<strong>REQUEST</strong> <strong>FOR</strong> <strong>PROPOSAL</strong><br />

DIRECTOR GENERAL NAVAL PROJECT, MUMBAI-23<br />

AUGMENTATION OF POWER SUPPLY AND FREQUENCY CONVERTER<br />

ARRANGEMENTS <strong>FOR</strong> BRAHMAPUTRA CLASS OF SHIPS<br />

Request for Proposal No.DGNP (MBI)/7564/B’PUTRA dated 14 Dec 12<br />

INSTRUCTIONS TO BIDDERS<br />

1. Bids <strong>in</strong> sealed cover are <strong>in</strong>vited from Orig<strong>in</strong>al Equipment Manufacturers<br />

(OEMs) or authorised dealers of OEMs for Augmentation of Power Supply and<br />

Frequency Converter Arrangements for Brahmaputra Class of Ships as listed <strong>in</strong> Part<br />

II of this RFP. Please super scribe the abovementioned Title, RFP number and date<br />

of open<strong>in</strong>g of the Bids on the sealed cover to avoid the Bid be<strong>in</strong>g declared <strong>in</strong>valid.<br />

2. Qualification Criteria: To qualify, an applicant must demonstrate to<br />

DGNP(MBI) that it substantially satisfies the requirements regard<strong>in</strong>g experience,<br />

design, personnel, f<strong>in</strong>ancial position and litigation history. The qualification will<br />

therefore be based on the applicant meet<strong>in</strong>g the m<strong>in</strong>imum criteria regard<strong>in</strong>g the<br />

applicant’s general and specific experience, personnel and equipment capabilities,<br />

and f<strong>in</strong>ancial position, specified <strong>in</strong> the Qualification criteria, as demonstrated by the<br />

applicant’s responses <strong>in</strong> the forms attached and other requested documentation.<br />

DGNP(MBI) reserves the right to waive off m<strong>in</strong>or deviations from the criteria if they<br />

do not materially affect the capability of an applicant to perform the contract. Any<br />

tender submitted without the necessary support<strong>in</strong>g documents is liable to be<br />

rejected. M<strong>in</strong>imum qualify<strong>in</strong>g criteria for the quot<strong>in</strong>g firms is as follows:-<br />

(a) Constitution, legal status and registration (class and type) with other<br />

government agencies and previous qualification for similar work <strong>in</strong>clud<strong>in</strong>g the<br />

grade awarded would be required.<br />

(b) OEM or authorised dealership certificate.<br />

(c) F<strong>in</strong>ancial Position. The Supplier should satisfy the follow<strong>in</strong>g<br />

requirements:-<br />

(i) Average f<strong>in</strong>ancial turnover (I.T.C.C, Annual Report, Balance<br />

sheet and profit & loss statement to be enclosed) of the quot<strong>in</strong>g<br />

firm/Pr<strong>in</strong>cipals for last 03 years of FY end<strong>in</strong>g 31 Mar 12 should be at<br />

least Rs. 5 Crores.<br />

(ii) F<strong>in</strong>ancial stand<strong>in</strong>g as certified by Banker, audited profit & loss<br />

and audited balance sheets for the last three years should be<br />

submitted and must demonstrate the soundness of the applicant’s<br />

f<strong>in</strong>ancial position, show<strong>in</strong>g long term profitability. Where necessary,<br />

DGNP(MBI) will make enquiries with the applicant’s bankers and/or<br />

other sources as applicable.<br />

Page 1 of 56


(iii) The applicant shall demonstrate that he has access to, or has<br />

available, liquid assets, unencumbered real assets, l<strong>in</strong>es of credit, and<br />

other f<strong>in</strong>ancial means sufficient to meet the construction cash flow for<br />

the contract, net of the applicant’s commitments for other contracts.<br />

The applicant must submit a solvency certificate to demonstrate that a<br />

level of work<strong>in</strong>g capital or credit is available to support the statement<br />

on f<strong>in</strong>anc<strong>in</strong>g of project.<br />

(d) Specific Experience. Firm/Pr<strong>in</strong>cipals should have experience <strong>in</strong><br />

design & manufacture of power supply and frequency converter arrangements<br />

and its associated system/sub systems.<br />

(e) Litigation History. The applicant shall provide accurate <strong>in</strong>formation<br />

on any current or past litigation or arbitration result<strong>in</strong>g from contracts<br />

completed or under execution by him over the last ten years. A history of<br />

awards aga<strong>in</strong>st the applicant can be a ground for disqualification of<br />

application. DGNP(MB) reserves the right to verify the facts wherever<br />

applicable and disqualify applicants on this account. In addition, an Affidavit<br />

on judicial stamp paper stat<strong>in</strong>g that the firm is not banned or blacklisted and<br />

no recovery outstand<strong>in</strong>g <strong>in</strong> any govt. department will be required.<br />

(f) Current Work Load and EDC. The applicants shall submit details of<br />

current orders with expected dates of completion (EDC) of work. Also, for<br />

works <strong>in</strong> progress, the percentage of work completed as on 31 Mar 12 is to be<br />

<strong>in</strong>cluded. Availability of qualified manpower with firm for the execution of the<br />

project and attend<strong>in</strong>g calls dur<strong>in</strong>g warranty period is to be confirmed by the<br />

applicant.<br />

(g) Open<strong>in</strong>g of ‘Q’ Bids.<br />

(i) ‘Q’ bids of only those firms that have been qualified dur<strong>in</strong>g<br />

Tech<strong>nic</strong>al evaluation would be opened. Submission or participation by<br />

a tenderer for more than one tender for the present RFP will result <strong>in</strong><br />

disqualification of all tenders submitted by him for this RFP.<br />

(ii) Failure to provide <strong>in</strong>formation which is essential to evaluate the<br />

applicant’s qualifications or to provide timely clarification or<br />

substantiation of the <strong>in</strong>formation supplied will result <strong>in</strong> disqualification of<br />

the applicant.<br />

(iii) DGNP(MB) reserves the right to:-<br />

-Amend the scope and value of the contract be<strong>in</strong>g tendered.<br />

-Reject or accept any application.<br />

-Cancel the qualification process and reject all applications<br />

without assign<strong>in</strong>g any reasons.<br />

(h) Language. The rul<strong>in</strong>g language of the application shall be English.<br />

Page 2 of 56


3. General Information about the tender:-<br />

(a) Tender reference No DGNP (MBI)/7564/B’PUTRA<br />

(b) Last date and time for receipt of tenders: 15 Jan 2013 / 1400 Hrs<br />

(c) Date and Time for open<strong>in</strong>g of tenders: 15 Jan 2013 / 1500 Hrs<br />

(d) Place of open<strong>in</strong>g of tenders: DGNP Build<strong>in</strong>g Naval Dockyard, Mumbai<br />

(e) Pre-Bid Conference between 07 Jan 2013 and 11 Jan 2013 at JPD(L)<br />

Office, DGNP(MBI) Tel No. 022-22751884/ 22751665 (The details of<br />

personnel attend<strong>in</strong>g is to be <strong>in</strong>timated one day prior to the pre-bid meet<strong>in</strong>g)<br />

(f) For clarification contact as follows:-<br />

Clarification on Tech<strong>nic</strong>al matters/Scope of Work<br />

The Director General Naval Project<br />

[for JPDL]<br />

Naval Dockyard<br />

Mumbai 400023<br />

Tele:- 022-22751884/22751665/22661144/22751937<br />

Fax:- 022-22661142<br />

e-mail : wncdgnp-navy@<strong>nic</strong>.<strong>in</strong><br />

4. This RFP is divided <strong>in</strong>to five parts as follows:-<br />

(a) Part I – Conta<strong>in</strong>s General Information and Instructions for the Bidders<br />

about the RFP such as the time, place of submission and open<strong>in</strong>g of tenders,<br />

Validity period of tenders, etc.<br />

(b) Part II – Conta<strong>in</strong>s essential details of the items/services required, such<br />

as the Schedule of Requirements (SOR), Tech<strong>nic</strong>al Specifications, Delivery<br />

Period, Mode of Delivery and Consignee details.<br />

(c) Part III – Conta<strong>in</strong>s Standard Conditions of RFP, which will form part of<br />

the Contract with the successful Bidder.<br />

(d) Part IV – Conta<strong>in</strong>s Special Conditions applicable to this RFP and which<br />

will also form part of the contract with the successful Bidder.<br />

(e) Part V – Conta<strong>in</strong>s Evaluation Criteria and Format for Price Bids.<br />

Page 3 of 56


Commercial Bid<br />

5. The Commercial bid is to be submitted strictly <strong>in</strong> accordance with Enclosure -<br />

V to this tender enquiry. This format is to be strictly adhered to for submission of<br />

commercial bid. Non compliance could result <strong>in</strong> disqualification of the firm. The<br />

Commercial bid once opened, will not be subjected to unilateral revision by the firm,<br />

unless the firm is called for price negotiations specifically and asked to justify the<br />

rates. (Total Nos of pages <strong>in</strong> the Q-bid are to be mentioned on the first page of<br />

the Q-bid. Further each page to be numbered. For example if there are 20<br />

pages <strong>in</strong> Q bid, first page to be numbered as 1/20 and last page to be<br />

numbered as 20/20.)<br />

Conditions under which this RFP is issued<br />

6 This RFP is be<strong>in</strong>g issued with no f<strong>in</strong>ancial commitment and Buyer reserves<br />

the right to change or vary any part thereof at any stage. The Buyer reserves the<br />

right to reject any or all of the offers without assign<strong>in</strong>g any reason whatsoever. The<br />

Buyer also reserves the right to withdraw the RFP should it be so necessary at any<br />

stage.<br />

Note: - The bids of vendors not qualify<strong>in</strong>g the m<strong>in</strong>imum aforesaid qualification criteria<br />

are liable to be rejected.<br />

Page 4 of 56


Part I – General Information<br />

1. Two Bid System. In this Two-bid system, the bidders are to forward their<br />

quotes for the complete scope of work <strong>in</strong> two parts as follows:-<br />

(a) Part I: Tech<strong>nic</strong>al Bid (‘T’ bid): The ‘T’ bid should cover the<br />

complete scope of supply, progress schedule / timel<strong>in</strong>es and delivery<br />

durations, etc. The specifications should be well documented and supported<br />

by draw<strong>in</strong>gs, manuals, relevant calculations and descriptive text as necessary<br />

for an evaluation to be made. A copy of unpriced ‘Q’ bid must be <strong>in</strong>cluded<br />

alongwith the ‘T’ bid. This will be identical to the sealed ‘Q’-bid, but<br />

without any <strong>in</strong>dication of the prices.<br />

(b) Part II: Commercial Bid (‘Q’ bid): The ‘Q’ bid should give the cost of<br />

each item as per format enclosed.<br />

2. The Tech<strong>nic</strong>al bid and the Commercial bid should be sealed by the bidder <strong>in</strong><br />

separate covers duly super scribed and both these sealed covers are to be put <strong>in</strong> a<br />

s<strong>in</strong>gle cover which should also be sealed and duly super scribed as under:-<br />

“Augmentation of Power Supply and Frequency Converter Arrangements for<br />

Brahmaputra Class of Ships”. [Part I (Tech<strong>nic</strong>al) / Part II (Commercial)] is also<br />

to be <strong>in</strong>dicated as applicable on <strong>in</strong>ner covers.<br />

3. Earnest Money Deposit (EMD) shall be kept with the cover conta<strong>in</strong><strong>in</strong>g ‘T’ bid.<br />

4. The bidders have to strictly furnish clause by clause compliance of<br />

specifications br<strong>in</strong>g<strong>in</strong>g out clearly the deviations from specifications, if any.<br />

The Bidders are advised to submit the compliance statement <strong>in</strong> the follow<strong>in</strong>g format<br />

along with ‘T’ bid. In case of non-compliance, deviation from RFP is to be specified <strong>in</strong><br />

unambiguous terms.<br />

Para of RFP<br />

Specifications<br />

Specification of<br />

Item offered<br />

Compliance to RFP<br />

specification – whether<br />

Yes or No<br />

Page 5 of 56<br />

In case of noncompliance,<br />

Deviation from<br />

RFP<br />

5. Last Date and Time for Deposit<strong>in</strong>g the Bids. 15 Jan 2013 by 1400 hrs.<br />

The sealed Bids (both Tech<strong>nic</strong>al and Commercial) should be deposited/reach by the<br />

due date and time. The responsibility to ensure this lies with the Bidder.<br />

6. Manner of deposit<strong>in</strong>g the Bids. Sealed Bids should be either dropped <strong>in</strong> the<br />

Tender Box marked as DGNP(MBI) or sent by registered post at the address given<br />

above so as to reach by the due date and time. Late tenders will not be considered.<br />

No responsibility will be taken for postal delay or non-delivery/ non-receipt of Bid<br />

documents. Bids sent by FAX or e-mail will not be considered. Hand written Bids will<br />

not be considered and will be rejected outright.


7. Time and date for open<strong>in</strong>g of Bids: 15 Jan 2013 at 1500 hrs If due to any<br />

exigency, the due date for open<strong>in</strong>g of the Bids is declared a closed holiday, the Bids<br />

will be opened on the next work<strong>in</strong>g day at the same time or on any other day/time, as<br />

<strong>in</strong>timated by the Buyer. The date of open<strong>in</strong>g of Commercial Bid will be <strong>in</strong>timated after<br />

acceptance of Tech<strong>nic</strong>al Bids.<br />

8. Location of the Tender Box. Muster Gate, Naval Dockyard, Mumbai<br />

Only those Bids that are found <strong>in</strong> the ‘DGNP’ tender box will be opened. Bids<br />

dropped <strong>in</strong> the wrong Tender Box will be rendered <strong>in</strong>valid.<br />

9. Place of open<strong>in</strong>g of the Bids. Office of Director General Naval Project,<br />

(Mumbai) Cruiser Grav<strong>in</strong>g Dock Accommodation Complex, 5 th floor,<br />

Conference Hall, Lion Gate, Naval Dockyard, Mumbai. The Bidders may depute<br />

their representatives, duly authorized <strong>in</strong> writ<strong>in</strong>g, to attend the open<strong>in</strong>g of Bids on the<br />

due date and time. Rates and important commercial/tech<strong>nic</strong>al clauses quoted by all<br />

Bidders will be read out <strong>in</strong> the presence of the representatives of all the Bidders. This<br />

event will not be postponed due to non-presence of your representative.<br />

10. Forward<strong>in</strong>g of Bids. Bids should be forwarded by Bidders under their orig<strong>in</strong>al<br />

memo / letter pad <strong>in</strong>ter alia furnish<strong>in</strong>g details like TIN number, VAT/CST number,<br />

PAN number, Bank address with EFT Account if applicable, etc and complete postal<br />

& e-mail address of their office.<br />

11. Pre-Bid meet<strong>in</strong>g. Pre-bid meet<strong>in</strong>g will be scheduled between 07 Jan 13 and<br />

11 Jan 13 for clarify<strong>in</strong>g issues and clear<strong>in</strong>g doubts, about the specification and other<br />

tech<strong>nic</strong>al details of the equipment projected <strong>in</strong> the RFP. Firms are required to take<br />

prior appo<strong>in</strong>tment for the same. It is advised to all the bidd<strong>in</strong>g firms should attend the<br />

pre-bid meet<strong>in</strong>g <strong>in</strong> their own <strong>in</strong>terest. Firms are also advised to visit the site to<br />

ascerta<strong>in</strong> the requirement and scope to avoid any change of scope <strong>in</strong> future.<br />

12. Modification and Withdrawal of Bids. A bidder may modify or withdraw his<br />

bid after submission provided that the written notice of modification or withdrawal is<br />

received by the Buyer prior to deadl<strong>in</strong>e prescribed for submission of bids. A<br />

withdrawal notice may be sent by fax but it should be followed by a signed<br />

confirmation copy to be sent by post and such signed confirmation should reach the<br />

purchaser not later than the deadl<strong>in</strong>e for submission of bids. No bid shall be modified<br />

after the deadl<strong>in</strong>e for submission of bids. No bid may be withdrawn <strong>in</strong> the <strong>in</strong>terval<br />

between the deadl<strong>in</strong>e for submission of bids and expiration of the period of bid<br />

validity specified. Withdrawal of a bid dur<strong>in</strong>g this period will result <strong>in</strong> Bidder’s<br />

forfeiture of bid security.<br />

13. Clarification Regard<strong>in</strong>g Contents of the Bids. Dur<strong>in</strong>g evaluation and<br />

comparison of bids, the Buyer may, at its discretion, ask the bidder for clarification of<br />

his bid. The request for clarification will be given <strong>in</strong> writ<strong>in</strong>g and no change <strong>in</strong> prices or<br />

substance of the bid will be sought, offered or permitted. No post-bid clarification on<br />

the <strong>in</strong>itiative of the bidder will be enterta<strong>in</strong>ed.<br />

14. Rejection of Bids. Canvass<strong>in</strong>g by the Bidder <strong>in</strong> any form, unsolicited letters<br />

and post-tender corrections may <strong>in</strong>voke summary rejection with forfeiture of EMD.<br />

Conditional tenders will be rejected.<br />

Page 6 of 56


15. Validity of Bids. The Bids should rema<strong>in</strong> valid till 120 days from the last date<br />

of submission of the Bids.<br />

16. Earnest Money Deposit. Bidders are required to submit Earnest Money<br />

Deposit (EMD) for amount of 30 Lakhs along with their bids. The EMD may be<br />

submitted <strong>in</strong> the form of an Account Payee Demand Draft, Fixed Deposit Receipt,<br />

Banker's Cheque or Bank Guarantee from any of the public sector banks or a private<br />

sector bank authorised to conduct government bus<strong>in</strong>ess as per Form DPM-13<br />

(Available <strong>in</strong> MoD website and placed at Enclosure to Part I). EMD is to rema<strong>in</strong><br />

valid for a period of forty five days beyond the f<strong>in</strong>al bid validity period. EMD of<br />

the unsuccessful bidders will be returned to them at the earliest after expiry of the<br />

f<strong>in</strong>al bid validity and latest on or before the 30th day after the award of the contract.<br />

EMD is not required to be submitted by those Bidders who are registered with the<br />

