<strong>TRIO</strong><br />

The panel formwork with the BFD coupler system<br />

For standard element joints On external corners With filler timber up to 100 mm<br />

For timber extensions<br />

6. T-junctions<br />

Basic rules for T-Junctions<br />

Wall thicknesses 180 – 400 mm and 600 mm<br />

External formwork: with panel TR 90<br />

Internal formwork: with <strong>TRIO</strong> Corner TE<br />

Adapting to wall thicknesses using wall thickness<br />

compensation WDA 5, WDA 6 or timber infills.<br />

90<br />

90<br />

120<br />

270 x 240<br />

TE<br />

TE<br />

TE<br />

TE<br />

TE<br />

TE<br />

7. Bulkhead Formwork<br />

Using the <strong>TRIO</strong> MT/MTF stopend panel with continuous<br />

reinforcement, with or without water bars.<br />

MT centre part,<br />

without water bar<br />

The concrete cover c is<br />

25 mm or 50 mm.<br />

270 x 240<br />

Push-Pull Props and Kicker Braces<br />

Push-pull props and kickers to brace<br />

the formwork and bearing the windload<br />

are to be arranged as shown on the<br />

adjacent diagram and table.<br />

The first panel must always be braced with<br />

2 push-pull props and subsequent panels<br />

Table for PERI Push-Pull Props and Kicker Braces<br />

Formwork height h [m]<br />

Allowable prop spacing [m]<br />

(<strong>ma</strong>x. width of influence)<br />

Actual prop load F RS [kN]<br />

at <strong>ma</strong>ximum spacing<br />

Actual kicker load FAV [kN]<br />

at <strong>ma</strong>ximum spacing<br />

x =<br />

Distance of base plate [m]<br />

from rear face of formwork<br />

y =<br />

*Top connection point [m]<br />

from top of formwork<br />

*If necessary, the distance from top of formwork must be<br />

adapted to the system.<br />

A <strong>ma</strong>ximum force of 11.3 kN is to be led into the building at<br />

