<strong>AIDE</strong> D4.1.6 Final Activity Report PU Contract N. IST-1-507674-IP<br />

8.1.2 Report per work package<br />

8.1.2.1 WP1.0 Sub-project 1 Technical Coordination<br />

Work package no. WP1.0<br />

Work package name Sub-project 1 Technical Coordination<br />

Objectives (from<br />

Description of Work)<br />

Technical coordination for the sub-project.<br />

Work package leader JRC months 1-43; UNIMORE months 44-50<br />

Other contractors<br />

involved<br />

PSA<br />

8.1.2.1.1 Work performed and key results obtained<br />

The sub-project management (SPM) is responsible for all contacts and progress reporting to the IP<br />

management. The main activities carried out have been: coordination of research work within SP1;<br />

provision and preparation of the periodical reporting of SP1, in quarterly and annual reports;<br />

promotion of information exchange and collaboration with other sub-projects; coordination and<br />

management of decisions taken at IP management level.<br />

The sub-project controlling consists in detecting any deviations from the project plan and initiating<br />

prompt corrective action to guarantee its continuity and consistency and to adequately allocate its<br />

resources. Furthermore, this WP is responsible for the contents, schedule and budgets of the<br />

individual sub-project work packages.<br />

8.1.2.1.2 Discussion and self assessment: results versus objectives and state-of-the-art<br />

WP1.0 succeeded in keeping partners’ efforts in line with IP, SP and WP objectives, thus assisting<br />

in finalizing SP’s achievements to give a significant contribution to the progress of the State of the<br />

Art.<br />

Main results are described in the <strong>deliverable</strong>s related to managerial issues (technical, financial,<br />

quality) submitted at IP level within the work plan of WP4.1 together with the quarterly and annual<br />

progress reports, financial reports and information required from the IP technical coordination.<br />