Central Purchase Organization (e.g. DGS&D), or any Department of MoD for the<br />

same items/ range of products or services for which the tenders have been<br />

issued. However, the firm has to submit the valid registration proof along with the<br />

bid. The Bid Security of the successful bidder would be returned, without any <strong>in</strong>terest<br />

whatsoever, after the receipt of Performance Security from them as called for <strong>in</strong> the<br />

contract. The EMD will be forfeited if the bidder withdraws or amends impairs or<br />

derogates from the tender <strong>in</strong> any respect with<strong>in</strong> the validity period of their tender.<br />

17. Unwill<strong>in</strong>gness to quote. Bidders unwill<strong>in</strong>g to quote should ensure that<br />

<strong>in</strong>timation to this effect reaches before the due date and time of open<strong>in</strong>g of the Bid,<br />

fail<strong>in</strong>g which the default<strong>in</strong>g Bidder may be de-listed for the given range of items as<br />

mentioned <strong>in</strong> this RFP.<br />

18. Independent Monitor. The buyer has appo<strong>in</strong>ted an <strong>in</strong>dependent monitor<br />

by way of Vigilance Officer to monitor this contract, whose name and address is<br />

given below. The vendor is at liberty to contact the under mentioned Officer directly if<br />

any case of undue <strong>in</strong>fluence is noticed or any unethical means by any party/official is<br />

employed to secure the contract/order or to disable/disqualify the vendor.<br />

Shri AK Bhagat<br />

Tel. No.: 022-22751257<br />

Office of the Director General<br />

Naval Project (MB)<br />

Shahid Bhagat S<strong>in</strong>gh Road<br />

Naval Dockyard<br />

Mumbai – 400 023<br />

Page 7 of 56


EMD BANK GUARANTEE <strong>FOR</strong>MAT<br />

Page 8 of 56<br />

Form DPM-13<br />

Whereas …………………………………… (here<strong>in</strong>after called the “Bidder”) has<br />

submitted their offer dated………………………………….for the supply of<br />

……………………………………… (here<strong>in</strong>after called the “Bid”) aga<strong>in</strong>st the Buyer’s<br />

Request for proposal No. ……………………………………………… KNOW ALL MEN<br />

by these presents that WE<br />

……………………………of………………………………………….. hav<strong>in</strong>g our<br />

registered office at ……………………………………………………………. are bound<br />

unto …………………. (here<strong>in</strong>after called the “Buyer) <strong>in</strong> the sum of<br />

………………………………………………………………………for which payment will<br />

and truly to be made to the said Buyer, the Bank b<strong>in</strong>ds itself, its successors and<br />

assigns by these presents.<br />

Sealed with the Common Seal of the said Bank this…………… day of<br />

………….20……<br />

The conditions of obligations are –<br />

(1) If the Bidder withdraws or amends, impairs or derogates from the Bid <strong>in</strong> any<br />

respect with<strong>in</strong> the period of validity of this tender.<br />

(2) If the Bidder hav<strong>in</strong>g been notified of the acceptance of his tender by the Buyer<br />

dur<strong>in</strong>g the period of its validity.<br />

a) If the Bidder fails to furnish the Performance Security for the due performance<br />

of the contract.<br />

b) Fails or refuses to accept/execute the contract. WE undertake to pay the<br />

Buyer up to the above amount upon receipt of its first written demand, without<br />

the Buyer hav<strong>in</strong>g to substantiate its demand, provided hat <strong>in</strong> its demand the<br />

Buyer will note that the amount claimed by it is due to it ow<strong>in</strong>g to the occurrence<br />

of one or both the two conditions, specify<strong>in</strong>g the occurred condition or<br />

conditions. This guarantee will rema<strong>in</strong> <strong>in</strong> force upto and <strong>in</strong>clud<strong>in</strong>g 45 days after<br />

the period of tender validity and any demand <strong>in</strong> respect thereof should reach the<br />

Bank not later than the above date.<br />

…………………………….<br />

(Signature of the authorized officer of the Bank)<br />

Name and designation of the officer<br />

Seal, name & address of the Bank and address of the Branch


GENERAL<br />

PART II – ESSENTIAL DETAILS OF ITEMS/SERVICES REQUIRED<br />

1. This specification is for creat<strong>in</strong>g a facility to provide 440V, 3PH, 60 Hz shore<br />

supply to ships at Naval Dockyard (Mumbai), which shall comprise ma<strong>in</strong>ly 02 Nos.<br />

1000 KW (1250kVA) Variable Frequency Drive (VFD) type frequency converter sets<br />

with a provision to parallel them, associated transformers, cabl<strong>in</strong>g, shore supply<br />

EBXL cable sets with cable drums, HT & LT panels, cope boxes, feeder pillars etc.<br />

SCOPE OF WORK<br />

2. Augmentation of Power supply and frequency converter arrangement at Naval<br />

Dockyard, Mumbai <strong>in</strong>volves supply, <strong>in</strong>stallation, test<strong>in</strong>g and commission<strong>in</strong>g of<br />

Frequency Converter sets, Control Panels, parallel<strong>in</strong>g arrangements, associated<br />

switch gear, remote <strong>in</strong>dication and monitor<strong>in</strong>g panel at operator’s cab<strong>in</strong>, cables –<br />

XLPE (permanently laid) and shore supply cables- EBXL (loose supply), cope<br />

boxes/pillar boxes. The entire work has to be completed on a turnkey basis. Any<br />

additional <strong>in</strong>stallation material essential to commission the facilities on turnkey basis<br />

is to be catered for by the vendor and no separate/additional charges will be paid to<br />

the vendor.<br />

3. The <strong>in</strong>dicative scope of supply is as follows:<br />

SI Item Rat<strong>in</strong>g Qty<br />

(a) MG Set, with necessary<br />

remote <strong>in</strong>dication panel.<br />

(b) Variable Frequency Drive<br />

Cum Controller (with<br />

<strong>in</strong>tegral dry type<br />

transformer if necessary)<br />

AC motor of 1200 kW, suitable HT/LT<br />

voltage (match<strong>in</strong>g with VFD drive),<br />

4 Pole, 50/60 Hz, design specification as<br />

per EED-Q-071 (R3).<br />

AC Generator of 1000KW, 380-480 V, 3<br />

Ph, 50/60 Hz (dual Frequency), 1800<br />

RPM (or as required by design), 4 pole<br />

(or as required by design), design<br />

specifications as per EED-Q-242(R2).<br />

Input Voltage 6.6 kV or 11 kV<br />

(selectable), Input frequency 50 Hz,<br />

suitable for above AC Induction Motor<br />

(c) Synchronization panel Synchroniz<strong>in</strong>g relay, meters, PTs, auto<br />

and manual synchronizer<br />

Page 9 of 56<br />

2<br />

2<br />

1


(d) Incom<strong>in</strong>g VCB, HT<br />

Breaker panel compris<strong>in</strong>g<br />

of two <strong>in</strong>com<strong>in</strong>g breakers<br />

and necessary<br />

<strong>in</strong>strumentation<br />

(e) Base frame, rail<strong>in</strong>g and<br />

wheels and coupl<strong>in</strong>g<br />

11kV, 630 Amps.<br />

Follow<strong>in</strong>g required:<br />

(a) 11/6.6 KV compatible VCB<br />

(b)Display meter should have<br />

multifunction Trivector meter(02 nos.)<br />

(c) Follow<strong>in</strong>g Relays required:<br />

(i) Earth fault – 02 nos.<br />

(ii) Over current – 02 nos.<br />

(iii) Under frequency – 02 nos.<br />

(iv) Under voltage – 02 nos.<br />

Page 10 of 56<br />

1set<br />

Suitable for above MG set 2 sets<br />

(f) Anti Vibration Mounts Suitable for the above MG Set 16<br />

(g) Indoor Power Distribution<br />

Board(FC Set Room)<br />

Follow<strong>in</strong>g required:<br />

(a) ACB – 11 nos.<br />

(Incom<strong>in</strong>g feeder ACB 2000 A: 02 nos.<br />

Bus coupler ACB 2000 A : 01 nos.<br />

Outgo<strong>in</strong>g feeder ACB 2000 A: 08 nos.)<br />

(b) Meters –<br />

Voltmeter(10 nos.) &<br />

Ammeter (10 nos.)<br />

(c) Insulation meter<br />

(d) Follow<strong>in</strong>g Relays required:<br />

(i) Earth fault – 10 nos.<br />

(ii)Overcurrent – 10 nos.<br />

(iii)Under frequency (<strong>in</strong>comer ACB)-<br />

02 nos.<br />

(iv)Reverse Power relay (Incomer<br />

(ACB) – 02 nos.<br />

(v) Differential(Incomer ACB) –<br />

02 nos.<br />

1set


(h) Feeder Pillars ACB 2000Amps, CTs<br />

(j) Outdoor Cope Boxes<br />

(should be rat/ pest<br />

<strong>in</strong>gress protected and<br />

should be IP 65)<br />

Meter – Voltmeter<br />

Page 11 of 56<br />

Ammeter<br />

MCCB 800 Amps, CTs<br />

Meter- Ammeter<br />

800A Copper Bus bars 8<br />

(k) HT Cables XLPE, 11kV, 3 core, armoured, AI cables As<br />

(l) LT Cables XLPE, 11kV, 3 core, armoured, AI cables<br />

(m) Shore Supply Cables EBXL, 1.1kV,Flexible, s<strong>in</strong>gle core,<br />

Copper 300sq mm Conductor, as per<br />

EED Q 50-12<br />

(n) All other items as required for a turnkey execution of the project<br />

SPECIFICATION <strong>FOR</strong> FREQUENCY CONVERTOR SETS<br />

System Description<br />

4<br />

4<br />

4<br />

8<br />

8<br />

listed<br />

at Para<br />

30<br />

4. The system shall comprise of two sets of Frequency converters produc<strong>in</strong>g<br />

380-480V, 50/60 Hz (dual frequency), 3 phase 1250 kVA (1000 kW at 0.8 lagg<strong>in</strong>g<br />

power factor) output. The system shall operate with an <strong>in</strong>com<strong>in</strong>g HT supply of 11kV /<br />

6.6 kV (should be designed for both), 3 Ph, and 50 Hz.<br />

5. In each set, the HT supply is fed to a step down Transformer of suitable<br />

rat<strong>in</strong>g. From the secondary of the transformer, supply is fed to a Variable Frequency<br />

Drives (VFD). The VFD output is fed to an AC cage motor rated suitably to drive an<br />

AC generator to produce 380-480 V, 50/60 Hz, 3 phase 1250 kVA ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g 440 V<br />

at 60 Hz and 380 & 415 V at 50 Hz at consumer end i.e., at the cope box.<br />

6. The speed of the motor shall be controlled by variable frequency drive with a<br />

provision to bypass the same <strong>in</strong> case of emergency operation. AC generator shall be<br />

directly coupled to AC motor and mounted on a common base plate. The generator<br />

shall be rated for 1250 kVA, 440 V at 60 Hz and 380 & 415 V at 50 Hz at consumer<br />

end, i.e., the cope box.


7. The term<strong>in</strong>al voltage of the generator shall be regulated by an automatic<br />

voltage regulator. A hand voltage regulator shall also be provided along with a hand /<br />

auto changeover switch. Both the regulators are to be housed <strong>in</strong> Excitation Control<br />

Panel.<br />

8. Two such Motor Generator (MG) sets shall be provided <strong>in</strong> this system with<br />

any one of them <strong>in</strong>tended to operate as ‘Ma<strong>in</strong>’ and the other as ‘standby’. The MG<br />

sets shall have facility to be synchronized or ‘paralleled’ for un<strong>in</strong>terrupted transfer of<br />

power to the load from one set to another. A synchroniz<strong>in</strong>g / parallel<strong>in</strong>g panel is to be<br />

provided for synchronization of two Generators. Though normally only one MG set is<br />

envisaged to run on load at any time, except dur<strong>in</strong>g parallel<strong>in</strong>g for load transfer, both<br />

generators are to be rated for cont<strong>in</strong>uous duty as they may be required to run<br />

simultaneously <strong>in</strong> <strong>in</strong>dependent mode. Provision is therefore to be made <strong>in</strong> the Power<br />

Panels etc. to allow such operation and feed required consumers separately from<br />

each FC set.<br />

9. The system shall be designed for outdoor application suitable to be housed <strong>in</strong><br />

a room with concrete structure close to the jetty. The system shall be suitable to be<br />

<strong>in</strong>stalled on a cement/suitable foundation normally without any special foundation<br />

arrangements. Indoor Power Distribution Board with suitable breakers shall be<br />

placed <strong>in</strong>side the room. The system will be located as follows:-<br />

(a) Incom<strong>in</strong>g HT Breaker panel associated HT to LT step down<br />

transformers, along with necessary <strong>in</strong>strumentation, to be fitted <strong>in</strong> proposed<br />

FC set station.<br />

(b) The VFDs with necessary <strong>in</strong>com<strong>in</strong>g LT supply panel(s), MG sets and<br />

<strong>in</strong>door outgo<strong>in</strong>g (440V 60Hz 3phase) power distribution panel <strong>in</strong> the proposed<br />

FC set station.<br />

(c) The LT distribution breakers (08 <strong>in</strong> nos.) along with the necessary<br />

<strong>in</strong>strumentation are to be located <strong>in</strong> the proposed FC set station.<br />

(d) The feeder pillars (04 <strong>in</strong> no.), each with one set of ACB and two sets of<br />

MCB are to be located on the jetty.<br />

10. The FC sets along with VFD drives, power panels and associated fitt<strong>in</strong>gs<br />

proposed to be <strong>in</strong>stalled <strong>in</strong> FC Room shall not take more than 20 m × 7 m × 7.5 m of<br />

space <strong>in</strong>clusive of ma<strong>in</strong>tenance envelope and free spaces / heights required. The<br />

bidders should provide proposed layout along with the T-bid.<br />

11. Necessary lay<strong>in</strong>g of cables with ACB and MCCB panels, feeder pillars and<br />

cope boxes suitable for outdoor <strong>in</strong>stallation shall also be provided and <strong>in</strong>stalled for<br />

load distribution, and protection. All <strong>in</strong>cidental civil work <strong>in</strong>clud<strong>in</strong>g cable supports /<br />

trays and their grout<strong>in</strong>g, foundations for cope/pillar boxes etc. will be with<strong>in</strong> the scope<br />

of <strong>in</strong>stallation. The metallic frames and all other parts of the foundation will be factory<br />

treated for protection aga<strong>in</strong>st corrosion with life of 40 years. The treatment can be of<br />

epoxy coats or other modern methods which need to be approved <strong>in</strong> advance.<br />

Page 12 of 56


12. If necessary, an auxiliary supply of 415 V, 30 amps, 50 Hz shall to be<br />

provided by Naval Dockyard, Mumbai, <strong>in</strong> addition to <strong>in</strong>com<strong>in</strong>g 6.6kV, for power<strong>in</strong>g<br />

space heaters, light<strong>in</strong>g and other auxiliary loads, dur<strong>in</strong>g non-operation of MG sets.<br />

The necessary switchgear and cabl<strong>in</strong>g from nearest supply po<strong>in</strong>t i.e. CW Sub Station<br />

will be with<strong>in</strong> the scope of <strong>in</strong>stallation, <strong>in</strong>clud<strong>in</strong>g all material necessary.<br />

13. The lay<strong>in</strong>g and term<strong>in</strong>ations of all necessary <strong>in</strong>com<strong>in</strong>g HT cables and any<br />

other necessary supply / control cables from the exist<strong>in</strong>g Cruiser Wharf Substation to<br />

the system (<strong>in</strong>clud<strong>in</strong>g transformers) will be done by the contractor <strong>in</strong>clud<strong>in</strong>g end<br />

term<strong>in</strong>ations, supply of necessary accessories like cables, lugs etc. and also<br />

carry<strong>in</strong>g-out some m<strong>in</strong>or civil work, as required.<br />

14. Indicative layout of the FC room at cruiser wharf entrance, Schematic layout<br />

of the system on Cruiser Wharf, <strong>in</strong>clud<strong>in</strong>g cabl<strong>in</strong>g and system s<strong>in</strong>gle l<strong>in</strong>e diagram are<br />

available at DGNP(MBI) and can be provided on request to Bidders.<br />

15. The system shall be designed, eng<strong>in</strong>eered, manufactured, <strong>in</strong>stalled,<br />

tested and commissioned as a turnkey project.<br />

System Specifications<br />

16. Ambient Conditions. The system shall be suitable to operate under the<br />

follow<strong>in</strong>g conditions:<br />

(a) Ambient Temperature : 45 deg. Cent.,<br />

(b) Atmosphere : Sal<strong>in</strong>e and corrosive.<br />

(c) Altitude : Less than 1000 m. Above MSL<br />

(d) Relative humidity : 95% (non-condens<strong>in</strong>g)<br />

17. Input and Output Supply.<br />

(a) Input.<br />

(i) 6.6 KV or 11 KV 3 Phase 50 Hz (To be selectable to cater for<br />

future migration to 11 kV)<br />

(ii) Voltage Tolerance - +/- 10%<br />

(iii) Frequency Tolerance - +/- 5%<br />

(iv) Comb<strong>in</strong>ed Tolerance - +/- 15%<br />

(v) Aux. Supply: 415 V, 50 Hz, 3 phase.<br />

(b) Output.<br />

(i) 380-480 V, 50/60 Hz, 3 phase 1250 kVA ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g 440 V at<br />

