Summary I<br />
The necessary space of a <strong>power</strong> <strong>plant</strong> in Europe is governed by<br />
the following aspects:<br />
typically no green field but brown field projects<br />
normally erection of one or max two new big 750 MW units, not up to<br />
six<br />
less predesigned lay out<br />
supplier independent design, meeting the possibilities of different<br />
manufacturers<br />
Typical area for an additional 750 MW <strong>power</strong> <strong>plant</strong> on an existing<br />
site is 12ha (app.30 acres) including coal yard for 10 day storage<br />
without switchyard and other infrastructure)<br />
Extreme examples show that also 2 x 660MW are possible in this<br />
area<br />
Dr.Benesch 05.02.2008 Seite | 31<br />
Summary II<br />
Typical area for an additional 750 MW <strong>power</strong> <strong>plant</strong> on an existing<br />
site is 12ha (app.30 acres) including coal yard for 10 day storage<br />
without switchyard and other infrastructure)<br />
In general the necessary space for the core components are the<br />
same in India and Europe.<br />
Major differences can be derived due to:<br />
two path instead of one path design<br />
other ash storage<br />
pre cooling lakes and water reservoirs<br />
local switch yards<br />
spare part storage<br />
preassembly areas and lay down areas<br />
higher investigated flue gas treatment systems in Europe<br />
bigger coal storage<br />
Dr.Benesch 05.02.2008 Seite | 32