11.07.2015 Views

2011 10 Cambridge Pre-Packaged Olde English Paver Fireplace Kit ...

2011 10 Cambridge Pre-Packaged Olde English Paver Fireplace Kit ...

2011 10 Cambridge Pre-Packaged Olde English Paver Fireplace Kit ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Cambridge</strong> <strong>Pre</strong>-<strong>Packaged</strong><strong>Olde</strong> <strong>English</strong> <strong>Paver</strong> <strong>Fireplace</strong> <strong>Kit</strong> Deluxe Surround<strong>2011</strong><strong>Cambridge</strong> <strong>Fireplace</strong>:This unit is capable of burning natural gas, propane and wood. If either propane or natural gas is thepreferred method of burning, seek a licensed professional plumber before construction. Also, if usingpropane or natural gas, a knockout is located on either side of the unit to facilitate gas piping. All pipingand knockouts must be completed before installing blocks around unit as the unit will become inaccessiblewhen construction is completed.Tools Required for <strong>Fireplace</strong> <strong>Kit</strong> Installation:Safety GogglesEar ProtectionDust MaskGlovesShovels (digging & flat)Metal Cutters for banding on cubesMason Hammer (chipping, hammer)Road Stone RakeTamper (Hand or Mechanical)WheelbarrowLevel (2’ and 6’ recommended)Speed SquareCaulk Gun <strong>10</strong> oz or 28 oz (depends on what sizeadhesive is purchased)Rubber Mallet14” Demo saw with diamond bladeTape MeasureMarking Device (pencil, soap stone, etc)Chalk LineHand BroomConcrete Tools (Trowel/Floats)6 Foot ladder or scaffold according to your company’sstate, and OSHA safety policyDrill & 1/16” bit5/16” nut driver7 ¼” Circular saw with wood blade4” Electric grinder4” Diamond cup grinder15’ Ratchet strapItems Included in the <strong>Fireplace</strong> <strong>Kit</strong>:1 - Lennox Stainless Steel <strong>Fireplace</strong> with instructionmanual1 - 4 Foot air-cooled chimney1 - Black powder coated termination cap1 - Galvanized flashing for top of completed fireplace1 - Reinforced concrete lintels 48” x 4” x 6”4 - Reinforced concrete lintels 32” x 4” x 6”3 - Plastic shim pack sheet for leveling lintels orblock as needed1 - Cast Stone Surround Deluxe3 - Cubes of <strong>Cambridge</strong> <strong>Olde</strong> <strong>English</strong> <strong>Paver</strong>s1 - Installation manual for concrete pad and <strong>Olde</strong><strong>English</strong> <strong>Paver</strong>sMaterial Required:¾” clean stone (approx. 1 ton)Concrete (approx. 17-80 lb bags)<strong>Cambridge</strong> concrete adhesive (approx. 6-29 oz. or17-<strong>10</strong>.3 oz. tubes)(4 pcs) 2” x 4” x 8’ lumber2 ½” wood screws½” rebar (approx. 11’)Silicone for flashing3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!