02.03.2013 Views

Effective: 08-01-11 - TECO-Westinghouse Motor Company

Effective: 08-01-11 - TECO-Westinghouse Motor Company

Effective: 08-01-11 - TECO-Westinghouse Motor Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FACTORY MODIFICATION PRICING<br />

MODIFICATION LEAD TIME<br />

1. TWMC standard lead time for all modifications is 5-10 working days. If shorter lead time is required, please contact TWMC.<br />

Expediting fees may apply.<br />

2. Modification lead time does not include transit time.<br />

3. Lead time is based upon availability of parts.<br />

Note: M2X is the only modification that can be done to our explosion-proof motors<br />

MOD.<br />

NUMBER<br />

DESCRIPTION<br />

LIST PRICE<br />

56-180T 210T 250T 280T 320T 360T 400T 440T 5000<br />

Notes:<br />

(1) Please double the List Price for 240 Volt Space Heaters operated on 120 Volts.<br />

(2) Price includes the flange.<br />

(3) Only 1/ phase available for 360 frames and smaller.<br />

(4) Price is per bearing.<br />

(5) Not required for MAX-E2® or MAX-E2/841®.<br />

(6) For frames 140T through 400T, please use MAX-E2/841®.<br />

(7) Not available for Hybrid 449T/ TS frames: EP3006, EP3502, EP3504, HB3006, HB3502 and HB3504.<br />

<strong>Effective</strong> <strong>08</strong>-<strong>01</strong>-<strong>11</strong><br />

Supercedes 12-<strong>01</strong>-09<br />

M1 Nameplate Change 95 95 95 95 95 95 95 95 95 95<br />

M1A Additional Nameplate 127 127 127 127 127 127 127 127 127 127<br />

M1B 304 Stainless Steel Hardware N/A N/A 425 550 675 850 1050 1325 1550 1850<br />

M2 (1) Space Heater 370 370 446 486 549 549 612 751 1,525 1,733<br />

M2A (1) Space Heater w/ Auxiliary Box 8<strong>01</strong> 8<strong>01</strong> 907 978 1,047 1,<strong>11</strong>6 1,185 1,325 1,925 2,137<br />

M2X Space Heater “Explosion Proof” 558 558 697 838 978 978 1,<strong>11</strong>6 1,395 N/A N/A<br />

M3C (2) Installation of C-Face 300 384 468 677 823 1,047 1,475 2,093 5,580 6,278<br />

Installation of C-Face w/ INPRO Seal<br />

(MAX-E2/841® only)<br />

613 873 1,256 1,395 1,744 1,953 2,372 2,372 N/A N/A<br />

M3D (7) Installation of D-Flange 300 N/A 468 677 823 1,047 1,475 2,093 5,580 6,278<br />

Installation of D-Flange w/ INPRO Seal<br />

(MAX-E2/841® only)<br />

613 N/A 1,256 N/A N/A N/A 2,372 2,372 N/A N/A<br />

M4 (3) Stator Winding RTD’s, 100 Ohm Platinum<br />

(1/ Phase)<br />

809 924 982 982 1,<strong>11</strong>6 1,<strong>11</strong>6 1,271 1,271 1,617 1,617<br />

M4A (3) Stator Winding RTD's w/ Auxiliary Box<br />

(1/ Phase)<br />

N/A N/A N/A N/A N/A 1,744 1,744 1,744 2,232 2,302<br />

M4B (3) Stator Winding RTD’s, 100 Ohm Platinum<br />

w/ Auxiliary Box (2/ Phase)<br />

N/A N/A N/A N/A N/A N/A 3,244 3,244 3,732 3,802<br />

M5 Thermistors (1/ Phase) 558 838 838 838 1,<strong>11</strong>6 1,<strong>11</strong>6 1,<strong>11</strong>6 1,<strong>11</strong>6 1,395 1,395<br />

M5A Thermistors (1/ Phase) w/ Auxiliary Box 1,271 1,386 1,395 1,395 1,675 1,744 1,744 1,744 2,232 2,302<br />

M6 Thermostats (1/ Phase) 279 418 418 418 558 589 670 670 697 697<br />

M6A Thermostats (1/ Phase) w/ Auxiliary Box 8<strong>01</strong> 942 978 978 1,<strong>11</strong>6 1,185 1,185 1,185 1,535 1,604<br />

M7<br />

Bearing RTD’s, 100 Ohm Platinum<br />

(2/ <strong>Motor</strong>)<br />

N/A N/A N/A N/A N/A N/A 3,004 3,004 3,004 3,004<br />

M8 (4) Bearing Conversion - Roller to Ball<br />

or Ball to Roller<br />

N/A N/A N/A N/A N/A 2,310 2,625 3,437 5,<strong>08</strong>2 5,544<br />

M8A (4) Convert to Ceramic Bearings 998 1,575 1,680 1,838 2,520 3,413 4,095 6,563 <strong>11</strong>,025 14,175<br />

M8B (4) Convert to Insulated Bearings 840 840 1,100 1,707 1,707 1,707 2,048 3,282 5,512 7,<strong>08</strong>8<br />

M9 Change Rotation N/A N/A N/A N/A N/A N/A N/A N/A 2,587 2,587<br />

M9A Change to Low Noise Fan/ Fan Cover N/A N/A N/A N/A N/A N/A N/A QUOTE QUOTE QUOTE<br />

M10<br />

Shorten Shaft to NEMA TS Dimensions;<br />

Non-NEMA Dim Requires TWMC Drawing<br />

N/A N/A N/A 1,256 1,395 1,535 1,675 1,953 QUOTE QUOTE<br />

M10A<br />

Special Keyless 4140 Shaft Ext.<br />

for 5000 Frames and Above<br />

N/A N/A N/A N/A N/A N/A N/A N/A QUOTE QUOTE<br />

M<strong>11</strong> F1 to F2 Mounting Conversion 210 264 377 377 377 503 503 589 9,486 9,486<br />

M12 Oversized Main Conduit Box N/A N/A N/A N/A N/A N/A N/A 4,620 4,620 4,620<br />

M12A Fully Loaded Main Conduit Box N/A N/A N/A N/A N/A N/A N/A 18,480 18,480 18,480<br />

M3C841 (2)<br />

M3D841 (2)<br />

5800<br />

& UP<br />

www.tecowestinghouse.com or call 1-800-USE-<strong>TECO</strong> | 73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!