E<strong>in</strong> Unternehmen<br />

von ThyssenKrupp<br />

Services<br />

<strong>Stützwand</strong> <strong>in</strong> <strong>Spundwandbauweise</strong> <strong>zur</strong><br />

<strong>Errichtung</strong> e<strong>in</strong>er <strong>Parkgarage</strong> auf dem Gelände<br />

des ThyssenKrupp-Hauptquartiers <strong>in</strong> Essen.<br />

Reta<strong>in</strong><strong>in</strong>g wall of sheet pil<strong>in</strong>g for the<br />

construction of a park<strong>in</strong>g garage on the<br />

site of the ThyssenKrupp headquarters <strong>in</strong> Essen.<br />

HOESCH<br />

SPUNDWAND UND PROFIL<br />

E<strong>in</strong> Unternehmen der Salzgitter Gruppe<br />

PEINER<br />

TRÄGER<br />

E<strong>in</strong> Unternehmen der Salzgitter Gruppe<br />

ThyssenKrupp GfT Bautechnik<br />

ThyssenKrupp


2<br />

Case Study<br />

Beschichtete Stützspundwand<br />

im Fertigzustand<br />

Coated sheet pil<strong>in</strong>g <strong>in</strong><br />

its completed state<br />

Baubeschreibung mit Art und Umfang der Leistungen.<br />

Description of the project with the type and scale of work.<br />

Mit dem symbolischen Spatenstich durch den Vorstandsvorsitzenden<br />

der ThyssenKrupp AG, Herrn Dr.-Ing. Schulz,<br />

am 12. Juni 2007, haben die Bauarbeiten für das neue<br />

ThyssenKrupp Hauptquartier begonnen. In Essen wird <strong>in</strong><br />

Zukunft der neue Hauptsitz des Konzerns se<strong>in</strong>. Das ca.<br />

21 ha große Areal bef<strong>in</strong>det sich westlich der Bundes-<br />

strasse B 224, am neuen Berthold-Beitz-Boulevard.<br />

Im Rahmen dieser Baumaßnahme wurde e<strong>in</strong>e <strong>Stützwand</strong><br />

aus verankerten LARSSEN-Stahlspundwandprofilen vorgesehen,<br />

da diese bei den bis zu 10,30 m tiefen Geländesprüngen<br />

e<strong>in</strong>e dauerhafte Geländesicherung garantieren.<br />

Vor der Spundwand konnte dann e<strong>in</strong> Parkhaus mit ca.<br />

850 Stellplätzen errichtet werden. Mit der Planung für die<br />

ca. 320 m lange Stützspundwand wurde im Sommer 2007<br />

begonnen. Die Planungsleistungen, die das Ingenieurbüro<br />

API erbrachte, wurden von den Mitarbeitern unseres eigenen<br />

Technischen Büros h<strong>in</strong>sichtlich der statischen Berechnungen,<br />

den Rammplänen sowie den Ausführungsh<strong>in</strong>-<br />

weisen unterstützt. Nach der Ausschreibung und der Auftragsvergabe<br />

durch den Bauherren ThyssenKrupp Real<br />

Estate, konnte mit den Arbeiten im Februar 2008 begonnen<br />

werden.<br />

Blick auf die Baustelle ThyssenKrupp-Hauptquartier <strong>in</strong> Essen<br />

View of the ThyssenKrupp headquarters construction site<br />

Construction work on the ThyssenKrupp Quarter <strong>in</strong><br />

Essen got underway on June 12, 2007, with the sym-<br />

bolic ground-break<strong>in</strong>g by the Executive Board Chairman<br />

of ThyssenKrupp AG, Dr.-Ing. Schulz. The future of the<br />

new Group headquarters will be <strong>in</strong> Essen. The roughly<br />

21 hectare site is located to the west of the federal highway<br />

B224 on the new Berthold Beitz Boulevard.<br />

In the course of this project, a reta<strong>in</strong><strong>in</strong>g wall of anchored<br />

