26.11.2012 Views

ECO ECP - Hollolan Sähköautomatiikka Oy

ECO ECP - Hollolan Sähköautomatiikka Oy

ECO ECP - Hollolan Sähköautomatiikka Oy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MANUTENZIONE<br />

Gli interventi di manutenzione sul generatore<br />

Mecc Alte si possono dividere in<br />

ordinari e straordinari; in ogni caso qualsiasi<br />

intervento deve essere autorizzato<br />

dal responsabile della sicurezza, a macchina<br />

ferma e isolata elettricamente dall’impianto<br />

o dalla rete.<br />

La manutenzione e la ricerca guasti<br />

deve essere eseguita da personale elettricamente/meccanicamente<br />

qualificato<br />

in quanto ogni operazione a seguito descritta<br />

presenta pericoli per il personale.<br />

Si raccomanda inoltre che siano prese<br />

tutte le precauzioni per impedire che la<br />

macchina venga riavviata inavvertitamente<br />

durante le fasi di manutenzione<br />

e ricerca guasti.<br />

Gli interventi di manutenzione ordinaria<br />

possono essere riassunti in :<br />

a) verifiche condizioni avvolgimenti<br />

dopo lunghi periodi di immagazzinamento<br />

o di sosta<br />

b) verifiche, ad intervalli regolari, del<br />

corretto funzionamento (assenza di<br />

rumori o vibrazioni anomale)<br />

c) verifiche meccaniche su tutti i bulloni<br />

di fissaggio ed in particolare delle<br />

connessioni elettriche<br />

d) pulizia esterna del generatore<br />

a) Verifiche condizioni avvolgimenti<br />

dopo lunghi periodi di immagazzinamento<br />

o di sosta.<br />

La condizione degli avvolgimenti può<br />

essere verificata mediante la misura<br />

della resistenza di isolamento verso<br />

terra. Tale misura si esegue con uno<br />

strumento “Megger” o similari a 500V di<br />

tensione continua; è importante che<br />

prima di eseguire la prova, il regolatore<br />

di tensione (fig. a), il ponte diodi rotante<br />

(fig. b), i filtri anti disturbi radio (fig. c) e<br />

tutti gli eventuali dispositivi connessi<br />

elettricamente agli avvolgimenti da verificare,<br />

vengano scollegati.<br />

32<br />

fig. a<br />

fig. b<br />

fig. c<br />

MAINTENANCE<br />

Maintenance operations on Mecc Alte<br />

generators can be divided into routine<br />

and extraordinary maintenance operations;<br />

in both cases, all operations must<br />

be authorised by the safety representative<br />

and they must be carried out when<br />

the machine is turned off and insulated<br />

from the electric installation or from the<br />

power mains.<br />

High-qualified mechanical or electrical<br />

technicians must carry out maintenance<br />

operations and any fault search<br />

since all operations described hereunder<br />

could put personnel in serious danger.<br />

It is also highly recommended to take<br />

all the necessary precautions so as to<br />

prevent an inadvertent starting of the<br />

machine during maintenance and fault<br />

search operations.<br />

Routine maintenance operations can<br />

be summed up as follows:<br />

a) Assessment of windings conditions<br />

after long periods of storage or inactivity<br />

b) Assessment, on a regular basis, of<br />

correct functioning (absence of anomalous<br />

noises or vibrations)<br />

c) Mechanical inspections on all fastening<br />

bolts and, in particular, on electric<br />

connections<br />

d) external cleaning of generator<br />

a) Assessment of windings conditions<br />

after long periods of storage or<br />

inactivity.<br />

Measuring the insulating earth resistance<br />

can assess the condition of the<br />

windings. This measurement can be<br />

carried out with a “Megger” device, or<br />

similar, with a 500V direct-current voltage.<br />

It is very important to disconnect<br />

the voltage regulator (fig. a), the rotating<br />

diode bridge (fig. b) and the radiointerference<br />

filter (fig. c), as well as any<br />

other device connected to the windings<br />

to be checked, before carrying out the<br />

measurement.<br />

<strong>ECO</strong>-<strong>ECP</strong> MANUAL SEPT. 2005 REVISION 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!