Newsletter ACERA - Octubre 2019
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
MEET<br />
the Control Center<br />
COR<br />
Remote Operations Center<br />
Name: COR (Remote Operations Center).<br />
Function: Specialized in the Coordination,<br />
Supervision, and Remote Operation of NCRE Power<br />
Plants.<br />
<strong>ACERA</strong>’s Member Company: EnorChile.<br />
Headquarters: Santiago.<br />
Enorchile<br />
Since its inception, the Enorchile Control Center has pioneered the<br />
coordination and remote operation of wind and solar power plants<br />
before the National Electric Coordinator. We currently cover more than<br />
1.400 MW in installed capacity, providing our services to both NCRE<br />
power plants (wind and solar) and generation and transmission<br />
installation connected to the national electricity system. COR operates<br />
24 hours a day, 365 days a year and is staffed by personnel specialized<br />
in dispatch, charge control, fault handling and application management<br />
for the smooth functioning of the installations.