LARSSEN steel pile profiles has been <strong>in</strong>stalled. This is necessary<br />

to stabilize the ground <strong>in</strong> the long term because of<br />

the up to 10.3 m variation <strong>in</strong> terra<strong>in</strong> levels. A multi-story<br />

park<strong>in</strong>g garage with roughly 850 stalls has now been built<br />

<strong>in</strong> front of the wall of sheet pil<strong>in</strong>g. The design of the<br />

roughly 320 m long wall of sheet pil<strong>in</strong>g got underway <strong>in</strong><br />

the summer of 2007. The design services provided by API<br />

eng<strong>in</strong>eers were supported by staff <strong>in</strong> our own Technical<br />

Office with the calculation of the static loads, pile-driv<strong>in</strong>g<br />

plans and execution <strong>in</strong>structions. After the bidd<strong>in</strong>g procedure<br />

and award of the contract by the client ThyssenKrupp<br />

Real Estate, work commenced <strong>in</strong> February 2008.<br />

Schlossdichtung System HOESCH<br />

HOESCH <strong>in</strong>terlock seal<strong>in</strong>g system


3<br />

Case Study<br />

Querschnitt <strong>Parkgarage</strong><br />

Cross section of park<strong>in</strong>g garage<br />

+59,48 Straße<br />

Road<br />

Berthold-Beitz-Boulevard<br />

Anschüttung<br />

Fill<br />

E<strong>in</strong>fach verankerte Spundwand mit Holmabdeckung<br />

Sheet pil<strong>in</strong>g with a s<strong>in</strong>gle l<strong>in</strong>e of anchors and capp<strong>in</strong>g<br />