the foot of the push-pull-prop for the given width of influence.<br />

Wind loads: h < 8 m = 0.5 kN/m 2<br />

8 m < h < 20 m = 0.8 kN/m 2<br />

<strong>TRIO</strong> Panels<br />

Width<br />

Height<br />

TR 270<br />

m 2<br />

Item no.<br />

Weight<br />

TR 120<br />

m 2<br />

Item no.<br />

Weight<br />

TR 60<br />

m 2<br />

Item no.<br />

Weight<br />

TRA 270<br />

m 2<br />

Item no.<br />

Weight<br />

TRA 90<br />

m 2<br />

Item no.<br />

Weight<br />

WDA 5 (6)<br />

WDA 5<br />

6.48<br />

022570<br />

329.00 kg<br />

350<br />

400<br />

600<br />

3.0<br />

3.53<br />

9.7<br />

2.1<br />

1.2<br />

1.0<br />

(360)<br />

90<br />

90<br />

90<br />

TRM 72<br />

Fig. 1<br />

Fig. 2<br />

4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0<br />

2.73<br />

9.7<br />

2.3<br />

1.6<br />

1.2<br />

2.19<br />

9.8<br />

2.2<br />

2.0<br />

1.5<br />

3.24<br />

022510<br />

162.00 kg<br />

1.44<br />

022600<br />

76.30 kg<br />

0.72<br />

022640<br />

43.40 kg<br />

1.08<br />

023900<br />

33.30 kg<br />

TE<br />

TE<br />

TE<br />

TE<br />

TE<br />

TE<br />

WDA 5 (6)<br />

MT centre part,<br />

with water bar<br />

TRM 72<br />

200<br />

(180)<br />

250<br />

300<br />

(240)<br />

according to the table. They are<br />

connected to the panel with the <strong>TRIO</strong><br />

Brace Connctor and to the slab with the<br />

appropriate base plate and the PERI<br />

anchor bolt MMS 20x130 .<br />

1.82<br />

9.8<br />

2.2<br />

2.4<br />

1.8<br />

1.58<br />

9.8<br />

2.3<br />

2.9<br />

2.0<br />

2.43<br />

022520<br />

115.00 kg<br />

1.08<br />

022610<br />

58.20 kg<br />

0.54<br />

022790<br />

34.70 kg<br />

2.43<br />

023850<br />

70.60 kg<br />

1.42<br />

9.6<br />

2.6<br />

3.5<br />

2.0<br />

F RS1<br />

F RS2<br />

x 1<br />

x 2<br />

y 1<br />

y 2<br />

1.62<br />

022550<br />

87.70 kg<br />

0.72<br />

022640<br />

43.40<br />

0.36<br />

022810<br />

25.90 kg<br />

1.62<br />

023870<br />

49.60 kg<br />

0.54<br />

023950<br />

18.00 kg<br />

1.93<br />

9.4<br />

9.5<br />

2.6<br />

4.3<br />

2.6<br />

1.5<br />

4.5<br />

1.67<br />

11.3<br />

8.5<br />

2.3<br />

4.7<br />

2.6<br />

1.8<br />

5.5<br />

1.49<br />

11.3<br />

9.3<br />

2.1<br />

5.3<br />

2.8<br />

1.8<br />

6.2<br />

0.81<br />

022560<br />

60.60 kg<br />

0.36<br />

022650<br />

28.40 kg<br />

0.18<br />

022820<br />

15.70 kg<br />

0.81<br />

023880<br />

31.70 kg<br />

0.27<br />

023960<br />

10.80 kg<br />

1.35<br />

11.3<br />

10.1<br />

1.9<br />

5.9<br />

3.0<br />