60 Hz and 380 & 415 V at 50 Hz at consumer end i.e. at the<br />

cope box.<br />

(ii) Voltage Tolerance - +/- 1% as at cope box<br />

(iii) Frequency Tolerance - +/- 1%<br />

Page 13 of 56


18. VCB INCOMING BREAKER PANEL<br />

(i) Breaker Type :VCB<br />

(ii) Rated Current :630 A<br />

(iii) Rated Frequency :50Hz<br />

(iv) Break<strong>in</strong>g capacity :25 KA for 3 sec<br />

(v) Rated Short circuit mak<strong>in</strong>g current (peak):66kA<br />

(vi) Rated Short Circuit break<strong>in</strong>g current rms : 25kA<br />

(vii) Rated Power Fr. :28kV With stand<br />

voltage<br />

(viii) Impulse withstand voltage :75kV<br />

(ix) No of poles :3<br />

(x) Voltage rat<strong>in</strong>g :11/6.6kV Compatible<br />

VCB Panel<br />

(xi) Protection :Over Current, Short<br />

circuit., Earth Fault<br />

(xii) Meter<strong>in</strong>g :Voltage and current<br />

(xiii) Accessories :Space heater<br />

(xiv) CTs and PT :Ct ratio-200/5 A, Pt<br />

ratio- 11 or 6.6kV/ 110V<br />

(xv) Enclosure :IP 43 or better<br />

(xvi) Cable Entry :From bottom<br />

(xvii) Draw out :Manual<br />

(xviii) Auxiliary contacts :As required<br />

(xix) Shunt trip coil :110 V A/C<br />

(xx) Make :Reputed makes like<br />

Siemens, Areva &<br />

Schneider, ABB etc.<br />

(xxi) Colour cod<strong>in</strong>g :CRCA/coated steels.<br />

Corrosion resistant<br />

powder coat<strong>in</strong>g light.<br />

(xxii) Busbar :Busbars rated to carry<br />

630 Amps, 6.6/11 kV,<br />

50Hz, copper materials,<br />

heat shr<strong>in</strong>kable PVC<br />

sleeve <strong>in</strong>sulation, all<br />

copper – to – copper<br />

jo<strong>in</strong>ts are t<strong>in</strong> or silver<br />

plated. The busbar is<br />

fully <strong>in</strong>sulated for 1<br />

m<strong>in</strong>ute. Colour code<br />

(RYB) & with<br />

temperature rise with<strong>in</strong><br />

specified limits.<br />

Page 14 of 56


(xxiii) Compartment Earth<strong>in</strong>g :Each compartment<br />

such as circuit<br />

breaker, relay/<br />

<strong>in</strong>strument, busbar<br />

CT/cable chambers<br />

should be earthed.<br />

(xxiv) Metal – to –metal jo<strong>in</strong>ts :Metal – to – metal<br />

jo<strong>in</strong>ts <strong>in</strong>side the panel<br />

to be design fitted to<br />

achieve zero gap.<br />

(xxv) Multi Function Tri vector Meter :Multifunction meter (Tri<br />

Vector Meter), with<br />

RS485-commu<strong>nic</strong>ation<br />

port with software as<br />

per the user<br />

requirement.<br />

(Make L&T/KAYCEE/<br />

CONZERV/MECO/<br />

KRYCARD<br />

19. Transformers for VFD (Preferred to be part of VFD panel):<br />

(i) Rat<strong>in</strong>g : As suitable<br />

(ii) Primary voltage :11kV / 6.6 kV (both needed,<br />

any one to be<br />

selectable/connectable), 50<br />

Hz., 3 ф<br />

(iii) Secondary -1 : As required<br />

(iv) Duty : Converter duty<br />

(v) Vector Group : Ddyn-11<br />

(vi) Impedance : 5%<br />

(vii) Installation : In door<br />

(viii) Accessories standard fitt<strong>in</strong>gs<br />

(ix) Tapp<strong>in</strong>gs :(±) 2.5%, :(±) 5% on HT side<br />

(x) Class of <strong>in</strong>sulation : B<br />

(xi) Size : To be compact to fit<br />

<strong>in</strong>to the available<br />

space of the room with<br />

all other equipment.<br />

(xii) Type- :Dry type, air cooled<br />

Page 15 of 56


20. Bus Coupler:<br />

(i) Bus coupler : As suitable<br />

(ii) Enclosure : IP 42 or better<br />

(iii) Cool<strong>in</strong>g : Air Natural<br />

(iv) Interlocks : Electrical suitable for<br />

synchronis<strong>in</strong>g<br />

(v) Meters : CT’s with Ammeter and PT’s<br />

with Voltmeter.<br />

(vi) Cable Entry : From Bottom<br />

21. Variable Frequency Drive (VFD) Module:<br />

(i) Input Voltage :LT, Value as required, 50 Hz,<br />

3Ph<br />

(ii) Incom<strong>in</strong>g Breaker :ACB, Rat<strong>in</strong>g as suitable<br />

(iii) Type of Breaker :Electrical Draw out, with<br />

Electro<strong>nic</strong> release<br />

(iv) Rated Output Voltage :Lt, Value as required, 3 Ph<br />

(v) Output Frequency :50 Hz<br />

(vi) Output Freq. Variation band :0-75 Hz (Cont<strong>in</strong>uously<br />

adjustable)<br />

(vii) Mode of operation :Constant (V/F) upto motor’s<br />

rated voltage, and, Constant<br />

V, variable f for f>50 Hz.<br />

(viii) Method of control :Microprocessor based digital<br />

control system.<br />

(ix) Motor rat<strong>in</strong>g : As per motor specifications<br />

(x) Duty :Cont<strong>in</strong>uous<br />

(xi) Range of Speed Control :0-Full range RPM.<br />

(xii) Ambient temperature :45-C<br />

(xiii) Power elements provided :3 phase L<strong>in</strong>e reactor<br />

(xiv) Meter<strong>in</strong>g :Voltage, Current, Speed<br />

(xv) L<strong>in</strong>e side switchgear :ACB of suitable rat<strong>in</strong>g<br />

(xvi) Protections :Over current, locked rotor,<br />

s<strong>in</strong>gle phas<strong>in</strong>g,<br />

motor protection relay.<br />

(xvii) Direction of rotation :Uni- Directional.<br />

(xviii) Controls :locally provided<br />

(xix) Cable entry :From bottom<br />

(xx) Enclosure :IP 42 or better<br />

Page 16 of 56


22. MG Set<br />

(a) AC Motor:<br />

(i) Rat<strong>in</strong>g : As required.<br />

(ii) Rated Voltage : HT/LT. Value as required.<br />

(iii) Rated frequency : 50/60 Hz (dual frequency),(4 Poles)<br />

(iv) Speed : 1800 RPM or as required by design<br />

(v) Range of Speed Control : 0-Full RPM<br />

(vi) Class of <strong>in</strong>sulation : F<br />

(vii) Temp rise : As per class B<br />

(viii) Cool<strong>in</strong>g : IC – 411 or better<br />

(ix) Enclosure : IP 23 or better<br />

(x) Max Ambient Temperature : 55°C at full Load<br />

(xi) Type : Cage<br />

(xii) Start<strong>in</strong>g : Suitable for VFD power source<br />

(xiii) Efficiency : Not less than 95% on full load.<br />

(xiv) Accessories : RTDs for w<strong>in</strong>d<strong>in</strong>gs and Bear<strong>in</strong>gs,<br />

Space Heater, etc.<br />

(xv) Design Specifications : As per EED-Q-071(R3)<br />

(b) AC Generator:<br />

(i) Rat<strong>in</strong>g : 1250 kVA, 3 Ph<br />

(ii) Voltage : 380-480 V,50/60 Hz (dual frequency),<br />

3phase 1250 kVA ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g 440 V<br />

at 60 Hz and 380 & 415 V at 50 Hz<br />

at consumer end i.e. at the cope box.<br />

Rated voltage at generator output<br />

term<strong>in</strong>als to be settable from 380V to<br />

480V<br />

(iii) Frequency : 50/60 Hz. (dual frequency), (4 Poles)<br />

(iv) Pf : 0.8 Pf (lag)<br />

(v) Speed : 1800 RPM<br />

(vi) Total Harmo<strong>nic</strong> Distortion: Distortion of the l<strong>in</strong>e voltage at no<br />

load must not exceed 2% of the<br />

amplitude of the fundamental.<br />

(vii) Transient Voltage Dip : less than 15% on application of100%<br />

step load.<br />

(viii) Exciter : Brushless<br />

(ix) Excitation control : AVR and hand voltage regulator<br />

(panel mounted)<br />

(x) Cool<strong>in</strong>g : IC 01 or better<br />

(xi) Enclosure : IP23 or better<br />

Page 17 of 56


(xii) Connection : Star<br />

(xiii) Efficiency : Not less than 94.5 % on full load<br />

(xiv) Max Ambient temperature: 55°C at full Load.<br />

(xv) Class of <strong>in</strong>sulation : F<br />

(xvi) Prime mover : AC motor as specified <strong>in</strong> sl(a) above<br />

(xvii) Application : To be suitable for naval duty<br />

(xviii) Duty : Cont<strong>in</strong>uous<br />

(xix) Temperature rise : Limited to class B<br />

(xx) Accessories : RTDs for w<strong>in</strong>d<strong>in</strong>gs and bear<strong>in</strong>gs,<br />

space heater.<br />

(xxi) Design Specifications : As per EED-Q-242 (R2)<br />

23. Excitation Control Panel:<br />

(i) Mount<strong>in</strong>g :On floor<br />

(ii) Cable entry :From bottom<br />

(iii) Controls provided :AVR & Manual Excitation<br />

controller with selector switch.<br />

(iv) Input supply :Transformer 6600/110V, 50<br />

Hz (rat<strong>in</strong>g suitable to provide<br />

control supply of 110V to all<br />

related panels)<br />

Note: controls of all the panels<br />

<strong>in</strong>clud<strong>in</strong>g VFD panel should<br />

be derived from this<br />

transformer only, <strong>in</strong>put supply<br />

to space heaters to be taken<br />

from 415V, 50 Hz 3 phase<br />

supply available at cruiser<br />

wharf S/stn.<br />

(v) Rat<strong>in</strong>g of excitation controller :To suit generator<br />

characteristics<br />

(vi) Power module :S<strong>in</strong>gle phase thyristor<br />

converter with digital Controls.<br />

(vii) Voltage control :Voltage <strong>in</strong>crease / decrease<br />

push buttons.<br />

(viii) Meter<strong>in</strong>g for Field :Field voltage – (Vf), Field<br />

current – (If)<br />

(ix) Relays :Over excitation, Rotat<strong>in</strong>g<br />

Diode Failure Indicator (DFI),<br />

(x) Control supply :110 V AC (to be <strong>in</strong>ternally<br />

derived)<br />

(xi) Frequency Control :Manual frequency control<br />

potentiometer be provided<br />

excitation control panel.<br />

Page 18 of 56


(xii) Insulation monitor<strong>in</strong>g :Onl<strong>in</strong>e <strong>in</strong>sulation monitor<strong>in</strong>g<br />

device be provided for<br />

monitor<strong>in</strong>g <strong>in</strong>sulation of MG<br />

sets, associated cables and<br />

other ACBs/MCCBs.<br />

(xiii) Local and remote controls :Provision is required to be<br />

made for both local and<br />

remote Control.<br />

(xiv) Breaker Tripp<strong>in</strong>g logic : Master trip relay contacts will<br />

be wired to TB for external<br />

connection to trip Coil to<br />

breaker<br />

(xv) Accessories :Annunciator, <strong>in</strong>dicat<strong>in</strong>g Lamp<br />

(LEDs), Push buttons.<br />

24. Synchronization Panel. The panel should permit automatic as well<br />

as manual parallel<strong>in</strong>g of the MG sets at generator ends. The follow<strong>in</strong>g specifications<br />

are guidel<strong>in</strong>es and can be altered as required for design.<br />

(i) Incomer voltage : As required<br />

(ii) Relays :Sync. check Relay<br />

(iii) Synchronizer :Auto synchronizer<br />

and manual<br />

synchronizer with<br />

selector switch.<br />

(iv) Meters :Double Volt meter,<br />

Double frequency<br />

Meter,Synchronizer<br />

with selector switch.<br />

(v) Generator selection :through selector<br />

switch.<br />

(vi) Speed control :Push buttons / pistol<br />

grip spr<strong>in</strong>g loaded<br />

switch provided for<br />

<strong>in</strong>crease / decrease.<br />

(vii) Voltage control :Push buttons provided<br />

for <strong>in</strong>crease / decrease.<br />

(viii) Breaker clos<strong>in</strong>g command :Through push button <strong>in</strong><br />

manual mode, and,<br />

automatically <strong>in</strong> auto mode<br />

(ix) Cable entry :From bottom<br />

(x) Enclosure :IP-43<br />

Page 19 of 56


25. Indoor Power Distribution Board –F/C Room [Incomer (02) , Bus<br />

coupler(01), Outgo<strong>in</strong>g(08)]:<br />

(i) Breaker :ACB 2000 Amps.<br />

(ii) Number :11<br />

(iii) Type :Electrical Draw out,<br />

with electro<strong>nic</strong> release<br />

(iv) CTs :Cast res<strong>in</strong> type, class<br />

1.0<br />

(v) Meters :AC Ammeter and<br />

Voltameter<br />

(vi) Protections :Standard<br />

(vii) Enclosure :Metallic treated for<br />

corrosion protection<br />

powder coated with<br />

dust protection<br />

(viii) Cable entry :from bottom<br />

(ix) Short Circuit Capacity :50 kA<br />

(x) Colour : Navy Grey<br />

26. Outdoors Feeder Pillars (each with 01 ACB- 2000A and 02 MCCB’s<br />

-800A):<br />

(i) Breaker :MCCB 800 Amps, non draw<br />

out, ACB 2000A drawout.<br />

(ii) CTs :Cast res<strong>in</strong> type, CTR: 1000/5<br />

MCCB, Class 1.0 and 2000/5<br />

A for ACB<br />

(iii) Meters :AC Ammeter and voltmeter<br />

(iv) Protections :Standard<br />

(v) Enclosure :Metallic treated for corrosion<br />

protection, with ra<strong>in</strong> and dust<br />

protection.<br />

(vi) Cable entry :from bottom<br />

(vii) Colour : Dark Blue<br />

27. Cope Boxes.<br />

(i) Bus Bars :T<strong>in</strong>ned Copper, 3 ph<br />

(ii) Enclosure :IP 54<br />

(iii) Mount<strong>in</strong>g :Floor mounted<br />

(iv) Cable Entry :Bottom<br />

(v) Doors : Detachable bolted Doors<br />

(vi) Pa<strong>in</strong>t :Powder coated epoxy pa<strong>in</strong>t<br />

(vii) Colour : Dark Blue<br />

Page 20 of 56


28. All meters <strong>in</strong> all panels shall be Digital except Ammeter and Voltmeters, which<br />

will be analogue (as they are more convenient to see load variations). Accuracy<br />

class shall be Class 1.5 and recommended makes are L&T/Rishabh/AE/Conzerve.<br />

Digital meters will have RS 485 port for network<strong>in</strong>g with SCADA system (SCADA<br />

system not <strong>in</strong> scope of current proposal).<br />

29. All cope and feeder pillars to have fibre glass or similar ma<strong>in</strong>tenance free with<br />

fluorescent pa<strong>in</strong>t lettered tallies <strong>in</strong>dicat<strong>in</strong>g source of supply and details of outgo<strong>in</strong>g<br />

feeders/ cope boxes connected, along with separate and prom<strong>in</strong>ent tallies “440 V 60<br />

Hz, 3 phase”<br />

30. Cables.<br />

(a) HT Cables between CWSS HT Panel &Transformer of VFD<br />

Drive<br />

(i) Grade :300 sq mm*2 runs, XLPE, 11kV<br />

Armoured, AI power cable<br />

(ii) Rat<strong>in</strong>g :300 Amps.<br />

(iii) Number of core :3 Core<br />

(iv) Runn<strong>in</strong>g Length :150 m (consolidated) approximate, to be<br />

verified on site before quot<strong>in</strong>g.<br />

(b) Cables between Indoor PDB and Outdoors Feeder Pillars<br />

(i) Grade :XLPE, 1.1kV Armoured, AI power cable<br />

(ii) Rat<strong>in</strong>g :2000 Amps.<br />

(iii) Number of core :3 Core<br />

(iv) Runn<strong>in</strong>g Length:1500 m (consolidated) approximate, to<br />

be verified on site before quot<strong>in</strong>g.<br />

(c) Cables between Outdoors Feeder Pillars and Cope Boxes<br />

(i) Grade :400 sqmm*2runs, XLPE, 1.1kV<br />

Armoured, AI power cable<br />

(ii) Rat<strong>in</strong>g :800 Amps.<br />

(iii) Number of core :3 Core<br />

(iv) Runn<strong>in</strong>g Length :500 m (consolidated) approximate, to be<br />

verified on site before quot<strong>in</strong>g.<br />

(d) Cables between Cope Boxes andShips(to be suppliedloose)<br />

(i) Grade :EBXL, 1.1 kV, Flexible, s<strong>in</strong>gle core,<br />

Copper 185sq mm Conductor, as per EED<br />

Q 50-12, 3 Core<br />

(ii) Rat<strong>in</strong>g :800 Amps, nom<strong>in</strong>al.<br />

(iii) Length :24 <strong>in</strong> no. pieces of 100 m length each and<br />

complete with suitable t<strong>in</strong>ned copper lugs<br />

crimped at both free ends of each cable.<br />

The total length will be 2500 mtrs.<br />

(Consolidated)<br />

Page 21 of 56


(e) In addition to all other LT / control cables required as per<br />

standard specifications of reputed make.<br />

31. Noise Level and Vibrations Standards - The maximum permissible sound<br />

pressure level for FC sets shall be not more than 90 dBA when both sets are runn<strong>in</strong>g<br />

at full load <strong>in</strong>side the room where the MG sets are fitted and <strong>in</strong> any case not more<br />

than 75 dBA per set at 1 meter under free field conditions, <strong>in</strong> accordance with latest<br />

norms of Noise pollution (Regulation & Control) Rules, 2000. Vibration Standards<br />

shall be as per IS 12075.<br />

32. Provision for Removal of MG Sets and Transformers for Repair. The MG<br />

sets and Transformer shall be fitted with suitable rails/guides and slid<strong>in</strong>g<br />

arrangement with castor wheels provided at the bottom of the base frame to facilitate<br />

their roll<strong>in</strong>g out horizontally to outside the FC Room when required for ma<strong>in</strong>tenance /<br />

overhaul and also refitt<strong>in</strong>g post such overhaul. The slid<strong>in</strong>g may be carried out on rails<br />

embedded <strong>in</strong> the floor<strong>in</strong>g. These wheels shall be easily removable by jack<strong>in</strong>g the MG<br />

sets and AVMs fitted for normal operations.<br />

33. Documentation. The follow<strong>in</strong>g documents shall be supplied:<br />

(a) Foot pr<strong>in</strong>t and Foundation layout<br />

(b) S<strong>in</strong>gle l<strong>in</strong>e diagram<br />

(c) Schematic diagram<br />

(d) Bill of material with OEM’s part identification list<br />

(e) Cable schedule<br />

(f) Instruction manuals<br />

(g) Tech<strong>nic</strong>al manuals for all equipment <strong>in</strong>clud<strong>in</strong>g circuit, cable connection<br />

diagrams and troubleshoot<strong>in</strong>g procedures<br />

(h) All test and calibration reports<br />

(j) OEM’s spare part list with draw<strong>in</strong>gs<br />

34. The above documents shall be submitted as follows:<br />

(a) Hard copy – 4 sets<br />

(b) Soft copy – 2 Nos. CDs. The soft copy of the documentation shall have<br />

the follow<strong>in</strong>g features:-<br />

(i) It should <strong>in</strong>clude complete contents as listed <strong>in</strong> para 33 above.<br />