+55,50<br />

16,56 16,56 16,56<br />

+61,90<br />

+58,90<br />

+55,90<br />

+52,60<br />

Quartär<br />

Quaternary<br />

Kreide (Grünsand)<br />

Cretaceous (greensand)<br />

Detail A<br />

Spundwandkopfbalken/<br />

Dehnungsfuge<br />

Sheet pil<strong>in</strong>g head beam/<br />

expansion jo<strong>in</strong>t<br />

4,50<br />

3,00<br />

3,00<br />

16,25<br />

+55,60<br />

20<br />

7 7<br />

80 80 80<br />

a = 5 mm<br />

a = 5 mm<br />

Holm mit Gleitschutz<br />

Capp<strong>in</strong>g with non-slip surface<br />

470 x 170 x 10<br />

W<strong>in</strong>kel<br />

Angel<br />

100 x 100 x 10<br />

Spundwand LARSSEN 606 n, bis 14,30 lang,<br />

mit Schlossdichtung System HOESCH<br />

3 sheets per expansion jo<strong>in</strong>t<br />

200 x 80 x 10<br />

200 Je Dehnungsfuge 3 Bleche<br />

Detail A<br />

Gelände +67,00<br />

Spundwandkopfbalken<br />

+66,25 Straße<br />

Terra<strong>in</strong> AUFSCHÜTTUNG<br />

Sheet pil<strong>in</strong>g head beam<br />

Road<br />

Gitterrostabdeckung A<br />

+67,00<br />

FILL<br />

Grat<strong>in</strong>g<br />

+63,40<br />

+60,40<br />

+57,40<br />

+54,40<br />

Nach der Spundwandwalzung bei HSP Hoesch Spundwand<br />

und Profil GmbH <strong>in</strong> Dortmund, wurden die fertigen<br />

LARSSEN-Profile <strong>zur</strong> Beschichtung bei der Fa. Hartmann<br />

<strong>in</strong> Dortmund angeliefert. Hier wurde der später sichtbare<br />

Bereich der Spundwände gesandstrahlt und mit e<strong>in</strong>em<br />

Korrosionsschutz, bestehend aus e<strong>in</strong>er Grund- und<br />

Zwischenbeschichtung, versehen. Die Spundwandschlösser<br />

wurden mit e<strong>in</strong>er Polyurethan-Dichtungsmasse, der<br />

Schlossdichtung System HOESCH, dauerhaft abgedichtet.<br />

Die Schlossdichtung verh<strong>in</strong>dert das Durchsickern von<br />

Oberflächenwasser und ist bei dieser Baumaßnahme<br />

unentbehrlich. Nach Beendigung aller Spundwandarbeiten<br />

erhielt die Spundwand noch e<strong>in</strong>e Endbeschichtung.<br />

Die mehr als hundertjährige <strong>in</strong>dustrielle Nutzung des Geländes<br />

durch die Krupp-Werke führte zunächst dazu, dass<br />

umfangreiche Bodenbewegungen erfolgen mussten, um<br />

die Rammachse für das Spundwandbauwerk herrichten zu<br />

können. Zudem mussten die Freilegung und Entfernung<br />

von Bombenbl<strong>in</strong>dgängern aus dem 2. Weltkrieg durchgeführt<br />

werden.<br />

+55,60<br />

Soil replacement 3 m beneath foundation ~52,60<br />

Bodenaustausch 3,0 m unter Fundamente ~52,60<br />

Lüftungsschacht<br />

Ventilation shaft<br />

3,00<br />

0,50<br />

3,00 3,00 3,00 1,50 0,60<br />

Gravel dra<strong>in</strong>age<br />

3,00<br />

Anker<br />

Anchor<br />

Anschüttung<br />

Fill<br />

LARSSEN 606n sheet pil<strong>in</strong>g, up to 14.3 m long,<br />

with the HOESCH <strong>in</strong>terlock seal<strong>in</strong>g system<br />

After the roll<strong>in</strong>g of the sheet piles at HSP Hoesch<br />

Spundwand und Profil GmbH <strong>in</strong> Dortmund, the f<strong>in</strong>ished<br />

LARSSEN sections were sent to Hartmann <strong>in</strong> Dortmund for<br />

coat<strong>in</strong>g. Here the later visible area of the sheet piles was<br />

sandblasted and given anti-corrosion protection consist<strong>in</strong>g<br />

of a primer and <strong>in</strong>termediate coat. The <strong>in</strong>terlocks were permanently<br />

waterproofed with a polyurethane seal<strong>in</strong>g compound,<br />

the HOESCH <strong>in</strong>terlock seal<strong>in</strong>g system. The <strong>in</strong>terlock<br />

seal prevents the seepage of surface water and is <strong>in</strong>dispensable<br />

for this construction project. On completion of<br />

all the sheet pil<strong>in</strong>g work, the wall was given a top coat.<br />

Because of the more than a century's <strong>in</strong>dustrial use of the<br />

site by the Krupp mills, extensive earthmov<strong>in</strong>g had to be<br />

carried out <strong>in</strong> preparation for driv<strong>in</strong>g the wall of sheet pil<strong>in</strong>g<br />

along the envisaged axis. Unexploded bombs from the<br />

2nd World War also had to be exposed and disposed of.


4<br />

Case Study<br />

E<strong>in</strong>fädeln der LARSSEN-Doppelbohlen<br />

Insert<strong>in</strong>g the LARSSEN double piles<br />

Die Spundbohlen wurden mit e<strong>in</strong>em Mäkler Typ ABI<br />

TM12/15 und e<strong>in</strong>em Vibrator MRZV 925 VS e<strong>in</strong>gebracht.<br />

Da Spundwandprofile Walztoleranzen h<strong>in</strong>sichtlich ihrer<br />

Breite und Geradheit haben und auch bei Rammvorgängen<br />

Toleranzen h<strong>in</strong>sichtlich der Wandlängen <strong>in</strong> der<br />

