30.06.2013 Views

bab vi industri - BAPPEDA Aceh

bab vi industri - BAPPEDA Aceh

bab vi industri - BAPPEDA Aceh

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Lanjutan Tabel/Continued table 6.2.5<br />

No.<br />

Tempat/Lokasi,<br />

cabang, ranting,<br />

subranting<br />

Location/branchs<br />

Jumlah<br />

mesin<br />

pembangkit<br />

Number of<br />

generator<br />

Daya terpasang<br />

Installed capacity<br />

(KW)<br />

Industri<br />

Daya mampu<br />

Electricity<br />

produced<br />

(KW)<br />

2010 2011 2010 2011 2010 2011<br />

(1) (2) (3) (4) (5) (6) (7) (8)<br />

VI. Cabang Langsa<br />

Langsa branch<br />

1. PLTD Pusong +<br />

Peureulak + P.<br />

Tiga<br />

2. PLTD Kuta<br />

Cane/Kuning<br />

3. PLTD Blang<br />

Kejeren<br />

3 3 280 280 280 280<br />

9 10 7 902 7 902 5 860 5 860<br />

5 11 540 4 950 260 6 610<br />

4. PLTD Tragon 1 1 117 117 80 80<br />

5. PLTD Lokop 3 3 240 240 215 240<br />

6. PLTD Pinding 3 4 280 280 235 235<br />

7. PLTM/D Seupakat 3 3 1 770 1 770 800 800<br />

9. Sewa genset 39 39 11 500 11 500 10 500 10 500<br />

Jumlah Cabang<br />

Total of branch<br />

71 71 27 055 26 787 20 780 5 300<br />

Jumlah/Total 400 215 253 138 252 335 172 992 180 277<br />

Sumber : PT. PLN (Persero) Wilayah <strong>Aceh</strong><br />

Source : PT. PLN (Persero) Region <strong>Aceh</strong><br />

<strong>Aceh</strong> Dalam Angka 2012 329

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!