18.01.2013 Views

Decision report- Carey's Gully Sludge Dewatering Facility - Greater ...

Decision report- Carey's Gully Sludge Dewatering Facility - Greater ...

Decision report- Carey's Gully Sludge Dewatering Facility - Greater ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. The permit holder shall ensure that all installed emissions control equipment<br />

namely the biofilter, including all ducting and ventilation equipment shall be<br />

well-maintained and operating correctly in a fully functional state.<br />

PAGE 48 OF 57<br />

The emissions control equipment shall draw adequate negative pressure to<br />

ensure the effective capture and treatment of air discharged from the <strong>Sludge</strong><br />

<strong>Dewatering</strong> Plant building, centrate wet well, and all other areas from which<br />

air is extracted to ensure that fugitive emissions are minimised.<br />

7. The permit holder shall ensure that the liquid sludge storage tanks, significant<br />

odour generating processes within De-watering Plant Building, and from the<br />

Centrate Plant wetwell, shall be mechanically ventilated to a biofilter to<br />

minimise the emission of odour into air.<br />

The volume of ventilation air discharged to the biofilter or biofilters shall not<br />

exceed a rate that causes the biofilter loading to exceed 40m 3 of inlet air flow<br />

per m 3 of active media per hour (40 m 3 /m 3 /hour).<br />

During any maintenance works when the biofilter or biofilters are operating<br />

without one cell, the volume of ventilation air discharged to the biofilter or<br />

biofilters shall not exceed a rate that causes the biofilter loading to exceed<br />

50m 3 of inlet air flow per m 3 of active media per hour (50m 3 /m 3 /hour).<br />

The permit holder shall notify the Manager, Environmental Regulation,<br />

Wellington Regional Council of any proposed maintenance a minimum of 48<br />

hours prior to the works commencing.<br />

Note: Notice can be emailed to notifications@gw.govt.nz. Please include the<br />

consent reference (WGN070230) and a contact name and number of a person<br />

responsible for the works.<br />

8. As far as practicable, the permit holder shall ensure, to minimise the time that<br />

sludge skip bins containing dewatered sludge are held at the facility, that<br />

filling of skips is sequenced so that skips are full (as defined in the SDLP<br />

required under Condition 9 of permit WGN070230 [26013]) before loading<br />

into an empty skip.<br />

Administrative conditions<br />

9. The permit holder shall keep a record of complaints received alleging adverse<br />

effects from the permit holder's operations. The complaints record shall<br />

contain the following where practicable:<br />

• The name and address of the complainant, if supplied;<br />

• Identification of the nature of the complaint;<br />

• Date and time of the complaint;<br />

• Weather conditions at the time of the complaint;<br />

• Results of the permit holder's investigations; and<br />

• Any mitigation measures adopted.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!