<strong>AIDE</strong> D4.1.6 Final Activity Report PU Contract N. IST-1-507674-IP<br />
WP 2.2<br />
Off-line workload<br />
assessment<br />
WP 2.1<br />
Final <strong>AIDE</strong> evaluation<br />
methodology<br />
WP 2.3<br />
Risk (reduction)<br />
estimate<br />
WP 2.4<br />
Evaluation of SP3<br />
prototypes<br />
Figure 10 – Graphical illustration of the relation between the different work packages of SP2<br />
8.2.2 Report per work package<br />
8.2.2.1 WP2.0 Sub-project 2 Technical Coordination<br />
Work package no. WP2.0<br />
Work package name Sub-project 2 Technical Coordination<br />
Objectives (from<br />
Description of Work)<br />
Work package leader TNO<br />
Other contractors<br />
involved<br />
Technical coordination for the sub-project.<br />
BMW<br />
8.2.2.1.1 Work performed and key results obtained<br />
This involved the everyday leadership and coordination of the SP activities. Furthermore in this WP<br />
we liaise and interface the sub-project to the other sub-projects, other IP’s, NoE Humanist, and the<br />
IP management.<br />
8.2.2.1.2 Discussion and self assessment: results versus objectives and state-of-the-art<br />
Quite some effort was directed to interaction on final evaluation (interaction) and involvement in<br />
dissemination support (SP4). In general given the prevailing level of professionalism among the<br />
partners participating in the SP these activities went mostly smoothly.<br />