Rammachse zugelassen s<strong>in</strong>d, wurde, von der Mitte des<br />

Bauwerks ausgehend, <strong>in</strong> zwei Richtungen gerammt. Am<br />

jeweiligen Ende der e<strong>in</strong>zelnen Wandabschnitte mussten<br />

Passbohlen e<strong>in</strong>gebaut werden, um bei den erforderlichen<br />

Richtungswechseln die festgelegten Achsmaße e<strong>in</strong>halten<br />

zu können. So wurde auch gewährleistet, dass bei den<br />

Rammarbeiten ke<strong>in</strong>e Stillstände durch das Herstellen der<br />

Passbohlen entstanden.<br />

Nach Fertigstellung der Hauptwand konnte mit der teilweisen<br />

H<strong>in</strong>terfüllung mit Bodenmaterial begonnen werden.<br />

Nachdem e<strong>in</strong> bestimmtes Auffüllniveau erreicht war, wurden<br />

die Ankertafeln und Ankerwände e<strong>in</strong>gebaut. Diese aus<br />

Spundwandprofilen hergestellten Verankerungselemente<br />

wurden später durch Rundstahlankermit der Hauptwand<br />

verbunden.<br />

Weiterh<strong>in</strong> wurden Stahl-Gurtungen, bestehend aus 2 U 400<br />

mit Gurtbolzen und Gurtbolzenplatten, von e<strong>in</strong>em Gerüst<br />

aus an die Hauptspundwand montiert. Der später sichtbare<br />

Teil der Gurtbolzen und der Gurtbolzenplatten wurde<br />

The piles were driven with an excavator-mounted telescopic<br />

leader ABI TM12/15 and a vibratory hammer<br />

MRZV 925 VS. S<strong>in</strong>ce sheet piles have roll<strong>in</strong>g tolerances for<br />

width and trueness and tolerances are permitted <strong>in</strong> driv<strong>in</strong>g<br />

processes <strong>in</strong> terms of wall lengths along the envisaged<br />

axis, piles were driven <strong>in</strong> two directions, start<strong>in</strong>g <strong>in</strong> the<br />

centre of the structure. This procedure resulted <strong>in</strong> only<br />

m<strong>in</strong>imum variation from the structure's axes plotted by the<br />

surveyor. Adapter piles had to be <strong>in</strong>stalled at the po<strong>in</strong>ts<br />

where the wall changed direction <strong>in</strong> order to achieve the<br />

def<strong>in</strong>ed axis lengths. The procedure also ensured that pile<br />

driv<strong>in</strong>g was not held up by production of the adapter piles.<br />

On completion of the ma<strong>in</strong> wall, the wall was partially backfilled<br />

with soil. When a certa<strong>in</strong> level was achieved, the anchor<br />

blocks and anchor walls were <strong>in</strong>stalled. These anchor<strong>in</strong>g<br />

elements made from sheet piles were later connected<br />

with round steel anchors to the ma<strong>in</strong> wall.<br />

Steel wal<strong>in</strong>gs consist<strong>in</strong>g of 2 U 400 with wal<strong>in</strong>g bolts and<br />

wal<strong>in</strong>g bolt plates were also <strong>in</strong>stalled <strong>in</strong> the ma<strong>in</strong> wall of<br />

sheet pil<strong>in</strong>g from a scaffold. The part of the wal<strong>in</strong>g bolts<br />

that would later rema<strong>in</strong> exposed and the wal<strong>in</strong>g bolt plates<br />

