<strong>Elite</strong> Evolution S923 FNPT II MCC<br />

©1990 - 2010, <strong>Elite</strong> <strong>Simulation</strong> Solutions AG, all rights reserved<br />

January 2010<br />

section page 46 of 58<br />

9 Installation<br />

9.1 Site Layout<br />

The operator shall consider the following:<br />

� access doors with at least 85 cm width and 2m height<br />

version<br />

� sufficiently wide access corridors. Preferably you can provide a plan copy of the room<br />

and the access to the room to evaluate whether the material can be carried into<br />

room.<br />

� the <strong>Elite</strong> Evolution S923 FNPT II MCC Mock up with instructor station enclosure size<br />

is 2.50 m x 4.25 m x 2.40 m (w x l x h) and includes a mounting unit for the visual<br />

projection system and a visual projection canvas.<br />

� Two ISDN channels or better (DSL) connection for remote access<br />

� Minimum required room space is 3.5m x 5.0m x 2.5m (w x l x h) please note that a<br />

multi-channel Visual set up requires more space.<br />

9.2 Power<br />

The <strong>Elite</strong> Evolution S923 FNPT II MCC Complex will operate on 110 / 230 V / 50 Hz electric<br />

power. All interfacing equipment (transformers, inverters, etc.) will be provided by the<br />

manufacturer.<br />

The customer shall provide 380 VAC / 50 HZ three phase power through an Europlug CEE<br />

type (32 A) 3 LNPE and related surge protection.<br />

The total electric power consumption for an S923 with one visual channel is maximally 10<br />

kW and consists of the following separable circuits:<br />

� Control loading Unit ~4 kW<br />

� Visual System ~1 kW (one channel)<br />

� Cockpit panel / IOS ~2.5 kW<br />

9.3 Environmental Considerations<br />

Operating<br />

� Temperature: +10 ° C - +25 ° C (Monitor, Projector)<br />

� Humidity: 20 % - 80 %, non-condensing<br />

� Heat dissipation: STD without pilots/instructor 14000 Btu/hr<br />

� The light environment of the STD room must be controllable<br />

3.1