15.01.2013 Views

Vinyl Chloride - Texas Commission on Environmental Quality

Vinyl Chloride - Texas Commission on Environmental Quality

Vinyl Chloride - Texas Commission on Environmental Quality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Vinyl</str<strong>on</strong>g> chloride<br />

Page 36<br />

====================================================================<br />

Gamma Model. (Versi<strong>on</strong>: 2.8; Date: 02/20/2007)<br />

Input Data File: THORNTON_VC_DATA.(d)<br />

Gnuplot Plotting File: THORNTON_VC_DATA.plt<br />

Tue Feb 19 09:25:33 2008<br />

====================================================================<br />

BMDS MODEL RUN<br />

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~<br />

The form of the probability functi<strong>on</strong> is:<br />

P[resp<strong>on</strong>se]= background+(1-background)*CumGamma[slope*dose,power],<br />

where CumGamma(.) is the cummulative Gamma distributi<strong>on</strong> functi<strong>on</strong><br />

Dependent variable = COLUMN2<br />

Independent variable = COLUMN1<br />

Power parameter is restricted as power >=1<br />

Total number of observati<strong>on</strong>s = 3<br />

Total number of records with missing values = 0<br />

Maximum number of iterati<strong>on</strong>s = 250<br />

Relative Functi<strong>on</strong> C<strong>on</strong>vergence has been set to: 1e-008<br />

Parameter C<strong>on</strong>vergence has been set to: 1e-008<br />

Default Initial (and Specified) Parameter Values<br />

Background = 0.016129<br />

Slope = 0.0220876<br />

Power = 1.3<br />

Asymptotic Correlati<strong>on</strong> Matrix of Parameter Estimates<br />

( *** The model parameter(s) -Background<br />

have been estimated at a boundary point, or have been specified by the user,<br />

and do not appear in the correlati<strong>on</strong> matrix )<br />

Slope Power<br />

Slope 1 1<br />

Power 1 1<br />

Parameter Estimates<br />

95.0% Wald C<strong>on</strong>fidence Interval<br />

Variable Estimate Std. Err. Lower C<strong>on</strong>f. Limit Upper C<strong>on</strong>f. Limit<br />

Background 0 NA<br />

Slope 0.277171 29.4759 -57.4945 58.0489<br />

Power 4.60287 370.467 -721.498 730.704<br />

NA - Indicates that this parameter has hit a bound implied by some inequality c<strong>on</strong>straint and thus has no<br />

standard error.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!