1.8<br />

6.9<br />

1.94<br />

022530<br />

97.60 kg<br />

270x240<br />

90<br />

TRM 72<br />

0.86<br />

022620<br />

48.60 kg<br />

0.43<br />

022800<br />

29.10 kg<br />

8. Wall Connections<br />

270x240<br />

TRM 72<br />

TE<br />

TE<br />

TRM 72<br />

TRM 72<br />

6.<br />

7.<br />

270x240<br />

270x240<br />

2. With WDA or timber<br />

3. With TRM 72<br />

1. With 270x240 2. With TRM 72<br />

Inner corner<br />

with 30 cm<br />

leg length<br />

1.62<br />

022580<br />

69.80 kg<br />

0.72<br />

022660<br />

33.20 kg<br />

0.36<br />

022840<br />

18.00 kg<br />

1.62<br />

023891<br />

42.10 kg<br />

0.54<br />

023971<br />

15.20 kg<br />

1. With 270x240<br />

Multi-purpose<br />

panel with<br />

continuous<br />

tie hole strip<br />

1.94<br />

022540<br />

103.00 kg<br />

0.86<br />

022630<br />

56.20 kg<br />

TAE TAM 72<br />

1.94<br />

023860<br />

60.90 kg<br />

0.65<br />

023980<br />

23.70 kg<br />

TRM 72<br />

TRM 72<br />

For assembly of<br />

base plates.<br />

PERI anchor bolt<br />

MMS 20x130<br />

Item no. 103606<br />

240 120 90 60 30 72 TE TRM 72 TGE<br />

2.88<br />

022514<br />

163.00 kg<br />

WDA 5 (6)<br />

AT MT AT AT MTF AT<br />

c c<br />

c c<br />

h<br />

Fig. 1<br />

0,5 kN/m2 0,5 kN/m2 y<br />

FF AV AV<br />

FF RS RS<br />

x<br />

60°<br />

WDA 5/6<br />

h<br />

0,8 kN/m 2<br />

0,5 kN/m 2<br />

Fig. 2<br />

F AV<br />

y<br />

y<br />

x<br />

F RS 2<br />

60°<br />

x<br />

F RS 1<br />

Hinged corner<br />

from 75°-285°<br />

for inner and<br />

outer corners<br />

1.62<br />

023200<br />

94.80 kg<br />

0.72<br />

032300<br />

43.60 kg<br />

60°<br />

TAR 85<br />

30<br />

Paletten und<br />

Stapelrungen<br />

Betriebsanleitung<br />

2.70 m<br />

3. With TR 30<br />

30<br />

TAR 85<br />

5. Wall Offsets<br />

Up to <strong>ma</strong>x. 200 mm<br />

Up to <strong>ma</strong>x. 860 mm<br />

Lower TAR 85 to be<br />

fixed from below<br />

TAR 85<br />

Stacking Device <strong>TRIO</strong>, galv.<br />

Perm. load 500 kg/piece.<br />

For safe stacking of 5 <strong>TRIO</strong> panels<br />

of any size.<br />

Follow instructions for Use!<br />

Instructions for Use<br />

Pallets and Stacking Devices<br />

Stacking Device <strong>TRIO</strong><br />

Item no. 023390<br />

Working Platforms<br />

Scaffold Bracket<br />

TRG 80 Item no. 023670<br />

TRG 120 Item no. 023680<br />

Planking and Guardrails<br />

Working platforms are to be assembled<br />

according to current valid guidelines.<br />

Maximum spacing of the scaffold<br />

brackets = 1.35 m with a permissible<br />

