24.02.2013 Views

Download Manual - Ozone

Download Manual - Ozone

Download Manual - Ozone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

14<br />

Once you have chosen a safe place to kite you will need to set up the different parts of your kite.<br />

INFLATING THE STRUTS AND LEADING EDGE USING ONE PUMP<br />

Bladders need to be looked after carefully. Never over-inflate bladders and be very careful if using compressed air at a kitesurf center as its very easy to<br />

over inflate and burst a bladder with the strong pressure.<br />

·Take hold of the center of the leading edge and walk kite into wind so your<br />

back is directly into wind. Attach the pump leash (photo) to the looped line in<br />

the center of the leading edge tube.<br />

·The <strong>Ozone</strong> Instinct has 2 valves on the leading edge. One has a one way<br />

valve and one of them is a larger valve to make deflating easy. The larger<br />

valve can also be used to partially inflate the leading edge. The smaller valve<br />

has a one way valve design which makes pumping up a bit slower and harder.<br />

Use this valve for the final pumps to get the leading edge solid to the touch.<br />

·Make sure all the clips are open (photo) before you start pumping.<br />

·Carefully and partially inflate the kite first. Before the struts are fully<br />

pressurized make sure the bladders are lined up correctly in the struts without<br />

any twists or air holes. Sometimes the internal bladders can fall out of line<br />

inside the Dacron material struts and if you inflate quickly and the bladders are<br />

not located right to the ends you will easily burst a bladder. So always gently<br />

massage the partially inflated struts to make sure the bladder is pushed into<br />

all areas of the Dacron pocket.<br />

·We recommend use of the <strong>Ozone</strong> pump and inflating the Instincts to 8 PSi<br />

(leading edge) using the meter (regular checks of the guage are advisable) or<br />

until solid to touch. Close the main valve on the leading edge.<br />

.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!