28.09.2012 Views

group - INTEGRA Holding AG

group - INTEGRA Holding AG

group - INTEGRA Holding AG

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Electrical work in Büren a.A.<br />

Signals along highway A2: Belchen tunnel<br />

Tunnel safety<br />

SIGNAL Ltd. is widely known as a dependable partner. Each of our branches have a<br />

team of advisors and a service bay for assembly and marking tasks. We invest in our<br />

employees to enable them to stay at the cutting-edge and they are fully versed with<br />

all relevant standards, laws, and regulations.<br />

We strive to understand the technical and other needs of our clients to enable us to<br />

deliver what is expected – in a competent manner, from the initial planning stage<br />

through to execution and service.<br />

At SIGNAL Ltd., our highest priority is quality, occupational safety, and environmental<br />

protection. We have been awarded three certifications pursuant to ISO 9001 for quality<br />

management, ISO 14001 for environmental protection, and OHSAS 18001 for occupational<br />

safety. Our prism signals passed the EN 12966 CE certification in 2011.<br />

FY2011<br />

We continued on our path of success in FY2011. Our staff of roughly 210 achieved<br />

operating revenues of over CHF 50,0 million – marking the second best performance<br />

in our 65-year history.<br />

The signals unit saw strong demand for information systems, signs for traffic zones,<br />

and speed limiting signs. The street marking unit grew well, mainly as a result of infrastructure<br />

optimization and lengthy periods of good weather. We successfully completed<br />

large projects during the year, such as the A16 Transjurane highway, the<br />

Belchen tunnel along highway A2, and the traffic information system in Lucerne. The<br />

only strategic goals that remained unfulfilled in 2011 resulted from the strong Swiss<br />

Franc and postponement of some projects.<br />

Outlook<br />

We aim to keep pushing the successful strategy we have pursued over the last few<br />

years. Our head office in Büren a.A. and the 11 branch offices can look forward to continued<br />

success in the short term, with a positive outlook for 2012. We will bolster our<br />

sales and street marking units, with special emphasis on the growing segments – systems<br />

and solutions with electronic barriers, automated bollards, dynamic information<br />

and display systems, and parking control systems. Our order backlog includes major<br />

highway projects for the traffic signals unit and for the stage two overhaul of the<br />

Lucerne ring road, the city tangent of Berne, the six-lane expansion for Blegi-Rütihof<br />

in the canton of Zug, and for further sections of the A16 Transjurane highway.<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!