12.07.2015 Views

Keputusan Tender ILJTM Fasa 3 dan 5 - Kementerian Sumber ...

Keputusan Tender ILJTM Fasa 3 dan 5 - Kementerian Sumber ...

Keputusan Tender ILJTM Fasa 3 dan 5 - Kementerian Sumber ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BIL25. INSTITUT LATIHAN PERINDUSTRIAN (ILP) LABUANKODPETENDERNAMA SYARIKATJUMLAHHARGA (RM)1 25/36 IY Resources 231,685.002 32/36 Evotech Engineering 159,193.003 10/36 Suceme Enterprise 348,460.004 27/36 Dream-Idea.Com Sdn Bhd 477,891.005 22/36 Hakita Engineering Sdn Bhd 126,174.006 7/36 Jalur Anggun Sdn Bhd 148,655.007 11/36 Hertech Resources 214,006.008 24/36 QS Industries Sdn Bhd 210,388.009 36/36 Perniagaan Restu Jaya (M) Sdn Bhd 86,523.0010 29/36 Khazanah Alam Sdn Bhd 103,530.0011 13/36 Syarikat Maslina Sdn Bhd 156,373.0012 6/36 Mesin Unggul Sdn Bhd 241,100.0013 21/36 Visual In-Tech Sdn Bhd 66,150.0014 8/36 Sirah Contractor & Supplies 799,495.0015 20/36 Sepakat Jayamakmur Sdn Bhd 67,705.0016 12/36 A & J Maju Jaya 26,750.00JUMLAH KESELURUHAN 3,464,078.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!