package no. WP2.0<br />

Work package name Sub-project 2 Technical Coordination<br />

Objectives (from<br />

Description of Work)<br />

Work package leader TNO<br />

Other contractors<br />

involved<br />

Technical coordination for the sub-project.<br />

BMW<br />

8.2.2.1.1 Work performed and key results obtained<br />

This involved the everyday leadership and coordination of the SP activities. Furthermore in this WP<br />

we liaise and interface the sub-project to the other sub-projects, other IP’s, NoE Humanist, and the<br />

IP management.<br />

8.2.2.1.2 Discussion and self assessment: results versus objectives and state-of-the-art<br />

Quite some effort was directed to interaction on final evaluation (interaction) and involvement in<br />

dissemination support (SP4). In general given the prevailing level of professionalism among the<br />

partners participating in the SP these activities went mostly smoothly.<br />

08/10/2008 40 VTEC