05.03.2013 Views

ProSafe 7000 Managed NETGEAR Switch Software Administration ...

ProSafe 7000 Managed NETGEAR Switch Software Administration ...

ProSafe 7000 Managed NETGEAR Switch Software Administration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Enable Both LAGs<br />

38 | Chapter 3. LAG s<br />

<strong>ProSafe</strong> <strong>7000</strong> <strong>Managed</strong> <strong>Switch</strong> Release 8.0.3<br />

The example is shown as CLI commands and as a Web interface procedure.<br />

CLI: Enable Both LAGs<br />

By default, the system enables link trap notification.<br />

(Console) #config<br />

(Console) (Config)#port-channel adminmode all<br />

(Console) (Config)#exit<br />

At this point, the LAGs could be added to VLANs.<br />

Web Interface: Enable Both LAGs<br />

a. Select <strong>Switch</strong>ing > LAG > LAG Configuration. A screen similar to the following<br />

displays.<br />

b. Select the top check box and the check boxes for lag_10 and lag_20 are selected.<br />

c. In the Admin Mode field, select Enable.<br />

d. Click Apply to save the settings.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!