02.02.2013 Views

Proceedings of the IFOAM workshop on Internal Control Systems (ICS)

Proceedings of the IFOAM workshop on Internal Control Systems (ICS)

Proceedings of the IFOAM workshop on Internal Control Systems (ICS)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

having sub-groups, with a certain group carrying out an <strong>ICS</strong> pilot project while <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

rest <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> group c<strong>on</strong>tinues with individual external inspecti<strong>on</strong>, which would allow<br />

comparis<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two sub-groups regarding quality management.<br />

C<strong>on</strong>formity<br />

with existing<br />

<str<strong>on</strong>g>IFOAM</str<strong>on</strong>g><br />

Accreditati<strong>on</strong><br />

Criteria (AC)<br />

for <strong>ICS</strong><br />

Re-inspecti<strong>on</strong><br />

rate<br />

The two types <str<strong>on</strong>g>of</str<strong>on</strong>g> pilot projects can be described as follows:<br />

“Traditi<strong>on</strong>al” <strong>ICS</strong> pilot projects “Diversified” <strong>ICS</strong> pilot projects<br />

Follows <str<strong>on</strong>g>the</str<strong>on</strong>g> current AC requirements<br />

(i.e. comm<strong>on</strong> marketing <str<strong>on</strong>g>of</str<strong>on</strong>g> 1 or<br />

several products, similar producti<strong>on</strong><br />

systems, geographic proximity),<br />

except that it is open to farmers<br />

without restricti<strong>on</strong> <strong>on</strong> farm size<br />

In c<strong>on</strong>formity with AC requirements<br />

(at least 10 external re-inspecti<strong>on</strong>s<br />

in minimum risk situati<strong>on</strong>)<br />

Target groups Groups that have cooperati<strong>on</strong> culture<br />

and meet AC requirements<br />

Goal <str<strong>on</strong>g>of</str<strong>on</strong>g> pilot<br />

project<br />

Geographic<br />

z<strong>on</strong>es<br />

Criteria for<br />

selecti<strong>on</strong><br />

Process for<br />

moving <strong>on</strong><br />

9<br />

Dem<strong>on</strong>strate feasibility and<br />

pr<str<strong>on</strong>g>of</str<strong>on</strong>g>itability <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>ICS</strong> in Europe � use<br />

as lobbying argument towards <str<strong>on</strong>g>the</str<strong>on</strong>g> EU<br />

in <str<strong>on</strong>g>the</str<strong>on</strong>g> medium term<br />

Encourage eligible groups to build up<br />

<strong>ICS</strong> <strong>on</strong>ce it is accepted<br />

=> Dem<strong>on</strong>strati<strong>on</strong> oriented<br />

In <str<strong>on</strong>g>the</str<strong>on</strong>g> EU and n<strong>on</strong> EU In <str<strong>on</strong>g>the</str<strong>on</strong>g> EU<br />

Some pilot projects should be<br />

established through farmer groups and<br />

o<str<strong>on</strong>g>the</str<strong>on</strong>g>rs should be established through<br />

purchasing companies (especially in<br />

cases where farmers have poor culture<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> cooperati<strong>on</strong>).<br />

Some <strong>ICS</strong> pilot projects should<br />

include livestock producti<strong>on</strong>, so that<br />

<strong>ICS</strong> from eastern Europe can learn.<br />

Minimum size <str<strong>on</strong>g>of</str<strong>on</strong>g> farmer group for<br />

pilot project is 20. Ideal size is 30<br />

or more, as l<strong>on</strong>g as number is not an<br />

ec<strong>on</strong>omic burden to <str<strong>on</strong>g>the</str<strong>on</strong>g> pilot group.<br />

<str<strong>on</strong>g>IFOAM</str<strong>on</strong>g> to fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r develop <str<strong>on</strong>g>the</str<strong>on</strong>g> pilot<br />

project planning and to establish<br />

criteria for selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> groups.<br />

Participants to c<strong>on</strong>tact selected<br />

groups to investigate possibility and<br />

interest in pilot projects.<br />

Does not follow current AC<br />

requirements<br />

Open to discussi<strong>on</strong>. We could go less<br />

than 10 re-inspecti<strong>on</strong>s<br />

Groups that have a l<strong>on</strong>g history and<br />

str<strong>on</strong>g capacity to manage complexity<br />

in <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>text <str<strong>on</strong>g>of</str<strong>on</strong>g> internal c<strong>on</strong>trol<br />

(e.g. N&P)<br />

Investigate <str<strong>on</strong>g>the</str<strong>on</strong>g> possibility <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>ICS</strong><br />

managing diversity and identify<br />

necessary pre-c<strong>on</strong>diti<strong>on</strong>s to/criteria<br />

for effective diversity management<br />

� results <str<strong>on</strong>g>of</str<strong>on</strong>g> pilot projects to be<br />

used for lobbying in <str<strong>on</strong>g>the</str<strong>on</strong>g> l<strong>on</strong>g term<br />

(after simple <strong>ICS</strong> have been<br />

accepted) if it is proved that we<br />

can cope with all <str<strong>on</strong>g>the</str<strong>on</strong>g> risks<br />

=> research oriented<br />

Close proximity (territorial basis)<br />

Existing “internal” c<strong>on</strong>trol system<br />

Should encompass 2 types: comm<strong>on</strong><br />

marketing and individual marketing<br />

Same<br />

Requirements have to be compatible<br />

with existing system (new system<br />

should not lead to stricter<br />

requirements for <strong>ICS</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

developing world)<br />

Multiple steps and participatory<br />

process before starting <str<strong>on</strong>g>the</str<strong>on</strong>g>se<br />

diversified pilot projects. Needs<br />

some time and planning to avoid<br />

frustrating people. Begin with good<br />

<strong>on</strong>es like Italian or French groups<br />

� <str<strong>on</strong>g>the</str<strong>on</strong>g>n planning for a more<br />

developed strategy.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!