` (ii) It should be <strong>in</strong> a searchable text document format like PDF or<br />

MS Word (and not scanned versions of hard copy) which should be<br />

open able on normal PC without any requirement of any special<br />

software / application.<br />

Page 22 of 56


35. Spares for Five years of Normal Operation: To be provided. An <strong>in</strong>dicative<br />

list is as follows:-<br />

(a) Automatic Voltage Regulator - 4 Nos<br />

(b) Revolv<strong>in</strong>g diode disc complete with diodes - 6 Nos.<br />

(c) Diodes for revolv<strong>in</strong>g diode disk<br />

(i) Anode - 4 Nos.<br />

(ii)Cathode - 4 Nos.<br />

(d) Bear<strong>in</strong>gs<br />

(i) DE side of Motor - 2 Nos.<br />

(ii)NDE side of Motor - 2 Nos.<br />

(iii)DE side of Generator - 2 Nos.<br />

(iv)NDE side of Generator - 2 Nos.<br />

(e) Power Card - 2 Nos.<br />

(f) Control Card - 2 Nos.<br />

(g) Display Card - 2 Nos.<br />

(h) Indicat<strong>in</strong>g lamps - 12 Nos.<br />

(j) HRC fuses - 12 Nos.<br />

(k) ACB 1600 Amps - 1 Nos.<br />

(l) MCCB 800 Amps - 3 Nos.<br />

(m) IGBT Module - 2 Nos.<br />

36. In addition to the above mentioned list of spares, follow<strong>in</strong>g spares are to be<br />

supplied per unit:-<br />

(a) A complete set of VFD spares <strong>in</strong>clud<strong>in</strong>g all important cards, contactors,<br />

<strong>in</strong>dication assembly, other sub assemblies, consumables like fuses, lamps,<br />

lamp covers, switches, knobs, etc.<br />

(b) Tools for system ma<strong>in</strong>tenance.<br />

(c) All test equipments necessary for ma<strong>in</strong>tenance.<br />

(d) One complete set of spares for HT and LT breakers, e.g. 1 Nos clos<strong>in</strong>g<br />

& tripp<strong>in</strong>g coil, 3 Nos. PT fuses, 3 Nos. Vacuum bottle, 3 Nos micro/limit<br />

switches, 25 Nos. <strong>in</strong>dication lamp.<br />

(e) One spare MCCB.<br />

37. Load Trials. The complete system shall be tested <strong>in</strong> factory as well as on<br />

site. While FATs schedule will be decided by OEM, onsite tests shall <strong>in</strong>clude both<br />

transient, static load and parallel<strong>in</strong>g tests. The procedure for the same will be as<br />

placed at Annexure A. The tests are to be carried out <strong>in</strong> the presence of the<br />

User/ND(MBI), on site i.e Naval Dockyard, Mumbai post <strong>in</strong>stallation. Inability to<br />

undertake any particular test by the bidder is to be <strong>in</strong>dicated dur<strong>in</strong>g the Pre-bid<br />

meet<strong>in</strong>g and a decision would be arrived then.<br />

Page 23 of 56


38. Tra<strong>in</strong><strong>in</strong>g of Personnel. The Supplier should, dur<strong>in</strong>g manufacture, erection<br />

and commission<strong>in</strong>g, <strong>in</strong>struct the User’s staff <strong>in</strong> the operation of the equipment to get<br />

conversant with the system operation. After all the systems have been completely<br />

erected at the site under the supervision of the Supplier’s representative and all<br />

necessary tests have been carried out, the Supplier’s representative shall rema<strong>in</strong><br />

available at site for further period of at least 1 week to <strong>in</strong>struct as required to enable<br />

successful operation and ma<strong>in</strong>tenance by the User.<br />

INSPECTION AND TESTING<br />

39. All equipment, assemblies, sub-assemblies, components <strong>in</strong>clud<strong>in</strong>g boughtouts<br />

and all material shall be subjected to third party <strong>in</strong>spection(IRS/LRS/BVQI)<br />

test<strong>in</strong>g at the stages of manufacture and dur<strong>in</strong>g erection, test<strong>in</strong>g and commission<strong>in</strong>g<br />

at site as per approved QAP f<strong>in</strong>alized after award of Contract. The <strong>in</strong>spection would<br />

be carried out by the IRS(Indian Register of Shipp<strong>in</strong>g)/LRS(Lloyds Register<br />

Services)/ BVQI at the cost of the Seller. The tests, identifications, stamp<strong>in</strong>g and the<br />

like would be done as per the scope of work.<br />

40. The f<strong>in</strong>alization of design, submission of design and obta<strong>in</strong><strong>in</strong>g approval from<br />

third party <strong>in</strong>spection agency should be undertaken by the Supplier with<strong>in</strong> 03 months<br />

of Contract effective date. Any correction/improvement suggested by the third party<br />

<strong>in</strong>spector(IRS/LRS/BVQI) is to be <strong>in</strong>corporated without additional cost and time. The<br />

Supplier will be solely responsible for timely submission, follow-up and <strong>in</strong>spection by<br />

third party agency. Any delays on any of the stages would be on account of the<br />

Supplier. No extension of time for any activity will be permissible for delays on such<br />

counts.<br />

41. The Supplier is required to propose the <strong>in</strong>spection schedule to third party<br />

agency(IRS/LRS/BVQI) for approval. Once approved, the Supplier has to ensure that<br />

the approved <strong>in</strong>spection schedule is handed over to the Buyer with<strong>in</strong> one week.<br />

42. DGNP(MBI) reserves the right to visit OEM premises for any <strong>in</strong>spections<br />

carried out by third party agency(IRS/LRS/BVQI) 15 days notice is required to be<br />

given by the Supplier to DGNP(MBI) whenever the Supplier offers <strong>in</strong>spection to the<br />

third party agency(IRS/LRS/BVQI).<br />

43. Delivery Period - Delivery period for supply, <strong>in</strong>stallation and commission<strong>in</strong>g<br />

of the items would be 12 months from the effective date of contract, which is date of<br />

sign<strong>in</strong>g the contract by both the parties i.e. BUYER and SELLER. The delivery shall<br />

ONLY be considered complete after receipt of material/items at site, completion of<br />

<strong>in</strong>stallation, test/trials of equipments to the satisfaction of the End User and<br />

thereafter obta<strong>in</strong><strong>in</strong>g a work completion certificate from the End User. The<br />

commencement of this period will be from the effective date of sign<strong>in</strong>g the<br />

contract and the total duration of delivery will be accounted, till the date of<br />

Work Completion Certificate (WCC) issued from End User to the firm. Please<br />

note that Contract can be cancelled unilaterally by the Buyer <strong>in</strong> case items are<br />

not received and commissioned with<strong>in</strong> the contracted Delivery Period.<br />

Extension of contracted delivery period will be at the sole discretion of the Buyer,<br />

with applicability of LD clause.<br />

Page 24 of 56


44. Warranty The follow<strong>in</strong>g Warranty will form part of the contract placed on<br />

successful Bidder: –<br />

(a) The Seller warrants that the goods supplied under the contract conform<br />

to tech<strong>nic</strong>al specifications prescribed and shall perform accord<strong>in</strong>g to the said<br />

tech<strong>nic</strong>al specifications.<br />

(b) The Seller warrants for a period of 12 months from the date of<br />

acceptance of stores by Jo<strong>in</strong>t Receipt Inspection or date of <strong>in</strong>stallation and<br />

commission<strong>in</strong>g or date of obta<strong>in</strong><strong>in</strong>g work completion certificate from the user,<br />

whichever is later, that the goods/stores supplied under the contract and each<br />

component used <strong>in</strong> the manufacture thereof shall be free from all types of<br />

defects/failures.In case of defects with<strong>in</strong> the warrantee period, the same<br />

should be rectified free of cost for the defective parts.<br />

45. Compliance to Safety Rules The Supplier would be required to abide by all<br />

the safety rules & practices and Labour Rules applicable dur<strong>in</strong>g supply, <strong>in</strong>stallation,<br />

test<strong>in</strong>g and commission<strong>in</strong>g the facility at the site.<br />

46. The work is required to be undertaken <strong>in</strong>side defence area. The workers will<br />

be required to follow the security regulations as laid down / fresh security measures,<br />

if any as and when promulgated.<br />

47. Format of Schedules and Other Details The formats of different schedules<br />

and other details required to be submitted by the Supplier are given <strong>in</strong> the<br />

succeed<strong>in</strong>g pages.<br />

48. Consignee details –<br />

The Admiral Super<strong>in</strong>tendent<br />

Naval Dockyard<br />

Lion Gate<br />

Mumbai- 400 023<br />

Page 25 of 56


Throw<br />

On/off<br />

TRIAL SCHEDULE<br />

Page 26 of 56<br />

Annexure A<br />

1. Installation Inspection Will be carried out after completion of <strong>in</strong>stallation.<br />

(a) Load trials are to be carried out as per follow<strong>in</strong>g load conditions:-<br />

(i) 25% load for 30 m<strong>in</strong>utes.<br />

(ii) 50% load for 30 m<strong>in</strong>utes.<br />

(iii) 75% load for 60 m<strong>in</strong>utes.<br />

(iv) 100% load for 120 m<strong>in</strong>utes.<br />

(v) 110% load for 60 m<strong>in</strong>utes.<br />

(vi) total duration: 05 hours<br />

(b) Frequency and voltage control tests<br />

Load % % peak variation <strong>in</strong><br />

frequency<br />

Chan<br />

nge<br />

0-25 +25<br />

25-50 +25<br />

50-75 +25<br />

75-100 +25<br />

100-75 -25<br />

75-50 -25<br />

50-25 -25<br />

25- 0 -25<br />

Obser<br />

ved<br />

Permitted<br />

limits <strong>in</strong> %<br />

1.5<br />

Time of<br />

recovery(Sec)<br />

Obser<br />

ved<br />

Permitted<br />

limits <strong>in</strong> %<br />

2<br />

% peak variation <strong>in</strong><br />

voltage<br />

Obser<br />

ved<br />

0-70 +70 5 15<br />

100-0 -100 5 15<br />

Permitted<br />

limits <strong>in</strong> %<br />

7.5<br />

Time of<br />

recovery(Sec)<br />

Obser<br />

ved<br />

Permitted<br />

Limits <strong>in</strong> %<br />

1


2. Power Quality checks will be carried out as per the parameters mentioned at<br />

table below:-<br />

Note:-<br />

Parameters Acceptable Value<br />

Nom<strong>in</strong>al User Voltage 440V/415V/380V<br />

User Voltage Tolerances<br />

(a) Average of three l<strong>in</strong>e-to-l<strong>in</strong>e voltages<br />

(b) Any one l<strong>in</strong>e-to-l<strong>in</strong>e voltage <strong>in</strong>clud<strong>in</strong>g<br />

(a) Trial procedure & parameters are as per EED-Q-242(R2) for DGs.<br />

(b) Trials will be carried out <strong>in</strong> 0.8 lagg<strong>in</strong>g power factor.<br />

(c) Above trials will be carried out at output end i.e. at cope box.<br />

Page 27 of 56<br />

± 5%<br />

± 7%<br />

Voltage Modulation 2%<br />

L<strong>in</strong>e Voltage Unbalance Tolerance 2%<br />

Voltage Transient Recovery Time 01 Sec<br />

Waveform<br />

Total Harmo<strong>nic</strong> Distortion Tolerance 5%<br />

Individual Harmo<strong>nic</strong> 3%<br />

Deviation Factor 5%<br />

Frequency<br />

Nom<strong>in</strong>al Frequency 50/60 Hz<br />

Frequency Tolerance ± 3%<br />

Frequency Modulation 0.5%<br />

Frequency Transient Tolerance ± 4%<br />

Frequency Transient Recovery Time 02 seconds


SCHEUDLE “A”<br />

(To be prepared by vendor and submitted)<br />

TIME <strong>FOR</strong> COMMENCEMENT AND COMPLETION OF THE WORK<br />

We undertake to commence and complete all phases of construction,<br />

<strong>in</strong>stallation and commission<strong>in</strong>g activity with<strong>in</strong> the time periods mentioned <strong>in</strong> our offer.<br />

We further undertake to commence and complete the follow<strong>in</strong>g def<strong>in</strong>ed and itemized<br />

sections of the work with<strong>in</strong> the time stated below calculated from date of sign<strong>in</strong>g of<br />

contract.<br />

Page 28 of 56<br />

Commence <strong>in</strong>Complete <strong>in</strong><br />

1. Advance plann<strong>in</strong>g for design and<br />

Procurement and schedul<strong>in</strong>g ………days ………days<br />

2. Submission of design and draw<strong>in</strong>gs<br />

for structural and mecha<strong>nic</strong>al<br />

items for approval ………days ………days<br />

3. Submission of design and draw<strong>in</strong>gs<br />

for electrical items for approval ………days ………days<br />

4. Procurement of materials for –<br />

(a) Steel ………days ………days<br />

(b) Components ………days ………days<br />

(c) Controls ………days ………days<br />

5. Procurement of Import Licence<br />

if required ………days ………days<br />

6. Procurement of imported items ………days ………days<br />

7. Manufactur<strong>in</strong>g for –<br />

(a) Structurals ………days ………days<br />

(b) Drives ………days ………days<br />

(c) Electricals ………days ………days<br />

(d) Assembly ………days ………days<br />

8. Ready for shop test<strong>in</strong>g ………days ………days<br />

9. Transportation to site ………days ………days<br />

10. Installation at site ………days ………days<br />

11. Commission<strong>in</strong>g at site ………days ………days


12. Clean<strong>in</strong>g, pa<strong>in</strong>t<strong>in</strong>g and completion<br />

In all respects and hand<strong>in</strong>g over ………days ………days<br />

Detailed stage wise progress chart (CPM Diagram) (attach copy).<br />

Note : Total time for completion is 12 months from effective date of contract. This<br />

period will also <strong>in</strong>clude <strong>in</strong>spection, trials and hand<strong>in</strong>g over of all equipment / stores /<br />

documentation as contracted.<br />

Signature____________________<br />

For and on behalf of____________<br />

____________________________<br />

____________________________<br />

Date ___________________<br />

Page 29 of 56


SCHEUDLE ‘B’<br />

(To be prepared by vendor and submitted)<br />

LIST OF DRAWINGS / DOCUMENTS ACCOMPANYING THE TENDER<br />

<strong>FOR</strong> EQUIPMENT<br />

Description Draw<strong>in</strong>g Nos.<br />

The follow<strong>in</strong>g draw<strong>in</strong>gs are required to<br />

be submitted along with the Tender for<br />

each equipment :<br />

a) General Arrangement Draw<strong>in</strong>gs<br />

b) Layout of Mach<strong>in</strong>ery and Drives<br />

c) Control Circuit Diagram<br />

d) Load/speed curve for motors<br />

e) Stability calculations for major<br />

items like jibs, wheels, drums,<br />

slew bear<strong>in</strong>g, portals, etc.<br />

f) Any other enclosure for Hook<br />

Position <strong>in</strong>dicator, analog <strong>in</strong>di-<br />

cator, cable drum, etc.<br />

Signature<br />

For & On Behalf of<br />

Date<br />

Page 30 of 56


Part III – Standard Conditions of RFP<br />

The Bidder is required to give confirmation of their acceptance of the<br />

Standard Conditions of the Request for Proposal mentioned below which will<br />

automatically be considered as part of the Contract concluded with the successful<br />

Bidder (i.e. Seller <strong>in</strong> the Contract) as selected by the Buyer. Failure to do so may<br />

result <strong>in</strong> rejection of the Bid submitted by the Bidder.<br />

1. Law: The Contract shall be considered and made <strong>in</strong> accordance with the<br />

laws of the Republic of India. The contract shall be governed by and <strong>in</strong>terpreted <strong>in</strong><br />

accordance with the laws of the Republic of India.<br />

2. Effective Date of Contract: The contract shall come <strong>in</strong>to effect on the date of<br />

signatures of both the parties on the contract (Effective Date) and shall rema<strong>in</strong> valid<br />

until the completion of the obligations of the parties under the contract. The<br />

deliveries and supplies and performance of the services shall commence from the<br />

effective date of the contract.<br />

3. Arbitration: All disputes or differences aris<strong>in</strong>g out of or <strong>in</strong> connection with the<br />

Contract shall be settled by bilateral discussions. Any dispute, disagreement or<br />

question aris<strong>in</strong>g out of or relat<strong>in</strong>g to the Contract or relat<strong>in</strong>g to construction or<br />

performance, which cannot be settled amicably, may be resolved through arbitration.<br />

The standard clause of arbitration is as per Forms DPM-7, DPM-8 and DPM-9<br />

(Available <strong>in</strong> MoD website and can be provided on request).<br />

4. Penalty for Use of Undue Influence: The Seller undertakes that he has not<br />

given, offered or promised to give, directly or <strong>in</strong>directly, any gift, consideration,<br />

reward, commission, fees, brokerage or <strong>in</strong>ducement to any person <strong>in</strong> service of the<br />

Buyer or otherwise <strong>in</strong> procur<strong>in</strong>g the Contracts or forbear<strong>in</strong>g to do or for hav<strong>in</strong>g done<br />

or forborne to do any act <strong>in</strong> relation to the obta<strong>in</strong><strong>in</strong>g or execution of the present<br />

Contract or any other Contract with the Government of India for show<strong>in</strong>g or<br />

forbear<strong>in</strong>g to show favour or disfavour to any person <strong>in</strong> relation to the present<br />

Contract or any other Contract with the Government of India. Any breach of the<br />

aforesaid undertak<strong>in</strong>g by the Seller or any one employed by him or act<strong>in</strong>g on his<br />

behalf (whether with or without the knowledge of the Seller) or the commission of<br />

any offers by the Seller or anyone employed by him or act<strong>in</strong>g on his behalf, as<br />

def<strong>in</strong>ed <strong>in</strong> Chapter IX of the Indian Penal Code, 1860 or the Prevention of Corruption<br />

Act, 1986 or any other Act enacted for the prevention of corruption shall entitle the<br />