E<strong>in</strong>br<strong>in</strong>gen der Ankerlagen<br />

Install<strong>in</strong>g the anchor system


5<br />

Case Study<br />

Gurtung/Verankerung<br />

Wal<strong>in</strong>g/anchor<strong>in</strong>g<br />

vor dem E<strong>in</strong>bau ebenfalls zum Schutz vor Korrosion<br />

beschichtet. Diese Gurtung dient e<strong>in</strong>erseits zum späteren<br />

Anschluss der Rundstahlanker aber auch zum Ausrichten<br />

der Wand, so dass das Bauwerk im Endzustand e<strong>in</strong>en technisch<br />

e<strong>in</strong>wandfreien und e<strong>in</strong>en guten optischen Gesamte<strong>in</strong>druck<br />

macht. Auch die Abdeckung des Spundwandkopfes<br />

durch e<strong>in</strong>e beschichtete Stahlholmkonstruktion<br />

konnte e<strong>in</strong>wandfrei montiert werden und trägt ebenfalls zu<br />

e<strong>in</strong>em harmonischen Gesamtbild bei.<br />

Nachdem die E<strong>in</strong>fach-Verankerung e<strong>in</strong>gebaut war, konnte<br />

man mit der Restverfüllung h<strong>in</strong>ter der Hauptwand und<br />

dem Überschütten der Anker und der Ankertafeln fortfahren.<br />

E<strong>in</strong> lagenweises und gleichmäßiges E<strong>in</strong>bauen<br />

des Bodens ist für diese Art von Bauwerken sehr wichtig,<br />

da bei ungleichmäßiger Erddruckverteilung die Spundwand<br />

unterschiedlich belastet würde und sich somit<br />

e<strong>in</strong>e mögliche partielle Schiefstellung der Wand ergeben<br />

könnte.<br />

Als führender Anbieter im Hafen- und Spezialtiefbau<br />

wurde durch das <strong>in</strong>tegrierte Lieferprogramm mit Spundwandprofilen,<br />

Rammtechnik, Ankertechnik und Eng<strong>in</strong>eer<strong>in</strong>g,<br />

<strong>in</strong> enger Zusammenarbeit mit den aus-führenden<br />

Firmen und Ingenieurbüros, e<strong>in</strong>e komplexe und anspruchsvolle<br />

Baumaßnahme erfolgreich durchgeführt.<br />

were also coated with anti-corrosion pa<strong>in</strong>t before fitt<strong>in</strong>g.<br />

This wal<strong>in</strong>g later had the round steel anchors connected<br />

to it and aligned the wall so that, <strong>in</strong> its f<strong>in</strong>al state, the<br />

structure is technically immaculate and makes a good<br />

visual impression. The head of the sheet pil<strong>in</strong>g has been<br />

fitted neatly with a coated steel capp<strong>in</strong>g system, which<br />

also contributes to a harmonious overall appearance.<br />

When the s<strong>in</strong>gle anchor system had been fitted, the rema<strong>in</strong><strong>in</strong>g<br />

space beh<strong>in</strong>d the wall was backfilled, cover<strong>in</strong>g the<br />

anchors and anchor blocks. Layer-by-layer and uniform<br />

<strong>in</strong>stallation of the soil is very important for this type of<br />

structure, as an uneven distribution of soil would apply<br />

vary<strong>in</strong>g pressure to the sheet pil<strong>in</strong>g and thus possibly<br />

cause the wall to go out of true locally.<br />

As a lead<strong>in</strong>g supplier of port and specialized civil eng<strong>in</strong>eer<strong>in</strong>g<br />

equipment, the Company with its <strong>in</strong>tegrated supply<br />

range compris<strong>in</strong>g sheet pil<strong>in</strong>g sections, pile drivers, anchors<br />

and eng<strong>in</strong>eer<strong>in</strong>g services has successfully accomplished<br />

a complex and challeng<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g project <strong>in</strong><br />

close cooperation with the contracted construction specialists<br />

and eng<strong>in</strong>eers.


