09<br />

PERFORMANCE SUMMARY<br />

John Jeffrey, Instruments<br />

Craftsman, Engineering Services<br />

PROGRESS AGAINST<br />

PLANS FOR 2005<br />

PEOPLE<br />

Health and Safety<br />

• A 25 per cent reduction in Lost Time Injuries<br />

from 2004 and 50 per cent reduction on 2003.<br />

People Commitment<br />

• Continue Team Leader training and<br />

development and commence Superintendent<br />

training.<br />

Communities<br />

• Complete the land sale transaction.<br />

PLANET<br />

Environment<br />

• Work with Environment Agency to ensure<br />

agreed revised emission levels are achieved.<br />

• Work with Department of Environment, Food<br />

and Rural Affairs to ensure changing<br />

regulatory requirements are workable and<br />

able to be implemented.<br />

Climate Change<br />

• Continue to reduce site fluoride emissions,<br />

meeting and improving upon regulatory limits<br />

• Continue to reduce Carbon Emissions,<br />

meeting and improving upon regulatory limits.<br />

PROSPERITY<br />

Operational Excellence<br />

• Continue improvement through integration<br />

into a single Business System supported by<br />

management led focus teams.<br />

• Continue with Stage 2 of the project<br />

progressing consenting and partnership<br />

development.<br />

• Further enhance <strong>AA</strong>M's ability to produce<br />

value added product with target of 81 per cent.<br />

In the 2004 Social and Environment <strong>Report</strong>, <strong>AA</strong>M<br />

identified a number of objectives to be achieved<br />

for the 2005 year. This table outlines our<br />

performance against these objectives.<br />

• Target not met (No improvement on 2004<br />

performance).<br />

• Target met/ongoing.<br />

• Target met.<br />

• Target met.<br />

• Ongoing.<br />

• Target met.<br />

• Target met.<br />

• Target met.<br />

STATUS PLANS FOR <strong>2006</strong><br />

• Target not met (UK energy prices resulted in<br />

expenditure & development slowdown).<br />

• Ongoing - casting pit modified, however<br />

reduced Value Added product demand to 74<br />

per cent.<br />

• A 30 per cent reduction in Lost Time Injuries<br />

from 2005.<br />

• Introduce behavioural safety into the <strong>AA</strong>M<br />

safety approach.<br />

• Implement four panel 12 hours shift pattern<br />

for work/family balance.<br />

• Develop red squirrel and coastal park<br />

programmes for the community.<br />

• Recycle > 80 per cent of spent cell lining<br />

material (usually land filled).<br />

• Meeting and maintaining our Climate<br />

Change Levy agreement with Department of<br />

Environment, Food and Rural Affairs.<br />

• Maintain fluoride emissions below<br />

1.0kg F/t Al.<br />

• Maintaining emissions below 0.6kg F/t Al.<br />

• Implement centralised breakdown<br />

maintenance and restructure maintenance<br />

teams to improve asset utilisation.<br />

• Introduce Lean techniques into the<br />

operational departments to improve process<br />

outputs.<br />

• Role out 5S programme across the site.<br />

20