07.08.2020 Views

Pandrol Ind Inc Calorite Training Manual LP-AP CJ 2019 En-test (2)

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Trainee Worhbook

Mod,ule I

Step 4: Rail-end Preparation (cont'd,)

Q4: Why must all drilled holes be a minimum of 100

mm (4 in) away from the rail-end?

o

o

Q5: Why must rail-ends that have been torch-cut and have

cooled be cut back a minimum of 100 mm (a in) with

a rail saw?

o

o

Q6: When using a standard LP CJ OR AP CJ kit, why can

the maximum difference in rail height not exceed

3/16th in?

o

a

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!