6<br />

Case Study<br />

Daten und Fakten.<br />

Spundwandlieferung<br />

Spundwandschlossdichtung<br />

Korrosionsschutz/Beschichtung<br />

Ausrüstung und Verankerungs-<br />

material ASF<br />

Auftraggeber<br />

Bauüberwachung<br />

Ausführendes Bauunternehmen<br />

Spezialtiefbau/Rammarbeiten<br />

Ausführungsplanung<br />

Prüfung:<br />

Facts and figures<br />

Sheet piles supplied<br />

Interlock seal<br />

Coat<strong>in</strong>g and corrosion<br />

protection<br />

Equipment and ASF<br />

anchor<strong>in</strong>g materials<br />

Client<br />

Construction supervision<br />

Contractor<br />

Specialized civil eng<strong>in</strong>eer<strong>in</strong>g/<br />

pile driv<strong>in</strong>g<br />

Construction plann<strong>in</strong>g<br />

Inspection<br />

ca. 720 to LARSSEN 606 n ; <strong>in</strong> Güte S 355 GP <strong>in</strong> Längen bis 14,30 m<br />

ca. 5.200 m Schlossdichtung System HOESCH<br />

ca. 4700 m² Spundwandbeschichtung, Hartmann Bautenschutz, Dortmund<br />

320 m Gurtung 2 U 400, Ankerplatten, Bolzen, 320 m Kantenschutz,<br />

Ankertafelgurte, 78 Stück ASF-Rundstahlanker, 3“ und 3 ½“ bis 14,00 m lang,<br />

ASF-Anker, Anton Schmoll GmbH Verb<strong>in</strong>dungstechnik, Balve<br />

ThyssenKrupp Real Estate<br />

API Asmus + Prabucki Ingenieure Beratungsgesellschaft mbH, Essen<br />

ARGE ThyssenKrupp Quartier TB, Bottrop; He<strong>in</strong>rich Walter Bau, Borken;<br />

Eurovia Teerbau GmbH, Bottrop; G. Papenburg AG, Schwarmstedt<br />

Grundbau Jansen GmbH, L<strong>in</strong>nich<br />

ECE; API Asmus Prabucki Ingenieure, Essen;<br />

ThyssenKrupp GfT Bautechnik, Essen<br />

Ing. Büro Hamelmann Karvanek, Essen<br />

Approx. 720 t of LARSSEN 606 n of steel grade S 355 GP <strong>in</strong> lengths of up to 14.3 m<br />

Approx. 5,200 m of the HOESCH <strong>in</strong>terlock seal<strong>in</strong>g system<br />

Approx. 4,700 m² of sheet pile coat<strong>in</strong>g, Hartmann Bautenschutz, Dortmund<br />

320 m of 2 U 400 wal<strong>in</strong>gs, anchor blocks, bolts, 320 m of edge protection,<br />

anchor block wal<strong>in</strong>gs, 78 ASF round steel anchors, 3” and 3½”, up to 14 m long,<br />

ASF anchors, Anton Schmoll GmbH Verb<strong>in</strong>dungstechnik, Balve<br />

ThyssenKrupp Real Estate<br />

API Asmus + Prabucki Ingenieure Beratungsgesellschaft mbH, Essen<br />

ARGE ThyssenKrupp Quartier TB, Bottrop; He<strong>in</strong>rich Walter Bau, Borken;<br />