load of 150 kg/m2 .<br />

Concreting Platform 120 x 270<br />

Item no. 022950<br />

A single platform unit is only 320 mm<br />

high when folded. Each additional unit<br />

adds only 170 mm in height. 13 concreting<br />

platforms (35 m) stacked on top of each<br />

other is equal to the loading height of a<br />

truck.<br />

1466<br />

1. Standard Panel Connections<br />

2 BFD alignment coupler<br />

Item no. 023500<br />

for 2.70 m panel heights.<br />

4. With WDA or timber infills<br />

Stopend tie<br />

TE<br />

TE<br />

TAR 85<br />

TRM 72<br />

TRM 72<br />

60<br />

min.<br />

60<br />

Betriebsanleitung<br />

30<br />

30<br />

<strong>ma</strong>x.<br />

20 cm<br />

<strong>TRIO</strong> Versetzhaken 1,5t<br />

Art.-Nr. 023690<br />

TRM 72<br />

60<br />

Filler timber<br />

<strong>ma</strong>x.<br />

200<br />

Additional BFD for<br />

120 mm offsets upwards<br />

320 170 Transport and Storage<br />

WDA 5/6<br />

60<br />

86 cm<br />

60<br />

TRM 72<br />

TE<br />

TE<br />

TAR 85<br />

5.<br />

Timber<br />

Hook tie<br />

DW 15/400<br />

TAR 85<br />

TAR 85<br />

Stopend tie<br />

Lifting Hook <strong>TRIO</strong><br />

Maximum load capacity of 1.5 t,<br />

<strong>ma</strong>x. lifting gear angle of 30°.<br />

Always use in pairs!<br />

Follow instructions for Use!<br />

Instructions for Use<br />

Lifting Hook <strong>TRIO</strong><br />

Lifting Hook <strong>TRIO</strong><br />

Item no. 023690<br />

Variable filler timber<br />

Only one component is required for all connections<br />

The <strong>TRIO</strong> BFD alignment coupler ensures<br />

that all panel joints are: flush<br />

aligned<br />

tight<br />

in only one step!<br />

3. Corners<br />

<strong>TRIO</strong> Kombigehänge-2<br />

Art.-Nr. 044760<br />

Betriebsanleitung<br />

Filler timber<br />

Filler timber<br />

TE<br />

TRM 72<br />

60<br />

TGE<br />

Basic rules for corners<br />

Wall thicknesses 180 – 400 mm<br />

60<br />

72<br />

Adaptation to wall thickness using<br />

wall thickness compensation WDA 5,<br />

WDA 6 or timber infills<br />

Internal formwork:<br />

With <strong>TRIO</strong> Corner TE<br />

TRM 72<br />

Connection:<br />

2 BFD alignment couplers for h = 2.70 m<br />

TGE<br />

60<br />

4.<br />

2.<br />

3.<br />

Lifting Gear Combi-2 <strong>TRIO</strong><br />

Perm. load 2.9 t with 45° angle of spread of the lifting gear.<br />

The pins are used to move stacks of panels located on the ground.<br />

<strong>TRIO</strong> lifting hooks or <strong>TRIO</strong> stacking devices are attached to the load<br />