Buyer to cancel the contract and all or any other contracts with the Seller and<br />

recover from the Seller the amount of any loss aris<strong>in</strong>g from such cancellation. A<br />

decision of the Buyer or his nom<strong>in</strong>ee to the effect that a breach of the undertak<strong>in</strong>g<br />

had been committed shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the Seller. Giv<strong>in</strong>g or offer<strong>in</strong>g of any<br />

gift, bribe or <strong>in</strong>ducement or any attempt at any such act on behalf of the Seller<br />

towards any officer/employee of the Buyer or to any other person <strong>in</strong> a position to<br />

<strong>in</strong>fluence any officer/employee of the Buyer for show<strong>in</strong>g any favour <strong>in</strong> relation to this<br />

or any other contract, shall render the Seller to such liability/ penalty as the Buyer<br />

may deem proper, <strong>in</strong>clud<strong>in</strong>g but not limited to term<strong>in</strong>ation of the contract, imposition<br />

of penal damages, forfeiture of the Bank Guarantee and refund of the amounts paid<br />

by the Buyer.<br />

Page 31 of 56


5. Agents / Agency Commission: The Seller confirms and declares to the<br />

Buyer that the Seller is the orig<strong>in</strong>al manufacturer of the stores/provider of the<br />

services referred to <strong>in</strong> this Contract and has not engaged any <strong>in</strong>dividual or firm,<br />

whether Indian or foreign whatsoever, to <strong>in</strong>tercede, facilitate or <strong>in</strong> any way to<br />

recommend to the Government of India or any of its functionaries, whether officially<br />

or unofficially, to the award of the contract to the Seller; nor has any amount been<br />

paid, promised or <strong>in</strong>tended to be paid to any such <strong>in</strong>dividual or firm <strong>in</strong> respect of any<br />

such <strong>in</strong>tercession, facilitation or recommendation. The Seller agrees that if it is<br />

established at any time to the satisfaction of the Buyer that the present declaration is<br />

<strong>in</strong> any way <strong>in</strong>correct or if at a later stage it is discovered by the Buyer that the Seller<br />

has engaged any such <strong>in</strong>dividual/firm, and paid or <strong>in</strong>tended to pay any amount, gift,<br />

reward, fees, commission or consideration to such person, party, firm or <strong>in</strong>stitution,<br />

whether before or after the sign<strong>in</strong>g of this contract, the Seller will be liable to refund<br />

that amount to the Buyer. The Seller will also be debarred from enter<strong>in</strong>g <strong>in</strong>to any<br />

supply Contract with the Government of India for a m<strong>in</strong>imum period of five years.<br />

The Buyer will also have a right to consider cancellation of the Contract either wholly<br />

or <strong>in</strong> part, without any entitlement or compensation to the Seller who shall <strong>in</strong> such an<br />

event be liable to refund all payments made by the Buyer <strong>in</strong> terms of the Contract<br />

along with <strong>in</strong>terest at the rate of 2% per annum above LIBOR rate. The Buyer will<br />

also have the right to recover any such amount from any contracts concluded earlier<br />

with the Government of India.<br />

6. Access to Books of Accounts: In case it is found to the satisfaction of the<br />

Buyer that the Seller has engaged an Agent or paid commission or <strong>in</strong>fluenced any<br />

person to obta<strong>in</strong> the contract as described <strong>in</strong> clauses relat<strong>in</strong>g to Agents/Agency<br />

Commission and penalty for use of undue <strong>in</strong>fluence, the Seller, on a specific request<br />

of the Buyer, shall provide necessary <strong>in</strong>formation/ <strong>in</strong>spection of the relevant f<strong>in</strong>ancial<br />

documents/<strong>in</strong>formation.<br />

7. Non-disclosure of Contract Documents: Except with the written consent of<br />

the Buyer/ Seller, other party shall not disclose the contract or any provision,<br />

specification, plan, design, pattern, sample or <strong>in</strong>formation thereof to any third party.<br />

8. Liquidated Damages: In the event of the Seller's failure to submit the Bonds,<br />

Guarantees and Documents, supply the stores/goods and conduct trials, <strong>in</strong>stallation<br />

of equipment, tra<strong>in</strong><strong>in</strong>g, etc as specified <strong>in</strong> this contract, the Buyer may, at his<br />

discretion, withhold any payment until the completion of the contract. The BUYER<br />

may also deduct from the seller as agreed, liquidated damages to the sum of 0.5% of<br />

the contract price of the delayed/undelivered stores/services mentioned above for<br />

every week of delay or part of a week, subject to the maximum value of the<br />

Liquidated Damages be<strong>in</strong>g not higher than 10% of the value of delayed stores.<br />

9. Term<strong>in</strong>ation of Contract: The Buyer shall have the right to term<strong>in</strong>ate this<br />

Contract <strong>in</strong> part or <strong>in</strong> full <strong>in</strong> any of the follow<strong>in</strong>g cases :-<br />

(a) Failure to submit PBG as per Clause 1, Part IV of this RFP.<br />

(b) When the supplier has failed to honour any part of the contract<br />

<strong>in</strong>clud<strong>in</strong>g failure to deliver the contracted stores/render services <strong>in</strong> time.<br />

Page 32 of 56


(c) When the contractor is found to have made false or fraudulent<br />

declaration or statement to get the contract or he is found to be <strong>in</strong>dulg<strong>in</strong>g <strong>in</strong><br />

unethical or unfair trade practices.<br />

(d) The Buyer has noticed that the Seller has utilised the services of any<br />

Indian/Foreign agent <strong>in</strong> gett<strong>in</strong>g this contract and paid any commission to such<br />

<strong>in</strong>dividual/company etc.<br />

(e) The delivery of the material is delayed for causes not attributable to<br />

Force Majeure for more than 06 months after the scheduled date of delivery.<br />

(f) The delivery of material is delayed due to causes of Force Majeure by<br />

more than12 months.<br />

(g) When the item offered by the supplier repeatedly fails <strong>in</strong> the <strong>in</strong>spection<br />

and /or the supplier is not <strong>in</strong> the position to either rectify the defects or offer<br />

items confirm<strong>in</strong>g to the contracted quality standards.<br />

(h) When both parties agree mutually to term<strong>in</strong>ate the contract.<br />

(j) The Seller is declared bankrupt or becomes <strong>in</strong>solvent.<br />

(k) Any special circumstances to justify the cancellation or term<strong>in</strong>ation of a<br />

contract.<br />

(l) As per decision of the Arbitration Tribunal.<br />

10. Notices: Any notice required or permitted by the contract shall be written <strong>in</strong><br />

the English language and may be delivered personally or may be sent by FAX or<br />

registered pre-paid mail/airmail, addressed to the last known address of the party to<br />

whom it is sent.<br />

11. Transfer and Sub-lett<strong>in</strong>g: The Seller has no right to give, barga<strong>in</strong>, sell,<br />

assign or sublet or otherwise dispose of the Contract or any part thereof, as well as<br />

to give or to let a third party take benefit or advantage of the present Contract or any<br />

part thereof.<br />

12. Patents and Other Industrial Property Rights: The prices stated <strong>in</strong> the<br />

present Contract shall be deemed to <strong>in</strong>clude all amounts payable for the use of<br />

patents, copyrights, registered charges, trademarks and payments for any other<br />

<strong>in</strong>dustrial property rights. The Seller shall <strong>in</strong>demnify the Buyer aga<strong>in</strong>st all claims from<br />

a third party at any time on account of the <strong>in</strong>fr<strong>in</strong>gement of any or all the rights<br />

mentioned <strong>in</strong> the previous paragraphs, whether such claims arise <strong>in</strong> respect of<br />

manufacture or use. The Seller shall be responsible for the completion of the<br />

supplies <strong>in</strong>clud<strong>in</strong>g spares, tools, tech<strong>nic</strong>al literature and tra<strong>in</strong><strong>in</strong>g aggregates<br />

irrespective of the fact of <strong>in</strong>fr<strong>in</strong>gement of the supplies, irrespective of the fact of<br />

<strong>in</strong>fr<strong>in</strong>gement of any or all the rights mentioned above.<br />

Page 33 of 56


13. Amendments: No provision of present Contract shall be changed or modified<br />

<strong>in</strong> any way (<strong>in</strong>clud<strong>in</strong>g this provision) either <strong>in</strong> whole or <strong>in</strong> part except by an <strong>in</strong>strument<br />

<strong>in</strong> writ<strong>in</strong>g made after the date of this Contract and signed on behalf of both the<br />

parties and which expressly states to amend the present Contract.<br />

14. Taxes and Duties<br />

(a) General.<br />

(i) If Bidder desires to ask for excise duty or Sales Tax / VAT extra,<br />

the same must be specifically stated. In the absence of any such<br />

stipulation, it will be presumed that the prices <strong>in</strong>clude all such charges<br />

and no claim for the same will be enterta<strong>in</strong>ed.<br />

(ii) If reimbursement of any Duty/Tax is <strong>in</strong>tended as extra over the<br />

quoted prices, the Bidder must specifically say so. In the absence of<br />

any such stipulation it will be presumed that the prices quoted are firm<br />

and f<strong>in</strong>al and no claim on account of such duty/tax will be entra<strong>in</strong>ed<br />

after the open<strong>in</strong>g of tenders.<br />

(iii) If a Bidder chooses to quote a price <strong>in</strong>clusive of any duty/tax and<br />

does not confirm <strong>in</strong>clusive of such duty/tax so <strong>in</strong>cluded is firm and f<strong>in</strong>al,<br />

he should clearly <strong>in</strong>dicate the rate of such duty/tax and quantum of<br />

such duty/tax <strong>in</strong>cluded <strong>in</strong> the price. Failure to do so may result <strong>in</strong><br />

ignor<strong>in</strong>g of such offers summarily.<br />

(iv) If a Bidder is exempted from payment of any duty/tax up to any<br />

value of supplies from them, he should clearly state that no such<br />

duty/tax will be charged by him up to the limit of exemption which he<br />

may have. If any concession is available <strong>in</strong> regard to rate/quantum of<br />

any Duty/tax, it should be brought out clearly. Stipulations like, the said<br />

duty/tax was presently not applicable but the same will be charged if it<br />

becomes leviable later on, will not be accepted unless <strong>in</strong> such cases it<br />

is clearly stated by a Bidder that such duty/tax will not be charged by<br />

him even if the same becomes applicable later on. In respect of the<br />

Bidders, who fail to comply with this requirement, their quoted prices<br />

shall be loaded with the quantum of such duty/tax which is normally<br />

applicable on the item <strong>in</strong> question for the purpose of compar<strong>in</strong>g their<br />

prices with other Bidders.<br />

(v) Any change <strong>in</strong> any duty/tax upward/downward as a result of any<br />

statutory variation <strong>in</strong> excise tak<strong>in</strong>g place with<strong>in</strong> contract terms shall be<br />

allowed to the extent of actual quantum of such duty/tax paid by the<br />

supplier, provided the supplies are made dur<strong>in</strong>g the orig<strong>in</strong>al delivery<br />

period. Similarly, <strong>in</strong> case of downward revision <strong>in</strong> any duty/tax, the<br />

actual quantum of reduction of such duty/tax shall be reimbursed to the<br />

Buyer by the Seller. All such adjustments shall <strong>in</strong>clude all reliefs,<br />

exemptions, rebates, concession etc. if any obta<strong>in</strong>ed by the Seller.<br />

Page 34 of 56


(b) Customs Duty<br />

(i) For imported stores offered aga<strong>in</strong>st forward delivery, the Bidder<br />

shall quote prices thereof exclusive of customs duty. The Bidder shall<br />

specify separately the C.I.F. prices and total amount of customs duty<br />

payable. They will also <strong>in</strong>dicate correctly the rate of customs duty<br />

applicable along with Indian Customs Tariff Number. Customs duty as<br />

actually paid will be reimbursed on production of necessary documents<br />

i.e.<br />

(aa) Triplicate copy of the bill of entry;<br />

(ab) Copy of bill of lad<strong>in</strong>g;<br />

(ac) A copy of foreign pr<strong>in</strong>cipal’s <strong>in</strong>voice. However, if the<br />

Bidder imports the stores <strong>in</strong> question aga<strong>in</strong>st his own<br />

commercial quota Import Licences, he will also be required to<br />

submit <strong>in</strong> addition the triplicate copy of bills of entry etc. a<br />

certificate from his Internal Auditor on the bill itself, to the effect<br />

that the follow<strong>in</strong>g items/quantity <strong>in</strong> the bill of entry related to the<br />

stores imported aga<strong>in</strong>st Defence Buyer contract<br />

number…………………………….. dated…………..<br />

(ii) Subsequent to the reimbursement of customs duty, the Bidder<br />

will submit to the concerned Payment Authority a certificate to the<br />

effect that he has not obta<strong>in</strong>ed any refund of customs duty subsequent<br />

to the payment of duty to the Customs authority by him. In addition, he<br />

shall also submit to the Pay<strong>in</strong>g Authority concerned a certificate<br />

immediately after a period of three months from the date of payment of<br />

the duty to customs authorities to the effect that he has not applied for<br />

refund of the customs duty subsequent to the payment of duty to the<br />

customs authorities by him.<br />

(iii) In case the Bidder obta<strong>in</strong>s any refund of customs duty,<br />

subsequently to the payment of the same by him to the customs<br />

authorities and reimbursement of the customs duty to him by the<br />

Payment Authority, he should forthwith furnish the details of the refund<br />

obta<strong>in</strong>ed and afford full credit of the same to the Buyer.<br />

(c) Excise Duty<br />

(i) Where the excise duty is payable on advalorem basis, the<br />

Bidder should submit along with the tender, the relevant form and the<br />

Manufacturer’s price list show<strong>in</strong>g the actual assessable value of the<br />

stores as approved by the Excise authorities.<br />

(ii) Bidders should note that <strong>in</strong> case any refund of excise duty is<br />

granted to them by Excise authorities <strong>in</strong> respect of Stores supplied<br />

under the contract, they will pass on the credit to the Buyer<br />

Page 35 of 56


immediately along with a certificate that the credit so passed on relates<br />

to the Excise Duty, orig<strong>in</strong>ally paid for the stores supplied under the<br />

contract. In case of their failure to do so, with<strong>in</strong> 10 days of the issue of<br />

the excise duty refund orders to them by the Excise Authorities the<br />

Buyer would be empowered to deduct a sum equivalent to the amount<br />

refunded by the Excise Authorities without any further reference to<br />

them from any of their outstand<strong>in</strong>g bills aga<strong>in</strong>st the contract or any<br />

other pend<strong>in</strong>g Government Contract and that no disputes on this<br />

account would be raised by them.<br />

(iii) The Seller is also required to furnish to the Pay<strong>in</strong>g Authority the<br />

follow<strong>in</strong>g certificates:<br />

(aa) Certificate with each bill to the effect that no refund has<br />

been obta<strong>in</strong>ed <strong>in</strong> respect of the reimbursement of excise duty<br />

made to the Seller dur<strong>in</strong>g three months immediately preced<strong>in</strong>g<br />

the date of the claim covered by the relevant bill.<br />

(ab) Certificate as to whether refunds have been obta<strong>in</strong>ed or<br />

applied for by them or not <strong>in</strong> the preced<strong>in</strong>g f<strong>in</strong>ancial year after<br />

the annual Audit of their accounts also <strong>in</strong>dicat<strong>in</strong>g details of such<br />

refunds/applications, if any.<br />

(ac) A certificate along with the f<strong>in</strong>al payment bills of the Seller<br />

to the effect whether or not they have any pend<strong>in</strong>g<br />

appeal/protest for refund or partial refund of excise duties<br />

already reimbursed to the Seller by the Government pend<strong>in</strong>g<br />

with the Excise authorities and if so, the nature, the amount<br />

<strong>in</strong>volved, and the position of such appeals.<br />

(ad) An undertak<strong>in</strong>g to the effect that <strong>in</strong> case it is detected by<br />

the Government that any refund from Excise Authority was<br />

obta<strong>in</strong>ed by the Seller after obta<strong>in</strong><strong>in</strong>g reimbursement from the<br />

Pay<strong>in</strong>g Authority, and if the same is not immediately refunded by<br />

the Seller to the Pay<strong>in</strong>g Authority giv<strong>in</strong>g details and particulars of<br />

the transactions, Pay<strong>in</strong>g Authority will have full authority to<br />

recover such amounts from the Seller’s outstand<strong>in</strong>g bills aga<strong>in</strong>st<br />

that particular contract or any other pend<strong>in</strong>g Government<br />

contracts and that no dispute on this account would be raised by<br />

the Seller.<br />

(iv) Unless otherwise specifically agreed to <strong>in</strong> terms of the contract,<br />

the Buyer shall not be liable for any claim on account of fresh<br />

imposition and/or <strong>in</strong>crease of Excise Duty on raw materials and/or<br />

components used directly <strong>in</strong> the manufacture of the contracted stores<br />

tak<strong>in</strong>g place dur<strong>in</strong>g the pendency of the contract.<br />

Page 36 of 56


(d) Sales Tax / VAT<br />

(i) If it is desired by the Bidder to ask for Sales tax / VAT to be paid<br />

as extra, the same must be specifically stated. In the absence of any<br />

such stipulation <strong>in</strong> the bid, it will be presumed that the prices quoted by<br />

the Bidder are <strong>in</strong>clusive of sales tax and no liability of sales tax will be<br />

developed upon the Buyer.<br />

(ii) On the Bids quot<strong>in</strong>g sales tax extra, the rate and the nature of<br />

Sales Tax applicable at the time of supply should be shown separately.<br />

Sales tax will be paid to the Seller at the rate at which it is liable to be<br />

assessed or has actually been assessed provided the transaction of<br />

sale is legally liable to sales tax and the same is payable as per the<br />

terms of the contract.<br />

(e) Octroi Duty & Local Taxes<br />

(i) Normally, materials to be supplied to Government Departments<br />

aga<strong>in</strong>st Government Contracts are exempted from levy of town duty,<br />

Octroi Duty, Term<strong>in</strong>al Tax and other levies of local bodies. The local<br />

Town/Mu<strong>nic</strong>ipal Body regulations at times, however, provide for such<br />

Exemption only on production of such exemption certificate from any<br />

authorised officer. Seller should ensure that stores ordered aga<strong>in</strong>st<br />

contracts placed by this office are exempted from levy of Town<br />

Duty/Octroi Duty, Term<strong>in</strong>al Tax or other local taxes and duties.<br />

