Renewable Energy Development Sector Investment Program (REDSIP)<br />

and offices at Marala Barrage. The cost of new electric transmission line is calculated as per<br />

WAPDA schedule and is given in the table 3.4:<br />

Table 3.4 Electric Poles and Transmission Line<br />

Sr.<br />

Items Quantity Cost (PK Rs.) Cost (PK Rs. In<br />

No.<br />

Million)<br />

1 Electric Poles & Transmission Line 41 1,926,004 1.926<br />

3.5.2 Telecommunication Poles<br />

45. The <strong>MHPP</strong> will also impact on 10 number telecommunication poles. The relocation<br />

cost of telecommunication poles is calculated with the consultation of Pakistan<br />

Telecommunication Company Limited (PTCL) at replacement cost. The cost of relocation of<br />

telecommunication poles is given in table 3.5:<br />

Table 3.5 Telecommunication Poles<br />

Sr.<br />

Items Quantity Cost per<br />

No.<br />

(Nos.) pole (Rs.)<br />

1 Telecommunication Poles 10 10,000<br />

Total Cost 100,000<br />

3.6 Impacts on Road<br />

46. The access metalled road measuring 915 m in length from barrage side to I&PD<br />

Colony will be affected. This road will be rerouted along the diversion canal or on flood<br />

embankment within Government land. The construction of metalled road is included in the<br />

bidding documents and bidder will construct the same road. No additional land and amount<br />

will be required.<br />

3.7 Impacts and Mitigation of Transmission Lines<br />

47. A 1.5 Km transmission line will be constructed from power house to WAPDA grid<br />

station (66 KV) adjacent to I&PD Colony within the ROW of the UCC. For this purpose an<br />

estimated total of 21 poles would be erected. All these poles will be installed in the ROW of<br />

UCC. Thus no additional land will be acquired for this purpose. The construction of<br />

transmission line is the part of the contract, no separate contract or funding is required for<br />

this purpose.<br />

3.8 Positive Impacts<br />

48. The <strong>MHPP</strong> will provide mean annual energy of 50.50 GWh to the national power<br />

supply. The electricity generated will be supplied to the national grid in the region and will<br />

benefit the people and contribute in the economic growth of country.<br />

49. The <strong>MHPP</strong> will also provide unskilled/skilled jobs during the construction phase and a<br />

limited number of jobs during operation. This will be a bonus for the people of the area.<br />

50. <strong>MHPP</strong> is a clean and renewable and friendly source of energy and will avoid<br />

contributions to pollution loads, resulting from the alternative use of thermal electricity<br />

generation.<br />

3.9 Budget for Relocation and Construction<br />

51. The cost of relocation and reconstruction of buildings, structures and utilities is<br />

estimated in consultation with concerned departments. Efforts are made to workout realistic<br />

cost /values on the basis of current market values. Table 3.6 gives the break up of relocation<br />

of buildings, structures and utilities including replantation. The PPMU is responsible for<br />

financing to implement the DDR components.<br />

DDR Marala Hydropower Project 12