TYainee Worhbooh

Mod,ule I

The 13 Steps

A successful LP CJ &AP CJ thermite weld can be seen as

13 separate steps that must be done in a specifi.c sequence

EJ

1. Job Preparation:

¡ Using a standard checklist to assure that you have all

necessary tools, materials, equipment, and information

before you leave for the weld site

2. Site Preparation:

. Evaluate the general site condition

. Correct any situations that create a potential fire or

safety hazard

.,Ër

Fil

3. Track Preparation:

. Secure the rail so that it doesn't move during joint

preparation, alignment and welding

4. Rail-end Preparation:

. Inspect, & prepare the joint to a condition acceptable for

thermite welding

DI

5. Rail-end Alignment:

o Set-up the correct gap, peak (also called the'crown'or

'vertical alignment'), horizontal alignment, and

eliminate unequal cant between rail-ends

. A critical step where inconsistent work will lead to weld

failure

I4