13.07.2015 Views

PDF-format - Miljøstyrelsen

PDF-format - Miljøstyrelsen

PDF-format - Miljøstyrelsen

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bilag D___ OrdnanceLowNot expected, but possible.7. HAZARD CONTROL MEASURESSafe work practices and control measures to be used for performing this task are identified in several documents.Site-wide hazards and control measures are described in the PMC HASP. Site-wide safety practices are specified inthe Project Rules Handbook for the RMA PMC, Volume I and Volume II. TerraTherm and ENSR Health and SafetyProcedures are listed in Section 8, below.Task-specific hazard control measures are specified in the Activity Hazard Analysis (AHA). The AHA has beendeveloped for the following activities and are included as Attachment _A__.Activities with an AHA:Site Mobilization/DemobilizationExisting Utility Closure (Excavation)Well / Monitoring Point installation / removalHeavy Equipment Operation & Material Handling(Backhoe, Bobcat & Forklift)Surface Cover InstallationPipe ConnectionElectrical InstallationISTD Shakedown and System OperationPersonal and Equipment Decontamination8. WRITTEN SAFETY PROCEDURES AND PROGRAMSWork at the Hex Pit will be performed in accordance with TerraTherm’s Corporate Health & Safety Policy (submittedwith our proposal). Since Joe Sanders, CIH of ENSR will be acting as Site Safety Officer, TerraTherm has decided toadopt the following sections of existing ENSR safety procedures and programs for this project. Copies of applicableprocedures and programs are included as Attachment __B__.Reference Procedure or ProgramENSR H&S SOP 5.1, Hazard CommunicationENSR H&S SOP 8.1, Respiratory ProtectionENSR H&S SOP 10.2, NoiseENSR H&S SOP 10.3, Cold StressENSR H&S SOP 10.4, Hot EnvironmentsENSR H&S SOP 11.5, Environmental DrillingENSR H&S SOP 11.7, Fall ProtectionENSR H&S SOP 11.1, ExcavationENSR H&S SOP 11.8, Lockout-TagoutApplicable Section(s)AllAllAllAllAllAllAllAllAll9. PERMITSThe following permits are required for work. Applicable completed permits and/or permit forms are included asAttachment __C__Permit___ Hot Work_√__ ExcavationNotes and comments (reference activities, procedures, and coordination with appropriateorganizations):Required only if ignition sources are to be used in potentially explosive atmospheres (notexpected).TerraTherm will apply for a permit to conduct intrusive work activities for specific tasks atthe Hex Pit site.Not expected.220 Form Rev. 5/98

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!