Newsletter ACERA Septiembre 2016
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
STATISTICS<br />
NCRE RESULTS<br />
Six NCRE projects were admitted to environmental permit process during last September, adding 640 MW. Three of them are of photovoltaic<br />
solar power, adding 422 MW, among which the expansion of Alturas de Ovalle of Grenergy (3 MW) must be pointed out. Two projects are of wind<br />
power, adding 211 MW, among which the San Gabriel Wind Park, of Acciona (183 MW) may be highlighted. In addition, one mini hydro project<br />
of 7 MW was introduced.<br />
In addition, four NCRE projects obtained the environmental approval totaling 280 MW: one mini hydro of 3.8 MW, two photovoltaic solar power<br />
projects for 183 MW, and a wind project of 93 MW. Among them, the AR Valle Altillo Solar, of AR Energia (30.29 MW) and the Tamarico<br />
Photovoltaic Solar Park, of Celtic (153 MW), must be pointed out.<br />
In the last Exempt Resolution Nº 675 of September 22, <strong>2016</strong>, published by the CNE, two photovoltaic solar power parks of 140 MW were<br />
declared in construction.<br />
During the same month, the CDEC SIC informed that three projects began their test period for 9 MW: two mini hydro -for a total of 6 MW- and<br />
one photovoltaic solar of 3 MW. In addition, the CDEC SIC informed that three projects began their economic operation: the Renaico Wind Park<br />
(88 MW) of Enel Green Power, the Conejo solar park of Pattern (104 MW) and the Itata hydraulic plant, of 20 MW.<br />
NCRE PROJECTS BY STATUS<br />
10.000<br />
8.000<br />
Technology<br />
Capacity (MW)<br />
Installed Under construction Approved<br />
Admitted to<br />
environmental<br />
permit process<br />
Total<br />
6.000<br />
Wind energy<br />
Solar PV<br />
1.247<br />
1.401<br />
299<br />
1.715<br />
6.779<br />
10.774<br />
2.443<br />
5.021<br />
10.768<br />
18.911<br />
4.000<br />
CSP<br />
Bioenergy<br />
0<br />
481<br />
110<br />
0<br />
1.222<br />
171<br />
1.585<br />
120<br />
2.917<br />
772<br />
2.000<br />
Geothermal<br />
0<br />
48<br />
70<br />
50<br />
168<br />
Mini hydro NCRE<br />
595<br />
22<br />
337<br />
126<br />
1.079<br />
0<br />
Wind energy Solar PV CSP Bioenergy Geothermal Mini hydro NCRE PSH Termosolar<br />
PSH (Pumped<br />
storage hydro)<br />
0 0 300 0<br />
300<br />
Thermosolar<br />
39 0 0 0 39<br />
Installed capacity (MW)<br />
Capacity under construction (MW)<br />
Total<br />
3.763<br />
2.193<br />
19.652<br />
9.345<br />
34.953<br />
Approved capacity (MW)<br />
Capacity admitted to environmental permit process (MW)<br />
INSTALLED AND UNDER CONSTRUCTION NCRE POWER PER SYSTEM<br />
SIC installed capacity (MW)<br />
SING installed capacity (MW)<br />
Mini hydro NCRE<br />
552<br />
Mini hydro NCRE<br />
16<br />
Solar PV<br />
1.028<br />
Solar PV<br />
365<br />
Wind energy<br />
1.149<br />
Wind energy<br />
90<br />
Bioenergy<br />
481<br />
SIC under construction capacity (MW)<br />
SING under construction capacity (MW)<br />
Mini hydro NCRE<br />
22<br />
Solar PV<br />
806<br />
Solar PV<br />
909<br />
CSP<br />
110<br />
Wind energy<br />
187<br />
Wind energy<br />
112<br />
Geothermal<br />
48<br />
Wind energy<br />
Solar PV CSP Bioenergy Geothermal Mini hydro NCRE