Installation Manual Ascent II⢠Toilet Pumping System - PEX Universe
Installation Manual Ascent II⢠Toilet Pumping System - PEX Universe
Installation Manual Ascent II⢠Toilet Pumping System - PEX Universe
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4-3-2 Discharge and Vent Flanges:<br />
Both the discharge and vent flanges are fastened to the main<br />
cover and can be removed by unscrewing the four fasteners<br />
and pulling the flange away from the main cover.<br />
4-3-3 Check Valve:<br />
The discharge flange has an integrated check valve. The valve is held in place by a support backing plate that is also<br />
connected to the discharge hose. To access the check valve, first remove the discharge flange from the main cover by<br />
removing 4 screws. Then, remove the hose followed by the two screws. The hose nipple can then be separated from the<br />
flange by pulling it outward. The check valve snaps onto the hose nipple. When reinstalling, the hinge of the check valve<br />
must be aligned with the “notch” in the hose nipple or backing plate. After installation of the hose nipple, confirm the check<br />
valve opens completely.<br />
©Copyright 2011 Liberty Pumps Inc. All rights reserved. 10