The complaints record shall be made available to the Wellington Regional<br />

Council on request. The permit holder will ensure that each complaint it<br />

receives is responded to.<br />

10. The permit holder shall prepare and maintain an Odour Management Plan<br />

(OMP) for submission to the Manager, Environmental Regulation,<br />

Wellington Regional Council within three months of the commencement of<br />

this permit. The OMP can be updated by the consent holder at any time and<br />

filed with Wellington Regional Council for its approval. The scope of the<br />

OMP shall include the sludge dewatering facility and but not be limited to the<br />

following information:<br />

Monitoring<br />

• Methods for ensuring the biofilter monitoring and recording parameters<br />

required by conditions of this permit are met.<br />

• The maintenance procedures for ensuring the good, clean condition of the<br />

skip bins and containers to keep them free of leaks and old sludge<br />

material.<br />

• The operation and maintenance of all emissions control equipment<br />

(including the associated ducting for this equipment).<br />

• Staff training on the process requirement, use of emissions control<br />

equipment, and emergency response.<br />

• A methodology to record and log the times during which the Skip Bay<br />

doors are opened and closed each day.<br />

• An outline of the specific roles of each of the <strong>Sludge</strong> <strong>Dewatering</strong> <strong>Facility</strong><br />

contractors, skip bin removal contractors and Wellington City Council as<br />

consent holder and their responsibilities in regards to the sludge<br />

dewatering and disposal processes.<br />

• The process for the mitigation of any odour from the skip bins of sludge<br />

transported/transferred from the Western Waste Water Treatment Plant.<br />

The OMP shall be operated and modelled in general accordance with the<br />

Draft Operations and Management Plan submitted to Wellington Regional<br />

Council as additional information on 13 August 2009.<br />

The OMP shall be prepared to the satisfaction of the Manager, Environmental<br />

Regulation, Wellington Regional Council. The permit holder shall ensure<br />

that the plan is consistent with the conditions of this permit, and shall be<br />

updated as required, with the latest copy made available to the Manager,<br />

Environmental Regulation, Wellington Regional Council.<br />

11. Building tightness: The permit holder shall ensure that an independent,<br />

appropriately qualified person who meets the satisfaction of the Manager,<br />

Environmental Regulation, Wellington Regional Council conducts a 'building<br />

PAGE 49 OF 57