Wherever required, they should obta<strong>in</strong> the exemption certificate from<br />

the Buyer, to avoid payment of such local taxes or duties.<br />

(ii) In case where the Mu<strong>nic</strong>ipality or other local body <strong>in</strong>sists upon<br />

payment of these duties or taxes the same should be paid by the Seller<br />

to avoid delay <strong>in</strong> supplies and possible demurrage charges. The receipt<br />

obta<strong>in</strong>ed for such payment should be forwarded to the Buyer without<br />

delay together with a copy of the relevant act or bylaws / notifications of<br />

the Mu<strong>nic</strong>ipality of the local body concerned to enable him to take up<br />

the question of refund with the concerned bodies if admissible under<br />

the said acts or rules.<br />

Page 37 of 56


Part IV – Special Conditions of RFP<br />

The Bidder is required to give confirmation of their acceptance of Special<br />

Conditions of the RFP mentioned below which will automatically be considered as<br />

part of the Contract concluded with the successful Bidder (i.e. Seller <strong>in</strong> the Contract)<br />

as selected by the Buyer. Failure to do so may result <strong>in</strong> rejection of Bid submitted by<br />

the Bidder.<br />

1. Performance Guarantee. The Bidder will be required to furnish a<br />

Performance Guarantee by way of Bank Guarantee through a public sector bank or<br />

a private sector bank authorized to conduct government bus<strong>in</strong>ess (ICICI Bank Ltd.,<br />

Axis Bank Ltd or HDFC Bank Ltd.) for a sum equal to 10% of the contract value<br />

with<strong>in</strong> 30 days of date of sign<strong>in</strong>g of contract.Performance Bank Guarantee should be<br />

valid up to 60 days beyond the date of warranty. The specimen of PBG is given <strong>in</strong><br />

Form DPM-15. Format Placed at enclosure.<br />

2. Tolerance Clause. To take care of any change <strong>in</strong> the requirement dur<strong>in</strong>g the<br />

period start<strong>in</strong>g from issue of RFP till placement of the contract, Buyer reserves the<br />

right to 50 % plus/m<strong>in</strong>us <strong>in</strong>crease or decrease the quantity of the required goods<br />

upto that limit without any change <strong>in</strong> the terms & conditions and prices quoted by the<br />

Seller. While award<strong>in</strong>g the contract, the quantity ordered can be <strong>in</strong>creased or<br />

decreased by the Buyer with<strong>in</strong> this tolerance limit.<br />

3. Payment Terms. It will be mandatory for the Bidders to <strong>in</strong>dicate their bank<br />

account numbers and other relevant e-payment details so that payments could be<br />

made through ECS/EFT mechanism <strong>in</strong>stead of payment through cheques, wherever<br />

feasible. A copy of the model mandate form prescribed by RBI to be submitted by<br />

Bidders for receiv<strong>in</strong>g payments through ECS is at Form DPM-11 (Available <strong>in</strong> MoD<br />

website and can be given on request). The payment will be made as per the<br />

follow<strong>in</strong>g terms, on production of the requisite documents:-<br />

S.No. Stage Payment Details Payment<br />

Amount<br />

(a) Stage Payment 1 On Approval of QAP and Design by<br />

Inspection agency aga<strong>in</strong>st BG of equivalent amount<br />

valid up to Stage Payment 2.<br />

10 %<br />

(b) Stage Payment 2 Receipt of <strong>in</strong>spection notes of all<br />

equipment /systems duly certified by Inspection agency<br />

aga<strong>in</strong>st BG of equivalent amount valid up to Stage<br />

Payment 3.<br />

(c) Stage Payment 3 Receipt of all equipments/systems<br />

<strong>in</strong>stallation material etc at ND(MBI) and issue of<br />

<strong>in</strong>spection note by Inspection agency/User.<br />

(d) F<strong>in</strong>al Payment On completion of commission<strong>in</strong>g of<br />

entire system and successful tak<strong>in</strong>g over by User.<br />

Page 38 of 56<br />

20 %<br />

50 %<br />

20 %


4. Pay<strong>in</strong>g Authority. Director General Naval Project, Mumbai. The payment<br />

of bills will be made on submission of the follow<strong>in</strong>g documents by the Seller to the<br />

Pay<strong>in</strong>g Authority along with the bill:<br />

(a) Ink-signed copy of cont<strong>in</strong>gent bill / Seller’s bill.<br />

(b) Ink-signed copy of Commercial <strong>in</strong>voice / Seller’s bill.<br />

(c) Copy of Contract with U.O. number and date of IFA’s concurrence,<br />

where required under delegation of powers.<br />

(d) CRVs <strong>in</strong> duplicate<br />

(e) Inspection note.<br />

(f) Claim for statutory and other levies to be supported with requisite<br />

documents / proof of payment such as Excise duty challan, Customs duty<br />

clearance certificate, Octroi receipt, proof of payment for EPF/ESIC<br />

contribution with nom<strong>in</strong>al roll of beneficiaries, etc as applicable.<br />

(g) Exemption certificate for Excise duty / Customs duty, if applicable.<br />

(h) Bank Guarantee from nationalized bank for advance, if any <strong>in</strong><br />

prescribed format.<br />

(i) Guarantee / Warranty certificate.<br />

(j) Performance Bank guarantee from public sector bank or<br />

ICICI/AXIS/HDFC Bank/Indemnity Bond where applicable.<br />

(k) DP extension letter with CFA’s sanction, U.O. number and date of<br />

IFA’s concurrence, where required under delegation of powers, <strong>in</strong>dicat<strong>in</strong>g<br />

whether extension is with or without LD.<br />

(l) Details for electro<strong>nic</strong> payment viz Account holder’s name, Bank name,<br />

Branch name and address, Account type, Account number, IFSC code, MICR<br />

code (if these details are not <strong>in</strong>corporated <strong>in</strong> contract).<br />

(m) Any other document / certificate that may be provided for <strong>in</strong> the<br />

contract.<br />

(n) User Acceptance.<br />

(o) Xerox copy of PBG.<br />

5. Fall clause. The follow<strong>in</strong>g Fall Clause will form part of the contract placed on<br />

successful Bidder:-<br />

(a) The price charged for the stores supplied under the contract by the<br />

Seller shall <strong>in</strong> no event exceed the lowest prices at which the Seller sells the<br />

stores or offer to sell stores of identical description to any<br />

persons/Organisation <strong>in</strong>clud<strong>in</strong>g the purchaser or any department of the<br />

Central government or any Department of state government or any statutory<br />

undertak<strong>in</strong>g the central or state government as the case may be dur<strong>in</strong>g the<br />

period till performance of all supply Orders placed dur<strong>in</strong>g the currency of the<br />

rate contract is completed.<br />

(b) If at any time, dur<strong>in</strong>g the said period the Seller reduces the sale price,<br />

sells or offer to sell such stores to any person/organisation <strong>in</strong>clud<strong>in</strong>g the Buyer<br />

or any Deptt, of central Govt. or any Department of the State Government or<br />

any Statutory undertak<strong>in</strong>g of the Central or state Government as the case<br />

may be at a price lower than the price chargeable under the contract, the<br />

Seller shall forthwith notify such reduction or sale or offer of sale to the<br />

Director general of Supplies & Disposals and the price payable under the<br />

Page 39 of 56


contract for the stores of such reduction of sale or offer of the sale shall stand<br />

correspond<strong>in</strong>gly reduced. The above stipulation will, however, not apply to:-<br />

(i) Exports by the Seller.<br />

(ii) Sale of goods as orig<strong>in</strong>al equipment at price lower than the<br />

prices charged for normal replacement.<br />

(iii) Sale of goods such as drugs which have expiry dates.<br />

(iv) Sale of goods at lower price on or after the date of completion of<br />

the Contract sale/placement of the order of goods by the authority<br />

concerned under the exist<strong>in</strong>g or previous Rate Contracts as also under<br />

any previous contracts entered <strong>in</strong>to with the Central or State Govt.<br />

Depts, <strong>in</strong>clud<strong>in</strong>g their undertak<strong>in</strong>gs exclud<strong>in</strong>g jo<strong>in</strong>t sector companies<br />

and/or private parties and bodies.<br />

(c) The Seller shall furnish the follow<strong>in</strong>g certificate to the Pay<strong>in</strong>g Authority<br />

along with each bill for payment for supplies made aga<strong>in</strong>st the Contract – “We<br />

certify that there has been no reduction <strong>in</strong> sale price of the stores of<br />

description identical to the stores supplied to the Government under the<br />

Contract here<strong>in</strong> and such stores have not been offered/sold by me/us to any<br />

person/organisation <strong>in</strong>clud<strong>in</strong>g the purchaser or any department of Central<br />

Government or any Department of a state Government or any Statutory<br />

Undertak<strong>in</strong>g of the Central or state Government as the case may be upto the<br />

date of bill/the date of completion of supplies aga<strong>in</strong>st all supply orders placed<br />

dur<strong>in</strong>g the currency of the Contract at price lower than the price charged to<br />

the government under the contract except for quantity of stores categories<br />

under sub-clauses (a),(b) and (c) of sub-para (ii) above details of which are<br />

given below - ........”.<br />

6. Exchange Rate Variation Clause. No adjustment of prices shall be<br />

enterta<strong>in</strong>able on account of any variation <strong>in</strong> exchange rate.<br />

7. Risk & Expense Clause<br />

(a) Should the stores or any <strong>in</strong>stallment thereof not be delivered with<strong>in</strong> the<br />

time or times specified <strong>in</strong> the contract documents, or if defective delivery is<br />

made <strong>in</strong> respect of the stores or any <strong>in</strong>stallment thereof, the Buyer shall after<br />

grant<strong>in</strong>g the Seller 45 days to cure the breach, be at liberty, without prejudice<br />

to the right to recover liquidated damages as a remedy for breach of contract,<br />

to declare the contract as cancelled either wholly or to the extent of such<br />

default.<br />

(b) Should the stores or any <strong>in</strong>stallment thereof not perform <strong>in</strong> accordance<br />

with the specifications / parameters provided by the SELLER dur<strong>in</strong>g the check<br />

proof tests to be done <strong>in</strong> the BUYER’s country, the BUYER shall be at liberty,<br />

without prejudice to any other remedies for breach of contract, to cancel the<br />

contract wholly or to the extent of such default.<br />

(c) In case of a material breach that was not remedied with<strong>in</strong> 45 days, the<br />

BUYER shall, hav<strong>in</strong>g given the right of first refusal to the SELLER be at liberty<br />

Page 40 of 56


to purchase, manufacture, or procure from any other source as he th<strong>in</strong>ks fit,<br />

other stores of the same or similar description to make good:-<br />

(i) Such default.<br />

(ii) In the event of the contract be<strong>in</strong>g wholly determ<strong>in</strong>ed the balance<br />

of the stores rema<strong>in</strong><strong>in</strong>g to be delivered thereunder.<br />

(d) Any excess of the purchase price, cost of manufacturer, or value of any<br />

stores procured from any other supplier as the case may be, over the contract<br />

price appropriate to such default or balance shall be recoverable from the<br />

Seller. Such recoveries shall not exceed 100% of the value of the Contract.<br />

8. Force Majeure Clause<br />

(a) Neither party shall bear responsibility for the complete or partial<br />

nonperformance of any of its obligations (except for failure to pay any sum<br />

which has become due on account of receipt of goods under the provisions of<br />

the present contract), if the non-performance results from such Force Majeure<br />

circumstances as Flood, Fire, Earth Quake and other acts of God as well as<br />

War, Military operation, blockade, Acts or Actions of State Authorities or any<br />

other circumstances beyond the parties control that have arisen after the<br />

conclusion of the present contract.<br />

(b) In such circumstances the time stipulated for the performance of an<br />

obligation under the present contract is extended correspond<strong>in</strong>gly for the<br />

period of time of action of these circumstances and their consequences.<br />

(c) The party for which it becomes impossible to meet obligations under<br />

this contract due to Force Majeure conditions, is to notify <strong>in</strong> written form the<br />

other party of the beg<strong>in</strong>n<strong>in</strong>g and cessation of the above circumstances<br />

immediately, but <strong>in</strong> any case not later than 10 (Ten) days from the moment of<br />

their beg<strong>in</strong>n<strong>in</strong>g.<br />

(d) Certificate of a Chamber of Commerce (Commerce and Industry) or<br />

other competent authority or organization of the respective country shall be a<br />

sufficient proof of commencement and cessation of the above circumstances.<br />

(e) If the impossibility of complete or partial performance of an obligation<br />

lasts for more than 12 (twelve) months, either party hereto reserves the right<br />

to term<strong>in</strong>ate the contract totally or partially upon giv<strong>in</strong>g prior written notice of<br />

30 (thirty) days to the other party of the <strong>in</strong>tention to term<strong>in</strong>ate without any<br />

liability other than reimbursement on the terms provided <strong>in</strong> the agreement for<br />

the goods received.<br />

9. Specification. The follow<strong>in</strong>g Specification clause will form part of the contract<br />

placed on successful Bidder - The Seller guarantees to meet the specifications as<br />

per Part-II of RFP and to <strong>in</strong>corporate the modifications to the exist<strong>in</strong>g design<br />

configuration to meet the specific requirement of the Buyer Services as per<br />

modifications/requirements recommended after the Ma<strong>in</strong>tenance Evaluation Trials.<br />

All tech<strong>nic</strong>al literature and draw<strong>in</strong>gs shall be amended as the modifications by the<br />

Page 41 of 56


Seller before supply to the Buyer. The Seller, <strong>in</strong> consultation with the Buyer, may<br />

carry out tech<strong>nic</strong>al upgradation/alterations <strong>in</strong> the design, draw<strong>in</strong>gs and specifications<br />

due to change <strong>in</strong> manufactur<strong>in</strong>g procedures, <strong>in</strong>digenisation or obsolescence. This<br />

will, however, not <strong>in</strong> any way, adversely affect the end specifications of the<br />

equipment. Changes <strong>in</strong> tech<strong>nic</strong>al details, draw<strong>in</strong>gs repair and ma<strong>in</strong>tenance<br />

techniques along with necessary tools as a result of upgradation/alterations will be<br />

provided to the Buyer free of cost with<strong>in</strong> 15 days of affect<strong>in</strong>g such<br />

upgradation/alterations.<br />

10. OEM Certificate. In case the Bidder is not the OEM, the agreement certificate<br />

with the OEM for sourc<strong>in</strong>g the spares shall be mandatory. However, where OEMs do<br />

not exist, m<strong>in</strong>or aggregates and spares can be sourced from authorized vendors<br />

subject to quality certification.<br />

11. Earliest Acceptable Year of Manufacture. 2012 Quality / Life certificate will<br />

need to be enclosed with the Bill.<br />

12. Buyer Furnished Equipment. No equipment will be provided by the Buyer at his<br />

expense to the Seller:<br />

13. Transportation. The follow<strong>in</strong>g Transportation clause will form part of the contract<br />

placed on successful Bidder<br />

(a) CIF/CIP – The stores shall be delivered CIF/CIP at Naval Dockyard,<br />

Mumbai. Seller will bear the costs and freight necessary to br<strong>in</strong>g the goods to<br />

the port of dest<strong>in</strong>ation. The Seller also has to procure mar<strong>in</strong>e/other <strong>in</strong>surance<br />

aga<strong>in</strong>st the Buyer’s risk of loss of or damage to goods dur<strong>in</strong>g the carriage.<br />

The Seller will contract for <strong>in</strong>surance and pay the <strong>in</strong>surance premium. Seller is<br />

also required to clear the goods for export. The stores shall be delivered to<br />

the Buyer by Indian ships only. The date of issue of the Bill of Lad<strong>in</strong>g shall be<br />

considered as the date of delivery. No part shipment of goods would be<br />

permitted. Trans-shipment of goods would not be permitted. In case it<br />

becomes <strong>in</strong>evitable to do so, the Seller shall not arrange part-shipments<br />

and/or transshipment without the express/prior written consent of the Buyer.<br />

The goods should be shipped by Indian vessels only. However, the Seller can<br />

still utilize the services of the MoD, Govt of India Freight Forward<strong>in</strong>g Agent<br />

details for which will be provided by the Buyer. Seller will be required to<br />

commu<strong>nic</strong>ate the follow<strong>in</strong>g <strong>in</strong>formation <strong>in</strong>variably by telex/signed <strong>in</strong> case of<br />

import of Defence Stores be<strong>in</strong>g brought <strong>in</strong> commercial ships to Embarkation<br />

Head Quarters concerned well <strong>in</strong> advance before the Ship sails the port of<br />

load<strong>in</strong>g:<br />

(i) Name of the Ship<br />

(ii) Port of Load<strong>in</strong>g and name of Country.<br />

(iii) ETA at port of Discharge i.e. Mumbai, Kolkatta, Chennai and<br />

Kochi.<br />

(iv) Number of Packages and weight.<br />

(v) Nomenclature and details of major equipment.<br />

(vi) Special <strong>in</strong>structions, if any stores of sensitive nature requir<strong>in</strong>g<br />

special attention.<br />

Page 42 of 56


14. Air lift. The follow<strong>in</strong>g Airlift clause will form part of the contract placed on<br />

successful Bidder - Should the Buyer <strong>in</strong>tend to airlift all or some of the stores, the<br />

Seller shall pack the stores accord<strong>in</strong>gly on receipt of an <strong>in</strong>timation to that effect from<br />

the Buyer. Such deliveries will be agreed upon well <strong>in</strong> advance and paid for as may<br />

be mutually agreed.<br />

15. Pack<strong>in</strong>g and Mark<strong>in</strong>g. The follow<strong>in</strong>g Pack<strong>in</strong>g and Mark<strong>in</strong>g clause will form part<br />

of the contract placed on successful Bidder<br />

(a) The Seller shall provide pack<strong>in</strong>g and preservation of the equipment and<br />

spares/goods contracted so as to ensure their safety aga<strong>in</strong>st damage <strong>in</strong> the<br />

conditions of land, sea and air transportation, transshipment, storage and<br />

weather hazards dur<strong>in</strong>g transportation, subject to proper cargo handl<strong>in</strong>g. The<br />

Seller shall ensure that the stores are packed <strong>in</strong> conta<strong>in</strong>ers, which are made<br />

sufficiently strong, and with seasoned wood. The pack<strong>in</strong>g cases should have<br />

hooks for lift<strong>in</strong>g by crane/fork lift truck. Tags with proper mark<strong>in</strong>g shall be<br />

fastened to the special equipment, which cannot be packed.<br />

(b) The pack<strong>in</strong>g of the equipment and spares/goods shall conform to the<br />

requirements of specifications and standards <strong>in</strong> force <strong>in</strong> the territory of the<br />