Eurovia Teerbau GmbH, Bottrop; G. Papenburg AG, Schwarmstedt<br />

Grundbau Jansen GmbH, L<strong>in</strong>nich<br />

ECE; API Asmus Prabucki Ingenieure, Essen;<br />

ThyssenKrupp GfT Bautechnik, Essen<br />

Ing. Büro Hamelmann Karvanek, Essen


7<br />

Case Study<br />

ThyssenKrupp GfT Bautechnik GmbH<br />

Postfach 10 22 53<br />

45022 Essen<br />

Altendorfer Straße 120<br />

45143 Essen<br />

Telefon: 0201 188-2313<br />

Telefax: 0201 188-2333<br />

bautechnik@thyssenkrupp.com<br />

www.tkgftbautechnik.com<br />

Berl<strong>in</strong><br />

Zeppel<strong>in</strong>r<strong>in</strong>g 11-13<br />

15749 Mittenwalde<br />

Telefon: 03375 9217-0<br />

Telefax: 03375 9217-10<br />

Bremen<br />

Max-Planck-Straße 10<br />

28832 Achim b. Bremen<br />

Telefon: 04202 5197-0<br />

Telefax: 04202 5197-20<br />

Dortmund<br />

Bünnerhelfstraße 10<br />

44379 Dortmund<br />

Telefon: 0231 557515-10<br />

Telefax: 0231 557515-20<br />

Dresden<br />

Dresdner Straße 39c<br />

01454 Radeberg<br />

Telefon: 03528 445874<br />

Telefax: 03528 442157<br />

Essen<br />

Wiehagen 10<br />

45472 Mülheim<br />

Telefon: 0208 49586-10<br />

Telefax: 0208 49586-88<br />

Frankfurt<br />

Hansar<strong>in</strong>g 8<br />

63843 Niedernberg<br />

Telefon: 06028 1233-50<br />

Telefax: 06028 1233-99<br />

Hamburg<br />

Billbrookdeich 146<br />

22113 Hamburg<br />

Telefon: 040 733207-10<br />

Telefax: 040 7314231<br />

Hannover<br />

Industriestraße 1<br />

30926 Seelze<br />

Telefon: 0511 4001-346<br />

Telefax: 0511 4001-250<br />

Jena<br />

Stadtrodaer Straße 5<br />

07646 Laasdorf<br />

Telefon: 036428 49017<br />

Telefax: 036428 40705<br />

Köln<br />

Niederkasseler Straße 9<br />

51147 Köln<br />

Telefon: 02203 96624-10<br />

Telefax: 02203 96624-99<br />

Leipzig<br />

Benndorfer Landstraße 2<br />

04509 Delitzsch<br />

Telefon: 034202 324-68<br />

Telefax: 034202 324-69<br />

Magdeburg<br />

Saalestraße 36<br />

39126 Magdeburg<br />

Telefon: 03 91 5011-26<br />

Telefax: 03 91 5011-28<br />

München<br />

Ottostraße 7<br />

85757 Karlsfeld<br />

Telefon: 08131 3814-10<br />

Telefax: 08131 3814-30<br />

Nürnberg<br />

Wetzlarer Straße 13<br />

90427 Nürnberg<br />

Telefon: 0911 30-5041<br />

Telefax: 0911 30-5364<br />

Rostock<br />

Hohe Tannen 9<br />

18196 Waldeck<br />

Telefon: 038208 842-10<br />

Telefax: 038208 842-20<br />

Stuttgart<br />

Weilimdorfer Straße 74/2<br />

70839 Gerl<strong>in</strong>gen<br />

Telefon: 07156 4307-22<br />

Telefax: 07156 4307-24<br />

Export<br />

Altendorfer Straße 120<br />

45143 Essen<br />

Telefon: +49 201 188-3991<br />

Telefax: +49 201 188-3979<br />

export-bautechnik@thyssenkrupp.com<br />

Osteuropa<br />

Altendorfer Straße 120<br />

45143 Essen<br />

Telefon: +49 201 188-2703<br />

Telefax: +49 201 188-3730<br />

osteuropa-bautechnik@thyssenkrupp.com<br />

ThyssenKrupp GfT<br />

Tiefbautechnik GmbH<br />

Alte Liederbacher Straße 6<br />

36304 Alsfeld<br />

Vertrieb:<br />

Telefon: 06631 781-131/132<br />

Telefax: 06631 781-130<br />

Kundendienst<br />

Telefon: 06631 781-122<br />

Ersatzteilservice<br />

Telefon: 06631 781-126<br />

24-Std.-Service<br />

Hotl<strong>in</strong>e: 0170 6326650<br />

tiefbautechnik@thyssenkrupp.com<br />

www.thyssenkrupp-gft-tiefbautechnik.com<br />

• Subject to alterations • TKBT • 07/2009 • DE/ENG<br />

Änderungen bleiben vorbehalten

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!