hook.<br />

Follow instructions for Use!<br />

Instructions for Use<br />

Lifting Gear Combi-2 <strong>TRIO</strong><br />

Filler timber<br />

Lifting Gear Combi-2 <strong>TRIO</strong><br />

Item no. 044760<br />

Handrail Post Holder <strong>TRIO</strong><br />

Item no. 101592<br />

> 3.00 m<br />

Scaffold Bracket TRG 100/112<br />

Item no. 023590<br />

9.<br />

External formwork:<br />

With TR 72 panels or TRM 72 and TR 60<br />

Connection:<br />

5 BFD alignment couplers for h = 2.70 m<br />

Handrail<br />

Post HSGP<br />

Item no. 034580<br />

WDA 10<br />

<strong>ma</strong>x. 2.10 m or<br />

width of influence 1.35 m<br />

Accessories:<br />

Handrail Post<br />

HSGP<br />

Item no. 034580<br />

9. Shafts<br />

The <strong>TRIO</strong> TSE shaft element allows<br />

complete shaft formwork units to be<br />

moved as one unit.<br />

Shaft Panel TSE 270,<br />

Item no. 105523<br />

<strong>TRIO</strong> shaft panel TSE in a raised<br />

position.<br />

4. Oblique Angles<br />

<strong>TRIO</strong> articulated corner TGE – for internal<br />

and external corners alike.<br />

Articulated<br />

Corner TGE 270<br />

Item no. 023200<br />

TE<br />

TE<br />

60<br />

60<br />

33 30<br />

30 30<br />

� 75°<br />

72<br />

72<br />

ø 24<br />

2. Length Adjustment<br />

Simple and fast solution.<br />

With timber, or timber and formlining,<br />

and BFD alignment coupler up to 100 mm.<br />

2 WDA 5 (6)<br />

TAR 85<br />

Shaft Panel TSE 120,<br />

Item no. 105524<br />

TAR 85<br />

Extensions<br />

Alignment couplers and all-round struts<br />

ensure that extensions with <strong>TRIO</strong> are<br />

simple and easy.<br />

Four BFD couplers are required<br />

for 2.40 m or 2.70 m wide panels<br />

for extensions up to 5.40 m.<br />

Compensation Waler TAR 85<br />

Item no. 023550<br />

<strong>ma</strong>x. 100<br />

Foundations<br />

Individual foundations with<br />

<strong>TRIO</strong> foundation strap<br />

Item no. 023800<br />

When striking, lever crowbar<br />

upwards.<br />

Tie details<br />

Articulated Corner<br />

TGE 120<br />

Item no. 023300<br />

BFD alignment<br />

coupler<br />

200<br />

(180)<br />

350<br />

(360)<br />

WDA 5 (6)<br />

WDA 5 (6) 2 WDA 5<br />

Strip foundations with<br />

Foundation Tie Clamp Item no. 023010<br />

Perforated Foundation Tie Item no. 023020<br />

Top Tie Bracket-2 AH Item no. 023630<br />

Top tie bracket-2 AH<br />

Foundation<br />

tie clamp<br />

Perforated<br />

foundation tie<br />

1.00<br />

TE<br />

TE<br />

60<br />

60<br />

TAR 85<br />

For rectangular shafts, shorten<br />

the chains on the longitudinal<br />

sides – this ensures that all shaft<br />

elements are evenly loaded.<br />

Internal formwork:<br />

with TR 60 or TR 30 panels and articulated<br />

corners<br />

Internal element connection:<br />

4 BFD couplers<br />

Cost-effective solution.<br />

With filler plates from 60 – 360 mm.<br />

LA 270, Item no. 023170<br />

LA 120, Item no. 023270<br />

250<br />

(240)<br />

400<br />

72<br />

72<br />

TAR 85<br />

6 – 300<br />

Extensions up to <strong>ma</strong>x. 8.10 m high<br />

(3 panels at 2.70 m) can be assembled<br />

as one unit.<br />

Two TAR 85 compensation walers and<br />

two BFD alignment couplers are required<br />

for extensions up to 8.10 m.<br />

1.00<br />

Foundation strap<br />

Stop rail<br />

TE<br />

Timber supplied by<br />

contractors for special<br />

wall thicknesses<br />

TE<br />

GSV PERI<br />

60<br />

60<br />

x<br />

72<br />

72<br />

<strong>ma</strong>x. 360<br />

<strong>TRIO</strong><br />

Rahmenschalung<br />

GSV<br />

geprüft<br />

durch neutrales Prüfinstitut<br />

Güteschutzverband<br />

Betonschalungen<br />

Prüfbericht Ausgabe 10/95<br />

External formwork:<br />

with multi-panel TRM 72 and articulated<br />

corners<br />

External element connection:<br />

2 compensation walers TAR 85, 6 BFD<br />

couplers<br />

Opti<strong>ma</strong>l visible surface solution.<br />

With formlining and filler support.<br />

TPP, Alu 270, Item no. 101813<br />

TPP, Alu 120, Item no. 101823<br />

0<br />

5<br />

10<br />

15<br />

20<br />

25<br />

30<br />

35<br />

40<br />

45<br />

50<br />

55<br />

60<br />

65<br />

70<br />

75<br />

TRS 90<br />

240 TE<br />

Extension Units (Steel)<br />

Formwork should be assembled<br />

to its full height on the ground!<br />

Width<br />

Height<br />

240 / 270<br />

300<br />

330<br />

or <strong>TRIO</strong> 330<br />

360<br />

390<br />

450<br />

480<br />

540<br />

Tips for trouble-free progress<br />

• Spray formwork on all sides with PERI BIO Clean<br />

before every use.<br />

• Spray back of formwork with water immediately<br />

after concreting to reduce the cleaning work.<br />

• Always start at a corner or difficult area.<br />

Pay attention to the wall thickness. See corners.<br />

• Only use the required number of ties. Unused tie holes<br />

must be sealed with plugs ø 20/24, item no 030300.<br />

• More infor<strong>ma</strong>tion can be found in the <strong>TRIO</strong> Assembly<br />