Seller’s country.<br />

(c) Each spare, tool and accessory shall be packed <strong>in</strong> separate cartons. A<br />

label <strong>in</strong> English shall be pasted on the carton <strong>in</strong>dicat<strong>in</strong>g the under mentioned<br />

details of the item conta<strong>in</strong>ed <strong>in</strong> the carton. A tag <strong>in</strong> English with said<br />

<strong>in</strong>formation shall also be attached to six samples of the item. If quantity<br />

contracted is less than six then tag shall be affixed to complete quantity<br />

contracted of the item. The cartons shall then be packed <strong>in</strong> pack<strong>in</strong>g cases as<br />

required.<br />

(i) Part Number:<br />

(ii) Nomenclature:<br />

(iii) Contract annex number:<br />

(iv) Annex serial number:<br />

(v) Quantity contracted:<br />

(d) One copy of the pack<strong>in</strong>g list <strong>in</strong> English shall be <strong>in</strong>serted <strong>in</strong> each cargo<br />

package, and the full set of the pack<strong>in</strong>g lists shall be placed <strong>in</strong> Case No.1<br />

pa<strong>in</strong>ted <strong>in</strong> a yellow colour.<br />

(e) The Seller shall mark each package with <strong>in</strong>delible pa<strong>in</strong>t <strong>in</strong> the English<br />

language as follows:-<br />

(i) EXPORT<br />

(ii) Contract No. ------------------------------------------<br />

(iii) Consignee ---------------------------------------------<br />

(iv) Port / airport of dest<strong>in</strong>ation ------------------------<br />

(v) Ultimate consignee ----------------------------------<br />

(vi) SELLER ------------------------------------------------<br />

(vii) Package No. ------------------------------------------<br />

Page 43 of 56


(viii) Gross/net weight : -----------------------------------<br />

(ix) Overall dimensions/volume : ---------------------<br />

(x) The Seller’s mark<strong>in</strong>g.<br />

(f) If necessary, each package shall be marked with warn<strong>in</strong>g<br />

<strong>in</strong>scriptions:, “Do not turn over”, category of cargo etc.<br />

(g) Should any special equipment be returned to the Seller by the Buyer,<br />

the latter shall provide normal pack<strong>in</strong>g, which protects the equipment and<br />

spares/goods from the damage of deterioration dur<strong>in</strong>g transportation by land,<br />

air or sea. In this case the Buyer shall f<strong>in</strong>alize the mark<strong>in</strong>g with the Seller.<br />

16. Quality. The quality of the stores delivered accord<strong>in</strong>g to the present Contract<br />

shall correspond to the tech<strong>nic</strong>al conditions and standards valid for the deliveries of<br />

the same stores for <strong>in</strong> Seller’s country or specifications enumerated as per RFP and<br />

shall also <strong>in</strong>clude there<strong>in</strong> modification to the stores suggested by the Buyer. Such<br />

modifications will be mutually agreed to. The Seller confirms that the stores to be<br />

supplied under this Contract shall be new i.e. not manufactured before (Year of<br />

Contract),and shall <strong>in</strong>corporate all the latest improvements and modifications thereto<br />

and spares of improved and modified equipment are backward <strong>in</strong>tegrated and<br />

<strong>in</strong>terchangeable with same equipment supplied by the Seller <strong>in</strong> the past if any. The<br />

Seller shall supply an <strong>in</strong>terchangeability certificate along with the changed part<br />

numbers where<strong>in</strong> it should be mentioned that item would provide as much life as the<br />

orig<strong>in</strong>al item.<br />

17. Quality Assurance. Seller would provide the QAP with<strong>in</strong> 03 months of the date<br />

of sign<strong>in</strong>g of the Contract to the third party <strong>in</strong>spection agency. Buyer reserves the<br />

right to modify the QAP. Seller would be required to provide all test facilities at his<br />

premises for acceptance and <strong>in</strong>spection by the . The details <strong>in</strong> this regard will be<br />

coord<strong>in</strong>ated dur<strong>in</strong>g the negotiation of the contract. The item should be of the latest<br />

manufacture, conform<strong>in</strong>g to the current production standard and hav<strong>in</strong>g 100%<br />

def<strong>in</strong>ed life at the time of delivery.<br />

18. Inspection Authority. The Inspection will be carried out by the third party<br />

agency(IRS/LRS/BVQI) as mentioned at Part II of this RFP.<br />

19. Pre-Dispatch Inspection. The follow<strong>in</strong>g Pre-dispatch Inspection clause will form<br />

part of the contract placed on successful Bidder<br />

(a) The Buyer’s representatives may carry out Pre-Dispatch Inspection<br />

(PDI) of the stores/equipment <strong>in</strong> addition to the third party <strong>in</strong>spector, <strong>in</strong> order<br />

to check their compliance with specifications <strong>in</strong> accordance with its usual<br />

standard procedures. Upon successful completion of such PDI, the Seller and<br />

third party <strong>in</strong>spector will issue and sign a Certificate of Conformity as per the<br />

specimen at Form DPM-21(Available <strong>in</strong> MoD website and can be given on<br />

request).Same will be forwarded to DGNP(MBI) prior dispatch of items.<br />

(b) The Seller shall <strong>in</strong>timate the third party <strong>in</strong>spector/Buyer at least 45 days<br />

before the scheduled date of PDI. The Buyer may send his authorised<br />

representative(s) to attend the PDI.<br />

Page 44 of 56


(c) The Seller shall provide all reasonable facilities, access and assistance<br />

to the Buyer’s representative for safety and convenience <strong>in</strong> the performance<br />

of their duties <strong>in</strong> the Seller’s country.<br />

20. Jo<strong>in</strong>t Receipt Inspection. The follow<strong>in</strong>g Jo<strong>in</strong>t Receipt Inspection clause will form<br />

part of the contract placed on successful Bidder –<br />

(a) The Parties agree that the Jo<strong>in</strong>t Receipt Inspection (JRI) of delivered<br />

goods shall be conducted on arrival at ND(MBI). JRI will consist of<br />

(i) Quantitative check<strong>in</strong>g to verify that the quantities of the<br />

delivered goods correspond to the quantities def<strong>in</strong>ed <strong>in</strong> this contract<br />

and the <strong>in</strong>voices.<br />

(ii) Complete functional check<strong>in</strong>g of the stores/equipment as per<br />

specifications <strong>in</strong> the contract and as per procedures and tests laid<br />

down by Buyer but functional check<strong>in</strong>g of spares shall not be done.<br />

(b) JRI will be carried out by the User and Buyer’s representative(s). The<br />

Buyer will <strong>in</strong>vite the Seller with a prior notice of a m<strong>in</strong>imum of fifteen (15) days<br />

to attend the JRI for the delivered goods. The Seller shall have the right not to<br />

attend the JRI. The bio data of the Seller’s representative will need to be<br />

commu<strong>nic</strong>ated fifteen (15) days prior to the dispatch of goods to the Buyer for<br />

obta<strong>in</strong><strong>in</strong>g necessary security clearance <strong>in</strong> accordance with the rules<br />

applicable <strong>in</strong> the Buyer’s country.<br />

(c) Upon completion of each JRI, JRI proceed<strong>in</strong>gs and Acceptance<br />

Certificate will be signed by the Seller and the User. In case the Seller’s<br />

representative is not present, the JRI proceed<strong>in</strong>gs and Acceptance Certificate<br />

shall be signed by the User only and the same shall be b<strong>in</strong>d<strong>in</strong>g on the Seller.<br />

Copy of JRI proceed<strong>in</strong>gs and Acceptance Certificate shall be dispatched to<br />

the Seller with<strong>in</strong> 30 days of completion of the JRI. In case of deficiencies <strong>in</strong><br />

quantity and quality or defects, details of these shall be recorded <strong>in</strong> the JRI<br />

proceed<strong>in</strong>gs, Acceptance Certificate shall not be issued and claims raised as<br />

per the Article on Claims <strong>in</strong> the contract.<br />

21. Frank<strong>in</strong>g Clause. The follow<strong>in</strong>g Frank<strong>in</strong>g Clause will form part of the contract<br />

placed on successful Bidder:-<br />

(a) Frank<strong>in</strong>g Clause <strong>in</strong> the case of Acceptance of Goods “The fact that<br />

the goods have been <strong>in</strong>spected after the delivery period and passed by the<br />

Inspect<strong>in</strong>g Officer will not have the effect of keep<strong>in</strong>g the contract alive. The<br />

goods are be<strong>in</strong>g passed without prejudice to the rights of the Buyer under the<br />

terms and conditions of the contract”.<br />

(b) Frank<strong>in</strong>g Clause <strong>in</strong> the case of Rejection of Goods “The fact that<br />

the goods have been <strong>in</strong>spected after the delivery period and rejected by the<br />

Inspect<strong>in</strong>g Officer will not b<strong>in</strong>d the Buyer <strong>in</strong> any manner. The goods are be<strong>in</strong>g<br />

Page 45 of 56


ejected without prejudice to the rights of the Buyer under the terms and<br />

conditions of the contract.”<br />

22. Claims. The follow<strong>in</strong>g Claims clause will form part of the contract placed on<br />

successful Bidder:–<br />

(a) The claims may be presented either: (i) on quantity of the stores, where<br />

the quantity does not correspond to the quantity shown <strong>in</strong> the Pack<strong>in</strong>g<br />

List/Insufficiency <strong>in</strong> pack<strong>in</strong>g, or (ii) on quality of the stores, where quality does<br />

not correspond to the quality mentioned <strong>in</strong> the contract.<br />

(b) The quantity claims for deficiency of quantity shall be presented with<strong>in</strong><br />

45 days of completion of JRI and acceptance of goods. The quantity claim<br />

shall be submitted to the Seller as per Form DPM-22 (Available <strong>in</strong> MoD<br />

website and can be given on request).<br />

(c) The quality claims for defects or deficiencies <strong>in</strong> quality noticed dur<strong>in</strong>g<br />

the JRI shall be presented with<strong>in</strong> 45 days of completion of JRI and<br />

acceptance of goods. Quality claims shall be presented for defects or<br />

deficiencies <strong>in</strong> quality noticed dur<strong>in</strong>g warranty period earliest but not later than<br />

45 days after expiry of the guarantee period. The quality claims shall be<br />

submitted to the Seller as per Form DPM-23 (Available <strong>in</strong> MoD website and<br />

can be given on request).<br />

(d) The description and quantity of the stores are to be furnished to the<br />

Seller along with concrete reasons for mak<strong>in</strong>g the claims. Copies of all the<br />

justify<strong>in</strong>g documents shall be enclosed to the presented claim. The Seller will<br />

settle the claims with<strong>in</strong> 45 days from the date of the receipt of the claim at the<br />

Seller’s office, subject to acceptance of the claim by the Seller. In case no<br />

response is received dur<strong>in</strong>g this period the claim will be deemed to have been<br />

accepted.<br />

(e) The Seller shall collect the defective or rejected goods from the<br />

location nom<strong>in</strong>ated by the Buyer and deliver the repaired or replaced goods at<br />

the same location under Seller’s arrangement.<br />

(f) Claims may also be settled by reduction of cost of goods under claim<br />

from bonds submitted by the Seller or payment of claim amount by Seller<br />

through demand draft drawn on an Indian Bank, <strong>in</strong> favour of Pr<strong>in</strong>cipal<br />

Controller/Controller of Defence Accounts concerned.<br />

(g) The quality claims will be raised solely by the Buyer and without any<br />

certification/countersignature by the Seller’s representative stationed <strong>in</strong> India.<br />

23. Warranty<br />

The follow<strong>in</strong>g Warranty will form part of the contract placed on successful<br />

Bidder:–<br />

Page 46 of 56


(a) The Seller warrants that the goods supplied under the contract conform<br />

to tech<strong>nic</strong>al specifications prescribed and shall perform accord<strong>in</strong>g to the said<br />

tech<strong>nic</strong>al specifications.<br />

(b) The Seller warrants for a period of 12 months from the date of<br />

acceptance of stores by Jo<strong>in</strong>t Receipt Inspection or date of <strong>in</strong>stallation and<br />

commission<strong>in</strong>g, whichever is later, that the goods/stores supplied under the<br />

contract and each component used <strong>in</strong> the manufacture thereof shall be free<br />

from all types of defects/failures.<br />

(c) If with<strong>in</strong> the period of warranty, the goods are reported by the Buyer to<br />

have failed to perform as per the specifications, the Seller shall either replace<br />

or rectify the same free of charge, with<strong>in</strong> a maximum period of 45 days of<br />

notification of such defect received by the Seller, provided that the goods are<br />

used and ma<strong>in</strong>ta<strong>in</strong>ed by the Buyer as per <strong>in</strong>structions conta<strong>in</strong>ed <strong>in</strong> the<br />

Operat<strong>in</strong>g Manual. Warranty of the equipment would be extended by such<br />

duration of downtime. Record of the down time would be ma<strong>in</strong>ta<strong>in</strong>ed by the<br />

user <strong>in</strong> the logbook. Spares required for warranty repairs shall be provided<br />

free of cost by the Seller. The Seller also undertakes to diagnose, test, adjust,<br />

calibrate and repair/replace the goods/equipment aris<strong>in</strong>g due to accidents by<br />

neglect or misuse by the operator or damage due to transportation of the<br />

goods dur<strong>in</strong>g the warranty period, at the cost mutually agreed to between the<br />

Buyer and the Seller.<br />

(d) The Seller also warrants that necessary service and repair back up<br />

dur<strong>in</strong>g the warranty period of the equipment shall be provided by the Seller<br />

and he will ensure that the downtime is with<strong>in</strong> 0.5 % of the warranty period.<br />

(e) The Seller shall associate tech<strong>nic</strong>al personnel of the Ma<strong>in</strong>tenance<br />

agency and Quality Assurance Agency of the Buyer dur<strong>in</strong>g warranty repair<br />

and shall also provide the details of complete defects, reasons and remedial<br />

actions for defects.<br />

(f) If a particular equipment/goods fails frequently and/or, the cumulative<br />

down time exceeds 20 % of the warranty period, the complete equipment<br />

shall be replaced free of cost by the Seller with<strong>in</strong> a stipulated period of 60<br />

days of receipt of the notification from the Buyer. Warranty of the replaced<br />

equipment would start from the date of acceptance after Jo<strong>in</strong>t Receipt<br />

Inspection by the Buyer/date of <strong>in</strong>stallation and commission<strong>in</strong>g.<br />

(g) In case the complete delivery of Eng<strong>in</strong>eer<strong>in</strong>g Support Package is<br />

delayed beyond the period stipulated <strong>in</strong> this contract, the Seller undertakes<br />

that the warranty period for the goods/stores shall be extended to that extent.<br />

(h) The Seller will guarantee the shelf life of (10) years under the Indian<br />

tropical condition as given below:<br />

(i) M<strong>in</strong>imum temperature – 10ºC<br />

(ii) Maximum temperature - 50ºC<br />

(iii)Average Humidity – 90%<br />

Page 47 of 56


(j) For procurement of oils and lubricants, the follow<strong>in</strong>g will be applicable:–<br />

(i) The Seller warrants that the special oils and lubricants required<br />

dur<strong>in</strong>g the warranty period of the equipment shall be provided by the<br />

Seller himself.<br />

(ii) The penalty amount<strong>in</strong>g to (20 %) of the value of the equipment<br />

shall be imposed on the Seller <strong>in</strong> case the Seller refuses or fails to<br />

meet the requirement of oils and lubricants dur<strong>in</strong>g the warranty period<br />

of the equipment.<br />

(iii) The Seller shall make available the detailed specifications of all<br />

oils and lubricants required to be used <strong>in</strong> the equipment at the l<strong>in</strong>e of<br />

<strong>in</strong>itial delivery of equipment to facilitate identification and development<br />

of <strong>in</strong>digenous equivalents to be used after the expiry of the warranty<br />

period.<br />

24. Product Support. The follow<strong>in</strong>g Product Support clause will form part of the<br />

contract placed on successful Bidder:-<br />

(a) The Seller agrees to provide Product Support for the stores,<br />

assemblies/sub-, fitment items and consumables, Special Ma<strong>in</strong>tenance<br />

Tools(SMT)/Special Test Equipments (STE) subcontracted from other<br />

agencies/ manufacturer by the Seller for a maximum period of 20 years<br />

<strong>in</strong>clud<strong>in</strong>g 01 year of warranty period after the delivery of equipment.<br />

(b) In the event of any obsolescence dur<strong>in</strong>g the above mentioned period of<br />

product support <strong>in</strong> respect of any component or sub-system, mutual<br />

consultation between the Seller and Buyer will be undertaken to arrive at an<br />

acceptable solution <strong>in</strong>clud<strong>in</strong>g additional cost, if any.<br />

(c) Any improvement/modification/ up gradation be<strong>in</strong>g undertaken by the<br />

Seller or their sub suppliers on the stores/equipment be<strong>in</strong>g purchased under<br />

the Contract will be commu<strong>nic</strong>ated by the Seller to the Buyer and, if required<br />

by the Buyer, these will be carried out by the Seller at Buyer's cost.<br />

25. Eng<strong>in</strong>eer<strong>in</strong>g Support Package (ESP) clause. The follow<strong>in</strong>g ESP clause will<br />

form part of the contract placed on successful Bidder –<br />

(a) Repair Philosophy. The Eng<strong>in</strong>eer<strong>in</strong>g Support Philosophy shall<br />

conform to the repair philosophy as follows:<br />

(i) Unit level repairs. These are repairs carried out with<strong>in</strong> the unit<br />

hold<strong>in</strong>g this equipment with tools generally held with<strong>in</strong> the unit or<br />

supplied by the manufacturer with each equipment or as per scal<strong>in</strong>g of<br />

1:10 or any other scal<strong>in</strong>g recommended by the manufacturer as per<br />

population held <strong>in</strong> the unit. These perta<strong>in</strong> to clean<strong>in</strong>g, lubrications,<br />

m<strong>in</strong>or repairs and replacement of components and m<strong>in</strong>or assemblies<br />

that can be carried out <strong>in</strong> field without any sophisticated tools or test<br />

Page 48 of 56


equipment. For carry<strong>in</strong>g out such repairs, the manufacturer is required<br />

to provide the follow<strong>in</strong>g:-<br />

(aa) Table of Tools and Equipment (TOTE) with each<br />

equipment <strong>in</strong>clud<strong>in</strong>g operators manual.<br />

(ab) Scal<strong>in</strong>g of special tools and spares as mentioned above<br />

