12.11.2019 Views

Newsletter ACERA - Octubre 2019

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MEET<br />

the Control Center<br />

COR<br />

Remote Operations Center<br />

Name: COR (Remote Operations Center).<br />

Function: Specialized in the Coordination,<br />

Supervision, and Remote Operation of NCRE Power<br />

Plants.<br />

<strong>ACERA</strong>’s Member Company: EnorChile.<br />

Headquarters: Santiago.<br />

Enorchile<br />

Since its inception, the Enorchile Control Center has pioneered the<br />

coordination and remote operation of wind and solar power plants<br />

before the National Electric Coordinator. We currently cover more than<br />

1.400 MW in installed capacity, providing our services to both NCRE<br />

power plants (wind and solar) and generation and transmission<br />

installation connected to the national electricity system. COR operates<br />

24 hours a day, 365 days a year and is staffed by personnel specialized<br />

in dispatch, charge control, fault handling and application management<br />

for the smooth functioning of the installations.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!