23.02.2013 Views

Transit Guide - Sound Transit

Transit Guide - Sound Transit

Transit Guide - Sound Transit

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SPRING 2008<br />

Link Light Rail Testing<br />

<strong>Sound</strong> <strong>Transit</strong> is gearing up for the opening of its Link light rail line. The light rail trains,<br />

which run in their own right of way free of highway congestion, will begin carrying<br />

passengers from the Downtown Seattle <strong>Transit</strong> Tunnel to Sea-Tac Airport in 2009.<br />

Train testing is now underway in the SODO area, south of downtown<br />

Seattle. Expanded testing along Martin Luther King Jr. Way South in the Rainier Valley<br />

and in Tukwila is scheduled to begin mid-summer, 2008, followed by Beacon Hill and<br />

the Airport segments. More information about train testing and outreach is found at<br />

www.soundtransit.org.<br />

TRAIN<br />

TESTING<br />

Be very careful when crossing light rail tracks<br />

in your car, bicycle or on foot. Always use designated<br />

crossings and obey all signs and signals. Trains can travel<br />

in any direction, on any track, at any time and they are<br />

very quiet, you may not hear them coming.<br />

Stay<br />

Safe & <strong>Sound</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!