<strong>in</strong>clud<strong>in</strong>g Ma<strong>in</strong>tenance manual.<br />

(ii) Field Repairs. These are repairs carried out <strong>in</strong> the field by<br />

tech<strong>nic</strong>ians specially tra<strong>in</strong>ed for this purpose and where the required<br />

special tools and spares have to be provided. These repairs comprise<br />

replacement of major assemblies and other components beyond the<br />

scope of unit level repairs. Normally a field work shop that carries out<br />

such repairs looks after three to four units hold<strong>in</strong>g the said equipment.<br />

The manufacturer is required to provide the follow<strong>in</strong>g:-<br />

(aa) Quantity and specification of spares that need to be<br />

stocked for a population of ordered equipment.<br />

(ab) Special Ma<strong>in</strong>tenance Tools and Test Equipment that need<br />

to be provided to each such field work shop. (The total number<br />

of such facilities would also have to be stated based on<br />

deployment pattern of the concerned equipment to carryout total<br />

cost<strong>in</strong>g).<br />

(iii) Base overhaul. All repairs <strong>in</strong>clud<strong>in</strong>g repairs to components,<br />

subassemblies and overhaul of the complete equipment are carried out<br />

by this facility. Depend<strong>in</strong>g on the population of the equipment, one to<br />

five such facilities may be established <strong>in</strong> India for this purpose (The<br />

actual No would have to be stated for cost<strong>in</strong>g).The manufacturer is<br />

required to provide the follow<strong>in</strong>g:-<br />

(aa) All Special Ma<strong>in</strong>tenance Tools, jigs, fixtures and test<br />

equipment for carry<strong>in</strong>g out repairs up to component level.<br />

(ab) Quantity and specification of spares, sub assemblies as<br />

per population expected to be ma<strong>in</strong>ta<strong>in</strong>ed.<br />

(ac) Oils and lubricants necessary for overhaul.<br />

(ad) All necessary tech<strong>nic</strong>al literature.<br />

(ae) Calibration facilities for test equipment. This level of<br />

repair def<strong>in</strong>es stripp<strong>in</strong>g and rebuild<strong>in</strong>g of equipment <strong>in</strong> a Base<br />

workshop.<br />

(b) Manufacturers Recommended List of Spares (MRLS). Based on the<br />

explanation given above, Bidders are requested to provide MRLS to susta<strong>in</strong><br />

the equipment for a period of 05 years for various levels of repair as per<br />

format given at Form DPM-19 (Available <strong>in</strong> MoD website and can be given on<br />

request). Bidders will be required to provide these both with Tech<strong>nic</strong>al and<br />

Commercial proposals. (In case where the equipment has been <strong>in</strong> usage the<br />

spares would be sought by Buyer, on the recommended list to be furnished by<br />

the ma<strong>in</strong>tenance agency, based on the exploitation of the equipment, and<br />

Page 49 of 56


NOT as per MRLS). While with the commercial proposal, the actual costs of<br />

each component/spare will be provided, <strong>in</strong> the case of Tech<strong>nic</strong>al Proposal<br />

these will be reflected as Low Cost/ Medium Cost/High Cost. A guidel<strong>in</strong>e for<br />

this purpose is as under:-<br />

(i) Low Cost. Less than 2 % of the unit cost of the equipment/sub<br />

system.<br />

(ii) Medium Cost. 2 to 10% of the unit cost of the equipment/sub<br />

system.<br />

(iii) High Cost. Greater than 10 % of the unit cost of<br />

equipment/subsystem. If the complete equipment comprises a number<br />

of different sub systems, for e.g. it is com<strong>in</strong>g mounted on a vehicle or is<br />

provided with a stand for mount<strong>in</strong>g or is <strong>in</strong>clusive of a generator or an<br />

air conditioner or has a sight, the MRLS must be provided separately<br />

for each such sub system.<br />

(c) Special Ma<strong>in</strong>tenance Tools and Test Equipment. This is to be<br />

formulated <strong>in</strong> a similar manner as expla<strong>in</strong>ed for MRLS. A suggested format is<br />

given at Form DPM-17 (Available <strong>in</strong> MoD website and can be given on<br />

request) and is to be <strong>in</strong>cluded <strong>in</strong> both Tech<strong>nic</strong>al and Commercial Proposals.<br />

The cost column may be left blank <strong>in</strong> the Tech<strong>nic</strong>al Proposal.<br />

(d) Tech<strong>nic</strong>al Literature. The details of tech<strong>nic</strong>al literature to be supplied<br />

with the system should be listed as per the suggested format at Form DPM-18<br />

(Available <strong>in</strong> MoD website and can be given on request). This should be<br />

provided with both Tech<strong>nic</strong>al and Commercial Proposals. The cost column<br />

may be left blank <strong>in</strong> the Tech<strong>nic</strong>al Proposal.<br />

(e) Miscellaneous Aspects. (Applicable only when trials are required) –<br />

In cases where the equipment is required to undergo trials, the equipment will<br />

also be put through Ma<strong>in</strong>tenance Evaluation Test. Based on this evaluation<br />

and <strong>in</strong> consultation with the supplier, the MRLS may be ref<strong>in</strong>ed. Dur<strong>in</strong>g user<br />

trials it may be brought out that the equipment is acceptable subject to<br />

carry<strong>in</strong>g out certa<strong>in</strong> modifications / improvements.<br />

(f) Ma<strong>in</strong>ta<strong>in</strong>ability Evaluation Trials (MET). This is carried with a view to<br />

facilitate provision<strong>in</strong>g of effective eng<strong>in</strong>eer<strong>in</strong>g support dur<strong>in</strong>g life cycle of the<br />

equipment. This would <strong>in</strong>volve stripp<strong>in</strong>g of the equipment and carry<strong>in</strong>g out<br />

recommended tests and adjustments and establish<strong>in</strong>g adequacy of<br />

ma<strong>in</strong>tenance tools, test equipment and tech<strong>nic</strong>al literature. MET details will be<br />

given as per format given at Form DPM-20 (Available <strong>in</strong> MoD website and can<br />

be given on request). To facilitate this process the Bidder is required to<br />

provide the follow<strong>in</strong>g :-<br />

(i) Tech<strong>nic</strong>al Literature.<br />

(aa) User Handbook/Operators Manual <strong>in</strong> English and H<strong>in</strong>di.<br />

(ab) Design Specifications.<br />

Page 50 of 56


(ac) Tech<strong>nic</strong>al Manuals.<br />

-Part I Tech description, specifications, function<strong>in</strong>g of<br />

various systems.<br />

-Part II Inspection/Ma<strong>in</strong>tenance tasks repair procedures,<br />

materials used, fault diagnosis and use of Special<br />

Ma<strong>in</strong>tenance Tools (SMTs)/Special Test Equipment<br />

(STEs).<br />

-Part III Procedure for assembly/disassembly, repair up to<br />

component level, safety precautions.<br />

-Part IV Part list with draw<strong>in</strong>g reference and List of<br />

SMTs/STEs Test Bench.<br />

(ad) Manufacturers Recommended List of Spares (MRLS).<br />

(ae) Illustrated Spare Parts List (ISPL) and along with the<br />

prices <strong>in</strong> the Commercial offer.<br />

(af) Tech<strong>nic</strong>al Manual on STE with draw<strong>in</strong>g reference.<br />

(ag) Complete Equipment Schedule.<br />

(ah) Table of Tools & Equipment (TOTE) & carried spares.<br />

(ai) Rotable list, norms of consumption, mandatory/ non<br />

mandatory spares list for each system.<br />

(ii) One set of Gauges<br />

(iii) One set of Special Ma<strong>in</strong>tenance Tools (SMTs).<br />

(iv) One set of Special Test Equipment (STEs).<br />

(v) Servic<strong>in</strong>g Schedule.<br />

(vi) Condemnation limits.<br />

(vii) Permissive repair schedule.<br />

(viii) Pack<strong>in</strong>g specifications /<strong>in</strong>structions.<br />

(ix) Design Specifications.<br />

(x) Any additional <strong>in</strong>formation suggested by the OEM.<br />

(g) Vendors quot<strong>in</strong>g lesser ESP / MRLS <strong>in</strong> terms of range and depth will<br />

have to make good the deficiency. The vendors quot<strong>in</strong>g surplus items <strong>in</strong> ESP<br />

/ MRLS should agree to buy back the surplus spares.<br />

26. Price Variation (PV) Clause. This is a firm and fixed price contract and will not<br />

be subject to any adjustment dur<strong>in</strong>g the performance of contract for any reason<br />

whatsoever. However, taxes and levies, as per current rates will be applicable,<br />

provided the supplies are made dur<strong>in</strong>g the orig<strong>in</strong>al delivery period.<br />

Page 51 of 56


From:<br />

Bank _______________<br />

To,<br />

The President of India<br />

M<strong>in</strong>istry of Defence,<br />

Government of India<br />

New Delhi<br />

Dear Sir,<br />

DPM-15<br />

Performance Bank Guarantee Format<br />

Page 52 of 56<br />

Enclosure to Part-IV<br />

Whereas you have entered <strong>in</strong>to a contract No._______ dated_________ (here<strong>in</strong>after<br />

referred to as the said Contract) with M/s__________________________,<br />

here<strong>in</strong>after referred to as the “seller” for supply of goods as per Part-II of the said<br />

contract to the said seller and whereas the Seller has undertaken to produce a bank<br />

guarantee for( % ) of total Contract value amount<strong>in</strong>g to _________ to secure its<br />

obligations to the President of India. We the _______________ bank hereby<br />

expressly, irrevocably and unreservedly undertake and guarantee as pr<strong>in</strong>cipal<br />

obligors on behalf of the seller that, <strong>in</strong> the event that the President of India declares<br />

to us that the goods have not been supplied accord<strong>in</strong>g to the Contractual obligations<br />

under the aforementioned contract, we will pay you, on demand and without demur,<br />

all and any sum up to a maximum of ____________Rupees _____________ only.<br />

Your written demand shall be conclusive evidence to us that such repayment is due<br />

under the terms of the said contract. We undertake to effect payment upon receipt of<br />

such written demand.<br />

2. We shall not be discharged or released from this undertak<strong>in</strong>g and guarantee by<br />

any arrangements, variations made between you and the Seller, <strong>in</strong>dulgence to the<br />

Seller by you, or by any alterations <strong>in</strong> the obligations of the Seller or by any<br />

forbearance whether as to payment, time performance or otherwise.<br />

3. In no case shall the amount of this guarantee be <strong>in</strong>creased.<br />

4. This guarantee shall rema<strong>in</strong> valid for …… months from the date of JRI acceptance<br />

of test consignment <strong>in</strong> India or until all the store, spares and documentation have<br />

been supplied accord<strong>in</strong>g to the contractual obligations under the said contract.<br />

5. Unless a demand or claim under this guarantee is made on us <strong>in</strong> writ<strong>in</strong>g or on<br />

before the aforesaid expiry date as provided <strong>in</strong> the above referred contract or unless<br />

this guarantee is extended by us, all your rights under this guarantee shall be<br />

forfeited and we shall be discharged from the liabilities hereunder.<br />

6. This guarantee shall be a cont<strong>in</strong>u<strong>in</strong>g guarantee and shall not be discharged by<br />

and change <strong>in</strong> the constitution of the Bank or <strong>in</strong> the constitution of<br />

M/s______________________________.


Notwithstand<strong>in</strong>g anyth<strong>in</strong>g conta<strong>in</strong>ed here<strong>in</strong> above:-<br />

(a) Our liability under this guarantee is restricted to Rs.<br />

______________________________________.<br />

(b) The guarantee is valid up to ____________________(Date).<br />

(c) We are liable to pay guarantee amount or part thereof, if and only if ,<br />

we receive a written claim or demand on or before ________(Date).<br />

Place: ________________<br />

Date: _________________<br />

Page 53 of 56<br />

Yours faithfully,<br />

For_____________Bank<br />

(Authorized Signatory / Attorney)


Part V – Evaluation Criteria & Price Bid<br />

1. Evaluation Criteria. The broad guidel<strong>in</strong>es for evaluation of Bids will be as<br />

follows:<br />

(a) Only those Bids will be evaluated which are found to be fulfill<strong>in</strong>g all the<br />

eligibility and qualify<strong>in</strong>g requirements of the RFP, both tech<strong>nic</strong>ally and<br />

commercially.<br />

(b) If bidder is non OEM of either frequency converter or the VFD drive<br />

then the bidder should provide a certificate from all OEMs clearly authoriz<strong>in</strong>g<br />

him to quote on their behalf for this tender and express<strong>in</strong>g unequivocal<br />

support and back<strong>in</strong>g for supply, <strong>in</strong>stallation, test<strong>in</strong>g and commission<strong>in</strong>g<br />

<strong>in</strong>clud<strong>in</strong>g required quality assurance cover for the system as whole and also<br />

undertak<strong>in</strong>g to provide all necessary after sales support to Naval Dockyard,<br />

Mumbai for at least 10 years after the date of commission<strong>in</strong>g. Further such<br />

bidder should have sufficient experience <strong>in</strong> execution of turnkey work of<br />

similar nature and similar cost <strong>in</strong> last three years. Order copies and work<br />

completion certificates must be submitted along with the bid to support the<br />

same.<br />

(c) In respect of Two-Bid system, the Tech<strong>nic</strong>al Bid (‘T’ bid) forwarded by<br />

the Bidders will be evaluated by the Buyer with reference to the tech<strong>nic</strong>al<br />

characteristics of the equipment as mentioned <strong>in</strong> the RFP. The compliance of<br />

‘T’bid would be determ<strong>in</strong>ed on the basis of the parameters specified <strong>in</strong> Part II<br />

of the RFP. The unpriced ‘Q’ bids will be evaluated along with the ‘T’ bid to<br />

ensure uniform compliance with required taxes and terms of payment<br />

amongst various bidders.<br />

(d) The ‘Q’bids of only those Bidders will be opened whose ‘T’ bid would<br />

clear the tech<strong>nic</strong>al evaluation. The Lowest Bid will be decided upon the lowest<br />

price quoted by the particular Bidder as per the Price Format given at Para 2<br />

below. The consideration of taxes and duties <strong>in</strong> evaluation process will be<br />

such that all taxes and duties (<strong>in</strong>clud<strong>in</strong>g those for which exemption certificates<br />

are issued) quoted by the Bidders will be considered. The ultimate cost to the<br />

Buyer would be the decid<strong>in</strong>g factor for rank<strong>in</strong>g of Bids.<br />

(e) The Bidders are required to spell out the rates of Customs duty, Excise<br />

duty, VAT, Service Tax, etc <strong>in</strong> unambiguous terms; otherwise their offers will<br />

be loaded with the maximum rates of duties and taxes for the purpose of<br />

comparison of prices. If reimbursement of Customs duty / Excise Duty / VAT<br />

is <strong>in</strong>tended as extra, over the quoted prices, the Bidder must specifically say<br />

so. In the absence of any such stipulation it will be presumed that the prices<br />

quoted are firm and f<strong>in</strong>al and no claim on account of such duties will be<br />

entra<strong>in</strong>ed after the open<strong>in</strong>g of tenders. If a Bidder chooses to quote a price<br />

<strong>in</strong>clusive of any duty and does not confirm <strong>in</strong>clusive of such duty so <strong>in</strong>cluded<br />

is firm and f<strong>in</strong>al, he should clearly <strong>in</strong>dicate the rate of such duty and quantum<br />

of excise duty <strong>in</strong>cluded <strong>in</strong> the price. Failure to do so may result <strong>in</strong> ignor<strong>in</strong>g of<br />

such offers summarily. If a Bidder is exempted from payment of Customs duty<br />

/ Excise Duty / VAT duty up to any value of supplies from them, they should<br />

Page 54 of 56


clearly state that no excise duty will be charged by them up to the limit of<br />

exemption which they may have. If any concession is available <strong>in</strong> regard to<br />

rate/quantum of Customs duty / Excise Duty / VAT, it should be brought out<br />

clearly. Stipulations like, excise duty was presently not applicable but the<br />

same will be charged if it becomes leviable later on, will not be accepted<br />

unless <strong>in</strong> such cases it is clearly stated by a Bidder that excise duty will not be<br />

charged by him even if the same becomes applicable later on. In respect of<br />

the Bidders who fail to comply with this requirement, their quoted prices shall<br />

be loaded with the quantum of excise duty which is normally applicable on the<br />

item <strong>in</strong> question for the purpose of compar<strong>in</strong>g their prices with other Bidders.<br />

The same logic applies to Customs duty and VAT also.<br />

(f) All Payments will be made <strong>in</strong> Indian Rupees only.<br />

(g) If there is a discrepancy between the unit price and the total price that<br />

is obta<strong>in</strong>ed by multiply<strong>in</strong>g the unit price and quantity, the unit price will prevail<br />

and the total price will be corrected. If there is a discrepancy between words<br />

and figures, the amount <strong>in</strong> words will prevail for calculation of price.<br />

(h) The Lowest Bid which is acceptable will be considered further for<br />

placement of contract / Supply Order after complete clarification and price<br />

negotiations as decided by the Buyer.<br />

2. Price Bid Format. The Price Bid Format is given below and Bidders are<br />

required to fill this up correctly with full details. Detailed breakdown of Sl. No.(a), (b),<br />

(f) and (g) are to be <strong>in</strong>dicated.<br />

Sl. No. Description UOM Unit<br />

Price<br />

(a) Basic cost of<br />

(b)<br />

item/items(Itemwise)<br />

Accessories<br />

(c) Installation / Commission<strong>in</strong>g<br />

charges<br />

(d) Tra<strong>in</strong><strong>in</strong>g<br />

(e) Tech<strong>nic</strong>al literature<br />

(f) Tools<br />

(g) Spares<br />

(h) Any other item<br />

(i) Excise Duty @ -- %<br />

(j) VAT @ -- %<br />

(k) Octroi / Entry taxes (Octroi<br />

exemption can be issued if<br />

required)<br />

Page 55 of 56<br />

Qty Total


(l) Any other Tax or duty<br />

(m) Grand Total<br />

(n) Grand Total R/Off<br />

(o) Terms of payment Accepted / Not Accepted<br />

3. The bidders are also required to provide a budgetary estimate for undertak<strong>in</strong>g AMC on<br />

expiry of warranty period. This figure will not be used for evaluation of lowest bid s<strong>in</strong>ce AMC will<br />

be conducted separately.<br />

Page 56 of 56