OPAL/SMARAGD/RUBIN - Einhell-UNICORE sro
OPAL/SMARAGD/RUBIN - Einhell-UNICORE sro
OPAL/SMARAGD/RUBIN - Einhell-UNICORE sro
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
13<br />
14<br />
15<br />
10<br />
later on to attach it to the steel base (optional<br />
accessory). If you are not using a steel base then<br />
you do not need to fit these bolts.<br />
12/d: Slide one bolt into each pre-assembled floor<br />
profile guide rail (bolt should be approx. 10 cm from<br />
the edge – see assembly preview).<br />
Page 51<br />
Pre-assembly of the rain guttering<br />
Important note for 3-panel greenhouses:If you<br />
have purchased a 3-panel greenhouse, skip step<br />
13 and continue with assembly step 15.No preassembly<br />
of the rain guttering is required on 3-panel<br />
greenhouses.<br />
Bottom illustration: Assembly preview of a<br />
greenhouse with 4 panels<br />
Page 52<br />
Top illustration: Assembly preview of a greenhouse<br />
with 5 panels<br />
Middle illustration: Assembly preview of a<br />
greenhouse with 6 panels<br />
Bottom illustration: Assembly preview of a<br />
greenhouse with 7 panels<br />
Page 55<br />
Pre-assembly of the ridge<br />
Important note for 3-panel greenhouses:<br />
If you have purchased a 3-panel greenhouse, skip<br />
step 14 and continue with assembly step 15.<br />
No pre-assembly of the ridge profile is required on<br />
3-panel greenhouses.<br />
Middle illustration: Assembly preview of a<br />
greenhouse with 4 panels<br />
Bottom illustration: Assembly preview of a<br />
greenhouse with 5 panels<br />
Page 56<br />
Top illustration: Assembly preview of a greenhouse<br />
with 6 panels<br />
Middle illustration: Assembly preview of a<br />
greenhouse with 7 panels<br />
14/a: Slide the bolt with the fluted side first into the<br />
designated opening of the ridge profile.<br />
Page 58<br />
Assembly of the floor profile on the front<br />
and rear walls<br />
15/a: Slide the floor profile which was already preassembled<br />
in step 12 (side) into the corner cover on<br />
the corner profile.<br />
ABA_OSR_Teil1_Titel+GB.pmd 10<br />
04.04.2006, 15:08<br />
16<br />
17<br />
18<br />
19<br />
Important note: If you have purchased a 5-panel<br />
house, the side profiles must be assembled in such<br />
a way that the two shorter profiles (1414 mm) face<br />
the front wall.<br />
Page 59<br />
Assembly of the rain guttering profile on<br />
the front and rear walls<br />
16/a: Slide the rain guttering profile as far as it will go<br />
onto the front or rear wall. It may be necessary to<br />
realign the corner and gable profiles to allow the rain<br />
guttering to be inserted with a perfect fit. To do this<br />
you will need to loosen the bolts on the assembly<br />
panel.<br />
Important note: If you have purchased a 5-panel<br />
house, the rain guttering profiles must be assembled<br />
in such a way that the two shorter profiles (1414 mm)<br />
face the front wall.<br />
Page 60<br />
Assembly of the ridge profile on the front<br />
and rear walls<br />
17/a: Slide the ridge as far as it will go onto the front<br />
or rear wall. It may be necessary to realign the gable<br />
profiles to allow the rain guttering to be inserted with<br />
a perfect fit. To do this you will need to loosen the<br />
bolts on the assembly panel.<br />
Important note: If you have purchased a 5-panel<br />
house, the ridge profiles must be assembled in such<br />
a way that the shorter profile (1414 mm) faces the<br />
front wall.<br />
Page 61<br />
Assembly of the side struts<br />
18/a: On the side struts, install one bolt approx. 5 cm<br />
from both the top and bottom edge. Please check the<br />
exact quantity required for your particular greenhouse<br />
model.<br />
18/b: On the remaining side struts, install one bolt<br />
approx. 5 cm from the bottom edge. Two bolts are<br />
installed at the top, one approx. 10 cm, the other<br />
approx. 5 cm from the edge.<br />
Page 62<br />
18/c: Assemble the side struts with the four preassembled<br />
bolts (see step 18/b) on the gusset plates<br />
on the floor profile and the rain guttering.<br />
Page 64<br />
Assembly of the roof struts<br />
Note: The side struts (roof) are inserted in the next<br />
step. Please make sure that you refer to the relevant