Trainee l4torkbook

Module I

Step 9: Pouring

¡ Put on welder's goggles & gloves

o At 6 minutes remove the burner nozzle from the mold for LP

CJ weld

o Place the diverter plug snug into the top gate. Press down

firmly for good seal (Figure 28).

¡ Set the crucible on top. Twist the crucible either clockwise

or counter-clockwise locking the guide plates in place; this

ensures that the crucible is centered over the gap.

o While holding the cover open, Iight ignition fuse by touching

inside of mold.

r Insert ignition fuse at an angle into charge in crucible (to a

maximum depth of 25 mm or 1 inch), igniting the charge

(Figure 29).

!

Lr

¡,

figure 28 fi.gure 29

¡ Cover crucible. When reaction is complete and metal starts

to fLow, wear dark glasses for protection.

o When the slag stops pouring, start the stopwatch