07.08.2020 Views

Pandrol Ind Inc Calorite Training Manual LP-AP CJ 2019 En-test (2)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Trainee Workbook

Module I

o Place mold halves together on rail, and gently rub back and

forth against the rail so they seat properly and make good

contact at the top. Make certain all sand dust is removed

from the rail.

o Put each mold half in its frame and place on rail so that

mold is centered over gap. Be sure that faces of both rails

can be seen from the top of the mold looking down

(Figure 20). Secure to rail by tightening mold clamp screws.

Mold should not extend below rail. Grind if necessary to

remove excess by using the mold base plate or a fiIe.

fi¡5- Eri$

figure 20

¡ Place the mold base plate on the plate holder. Roll paste

into 25mm (1") cylinder and apply all around base plate.

Flatten to same thickness as base plate (Figure 21). Place

under mold halves and secure with hangers. Compact paste

on long edges with packing rod (Figurc 22). Press paste at

both ends with fingers.

a

figure 21 ftgure 22

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!