IMAX Cinema, Waterloo<br />

This high-tech auditorium is located in a<br />

very difficult urban site: in the middle of a<br />

roundabout with tunnels below.<br />

The IMAX Cinema is the latest large<br />

screen format movie theatre for the British<br />

Film Institute located within the Bullring<br />

Roundabout, adjacent to Waterloo Station,<br />

and will be an addition to the South Bank<br />

Arts Centre. The cinema will be Europe's<br />

largest venue showing extra-high<br />

resolution IMAX films.<br />

The building consists of a circular drum<br />

approximately 40m in diameter and six<br />

storeys high providing an enclosure to<br />

house the auditorium. The perimeter<br />

structure is circular on plan and provides a<br />

gallery behind the glass cladding.<br />

Internally the majority of the space is<br />

devoted to the auditorium with other areas<br />

providing circulation, reception and plant<br />

- 34 -<br />

areas. The site is in a well in the middle of<br />

one of London's busiest roundabouts and<br />

as if the headache of site deliveries was not<br />

enough, a network of tunnels beneath the<br />

site made the foundation design a<br />

nightmare. Two Waterloo and City Line<br />

Underground tunnels run through the<br />

centre of the site at a depth of<br />

approximately 4.5m. At the south end of<br />

the site a main sewer and a BT duct<br />

infringe on the building's footprint<br />

requiring the foundations to span up to<br />

23m to avoid the obstructions. The solution<br />

was to provide a thick concrete slab<br />

supported on piles located where there was<br />

space to locate them.<br />

As there was no direct access by road to<br />

the site an elevated steel gantry was<br />

provided at road level which allowed<br />

traffic to enter from the roundabout to<br />

deliver materials. The gantry was designed<br />

to accept only a single wagon and there<br />

were restrictions on the hours during which<br />

deliveries could be made.<br />

In order to provide acoustic isolation of the<br />

auditorium from ground-borne vibration,<br />

spring mounts have been installed between<br />

the soffit of the first floor and the heads of<br />

the ground floor columns.<br />

The structure above the first floor podium<br />

slab is a structural steel frame. The upper<br />

floor areas are constructed using<br />

lightweight concrete cast onto profile steel<br />

sheeting. The floor beams are designed to