20.02.2013 Views

Identification and Approval Inspection Record - Layher

Identification and Approval Inspection Record - Layher

Identification and Approval Inspection Record - Layher

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Identification</strong> <strong>and</strong> <strong>Approval</strong> <strong>Inspection</strong> <strong>Record</strong><br />

of mobile working platforms (rolling towers) as per DIN EN 1004<br />

as per Sections 10 <strong>and</strong> 11 of the German Ordinance on Industrial Safety <strong>and</strong> Health (BetrSichV)<br />

Scaffolding erector:<br />

Telephone number:<br />

Place of erection:<br />

Tower No.:<br />

Scaffolding group: � 2 (150 kg/m²) � 3 (200 kg/m²)<br />

The sum of the live loads of all scaffolding levels positioned one above the other inside one scaffolding bay<br />

must not exceed the above value.<br />

Access type:<br />

outside buildings: ________________ m<br />

inside buildings: ________________ m<br />

Restrictions on use applying to the user:<br />

Inspected <strong>and</strong> approved<br />

Qualified person of scaffolding erector:<br />

Date, signature<br />

Qualified person during assembly:<br />

Assembly period:<br />

Qualified person for inspection:<br />

<strong>Inspection</strong> period:<br />

Client:<br />

Telephone number:<br />

� A Stairway � B Step Ladder � C Angled Ladder � D Vertical Ladder<br />

Maximum permissible platform height as per instructions for assembly <strong>and</strong> use.<br />

Unauthorized changes to the scaffolding are prohibited unless the scaffolding erector<br />

has been consulted beforeh<strong>and</strong>! The castors must be locked during work on the scaffolding.<br />

The instructions for assembly <strong>and</strong> use must be carefully complied with!<br />

Wilhelm <strong>Layher</strong> GmbH & Co. KG<br />

Scaffolding Gr<strong>and</strong>st<strong>and</strong>s Ladders<br />

Ochsenbacher Strasse 56<br />

D-74363 Gueglingen-Eibensbach<br />

Qualified person of user:<br />

Date, signature<br />

Tower No.: ____________________________<br />

Notes <strong>and</strong> comments:<br />

Inspected <strong>and</strong> approved<br />

Qualified person of scaffolding erector:<br />

Date, signature<br />

Qualified person of user:<br />

Date, signature<br />

Yes No<br />

Scaffolding components no visible damaged � �<br />

Castors load bearing capacity suitable � �<br />

provided with locking brake / � �<br />

secured by locking screw against breaking loose � �<br />

Ladder Frames paired ladders with double bracing � �<br />

horizontal bracing in the basic structure � �<br />

st<strong>and</strong>ard joints secured (spring clip) � �<br />

Decks decks / hatches in suitable number / spacing � �<br />

Accesses stairway, step ladder, angled ladder or vertical � �<br />

ladder provided<br />

Side protection 3-part side protection fitted at all working levels � �<br />

Ballast ballasting as per instructions for assembly <strong>and</strong> use � �<br />

Widening suitable for height � �<br />

Special structures According to Instructions for Assembly <strong>and</strong> Use / Static � �


Directions for use:<br />

• Level the tower using the adjusting spindles.<br />

• Access to the working platform is permitted only on the inside of the scaffolding.<br />

• Working on two or more working levels at the same time is not permitted.<br />

• The mobile working platform must not be tilted by horizontal loads, such as by pressure<br />

applied to the side protection during demolition work.<br />

• Assembly <strong>and</strong> movement are only permitted on sufficiently firm ground, <strong>and</strong> only in a<br />

longitudinal or diagonal direction. Avoid any impacts.<br />

• No personnel <strong>and</strong>/or loose objects may be on the tower while it is being moved.<br />

• After movement, lock the castors by pressing down the brake lever.<br />

• The scaffolding structures must not be subjected to any aggressive fluids or gases.<br />

• Mobile working platforms must not be connected by bridges to one another or to buildings.<br />

• When the mobile working platform is used outdoors or in open buildings, it must be moved to<br />

a wind-protected area when wind strengths exceed 6 on the Beaufort scale or at the end of a<br />

shift, or secured against toppling over by other suitable measures.<br />

• Decks can also be moved up or down by one rung to reach a different working height (ensure<br />

continued side protection).<br />

• The access hatches must be kept shut whenever they are not in use.<br />

• Climbing over from rolling towers is prohibited.<br />

• Jumping onto decked surfaces is prohibited.<br />

• It is prohibited to increase the height of the deck using ladders, boxes or other objects.<br />

• Mobile working platforms are not designed to be lifted or suspended.<br />

Wilhelm <strong>Layher</strong> GmbH & Co. KG<br />

Scaffolding Gr<strong>and</strong>st<strong>and</strong>s Ladders<br />

Ochsenbacher Strasse 56<br />

D-74363 Gueglingen-Eibensbach<br />

Unauthorized changes to the scaffolding are prohibited unless the scaffolding<br />

erector has been consulted beforeh<strong>and</strong>! The castors must be locked during<br />

work on the scaffolding.<br />

The instructions for assembly <strong>and</strong> use must be carefully complied with!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!