Instructions.<br />

Filler plate LA Formlining Filler support TPP<br />

TAR 85<br />

TAR 85<br />

Without exception, current safety regulations must be observed<br />

in those countries where our products are used.<br />

geprüft<br />

durch neutrales Prüfinstitut<br />

Güteschutzverband<br />

Betonschalungen<br />

300<br />

240<br />

Filler timber<br />

Since production began, <strong>TRIO</strong> has always fulfilled the<br />

highest requirements regarding the formwork evenness.<br />

2.70 m steel elements have been certified according<br />

to GSV guidelines (Ger<strong>ma</strong>n Formwork Association).<br />

81 kN/m 2 uniform area load, DIN 18202, Table 3, Line 6.<br />

67.5 kN/m 2 triangular load, DIN 18202, Table 3, Line 7.<br />

Permissible fresh concrete pressure for aluminium elements<br />

60 kN/m 2 uniform area load, DIN 18202, Table 3, Line 7.<br />

60 kN/m 2 h = 2.70 m, DIN 18202, Table 3, Line 6.<br />

TRS 90<br />

240<br />

TAR 85<br />

TRM 72 TGE<br />

TRS 90<br />

TRS 90<br />

0<br />

5<br />

10<br />

15<br />

20<br />

25<br />

30<br />

35<br />

40<br />

45<br />

50<br />

55<br />

60<br />

65<br />

70<br />

75<br />

120<br />

60<br />

Filler timber<br />

TAR 85<br />

TRM 72<br />

60<br />

Filler timber<br />

TAR 85<br />

TRM 72<br />

60 TGE<br />

240<br />

120<br />

TGE<br />

Corner construction:<br />

600 mm wall thickness<br />

Perm. fresh concrete pressure 60 kN/m 2 .<br />

Important:<br />

Along the length L of 2.25 m, 3<br />

BFD alignment couplers are<br />

required per element joint.<br />

600<br />

240<br />

240<br />

L<br />

Corner construction:<br />

80 cm wall thickness<br />

Perm. fresh concrete pressure 60 kN/m 2 .<br />

Important:<br />

Along the length L of 3.00 m,<br />

3 BFD alignment couplers are<br />

required per element joint.<br />

800<br />

Test report available<br />

on request.<br />

L<br />

L<br />

TE<br />

240<br />

60<br />

600<br />

90<br />

800<br />

90 TRM 72 240<br />

TGE<br />

L<br />

165°<br />

TGE<br />

TGE<br />

150°<br />

135°<br />

<strong>TRIO</strong> Column<br />

60<br />

TAR 85<br />

TRM 72<br />

60<br />

TAR 85<br />

TRM 72<br />

TAR 85<br />

TRM 72<br />

With elements for walls and columns<br />

Can be used as column panels for crosssections<br />

of up to 750 x 750 mm.<br />

Used in the wall as “standard” 900 mm<br />

formwork panel.<br />

Permissible fresh concrete pressure<br />

100 kN/m 2 .<br />

<strong>ma</strong>x.<br />

750x750<br />

Ready-to-use 5.40 m high <strong>TRIO</strong> column<br />

formwork with concreting platform,<br />

access ladder and push-pull props.<br />

Tie Rod<br />

Cylinder Yoke<br />

Item no. 022030<br />

TAR 85<br />

TRM 72<br />

60<br />

Filler timber<br />

TGE<br />

120°<br />

Tie hole positions<br />

Unused tie holes<br />

Compensation waler TAR 85<br />

BFD alignment coupler<br />

TGE<br />

TAR 85<br />

TRM 72 TGE<br />

30 TGE<br />

270 240 120 90 72 60 30 TE TGE TGE TE<br />

60<br />

For square or rectangular columns<br />

up to 750 x 750 mm.<br />

75°<br />

60<br />

30<br />

TAR 85<br />

TRM 72<br />

TRM 72<br />

TAR 85<br />

Compensation Waler<br />

TAR 85<br />

Item no. 023550<br />

Universal Waler 245<br />

Item no. 023920<br />

Waler Stop<br />

Item no. 023930<br />

Internal Internal External External<br />

Edition 02/2008


<strong>TRIO</strong><br />

Panel Formwork<br />

<strong>Poster</strong><br />

Edition 02/2008


PERI Product Range<br />

Wall Formwork<br />

Panel Formwork<br />

Girder Formwork<br />

Circular Formwork<br />

Facade Formwork<br />

Brace Frame<br />

Column Formwork<br />

Square<br />

Rectangular<br />

Circular<br />

Slab Formwork<br />

Panel Formwork<br />

Beam Grid Formwork<br />

Girder Formwork<br />

Slab Table<br />

Beam Formwork<br />

Shoring Systems<br />

Steel Slab Props<br />

Aluminium Slab Props<br />

Tower Systems<br />

Heavy-Duty Props<br />

PERI GmbH<br />

Formwork Scaffolding Engineering<br />

P.O. Box 1264<br />

89259 Weissenhorn<br />

Ger<strong>ma</strong>ny<br />

Tel +49 (0)73 09.9 50- 0<br />

Fax +49 (0)73 09.9 51- 0<br />

info@peri.de<br />

www.peri.de<br />

Climbing Systems<br />

Climbing Scaffold<br />

Self-Climbing System<br />

Climbing Protection Panel<br />

Platform Systems<br />

Scaffold, Stairways,<br />

Working Platforms<br />

Facade Scaffold<br />

Working Platform<br />

Weather Protection Roof<br />

Stairway Access<br />

Bridge and Tunnel<br />

Formwork<br />

Cantilevered Parapet Carriage<br />

Cantilevered Parapet Platform<br />

Engineer´s Construction Kit<br />

Services<br />

Formwork Assembly<br />

Cleaning / Repairs<br />

Formwork Planning<br />

Software<br />

Statics<br />

Special Constructions<br />

Additional Systems<br />

Plywood<br />

Formwork Girders<br />

Stopend Systems<br />

Pallets<br />

Transportation Containers<br />

D e 02/2008 10<strong>ma</strong> Art. Nr.: 790909 © Copyright by PERI GmbH