Buku Panduan Operasi RIL - Responsible Asia Forestry and Trade
Buku Panduan Operasi RIL - Responsible Asia Forestry and Trade
Buku Panduan Operasi RIL - Responsible Asia Forestry and Trade
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Rajah 2.10: Pembukaan pembetung atau jambatan sementara untuk meminimakan<br />
impak aliran sungai.<br />
Skid trail 1500 mm<br />
KERATAN RENTAS<br />
PRESPECTIVE<br />
Rajah 2.11: Parit lintang.<br />
50<br />
45<br />
300 mm<br />
300 mm