recuperadores de calor heat recovery units recuperateurs de ...
recuperadores de calor heat recovery units recuperateurs de ...
recuperadores de calor heat recovery units recuperateurs de ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7.5. Vertical configurationS7.5.1. CADB/CADT-D 05 / 08 / 18 / 30 / 45 / 56 (A-B-H)V DP MODELSMo<strong>de</strong>ls without an electric battery, but with the possibility of installinga water coil, for post-<strong>heat</strong>ing in remote installation configuration,with a double insulation wall and no by-pass.The airflows indicted in these configurations can be changed, accordingto the installation.The installer must only take into account the correct connection of the evacuationsystem for water produced by con<strong>de</strong>nsation (See section 7.3.3).From the factory configuration, we can configure the appliance, takinginto account that we can turn it , thus modifying the position ofthe support feet, and at the same time, it will also be necessary tomodify the position of the “water collection” tray, according to thechosen configuration.7.5.2. CADB/CADT-D 05 / 08 / 18 / 30 / 45 / 56 (A-D-H)VDP BP MODELSMo<strong>de</strong>ls without an electric battery, but with the possibility of installinga water coil, for post-<strong>heat</strong>ing in remote installation configuration,with a double insulation wall and with a by-pass.The airflows indicted in these configurations CANNOT be changed,according to the installation.7.5.3. CADB/CADT-DI 05 / 08 / 18 / 30 / 45 / 56 (C-D-E)V DP MODELS(Single and three phase)Mo<strong>de</strong>ls with double insulating wall, post <strong>heat</strong>ing water coil and no by-pass.The airflows indicted in these configurations CANNOT be changed, according to the installation.The installer must take into account the correct connection of the evacuation system for water produced by con<strong>de</strong>nsation (See section 7.3.3).Do not position the post-<strong>heat</strong>ing resistances in a different manner to the factory-supplied layout.CADB/CADT-DI 05 / 08 / 18 / 30 / 45 / 56 CV DP MODELSCADB/CADT-DI 05 / 08 / 18 / 30 / 45 / 56 DV DP MODELSCADB/CADT-DI 05 / 08 / 18 / 30 / 45 / 56 EV DP MODELS7.5.4. CADB/CADT-DI 05 / 08 / 18 / 30 / 45 / 56 (C-D-E)V DP BP MODELS(Single and three phase)Mo<strong>de</strong>ls with double insulating wall, post <strong>heat</strong>ing electric battery and with a by-pass.The airflows indicted in these configurations CANNOT be changed, according to the installation.The installer must take into account the correct connection of the evacuation system for water produced by con<strong>de</strong>nsation (See section 7.3.3).Do not position the post-<strong>heat</strong>ing resistances in a different manner to the factory-supplied layout.23