02.02.2013 Views

Proceedings of the IFOAM workshop on Internal Control Systems (ICS)

Proceedings of the IFOAM workshop on Internal Control Systems (ICS)

Proceedings of the IFOAM workshop on Internal Control Systems (ICS)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

It is also important to bear in mind that <strong>ICS</strong> are not aimed at being applicable<br />

in all cases.<br />

Since <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>ICS</strong> certificati<strong>on</strong> process will be a virtual <strong>on</strong>e, pilot projects have to<br />

be based <strong>on</strong> original incentives for farmers and for <str<strong>on</strong>g>the</str<strong>on</strong>g> certificati<strong>on</strong> body. The<br />

participants identified <str<strong>on</strong>g>the</str<strong>on</strong>g> following possible incentives for farmer groups and CBs to<br />

participate in <strong>ICS</strong> pilot projects:<br />

10<br />

• For <str<strong>on</strong>g>the</str<strong>on</strong>g> farmer groups:<br />

- Improvement <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> overall quality <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> system and benefits <str<strong>on</strong>g>of</str<strong>on</strong>g> group dynamic<br />

- Potential for gaining knowledge and capacity<br />

- Having training financed by <str<strong>on</strong>g>the</str<strong>on</strong>g> pilot project<br />

- O<str<strong>on</strong>g>the</str<strong>on</strong>g>r types <str<strong>on</strong>g>of</str<strong>on</strong>g> financial compensati<strong>on</strong> for <strong>ICS</strong> but subject to project c<strong>on</strong>trol, so<br />

as to avoid distorti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> incentives in reducing <str<strong>on</strong>g>the</str<strong>on</strong>g> cost <str<strong>on</strong>g>of</str<strong>on</strong>g> running <strong>ICS</strong> (should<br />

not have an ec<strong>on</strong>omic influence <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> way <str<strong>on</strong>g>the</str<strong>on</strong>g>y set up <str<strong>on</strong>g>the</str<strong>on</strong>g> system)<br />

• For <str<strong>on</strong>g>the</str<strong>on</strong>g> purchasing companies:<br />

- Research and development investment (when <strong>ICS</strong> are accepted, <str<strong>on</strong>g>the</str<strong>on</strong>g>y will be ahead<br />

and will have built capacity)<br />

- Prestige: be leaders <str<strong>on</strong>g>of</str<strong>on</strong>g> change (look for leaders!)<br />

- Some funding compensati<strong>on</strong> for recogniti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> efforts made<br />

• For <str<strong>on</strong>g>the</str<strong>on</strong>g> certificati<strong>on</strong> bodies<br />

- Some CBs have adopti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>ICS</strong> as a goal because <str<strong>on</strong>g>the</str<strong>on</strong>g>y are loosing smallholders and<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> big processing companies that go with <str<strong>on</strong>g>the</str<strong>on</strong>g>m<br />

- Having training financed by <str<strong>on</strong>g>the</str<strong>on</strong>g> pilot project � at <str<strong>on</strong>g>the</str<strong>on</strong>g> end, <str<strong>on</strong>g>the</str<strong>on</strong>g>y will have<br />

procedures and capacity ready for inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>ICS</strong>, when accepted by <str<strong>on</strong>g>the</str<strong>on</strong>g> EU<br />

- Goal is to promote OA, including through innovative means<br />

We should be careful before designing complex requirements for <strong>ICS</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> North<br />

(e.g. minimal staff qualificati<strong>on</strong>) because <str<strong>on</strong>g>the</str<strong>on</strong>g>re is a risk that <str<strong>on</strong>g>the</str<strong>on</strong>g> stricter<br />

criteria will end up being applied to developing countries as well, yet <str<strong>on</strong>g>the</str<strong>on</strong>g>ir<br />

systems are already at <str<strong>on</strong>g>the</str<strong>on</strong>g> limit <str<strong>on</strong>g>of</str<strong>on</strong>g> what is ec<strong>on</strong>omically feasible. It is safest to<br />

design flexible criteria such as that staff qualificati<strong>on</strong> should be based <strong>on</strong><br />

experience. In any case, <str<strong>on</strong>g>the</str<strong>on</strong>g> risk evaluati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> groups is a key comp<strong>on</strong>ent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

<strong>ICS</strong> approach.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!